Landfills are known as the cheapest form of disposal of solid wastes, and it is
the most common procedure of disposal in the world. Finding a location for
landfill sites is a difficult task due to the identification and selection process
which involves a series of demographic and topographic factors and strict
regulations. For optimal identification and site selection, using GIS tools is
crucial. In this research, attempts have been made to determine the best
location of new landfills in Shelby County, TN.
Abstract
Objectives
Based on the factors that mentioned earlier, first the potential locations for the
new landfill should be found. First of all, the vacant area should be analyzed.
The best way to do this, maybe preparing a GIS map, contrasting the vacant
area. This way, these areas can be identified visually.
Figure 2 the vacant areas the population density over the Shelby County
The dark areas on Figure 2, shows the parcels of Shelby county. Despite the
health issues of establishing landfills close to people, the cost of ownership of
current these areas are also high. So the lighter blue areas demonstrates the
vacant areas which are suitable for establishing landfill.
Three candidates are chosen in the white (vacant) areas. Before choosing these
three points, all considerable factors such as population, accessibility, water
concerns and other important factors considered. Also, set in point not close to
previous landfills are considered because it is supposed to cover a new area and
minimize the travels of collection vehicles, not an extra landfill next to existing
landfill. These three are examples for small test. It is obvious that the higher
number of candidates, will results in higher quality of results and details. These
three candidates are shown in Figure 2.
Another important thing should be considered, is service area and accessibility.
In these three candidates, each of them are assumed to service for 10 miles like
the assumption for the previous landfills. So it is better to not to overlap the
south and north Shelby landfills. It should be remembered the new landfill is
supposed to cover new areas and distribute the collection routes wisely. Other
factor is being close to the high populated area while not located in the
residential areas at the same time. So this makes choosing more sensitive
because of public oppose (Figure 3).
Figure 3 the accessibility of current landfills (service area of 10 miles)
, and their overlap with the new landfill candidate (service area of 10 miles)
Table 1 candidate’s features and associated judgmental scores
After analyzing three candidates for the overlapping of service are the only
candidates which meets the requirements is number 3. It is not going to overlap
the service area of existing landfills and in the other hand it is not close to
residential areas so it is preferred over the two other candidates in this case.
As mentioned above, optimal collection happens in populated areas so
candidates are supposed to being close to populated areas and not located in
residential areas at the same time. These three candidates meet the
requirement for not to be close to residential areas. Number 1 seems to be the
best due to being close to high populated areas. Candidate three has a big
advantage over the others and it is being close to main highways but in case of
being close to high density areas is not a good option.
To do the numerical comparison on the three candidates, a Table 1 was
established. This table contains a score, ranging from 1 to 10. The higher value,
represents better performance. The values are based on engineering judgmental,
and make the decision making easier and more precise.
Obviously, each individual may have different clue about the values in Table 1.
The better analysis can be done by collecting the judgments from a number of
engineers and professionals, and use the average aggregated values overall of
them.
It is clear that, each of the factors mentioned in Table 1 does not have the same
importance, and value to the decision maker. To better analyze this issue, Table
2 was established, showing the importance of each individual parameters in
Table 1. Similar to Table 1, these values are based on engineering judgmental
method. The range is between 1 to 10. Value equals to 1 shows the least
importance, and value 10 shows the most importance factor. The higher values of
importance, will results in more participation of that factor in final decision.
Table 2 the preferred magnitude of importance of each factor
Combination of Table 1 and Table 2 can be done by multiplying the importance of
each factor into its associated score of each candidate. This results is provided in
third column on Table 3.
The results and conclusion are discussed in the next section.
Methodology Results and conclusion
Based on the evaluations and results obtained from the methodology part,
the following table is established (Table below):
Table 3 the final result
The overall score of each candidate was obtained by summation of all scores
assigned to it. This scoring system provides a ranking system, and one may
choose the best option among candidates by looking at its score. The final
results shows that the best candidate is candidate number 3, with overall
score of 176. If this candidate is not going to be chosen, the next best
candidate would be candidate number 1 (Figure 4).
Figure 4 Comparison of current accessibility and the accessibility after
