This document provides information from a meeting of the James River Partnership regarding vessel traffic on the James River. It shows statistics on the number of ship and barge roundtrips on the river from 2008 to the projected numbers for 2013. Ship traffic has declined from 133 roundtrips in 2008 to a projected 61 in 2013. Barge traffic has fluctuated but remains significant, with over 2,000 roundtrips projected for 2013. Key cargos transported include petroleum products, aggregates, chemicals and containers.
Huntsman Lake Dam Rehabilitation
Huntsman Lake Dredging and Restoration
Department of Public Works and Environmental Services Pardon Our Dust Meeting
Fairfax County, VA
Huntsman Lake Dam Rehabilitation
Huntsman Lake Dredging and Restoration
Department of Public Works and Environmental Services Pardon Our Dust Meeting
Fairfax County, VA
Lakeland Resources Inc. (TSXv: LK) announces the completion of its Phase 1 drilling program at the Gibbons Creek/ Star Property, Athabasca Basin region in Northern Saskatchewan. Phase 1 consisted of a total of 2,550 metres, totaling 14 holes at the Gibbons Creek – Star Property(s). In total, four drill holes encountered...
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPAMarcellus Drilling News
A voluntary plan created and submitted by Range Resources to the Pennsylvania Dept. of Environmental Protection to permanently close (and restore) the Yeager wastewater impoundment (i.e. open pond) site in Amwell Township, located in Washington County, PA. The plan was tweaked by the DEP to require Range to test for certain compounds underneath the two liners in the impoundment--liners that, according to Range, had holes in both layers.
The California Central Valley Groundwater-Surface Water Simulation Model (C2VSim) simulates the monthly response of the Central Valley’s groundwater and surface water flow system to historical stresses, and can also be used to simulate the response to projected future stresses. C2VSim contains monthly historical stream inflows, surface water diversions, precipitation, land use and crop acreages from October 1921 through September 2009. The model dynamically calculates crop water demands, allocates contributions from precipitation, soil moisture and surface water diversions, and calculates the groundwater pumpage required to meet the remaining demand.
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Stephen Flood
2015 DHI UK & Ireland Symposium
Modelling of Extreme Conditions for Wave Overtopping at Weymouth Bay
Oliver Way (Hyder Consulting), Tuesday 21 April 2015 at 16:00 - 16:20
A wave model study of Weymouth Bay was undertaken for Weymouth and Portland Borough Council to investigate flooding in the historical centre of Weymouth which is understood to be caused by tidal and fluvial waters overtopping flood defences, groundwater rising above ground level in response to high tides and heavy rain and wave overtopping along the open coast / Esplanade. The wave modelling results in this study are used to provide input conditions to the overtopping calculations which will in turn be used as inputs to the models of overland flow to provide flood extents. MIKE 21 SW was applied to simulate extreme wave conditions with combined extreme water levels. The model domain extends from Chesil Beach in the west to Lulworth Cove in the east. Extreme water level data were supplied by the Environment Agency for Weymouth from the Coastal flood boundary conditions for UK mainland and islands report (Environment Agency, 2012). Extreme wave values were also obtained from this Environment Agency report at offshore locations on the model boundary. Extreme wave conditions were considered for three directional sectors: south west, south and south east. A joint probability approach was applied for a range of return periods and climate change epochs. Wave data were extracted at nearshore locations along the beach front of Weymouth Bay. These data were used as input conditions for wave overtopping calculations (EurOtop) at site specific points along the beach to determine overtopping discharge rates along the beach front.
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...Stephen Flood
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Alan Forster (URS).
Presented at the 2014 MIKE by DHI UK Symposium on 13th to 14th May 2014.
The California Central Valley Groundwater-Surface Water Simulation Model (C2VSim) simulates the monthly response of the Central Valley’s groundwater and surface water flow system to historical stresses, and can also be used to simulate the response to projected future stresses. C2VSim contains monthly historical stream inflows, surface water diversions, precipitation, land use and crop acreages from October 1921 through September 2009. The model dynamically calculates crop water demands, allocates contributions from precipitation, soil moisture and surface water diversions, and calculates the groundwater pumpage required to meet the remaining demand.
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
2015 DHI UK & Ireland Symposium
KEYNOTE: Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project
Adrian Bell (RPS),
Tuesday 21 April 2015 at 10:30 - 11:00
This project essentially looked at the stability of a deepened approach channel and examined the impact of the dredging and disposal for the scheme in support of a public planning hearing. The modelling used coupled MIKE 21 FM HD-SW-ST models as well as well as MIKE 21 and MIKE 3 FM HD and MT models.
