Consultation for Biro Perekonomian dan SDA
Setda Pemprov DIY
Policy Model - IDM
Consultation Design
 Based on „Principles of Ownership“
 Theme „Administration Reform and Good Governance“
 Scope „ Regional Economic Development“
 Consultant-Client relationship:
 Education, Accountability, Transformation and Connections.
 Area of support include Organizational capacity,
Quality policy, and Networking
 Consultation Phase:
 Assessment
 Implementation
 Evaluation and Reporting
Asssessmen
t
Implementati
on
Evaluation
and
Reporting
Agreements
 Agreement on Result
 CWG Policy Model Policy Paper
SOP
 CWG Integrated Data Management
 Intranet Database
 Master Plan
 CWG Open Consultation
 Mon Ev , Survey, Discussion
 Agreement on Objectives
 Equipment subsidy Program support
IDM hardwares
Media info
CWG Policy Model
Generic Tools
B
P
B
P
B
P
B
P
Sector Specific ? (e.g
Environment)
KRB I
KRB II
KRB III/
terdampa
k
langsung
Kawasan bebas
Hunian, mjd
Hutan
Lindung/TNGM
Kawasan
Hunian sangat
terbatas
KRB III
Periode
Rehabilitasi &
Rekonstruksi
Pemulihan Dini
(Early Recovery)
Periode
Darurat
Lanjutan/
Penuntasan
Periode
Darurat
Terkendali
PRA-BENCANA SAAT KEJADIAN BENCANA PASCA-BENCANA
Periode
Panik
Masa Tanggap Darurat
 Situasi tidak
terdapat
potensi
bencana
 Situasi
terdapat
potensi
bencana
BENCANA
Penanggulangan bencana pada tahap pasca
bencana
Saat ini
Transisi
9
Insya Allah Juni 2011
Tanggap darurat
dicabut
Inpres rehab rekon
Source: Coordination Meeting on Rehab/Recon 07.06.2011
Time/Maturity/StageofDevelopment
MaximumSizeduetotheConstraints,
ProvidedbytheSiteConditions
StateVariable/Orientor/Indicator
Disturbance
SystemB
SystemA
28.4.2009Folie 11
- Brundtland Commission (1987): „SD is development
that meets the needs of the present without
compromising the ability of future generations to meet
their own needs.“
Ecology
Society
Economy
Governance
Sustainability
12
NO
SEKTOR/
SUBSEKTOR
Total
Kebutuhan
Pemulihan
2011-2013
(Rp. Juta)
INDIKASI SUMBER PENDANAAN
2011-2013 (Rp. Juta)
APBN
APBD
PROV
APBD KAB
1 PERUMAHAN 247.077,05 244.873,05 2.204,00 -
2 INFRASTRUKTUR 417.673,09 323.248,95 47.440,91 46.983,23
3 EKONOMI 222.160,25 201.524,82 15.731,96 4.903,47
4 SOSIAL 149.248,60 144.523,05 3.645,81 1.079,74
5 LINTAS SEKTOR 314.595,96 312.702,21 1.270,00 623,75
Jumlah 1.350.754,95
1.226.872,08
70.292,68 53.590,19
Rekapitulasi Kebutuhan Pendanaan dari
Kementerian/Lembaga 2011-2013
13
= KRB III
= KRB II
= KRB I
= endapan awan
panas erupsi 2010
= area terdampak
letusan 2010
13
Pada daerah
terdampak
langsung erupsi
2010 = direlokasi
 dijadikan
Hutan lindung
Pada KRB III =
Living in
harmony with
risk  dengan
rekayasa sosial
dan teknis
Sumber:
Badan Geologi,
Kementerian ESDM,
2011
Peta Kawasan Rawan Bencana dan Terdampak Erupsi Merapi
CWG Policy Model vs Application
CWG Database
Integrated Data Management
 IT Structure Concept: Intranet database. 8 sub-section.
 Objective: Digitalization and normalization of paper-based data,
partial information, and other pooled info.
 Dataset: figures, graph, stats, images, tables, texts etc.
 Develop Master Plan 2012.
CWG OC
 Networking Opportunities ( PPP)
 Develop Theme / points of interest
 Successful investment on sectors:
education, tourism, local SMEs, etc
 Exporting services than products, HOW ?
 Capacity development; tech transfer,
knowledge transfer, training, etc
 CSR programs; economic empowerement,
env.
 Stakeholder Matrix, Disposition to Section,
Event Planning (ToR).
 Objective: to strengthen cooperation of
potential and existing stakeholders
supporting regional economic
development.
Ex. Swedish – CGG Cooperation Stakeholder Matrix.
Stakeholder
Categories
Relevant
Stakeholder
Characteristi
cs
Influence Importance Interest
Gov. Policy
Makers
Setda Prov
DPRD Kom A
Reg.Admin Legalities High Open to
investment
Implementing
Agency Staff
CGG
UMY
BP
BKPM
Bappeda
KADIN DIY
Local NGO
Local Univ
LGU
LGU
LGU
NGO
Partners
Analysis
Legal Facilitator
Dev. Regulator
Sets annual
RKPD
Business and
investment
climate
Main facilitator
Partnership
Staff
Executives (
Gov Access
Point
Budget Commt
Support real
dev.
In line w/ AoR
Reputation
network
Guide policies
Gov. Regulator
Budget Planning
Business
Development
Intended
Beneficieries
BP and SKPDs
Work force pop
Local
authorities
Policy support Policy Analysis Synchronization
to Dev. Plans
2009-2013
Adversely
affected
persons
Competing
industries and
business player
Local-
Regional
Private
Market share Partnership Profit sharing vs
risk sharing
Org. Interest
groups
Worker Union local-regional Represent
workers
Drive social
cohesion
Direct
employment
benefit and
better wages
Civil Society
Org.
APIKRI
(handcrafts)
Local
communities
Implementation,
operational .
Aspiration
window
Advocates fair
trade of
Ex. PPP projects –BAPPENAS 2011
Challenges vs Opportunities
 Time processing for equipment subsidy proposal (APA).
 Translation (Ind-Eng, Eng-Ind); tools, docs, papers, SOP.
 Positive support and feedback on IDM from supervisors and
staffs. Some sections (business, commerce, industry, SMEs,
General Section) have plans toward DGS already (i.e system
for electronic financial reporting and auditing, database SME,
online business portal).
 Integrating IDM with indicator of individual/org work
performance is possible. (i.e record of computer usage)
 Policy Model have raised already further technical questions
on procedures, tools, method, legal framework, and admin.
Vielen Dank !