providing the new landfill
As it said previously, the most important factor in the proposed method, was
accessibility. Table 3 shows the service area before and after establishing the
new landfill site. As it can be seen, the new landfill can lower the cost of
providing the service to the Shelby County.
References
1. Akbari, V., M. A. Rajabi, S. H. Chavoshi, and R. Shams. Landfill Site Selection by
Combining GIS and Fuzzy Multi Criteria Decision Analysis , Case Study : Bandar
Abbas , Iran.Vol. 3, No. Supple 1, 2008, pp. 39–47.
2. Of, M., L. Government, and P. Councils. Service Delivery Training Module 4 of 4
SOLID WASTE PLANNING.
3. Josimovic, B., and I. Maric. Methodology for the Regional Landfill Site Selection.
2012.
4. Purdy, S., and F. Sabugal. SITE SELECTION STUDY FOR A NEW SANITARY LANDFILL
FOR THE SUBIC BAY METROPOLITAN AUTHORITY , OLONGAPO , PHILIPPINES.
5. Taylor, R., and A. Allen. Waste disposal and landfill : Information needs. 2001,
pp. 1–22.
6. Babalola, A. Selection of Landfill Sites for Solid Waste Treatment in Damaturu
Town-Using GIS Techniques. J. Environ. Prot. (Irvine,. Calif)., Vol. 02, No. 01, 2011,
pp. 1–10. Available at:
http://www.scirp.org/journal/PaperDownload.aspx?DOI=10.4236/jep.2011.21001
[Accessed November 27, 2014].
7. Ball, J. M. LANDFILL SITE SELECTION.No. October 2005.
8. Poirier, R., C. Prentiss, and D. Ph. Report of the Mayor ’ s Advisory Committee on
Landfill Site Selection ( MACLSS ).No. September, 2012.
9. Javaheri, H., T. Nasrabadi, M. H. Jafarian, G. R. Rowshan, and H. Khoshnam. Site
selection of municipal solid waste landfills using analytical hierarchy process
method in a geographical information technology environment in giroft 1.Vol. 3, No.
3, 2006, pp. 177–184.
10. Points, K. What Is a Landfill. 2003, pp. 165–168.
In this research, attempts have been made to determine the right place for
third landfill (consider two main landfill in Shelby county) between the 3
potential areas. The growth in municipal solid waste generation in USA is a
consequence of urbanization, industrialization, and population growth. In the
USA, EPA reported more than 251 million tons of municipal solid wastes
generated by Americans in 2012 which is almost two time more than world
average. For this case, Shelby County, the total amount of waste generated
in 2011 is 882,126 tones, and it is supposed to find best potential site for
future landfill site selection.
We considered area of Shelby County in TN to investigate on establishing a
new landfill site. Currently this county contains two landfill sites. The
current solid waste production and its continuous increase may require to
build up a new landfill, which were studied in this paper.
Fig. 1: the current landfill locations and the roadmap of Shelby county area
Some benefits that can be achieved from establishing a new landfill site are
listed as bellows:
•Decrease total maneuvers required to provide the service to the study
•Decrease the need of transfer stations( they needed mostly when there is a
long distance between collection point and main disposal site)
•Increase the coverage and efficiency of service
•Reduction of emission pollution of collection vehicles
•Prolong the life of current landfills with distribution between 3 landfill
instead of 2
•Economic and social benefits such as massive amount of income of landfill
and provide job positions and etc.
1.Data collection
Data were collected from variety of resources. The GIS road network was
collected from ArcGIS’s public available resources. The land use data were
gathered from online map sources (i.e. Google map, and map quest) (Figure
1 and Figure 3).
As mentioned above, best way to analyze is combined geo dataset and other
available data over the net through GIS. All the collected data and geo data
set where merged into a one a geodatabase (Figure 1). Other collected data
were joined into the GIS layer. This makes the further analysis on the
datasets easier and provides further capabilities to study the problem (Figure
4). The roadmap of the city was converted into ArcGIS network. ArcGIS
network have the capability of analyze the transport of the collection
vehicles.
Parcel data obtained from census 2010 in order to choose a site which cover
most populated areas while at the same time not close to residential. People
do not like to have a landfill close to their live place. There are 331,208
parcel in the Shelby county area. GIS roadmap of Shelby County contains
46,639 edges or road segments. The network transformation procedure of
the ArcGIS calculates the junctions automatically. The total junctions were
found 26,335.
Amirhossein Naemi
Potential
location
Health
concerns
Accessibility
to parcels
Overlap of
service area
with current
landfills
Closeness to
highway
Population
density cover Total Score
Candidate number 1 42 20 14 20 49 145
Candidate number 2 21 35 28 16 35 135
Candidate number 3 35 25 49 32 35 176
Potential
location
Health
concerns
Accessibility to
parcels
Overlap of
service area
with current
landfills
Closeness to
highway
Population
density cover
Importance of
each factor
7 5 7 4 7
Department of Civil Engineering, University of Memphis
Study on possible new landfill in Shelby County
Potential location Health concerns
Accessibility to
parcels
Overlap of service
area with current
landfills
Closeness to
highway
Population density
cover
Candidate number 1 6 4 2 5 7
Candidate number 2 3 7 4 4 5
Candidate number 3 5 5 7 8 5