Presentation on the Corps' budget process as it pertains to the James River Federal Navigation Channel. This presentation was presented by Richard Klein, P.E., at the James River Partnership Meeting XVIII
Lakeland Resources Inc. (TSXv: LK) announces the completion of its Phase 1 drilling program at the Gibbons Creek/ Star Property, Athabasca Basin region in Northern Saskatchewan. Phase 1 consisted of a total of 2,550 metres, totaling 14 holes at the Gibbons Creek – Star Property(s). In total, four drill holes encountered...
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPAMarcellus Drilling News
A voluntary plan created and submitted by Range Resources to the Pennsylvania Dept. of Environmental Protection to permanently close (and restore) the Yeager wastewater impoundment (i.e. open pond) site in Amwell Township, located in Washington County, PA. The plan was tweaked by the DEP to require Range to test for certain compounds underneath the two liners in the impoundment--liners that, according to Range, had holes in both layers.
The California Central Valley Groundwater-Surface Water Simulation Model (C2VSim) simulates the monthly response of the Central Valley’s groundwater and surface water flow system to historical stresses, and can also be used to simulate the response to projected future stresses. C2VSim contains monthly historical stream inflows, surface water diversions, precipitation, land use and crop acreages from October 1921 through September 2009. The model dynamically calculates crop water demands, allocates contributions from precipitation, soil moisture and surface water diversions, and calculates the groundwater pumpage required to meet the remaining demand.
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Stephen Flood
2015 DHI UK & Ireland Symposium
Modelling of Extreme Conditions for Wave Overtopping at Weymouth Bay
Oliver Way (Hyder Consulting), Tuesday 21 April 2015 at 16:00 - 16:20
A wave model study of Weymouth Bay was undertaken for Weymouth and Portland Borough Council to investigate flooding in the historical centre of Weymouth which is understood to be caused by tidal and fluvial waters overtopping flood defences, groundwater rising above ground level in response to high tides and heavy rain and wave overtopping along the open coast / Esplanade. The wave modelling results in this study are used to provide input conditions to the overtopping calculations which will in turn be used as inputs to the models of overland flow to provide flood extents. MIKE 21 SW was applied to simulate extreme wave conditions with combined extreme water levels. The model domain extends from Chesil Beach in the west to Lulworth Cove in the east. Extreme water level data were supplied by the Environment Agency for Weymouth from the Coastal flood boundary conditions for UK mainland and islands report (Environment Agency, 2012). Extreme wave values were also obtained from this Environment Agency report at offshore locations on the model boundary. Extreme wave conditions were considered for three directional sectors: south west, south and south east. A joint probability approach was applied for a range of return periods and climate change epochs. Wave data were extracted at nearshore locations along the beach front of Weymouth Bay. These data were used as input conditions for wave overtopping calculations (EurOtop) at site specific points along the beach to determine overtopping discharge rates along the beach front.
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...Stephen Flood
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Alan Forster (URS).
Presented at the 2014 MIKE by DHI UK Symposium on 13th to 14th May 2014.
The California Central Valley Groundwater-Surface Water Simulation Model (C2VSim) simulates the monthly response of the Central Valley’s groundwater and surface water flow system to historical stresses, and can also be used to simulate the response to projected future stresses. C2VSim contains monthly historical stream inflows, surface water diversions, precipitation, land use and crop acreages from October 1921 through September 2009. The model dynamically calculates crop water demands, allocates contributions from precipitation, soil moisture and surface water diversions, and calculates the groundwater pumpage required to meet the remaining demand.
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
2015 DHI UK & Ireland Symposium
KEYNOTE: Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project
Adrian Bell (RPS),
Tuesday 21 April 2015 at 10:30 - 11:00
This project essentially looked at the stability of a deepened approach channel and examined the impact of the dredging and disposal for the scheme in support of a public planning hearing. The modelling used coupled MIKE 21 FM HD-SW-ST models as well as well as MIKE 21 and MIKE 3 FM HD and MT models.