More Related Content

Viewers also liked

Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014Rio Wicaksono
 
Good Governance : Regional Economic Development DI Yogyakarta
Good Governance : Regional Economic Development DI YogyakartaGood Governance : Regional Economic Development DI Yogyakarta
Good Governance : Regional Economic Development DI YogyakartaRio Wicaksono
 
Synergy GIZ and Counterparts
Synergy GIZ and CounterpartsSynergy GIZ and Counterparts
Synergy GIZ and CounterpartsRio Wicaksono
 
Models Approaches of Public Policy
Models Approaches  of Public PolicyModels Approaches  of Public Policy
Models Approaches of Public PolicyAgnes Montalbo
 
Grammar II-2014 prescriptive vs Descriptive Grammar
Grammar II-2014 prescriptive vs Descriptive GrammarGrammar II-2014 prescriptive vs Descriptive Grammar
Grammar II-2014 prescriptive vs Descriptive GrammarSerena Luna
 
models-of-public-policy-formulation
models-of-public-policy-formulationmodels-of-public-policy-formulation
models-of-public-policy-formulationNayyar Kazmi
 
DI&A Slides: Descriptive, Prescriptive, and Predictive Analytics
DI&A Slides: Descriptive, Prescriptive, and Predictive AnalyticsDI&A Slides: Descriptive, Prescriptive, and Predictive Analytics
DI&A Slides: Descriptive, Prescriptive, and Predictive AnalyticsDATAVERSITY
 
Sustainable Innovation Day
Sustainable Innovation DaySustainable Innovation Day
Sustainable Innovation DayPeter Bertels
 
Explain the six step model for public policy by SYED SALMAN JALAL KAKA KHEL
Explain the six step model for public policy by SYED SALMAN JALAL KAKA KHELExplain the six step model for public policy by SYED SALMAN JALAL KAKA KHEL
Explain the six step model for public policy by SYED SALMAN JALAL KAKA KHELSalman Kaka Khel
 