More Related Content

What's hot

A0311020109
A0311020109A0311020109
A0311020109
theijes
 
Bidanset Lombard Cityscape
Bidanset Lombard CityscapeBidanset Lombard Cityscape
Bidanset Lombard Cityscape
Paul Bidanset
 
Rainfall-Runoff Modelling using Modified NRCS-CN,RS and GIS -A Case Study
Rainfall-Runoff Modelling using Modified NRCS-CN,RS and GIS -A Case StudyRainfall-Runoff Modelling using Modified NRCS-CN,RS and GIS -A Case Study
Rainfall-Runoff Modelling using Modified NRCS-CN,RS and GIS -A Case Study
IJERA Editor
 
SueCA2
SueCA2SueCA2
SueCA2
Sue K
 
V35119123
V35119123V35119123
V35119123
IJERA Editor
 
Presentation slide on Project entitled "Preparation of Deformation Model of C...
Presentation slide on Project entitled "Preparation of Deformation Model of C...Presentation slide on Project entitled "Preparation of Deformation Model of C...
Presentation slide on Project entitled "Preparation of Deformation Model of C...
Ashmita Dhakal
 
TYBSC IT PGIS Unit III Chapter I Spatial Referencing and Positioning
TYBSC IT PGIS Unit III Chapter I Spatial Referencing and PositioningTYBSC IT PGIS Unit III Chapter I Spatial Referencing and Positioning
TYBSC IT PGIS Unit III Chapter I Spatial Referencing and Positioning
Arti Parab Academics
 

What's hot (7)

A0311020109
A0311020109A0311020109
A0311020109
 
Bidanset Lombard Cityscape
Bidanset Lombard CityscapeBidanset Lombard Cityscape
Bidanset Lombard Cityscape
 
Rainfall-Runoff Modelling using Modified NRCS-CN,RS and GIS -A Case Study
Rainfall-Runoff Modelling using Modified NRCS-CN,RS and GIS -A Case StudyRainfall-Runoff Modelling using Modified NRCS-CN,RS and GIS -A Case Study
Rainfall-Runoff Modelling using Modified NRCS-CN,RS and GIS -A Case Study
 
SueCA2
SueCA2SueCA2
SueCA2
 
V35119123
V35119123V35119123
V35119123
 
Presentation slide on Project entitled "Preparation of Deformation Model of C...
Presentation slide on Project entitled "Preparation of Deformation Model of C...Presentation slide on Project entitled "Preparation of Deformation Model of C...
Presentation slide on Project entitled "Preparation of Deformation Model of C...
 
TYBSC IT PGIS Unit III Chapter I Spatial Referencing and Positioning
TYBSC IT PGIS Unit III Chapter I Spatial Referencing and PositioningTYBSC IT PGIS Unit III Chapter I Spatial Referencing and Positioning
TYBSC IT PGIS Unit III Chapter I Spatial Referencing and Positioning
 

Similar to Study on possible new landfill in Shelby County

Nhst 11 surat, Application of RS & GIS in urban waste management
Nhst 11 surat,  Application of RS  & GIS in urban waste managementNhst 11 surat,  Application of RS  & GIS in urban waste management
Nhst 11 surat, Application of RS & GIS in urban waste management
Samirsinh Parmar
 