Presentation on the Corps' budget process as it pertains to the James River Federal Navigation Channel. This presentation was presented by Richard Klein, P.E., at the James River Partnership Meeting XVIII
ESTABLISHING OFFSHORE SHELLFISH AQUACULTURE IN FEDERAL WATERS OF THE ATLANTICTedManey
Presentation at Shellfish Aquaculture in Federal Waters Workshop
May 15 & 16, 2019
Cat Cove Marine Lab, Salem State University, Salem MA 01970
In 2012, we applied for an U.S. Army Corps of Engineers (USACE) permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 to establish a commercial scale (33 acre) offshore mussel farm off the coast of Cape Ann Massachusetts (NAE-2012-1598 NEMAC Aquaculture). In 2015 we were issued a permit with conditions from the USACE and NOAA that involved a phased-in approach, in which three longlines could be deployed with gear designed to prevent and minimize possible entanglement as a pilot study coupled with extensive monitoring for interactions with species that are protected under the Marine Mammal Protection Act and Endangered Species Act, and their habitats. Additional conditions from the USCG required our longline headers to be submerged to a depth of 50 ft to account for possible deep draft vessels transiting through the area.
This report will focus on the process of securing an USACE permit to establish this farm and disseminate what was learned about this process to others wishing to pursue offshore shellfish aquaculture.
Accotink Tributary at Oakford Drive Stream RestorationFairfax County
The Accotink Tributary at Oakford Drive Stream Restoration project included restoration of approximately 1,538 linear feet of stream using natural channel design for restoration, enhancing and stabilizing the degraded stream channel, bed and bank to stabilize, enhance and provide water quality benefits, aesthetics, and prevent further erosion.
Vessel Traffic Update on the James River in Virginia for the 2014 James River Partnership Meeting, Presented by David Host, Chairman and CEO of T. Parker Host, Inc.
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
In the Adani-Hindenburg case, what is SEBI investigating.pptxAdani case
Adani SEBI investigation revealed that the latter had sought information from five foreign jurisdictions concerning the holdings of the firm’s foreign portfolio investors (FPIs) in relation to the alleged violations of the MPS Regulations. Nevertheless, the economic interest of the twelve FPIs based in tax haven jurisdictions still needs to be determined. The Adani Group firms classed these FPIs as public shareholders. According to Hindenburg, FPIs were used to get around regulatory standards.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
An introduction to the cryptocurrency investment platform Binance Savings.Any kyc Account
Learn how to use Binance Savings to expand your bitcoin holdings. Discover how to maximize your earnings on one of the most reliable cryptocurrency exchange platforms, as well as how to earn interest on your cryptocurrency holdings and the various savings choices available.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
FIA officials brutally tortured innocent and snatched 200 Bitcoins of worth 4...jamalseoexpert1978
Farman Ayaz Khattak and Ehtesham Matloob are government officials in CTW Counter terrorism wing Islamabad, in Federal Investigation Agency FIA Headquarters. CTW and FIA kidnapped crypto currency owner from Islamabad and snatched 200 Bitcoins those worth of 4 billion rupees in Pakistan currency. There is not Cryptocurrency Regulations in Pakistan & CTW is official dacoit and stealing digital assets from the innocent crypto holders and making fake cases of terrorism to keep them silent.
Understanding User Needs and Satisfying ThemAggregage
https://www.productmanagementtoday.com/frs/26903918/understanding-user-needs-and-satisfying-them
We know we want to create products which our customers find to be valuable. Whether we label it as customer-centric or product-led depends on how long we've been doing product management. There are three challenges we face when doing this. The obvious challenge is figuring out what our users need; the non-obvious challenges are in creating a shared understanding of those needs and in sensing if what we're doing is meeting those needs.
In this webinar, we won't focus on the research methods for discovering user-needs. We will focus on synthesis of the needs we discover, communication and alignment tools, and how we operationalize addressing those needs.
Industry expert Scott Sehlhorst will:
• Introduce a taxonomy for user goals with real world examples
• Present the Onion Diagram, a tool for contextualizing task-level goals
• Illustrate how customer journey maps capture activity-level and task-level goals
• Demonstrate the best approach to selection and prioritization of user-goals to address
• Highlight the crucial benchmarks, observable changes, in ensuring fulfillment of customer needs
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesHolger Mueller
Holger Mueller of Constellation Research shares his key takeaways from SAP's Sapphire confernece, held in Orlando, June 3rd till 5th 2024, in the Orange Convention Center.
The Influence of Marketing Strategy and Market Competition on Business Perfor...
