Sunset Hills Road Walkway
Contract No. CN15304071
Project No. ST-000021-017
Task Order No. 101
Hunter Mill District
May 25, 2016
Sunset Hills Road Walkway
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Project Details
Sunset Hills Road Walkway
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Description:
The Sunset Hills Walkway project was substantially completed on May 2, 2016. The scope of
this improvement project included construction of a pedestrian walkway, curb ramps,
stormwater improvements, rest area, and bus pads.
Project Overview:
• 1,570 LF of new walkway and curb ramps.
• Installation of 136 LF of stormwater pipe, 3 stormwater structures
• 303 LF of new resurfacing of the W&OD trail.
• Rest area near the W&OD trail with bench and water fountain.
• Two bus pads for future bus service.
Project Team:
• Department of Transportation – Seyed Nabavi
• Utilities Design and Construction Division (UDCD) – Qais Bashir
• Project Inspector, UDCD – Keith Ferrell
• Survey Analyst, UDCD – Gregory Harper
Sunset Hills Road Walkway
Hunter Mill District, Tax Map #18-3
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
PROJECT SITE
Sunset Hills Road Walkway
Construction of Walkway and Trail
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Sunset Hills Road Walkway
Construction of Rest Area
Before After
Sunset Hills Road Walkway
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Pedestrian and Transit Improvements - Nutley Street at Barrick Street, Bus Sites 6226 & 6227
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Matthew Kaiser, Public Information Officer
703-324-5034, TTY 711
Matthew.Kaiser@fairfaxcounty.gov

Sunset Hills Road Walkway

  • 1.
    A Fairfax County,VA, publication Department of Public Works and Environmental Services Working for You! Sunset Hills Road Walkway Contract No. CN15304071 Project No. ST-000021-017 Task Order No. 101 Hunter Mill District May 25, 2016
  • 2.
    Sunset Hills RoadWalkway Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 3.
    Project Details Sunset HillsRoad Walkway Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Description: The Sunset Hills Walkway project was substantially completed on May 2, 2016. The scope of this improvement project included construction of a pedestrian walkway, curb ramps, stormwater improvements, rest area, and bus pads. Project Overview: • 1,570 LF of new walkway and curb ramps. • Installation of 136 LF of stormwater pipe, 3 stormwater structures • 303 LF of new resurfacing of the W&OD trail. • Rest area near the W&OD trail with bench and water fountain. • Two bus pads for future bus service. Project Team: • Department of Transportation – Seyed Nabavi • Utilities Design and Construction Division (UDCD) – Qais Bashir • Project Inspector, UDCD – Keith Ferrell • Survey Analyst, UDCD – Gregory Harper
  • 4.
    Sunset Hills RoadWalkway Hunter Mill District, Tax Map #18-3 Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch PROJECT SITE
  • 5.
    Sunset Hills RoadWalkway Construction of Walkway and Trail Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 6.
    Capital Facilities/Utilities Designand Construction Division/Transportation and Stormwater Construction Branch Sunset Hills Road Walkway Construction of Rest Area
  • 7.
    Before After Sunset HillsRoad Walkway Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  • 8.
    Additional Information For additionalInformation, please call www.fairfaxcounty.gov/dpwes Pedestrian and Transit Improvements - Nutley Street at Barrick Street, Bus Sites 6226 & 6227 Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Matthew Kaiser, Public Information Officer 703-324-5034, TTY 711 Matthew.Kaiser@fairfaxcounty.gov