Kim-Blanco_Cirlugea_de Sherbinin_OSM_validation_Data_science_day
Kim-Blanco_Cirlugea_de Sherbinin_OSM_validation_Data_science_dayKim-Blanco_Cirlugea_de Sherbinin_OSM_validation_Data_science_day
Kim-Blanco_Cirlugea_de Sherbinin_OSM_validation_Data_science_day
Bogdan-Mihai Cîrlugea
 
5.pdf
5.pdf5.pdf
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
Mark Kwabena Gadogbe
 
Applications of GIS in Municipal Solid Waste Management
Applications of GIS in Municipal Solid Waste ManagementApplications of GIS in Municipal Solid Waste Management
Applications of GIS in Municipal Solid Waste Management
Vignesh Sekar
 
Supervised and unsupervised classification techniques for satellite imagery i...
Supervised and unsupervised classification techniques for satellite imagery i...Supervised and unsupervised classification techniques for satellite imagery i...
Supervised and unsupervised classification techniques for satellite imagery i...
gaup_geo
 
Domain research presentation Final
Domain research presentation FinalDomain research presentation Final
Domain research presentation Final
Hema Chandra Reddy Ethapu
 
Geographic query and analysis
Geographic query and analysisGeographic query and analysis
Geographic query and analysis
Mohsin Siddique
 
A GIS ANCHORED TECHNIQUE TO OBTAIN OPTIMAL PATH THROUGH MINIMAL ALTERATION OF...
A GIS ANCHORED TECHNIQUE TO OBTAIN OPTIMAL PATH THROUGH MINIMAL ALTERATION OF...A GIS ANCHORED TECHNIQUE TO OBTAIN OPTIMAL PATH THROUGH MINIMAL ALTERATION OF...
A GIS ANCHORED TECHNIQUE TO OBTAIN OPTIMAL PATH THROUGH MINIMAL ALTERATION OF...
cscpconf
 
A gis anchored technique to obtain optimal path through minimal alteration of...
A gis anchored technique to obtain optimal path through minimal alteration of...A gis anchored technique to obtain optimal path through minimal alteration of...
A gis anchored technique to obtain optimal path through minimal alteration of...
csandit
 
GIS work sample
GIS work sampleGIS work sample
GIS work sample
Marvelous Echeng
 
Hybrid iterated local search algorithm for optimization route of airplane tr...
Hybrid iterated local search algorithm for optimization route of  airplane tr...Hybrid iterated local search algorithm for optimization route of  airplane tr...
Hybrid iterated local search algorithm for optimization route of airplane tr...
IJECEIAES
 
Tr b (2012) user rationality and optimal park-and-ride location
Tr b (2012) user rationality and optimal park-and-ride locationTr b (2012) user rationality and optimal park-and-ride location
Tr b (2012) user rationality and optimal park-and-ride location
Carlos Rios
 
Spatial data analysis
Spatial data analysisSpatial data analysis
Spatial data analysis
Johan Blomme
 
An Integrated Territory Planning And Vehicle Routing Approach For A Multi-Obj...
An Integrated Territory Planning And Vehicle Routing Approach For A Multi-Obj...An Integrated Territory Planning And Vehicle Routing Approach For A Multi-Obj...
An Integrated Territory Planning And Vehicle Routing Approach For A Multi-Obj...
Stacy Vasquez
 
Live work play
Live work playLive work play
Live work play
piku27
 
B1304010712
B1304010712B1304010712
B1304010712
IOSR Journals
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
theijes
 
Arc gis concept
Arc gis conceptArc gis concept
Arc gis concept
Arif Doel
 
Optimal Location of Administrative Center: A Case Study of Province No. 1, Nepal
Optimal Location of Administrative Center: A Case Study of Province No. 1, NepalOptimal Location of Administrative Center: A Case Study of Province No. 1, Nepal
Optimal Location of Administrative Center: A Case Study of Province No. 1, Nepal
IJAEMSJORNAL
 

Similar to Study on possible new landfill in Shelby County (20)

Nhst 11 surat, Application of RS & GIS in urban waste management
Nhst 11 surat,  Application of RS  & GIS in urban waste managementNhst 11 surat,  Application of RS  & GIS in urban waste management
Nhst 11 surat, Application of RS & GIS in urban waste management
 
Kim-Blanco_Cirlugea_de Sherbinin_OSM_validation_Data_science_day
Kim-Blanco_Cirlugea_de Sherbinin_OSM_validation_Data_science_dayKim-Blanco_Cirlugea_de Sherbinin_OSM_validation_Data_science_day
Kim-Blanco_Cirlugea_de Sherbinin_OSM_validation_Data_science_day
 
5.pdf
5.pdf5.pdf
5.pdf
 
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
Assessment of the Environmental Impact of Landfill Sites in the East Riding o...
 