James River Partnership 2013
1. US Army Corps of Engineers
BUILDING STRONG®
James River
Partnership Meeting
XVII
2. US Army Corps of Engineers
BUILDING STRONG®
Welcome
Betty Waring
Chief, Operations Branch
Norfolk District
6 Jun 2013
3. US Army Corps of Engineers
BUILDING STRONG®
Commander’s Perspective
Col. Paul B. Olsen, P.E.
Norfolk District
6 Jun 2013
4. US Army Corps of Engineers
BUILDING STRONG®
James River Partnership XVII
Project Overview
Walter Trinkala
Project Manager
Norfolk District
6 Jun 2013
5. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River Funding
FY 13 President's Budget:
FY 13 Expected Allocation
(work Plan)
Expected Sandy Funding
$3,948,000
$TBD
$1,000,000
FY 14 President’s Budget: $3,801,000
FY 14 Capability: $7,600,000
2
7. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Indefinite Delivery Indefinite Quantity
(IDIQ) Contract
W91236-13-B-0006
IDIQ Contract Solicitation included a base year and two
option years (3 years total) $12M capacity
Status:
• Bid Opening 11 June 2013
• Award 1 July 2013
• Task Order award 15 July 2013
www.fbo.gov
4
8. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 5
Hydraulic Pipeline / Cutterhead Dredge
9. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Hydraulic Pipeline / Cutterhead Dredge
6
10. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Maintenance Dredging Completed:
• Dancing Point – Swann Point Shoal Channel
• Dredged October 2012
• Jordan Point – Windmill Point
• Dredged November 2012
• Tribell Shoal Channel
• Dredged December 2012
• Dancing Point – Swann Point Shoal Channel
• Dredged February 2013
Total Volume of Dredged Material: 1,104,777 cubic yards
FY 2012 Accomplishments
7
60% Budget
11. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
ENGINEER RESEARCH AND
DEVELOPMENT CENTER (ERDC)
Dredging Operations and Environmental
Research (DOER)
ENGINEERING WITH NATURE
8
• Analyze existing data, literature survey, hydrodynamic modeling
• Sediment loading analyses, sediment transport model, sediment
pathway model
• System-wide model including wetland buildup and erosion.
12. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Dancing Point – Swann Point Channel
9
13. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 10
Lower End Dancing Point – Swann Point Channel
14. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Maintenance Dredging to be performed:
(Starting Mid July 2013)
• Dancing Point – Swann Point Shoal Channel
• Tribell Shoal Channel
• Richmond Deepwater Terminal
Condition Surveys:
• Goose Hill Shoal Channel
Remaining FY 2013 Activities
11
15. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River FY 13 Activities
•
12
16. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River FY 12 Accomplishments
13
18. US Army Corps of Engineers
BUILDING STRONG®
James River Partnership XVII
Corps Budget Process
Richard Klein
Chief, Programs Branch
Norfolk District
6 Jun 2013
20. HQ Provides Budget
Guidance ( Mar )
HQ Review &
Approval
( May -Jun )
Budget Presented
to Sec. Army
(Jul - Aug )
OMB Passback
( Nov )
Budget Submitted
to OMB ( Sep )
President’s Budget
to Congress ( Feb )
Field Offices Develop
Program Requirements
( Mar - Apr )
Appropriations Bills
( Jul - Sep )
President Signs
Approp. Bill
( Sep - Oct )
OMB Provides Budget
Guidance ( Jan )
Funding Alloc.
To Field Offices
( Oct - Dec )
Budget Resolutions
21. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 4
Budget Status
• FY 2013: President’s Budget released February 2012;
FY13 funding provided via Full-Year Continuing
Appropriations Act. In lieu of Conference Report and
Energy & Water Appropriations we will have FY13
Work Plan.
• FY 2014: President’s Budget released April 2013; no
action yet by House or Senate.
• FY 2015: Budget Guidance (EC) issued March 2013;
Budget development in progress at District and
Division levels.
22. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 5
New for FY 2013
• Continuing Appropriations Act (PL 112-175) provided
continued funding through March 27, 2013.
• Department of Defense, Military Construction and
Veterans Affairs, and Full-Year Continuing
Appropriations Act, enacted March 26, 2013, will
provide full-year civil works funding via the FY13 Work
Plan process.
• Also enacted Disaster Relief Appropriations on
January 29, 2013 (PL 113-2) in response to Hurricane
Sandy. Norfolk District receiving funds on several
projects.
23. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 6
New for FY 2014
Transforming the Civil Works (CW) Budget Process
1. Top-Down Approach to Budget Formulation.
2. Systems/Watershed Approach to Budget Formulation.
3. Feasibility Study Program Execution/Delivery.
Focus on studies with highest chance of success.
Senate Committee on the Budget, Concurrent
Resolution supports “measures to ensure that the
Harbor Maintenance Trust Fund will fully expend the
collections that are deposited into it annually.”
24. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Key Prioritization Factors
Operations and Maintenance (O&M)
• Essential O&M Infrastructure
• Risk & Reliability
• Commercial waterborne traffic
• Other Considerations: Dam Safety, Public
Safety, Critical Harbor of Refuge, Subsistence
Harbor, National Security, etc.
25. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 8
Norfolk District O&M Funding
FY 12 President’s Budget $23.3M
FY 12 Net Allocation $24.4M
FY 12 Supplemental Funds $1.7M
FY 13 President’s Budget $23.5M
FY 13 Work Plan TBD
FY 13 Supplemental Funds Approx. $35M
FY 14 President’s Budget $26.6M
26. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 9
Key Takeaways
• Action on FY 2014 Budget is with the House and
Senate
• FY 2015 Budget development just getting underway
• New approach to budgeting – by System or
Watershed
28. US Army Corps of Engineers
BUILDING STRONG®
James River Partnership XVII
ENVIRONMENTAL UPDATE
Robert Pruhs
Environmental Manager
Norfolk District
6 Jun 2013
29. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River Federal Navigation Project
Environmental Update
Dredged Material Placement Overview
Permit Status
• Virginia Department of Environmental Quality (DEQ)
• Virginia Water Protection Program / Clean Water Act,
Section 401 - Water Quality Certification
• Virginia Marine Resources Commission (VMRC)
• Subaqueous Permits
Endangered Species Act, Section 7 Consultation Status
• National Marine Fisheries Service (NMFS)
2
31. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River Federal Navigation Project
Environmental Update
Dredged Material Placement
Overview
• Lower James River Reach
• Overboard Placement
– One (1) Site
• DEQ – Permit Expires,
March 12, 2021
• VMRC – Permit
Expires, September
30, 2015
4
32. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River Federal Navigation Project
Environmental Update
Middle James River Reach
• Overboard Placement –
Five (5) Sites
• DEQ – Permit Expires,
June 1, 2014
• VMRC – Permit
Expires, February 24,
2014
5
33. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River Federal Navigation Project
Environmental Update
Upper James River Reach
• Upland Confined
Placement – Six (6)
Placement Sites
• DEQ – Permit Expires,
December 21, 2014
6
34. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River Federal Navigation Project
Environmental Update
FY 2012/2013 Accomplishments
• Endangered Species Act (ESA), Section 7 Consultation,
Atlantic Sturgeon.
• Norfolk District completed ESA Section 7 Consultation
with National Marine Fisheries (NMFS) in September
2012.
• NMFS Biological Opinion for the requires monitoring of
dredged material discharges for potential incidental
takes of Atlantic sturgeon.
• Biological opinion provides incidental take coverage for
maintenance dredging operations.
7
35. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River Federal Navigation Project
Environmental Update
FY 2013/2014 Activities
• Initiate Permit Renewals (DEQ & VMRC) for Middle
and Upper James River Reaches, August 2013.
• Implement NMFS Biological Opinion monitoring
requirements for project.
8
39. Ø Hopewell, and earlier City Point owes its existence to its
location overlooking the James and Appomattox Rivers.
Ø City Point, the oldest part of Hopewell, was founded in 1613 by
Sir Thomas Dale.
Ø City Point witnessed Revolutionary War skirmishes fought on
its banks.
Ø 1864-1865, General Ulysses S. Grant directed the 10-month
Siege of Petersburg from the grounds of Appomattox
Plantation at City Point.
Ø President Lincoln spent two of the last three weeks of his life at
City Point. He visited on March 24-April 8, 1865.
40. City Point became one of the busiest ports in the world during the
American Civil War with 40 steamers, 75 sailing ships and 100
barges each day.
41. Making History in City Point
The Peacemakers
President Abraham Lincoln meets with Union generals Grant and Sherman on the
River Queen at City Point to plan the last stages of the Civil War.
