The document summarizes Phase I of the Pohick Creek Restoration Project in Fairfax County, Virginia. The project involved constructing a rock wall and bench along the creek bank, installing live stakes and native plants, and adding soil lifts for stabilization. The project team from Fairfax County completed earthworks and bank stabilization along a section of Pohick Creek near the Noman M. Cole, Jr. Pollution Control Plant, removing and replacing existing riprap. The project was substantially completed on June 13, 2016.