Applications of GIS in Municipal Solid Waste Management
Applications of GIS in Municipal Solid Waste ManagementApplications of GIS in Municipal Solid Waste Management
Applications of GIS in Municipal Solid Waste Management
 
Supervised and unsupervised classification techniques for satellite imagery i...
Supervised and unsupervised classification techniques for satellite imagery i...Supervised and unsupervised classification techniques for satellite imagery i...
Supervised and unsupervised classification techniques for satellite imagery i...
 
Domain research presentation Final
Domain research presentation FinalDomain research presentation Final
Domain research presentation Final
 
Geographic query and analysis
Geographic query and analysisGeographic query and analysis
Geographic query and analysis
 
A GIS ANCHORED TECHNIQUE TO OBTAIN OPTIMAL PATH THROUGH MINIMAL ALTERATION OF...
A GIS ANCHORED TECHNIQUE TO OBTAIN OPTIMAL PATH THROUGH MINIMAL ALTERATION OF...A GIS ANCHORED TECHNIQUE TO OBTAIN OPTIMAL PATH THROUGH MINIMAL ALTERATION OF...
A GIS ANCHORED TECHNIQUE TO OBTAIN OPTIMAL PATH THROUGH MINIMAL ALTERATION OF...
 
A gis anchored technique to obtain optimal path through minimal alteration of...
A gis anchored technique to obtain optimal path through minimal alteration of...A gis anchored technique to obtain optimal path through minimal alteration of...
A gis anchored technique to obtain optimal path through minimal alteration of...
 
GIS work sample
GIS work sampleGIS work sample
GIS work sample
 
Hybrid iterated local search algorithm for optimization route of airplane tr...
Hybrid iterated local search algorithm for optimization route of  airplane tr...Hybrid iterated local search algorithm for optimization route of  airplane tr...
Hybrid iterated local search algorithm for optimization route of airplane tr...
 
Tr b (2012) user rationality and optimal park-and-ride location
Tr b (2012) user rationality and optimal park-and-ride locationTr b (2012) user rationality and optimal park-and-ride location
Tr b (2012) user rationality and optimal park-and-ride location
 
Spatial data analysis
Spatial data analysisSpatial data analysis
Spatial data analysis
 
An Integrated Territory Planning And Vehicle Routing Approach For A Multi-Obj...
An Integrated Territory Planning And Vehicle Routing Approach For A Multi-Obj...An Integrated Territory Planning And Vehicle Routing Approach For A Multi-Obj...
An Integrated Territory Planning And Vehicle Routing Approach For A Multi-Obj...
 
Live work play
Live work playLive work play
Live work play
 
B1304010712
B1304010712B1304010712
B1304010712
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Arc gis concept
Arc gis conceptArc gis concept
Arc gis concept
 
Optimal Location of Administrative Center: A Case Study of Province No. 1, Nepal
Optimal Location of Administrative Center: A Case Study of Province No. 1, NepalOptimal Location of Administrative Center: A Case Study of Province No. 1, Nepal
Optimal Location of Administrative Center: A Case Study of Province No. 1, Nepal
 

Recently uploaded

学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 

Recently uploaded (20)