42. HOPEWELL TODAY
Public-Private Downtown Activity - $11.9 million
> Beacon Theatre - $5.9 million total renovation of 640-seat art deco theatre and multipurpose
performing arts center to open the end of 2013
> John Randolph Medical Center - $2.0 million external capital improvements
> City Marina - $4.0 million in improvements
> Hopewell Downtown Partnership – Creation of a non-profit organization by the City Council
dedicated to improving Downtown Hopewell
> Main Street Designation – In 2012 Hopewell became 1 of 25 designated Main Street
communities in Virginia
43. Hopewell is home to several major national and international
industries such as:
Ø Honeywell International – A world-class manufacturer of quality
chemical products and the Hopewell plant is the world's largest
single site producer of caprolactam.
Ø Ashland, Inc. - One of the world's leading specialty chemical
companies whose chemistry is used every day in applications from
automotive, food and beverages, personal care products,
pharmaceuticals, and paper and tissue to durable goods.
Ø Evonik Goldschmidt - Multinational specialty chemical
manufacturer serving the automotive, plastics, pharmaceutical, and
other industries.
Ø Rock-Tenn - One of North America's leading producers of
corrugated and consumer packaging and recycling solutions.
44. HOPEWELL REGIONAL WASTE TREATMENT FACILITY
> Thanks to a strong city-industry partnership the 2013 General Assembly
budget included $5.0 million to help upgrade the regional plant to remove
harmful nutrients to help protect the Chesapeake Bay.
> 2012 completed $28.0 million expansion and upgrades of domestic
treatment to accommodate growth, specifically Fort Lee. Upgrades also
eliminated most of the City sewer overflow problems. This work and an
aggressive infiltration/inflow construction program has greatly enhanced
the underground infrastructure.
> The plant is currently performing pilot testing of new nitrogen removal
technologies to be incorporated into the design of Phase 2 project.
Estimated at $75.0 million – this project will be the largest upgrade in the
plant’s history.
45. WHAT’S NEXT……..
> Work with Petersburg National Battlefield Park to enhance historic and recreation
amenities at City Point – increase attendance
> Continue to plan river walk along James and Appomattox rivers
> Develop speaker series at the Beacon Theatre based on Lincoln at City Point
> Participate in historic James River and Chesapeake Bay cruise to and from Richmond
> Create water recreation designation at City Marina and develop adjoining city-owned
property
> Return River Queen to City Point
46. President Lincoln and Virginia
President Lincoln finally departed from City Point, Virginia at 11 p.m. Saturday, April 8, 1865. He
believed he had spent two momentous weeks, probably two of the most remarkable and
interesting, almost inconceivable weeks of his life. He was feeling better than he had felt during
his entire presidency.
While at City Point on board of the River Queen, President Lincoln had a premonition of his
own death, which proved tragic when he returned to Washington and was assassinated six
days later.
47. Thank You
J. Andrew “Andy” Hagy
Director of Economic Development
ahagy@hopewellva.gov
56. Current Situation
Looking in the near future, the Partnership needs to find
solutions to widen and deepen the James River to
accommodate ships up to 630 ft LOA and 100 ft beam.
Additionally, the 24-foot James River draft restriction also
should be looked at for improvement. Every ton of cargo
not loaded in Hopewell due to the 24-foot restriction has
to be barged to Norfolk for transloading to a warehouse
and then to a vessel after loading in Hopewell to top off
to the vessel’s loaded draft. An improved draft of 25 feet
would mean approx. 1700 NT of additional cargo loaded
in Hopewell on a vessel at a savings to Honeywell of
$20,000 per vessel.
57. James River Vessels
Small Honeywell Vessels
Balsa 57
GRT 4,355 mt
NRT 2,504 mt
LOA 105.5 m
BEAM 16.8 m
Hopewell
58. Midsize Honeywell Vessels
Antilles VI
GRT 7,341 mt
NRT 4,279 mt
LOA 115.3 m
BEAM 19.6 m
Century Seymour
GRT 9,978 mt
NRT 5,489 mt
LOA 137.03 m
BEAM 23 m
Century Pearl
GRT 9,967 mt
NRT 5,500 mt
LOA 137.030 m
BEAM 23 m
James River Vessels
Hopewell
59. Large Honeywell Vessels
Wichita Belle
GRT 17,590 mt
NRT 10,303 mt
LOA 170 m
BEAM 26.5 m
Pacific Future
GRT 18,597 mt
NRT 9,065 mt
LOA 181 m
BEAM 26.06 m
Clipper Kashashio
GRT 20,236 mt
NRT 10,947 mt
LOA 177.130 m
BEAM 28.4 m
James River Vessels
Hopewell
60. Future Honeywell Vessels Available
Federal Sable
GRT 23,100 mt
NRT 12,250 mt
LOA 190 m (623 ft)
BEAM 28.3 m (93 ft)
James River Vessels
Hopewell
Current Restrictions to Hopewell
LOA 183.18 m (601 ft)
BEAM 28.5 m (93.5 ft)
61. Current Situation
Hopefully, we can work together to identify the
improvements needed to accomplish this, and I am
encouraged that the economic benefits will justify this
effort.