学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 

Study on possible new landfill in Shelby County

  • 1. RESEARCH POSTER PRESENTATION DESIGN © 2012 www.PosterPresentations.com Landfills are known as the cheapest form of disposal of solid wastes, and it is the most common procedure of disposal in the world. Finding a location for landfill sites is a difficult task due to the identification and selection process which involves a series of demographic and topographic factors and strict regulations. For optimal identification and site selection, using GIS tools is crucial. In this research, attempts have been made to determine the best location of new landfills in Shelby County, TN. Abstract Objectives Based on the factors that mentioned earlier, first the potential locations for the new landfill should be found. First of all, the vacant area should be analyzed. The best way to do this, maybe preparing a GIS map, contrasting the vacant area. This way, these areas can be identified visually. Figure 2 the vacant areas the population density over the Shelby County The dark areas on Figure 2, shows the parcels of Shelby county. Despite the health issues of establishing landfills close to people, the cost of ownership of current these areas are also high. So the lighter blue areas demonstrates the vacant areas which are suitable for establishing landfill. Three candidates are chosen in the white (vacant) areas. Before choosing these three points, all considerable factors such as population, accessibility, water concerns and other important factors considered. Also, set in point not close to previous landfills are considered because it is supposed to cover a new area and minimize the travels of collection vehicles, not an extra landfill next to existing landfill. These three are examples for small test. It is obvious that the higher number of candidates, will results in higher quality of results and details. These three candidates are shown in Figure 2. Another important thing should be considered, is service area and accessibility. In these three candidates, each of them are assumed to service for 10 miles like the assumption for the previous landfills. So it is better to not to overlap the south and north Shelby landfills. It should be remembered the new landfill is supposed to cover new areas and distribute the collection routes wisely. Other factor is being close to the high populated area while not located in the residential areas at the same time. So this makes choosing more sensitive because of public oppose (Figure 3). Figure 3 the accessibility of current landfills (service area of 10 miles) , and their overlap with the new landfill candidate (service area of 10 miles) Table 1 candidate’s features and associated judgmental scores After analyzing three candidates for the overlapping of service are the only candidates which meets the requirements is number 3. It is not going to overlap the service area of existing landfills and in the other hand it is not close to residential areas so it is preferred over the two other candidates in this case. As mentioned above, optimal collection happens in populated areas so candidates are supposed to being close to populated areas and not located in residential areas at the same time. These three candidates meet the requirement for not to be close to residential areas. Number 1 seems to be the best due to being close to high populated areas. Candidate three has a big advantage over the others and it is being close to main highways but in case of being close to high density areas is not a good option. To do the numerical comparison on the three candidates, a Table 1 was established. This table contains a score, ranging from 1 to 10. The higher value, represents better performance. The values are based on engineering judgmental, and make the decision making easier and more precise. Obviously, each individual may have different clue about the values in Table 1. The better analysis can be done by collecting the judgments from a number of engineers and professionals, and use the average aggregated values overall of them. It is clear that, each of the factors mentioned in Table 1 does not have the same importance, and value to the decision maker. To better analyze this issue, Table 2 was established, showing the importance of each individual parameters in Table 1. Similar to Table 1, these values are based on engineering judgmental method. The range is between 1 to 10. Value equals to 1 shows the least importance, and value 10 shows the most importance factor. The higher values of importance, will results in more participation of that factor in final decision. Table 2 the preferred magnitude of importance of each factor Combination of Table 1 and Table 2 can be done by multiplying the importance of each factor into its associated score of each candidate. This results is provided in third column on Table 3. The results and conclusion are discussed in the next section. Methodology Results and conclusion Based on the evaluations and results obtained from the methodology part, the following table is established (Table below): Table 3 the final result The overall score of each candidate was obtained by summation of all scores assigned to it. This scoring system provides a ranking system, and one may choose the best option among candidates by looking at its score. The final results shows that the best candidate is candidate number 3, with overall score of 176. If this candidate is not going to be chosen, the next best candidate would be candidate number 1 (Figure 4). Figure 4 Comparison of current accessibility and the accessibility after providing the new landfill As it said previously, the most important factor in the proposed method, was accessibility. Table 3 shows the service area before and after establishing the new landfill site. As it can be seen, the new landfill can lower the cost of providing the service to the Shelby County. References 1. Akbari, V., M. A. Rajabi, S. H. Chavoshi, and R. Shams. Landfill Site Selection by Combining GIS and Fuzzy Multi Criteria Decision Analysis , Case Study : Bandar Abbas , Iran.Vol. 3, No. Supple 1, 2008, pp. 39–47. 