THANK YOU
62. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
US Army Corps of Engineers
BUILDING STRONG®
James River Partnership XVII
A perspective on Watershed Approach
Mr. Michael R. Darrow
Chief, Water Resources Division
Norfolk District
6 Jun 2013
64. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
USACE Guidance and Language
• EC 11-2-204. 31 March 2013 (FY15 Budget
Guidance)
3
65. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River Watershed Identified as a
Watershed/Systems-Based Budget Opportunity
• Watershed-Based Budget defined as a “sustainable, five-year
set of prioritized and performance-based project-level
investment options”.
• The James River watershed includes:
• Federal Flood Risk Management
• Navigation
• Environmental Restoration
• Regulatory permitting actions
• Flood Plain Management Services
• Planning Assistance to State
• Involves many partners, stakeholders, and customers.
4
66. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
James River Pilot Study
FY14 Budget Submission
• Developed a strategy to manage and fund projects in the James River
watershed by:
• Identifying past 5-year funding for GI, CG, CAP, and O&M
• Prioritizing FY-14 Work Packages among the Business Lines
• Considering needs of stakeholders, bare-bones O&M, and National
Objectives
• The result attempts to optimize the use of limited fiscal resources, while
providing the greatest benefit to customers and the nation.
• Considered how projects among Business Lines were connected and
gave special weighting to Comprehensive James River Basin Study
• Important benefit of watershed budgeting would be to have ability to
move funds among Business Lines to achieve greatest benefits
5
67. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 6
Navigation
Water Supply
Flood Risk Management
Ecosystem Restoration
Flood Risk Management
68. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Stakeholder Feedback
7
Existing Priorities
• Flood Risk Management
• Water Supply
• Ecosystem Restoration
• Disaster Preparedness & Response
• Navigation
• Regulatory
Future Priorities
• Water Supply
• Ecosystem Restoration
• Navigation
• Disaster Preparedness & Response
• Flood Risk Management
• Regulatory
“In order to establish a collaborative process
with a focus on conducting a comprehensive
basin-wide waster resources study that
optimizes needs across the basin versus
maximizing individual needs stakeholders
will need to seek enduring, sustainable, and
integrated solution sets across the upper
middle, and lower basins.”
“In my experience, sometimes competing
interests can be found within efforts under
the Navigation, Regulatory programs, and
Ecosystem Restoration programs.”
“An overall comprehensive watershed
analysis would help to prioritize the
resources within the watershed, identify
what needs to be done in order to
strengthen the resources and hopefully
provide a balance of where resource needs
may conflict with each other.”
“The need for water supply
and navigation sometimes
conflicts with flood risk
management and ecosystem
restoration.”
69. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 8
Challenges
• How to objectively assign relative value to projects among
Business Lines
• How to fairly incorporate stakeholder input
• How to consider projects or initiatives by other Federal, state,
and local agencies
• How to integrate the Regulatory Program permits within in the
specific watershed area
• How to address cost-shared vs. non cost-shared items
• Inability to share budgetary information with outside interests
70. BUILDING STRONG®US Army Corps of Engineers – Norfolk District
Way Forward
• Continued focus on projects and programs within a
watershed context
• Outreach, Outreach
• James River Comprehensive Study
• Full understanding of all the federal agencies plans
• Pool limited funds where interests overlap
• GIS – Tool for a common operating picture
9
72. BUILDING STRONG®US Army Corps of Engineers – Norfolk District 11
Recommendations
• Allow partners to be involved in the budget process and
help in developing proposals.
• Allow reprogramming of funds among projects within the
watershed.
• Enable immediate release of project fact sheets to
watershed partners, post-release of President’s Budget.
• For FY-15 budget cycle, develop a
methodology and guidance to enable