2. Of, M., L. Government, and P. Councils. Service Delivery Training Module 4 of 4 SOLID WASTE PLANNING. 3. Josimovic, B., and I. Maric. Methodology for the Regional Landfill Site Selection. 2012. 4. Purdy, S., and F. Sabugal. SITE SELECTION STUDY FOR A NEW SANITARY LANDFILL FOR THE SUBIC BAY METROPOLITAN AUTHORITY , OLONGAPO , PHILIPPINES. 5. Taylor, R., and A. Allen. Waste disposal and landfill : Information needs. 2001, pp. 1–22. 6. Babalola, A. Selection of Landfill Sites for Solid Waste Treatment in Damaturu Town-Using GIS Techniques. J. Environ. Prot. (Irvine,. Calif)., Vol. 02, No. 01, 2011, pp. 1–10. Available at: http://www.scirp.org/journal/PaperDownload.aspx?DOI=10.4236/jep.2011.21001 [Accessed November 27, 2014]. 7. Ball, J. M. LANDFILL SITE SELECTION.No. October 2005. 8. Poirier, R., C. Prentiss, and D. Ph. Report of the Mayor ’ s Advisory Committee on Landfill Site Selection ( MACLSS ).No. September, 2012. 9. Javaheri, H., T. Nasrabadi, M. H. Jafarian, G. R. Rowshan, and H. Khoshnam. Site selection of municipal solid waste landfills using analytical hierarchy process method in a geographical information technology environment in giroft 1.Vol. 3, No. 3, 2006, pp. 177–184. 10. Points, K. What Is a Landfill. 2003, pp. 165–168. In this research, attempts have been made to determine the right place for third landfill (consider two main landfill in Shelby county) between the 3 potential areas. The growth in municipal solid waste generation in USA is a consequence of urbanization, industrialization, and population growth. In the USA, EPA reported more than 251 million tons of municipal solid wastes generated by Americans in 2012 which is almost two time more than world average. For this case, Shelby County, the total amount of waste generated in 2011 is 882,126 tones, and it is supposed to find best potential site for future landfill site selection. We considered area of Shelby County in TN to investigate on establishing a new landfill site. Currently this county contains two landfill sites. The current solid waste production and its continuous increase may require to build up a new landfill, which were studied in this paper. Fig. 1: the current landfill locations and the roadmap of Shelby county area Some benefits that can be achieved from establishing a new landfill site are listed as bellows: •Decrease total maneuvers required to provide the service to the study •Decrease the need of transfer stations( they needed mostly when there is a long distance between collection point and main disposal site) •Increase the coverage and efficiency of service •Reduction of emission pollution of collection vehicles •Prolong the life of current landfills with distribution between 3 landfill instead of 2 •Economic and social benefits such as massive amount of income of landfill and provide job positions and etc. 1.Data collection Data were collected from variety of resources. The GIS road network was collected from ArcGIS’s public available resources. The land use data were gathered from online map sources (i.e. Google map, and map quest) (Figure 1 and Figure 3). As mentioned above, best way to analyze is combined geo dataset and other available data over the net through GIS. All the collected data and geo data set where merged into a one a geodatabase (Figure 1). Other collected data were joined into the GIS layer. This makes the further analysis on the datasets easier and provides further capabilities to study the problem (Figure 4). The roadmap of the city was converted into ArcGIS network. ArcGIS network have the capability of analyze the transport of the collection vehicles. Parcel data obtained from census 2010 in order to choose a site which cover most populated areas while at the same time not close to residential. People do not like to have a landfill close to their live place. There are 331,208 parcel in the Shelby county area. GIS roadmap of Shelby County contains 46,639 edges or road segments. The network transformation procedure of the ArcGIS calculates the junctions automatically. The total junctions were found 26,335. Amirhossein Naemi Potential location Health concerns Accessibility to parcels Overlap of service area with current landfills Closeness to highway Population density cover Total Score Candidate number 1 42 20 14 20 49 145 Candidate number 2 21 35 28 16 35 135 Candidate number 3 35 25 49 32 35 176 Potential location Health concerns Accessibility to parcels Overlap of service area with current landfills Closeness to highway Population density cover Importance of each factor 7 5 7 4 7 Department of Civil Engineering, University of Memphis Study on possible new landfill in Shelby County Potential location Health concerns Accessibility to parcels Overlap of service area with current landfills Closeness to highway Population density cover Candidate number 1 6 4 2 5 7 Candidate number 2 3 7 4 4 5 Candidate number 3 5 5 7 8 5