Viewers also liked (10)

Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014Non Motorized Training Program , Manado 07-09-2014
Non Motorized Training Program , Manado 07-09-2014
 
Good Governance : Regional Economic Development DI Yogyakarta
Good Governance : Regional Economic Development DI YogyakartaGood Governance : Regional Economic Development DI Yogyakarta
Good Governance : Regional Economic Development DI Yogyakarta
 
Synergy GIZ and Counterparts
Synergy GIZ and CounterpartsSynergy GIZ and Counterparts
Synergy GIZ and Counterparts
 
Models Approaches of Public Policy
Models Approaches  of Public PolicyModels Approaches  of Public Policy
Models Approaches of Public Policy
 
Grammar II-2014 prescriptive vs Descriptive Grammar
Grammar II-2014 prescriptive vs Descriptive GrammarGrammar II-2014 prescriptive vs Descriptive Grammar
Grammar II-2014 prescriptive vs Descriptive Grammar
 
THEORETICAL APPROACHES TO PUBLIC POLICY
THEORETICAL APPROACHES TO PUBLIC POLICYTHEORETICAL APPROACHES TO PUBLIC POLICY
THEORETICAL APPROACHES TO PUBLIC POLICY
 
models-of-public-policy-formulation
models-of-public-policy-formulationmodels-of-public-policy-formulation
models-of-public-policy-formulation
 
DI&A Slides: Descriptive, Prescriptive, and Predictive Analytics
DI&A Slides: Descriptive, Prescriptive, and Predictive AnalyticsDI&A Slides: Descriptive, Prescriptive, and Predictive Analytics
DI&A Slides: Descriptive, Prescriptive, and Predictive Analytics
 
Sustainable Innovation Day
Sustainable Innovation DaySustainable Innovation Day
Sustainable Innovation Day
 
Explain the six step model for public policy by SYED SALMAN JALAL KAKA KHEL
Explain the six step model for public policy by SYED SALMAN JALAL KAKA KHELExplain the six step model for public policy by SYED SALMAN JALAL KAKA KHEL
Explain the six step model for public policy by SYED SALMAN JALAL KAKA KHEL
 

Similar to Strategic Consultation Policy Model

Local Initiatives for E-Government (L.I.F.E)
Local Initiatives for E-Government (L.I.F.E)Local Initiatives for E-Government (L.I.F.E)
Local Initiatives for E-Government (L.I.F.E)Dadang Solihin
 
The CLG Customer-Led Service Transformation programme: social media strand
The CLG Customer-Led Service Transformation programme: social media strandThe CLG Customer-Led Service Transformation programme: social media strand
The CLG Customer-Led Service Transformation programme: social media strandIngrid Koehler
 
201-Hong Infrastructure for evidence based STI policy in Korea
201-Hong Infrastructure for evidence based STI policy in Korea201-Hong Infrastructure for evidence based STI policy in Korea
201-Hong Infrastructure for evidence based STI policy in Koreainnovationoecd
 
INTEGRAL BUSINESS @ DETECON
INTEGRAL BUSINESS @ DETECONINTEGRAL BUSINESS @ DETECON
INTEGRAL BUSINESS @ DETECONMarc Wagner
 
Icc phase iii cycle i reporting karlskrona
Icc phase iii cycle i reporting karlskronaIcc phase iii cycle i reporting karlskrona
Icc phase iii cycle i reporting karlskronaPer-Olav Gramstad
 
ImpactAssesment mrichards
ImpactAssesment mrichardsImpactAssesment mrichards
ImpactAssesment mrichardsvdg777
 
UN Internship Poster for UC Berkeley
UN Internship Poster for UC BerkeleyUN Internship Poster for UC Berkeley
UN Internship Poster for UC Berkeleyeversmilingshubhi
 
Management summary presentation
Management summary presentationManagement summary presentation
Management summary presentationIT Strategy Group
 
Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010
Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010
Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010UNSW Canberra
 
2.1 Identifying national gaps and needs and developing a problem tree
2.1 Identifying national gaps and needs and developing a problem tree 2.1 Identifying national gaps and needs and developing a problem tree
2.1 Identifying national gaps and needs and developing a problem tree NAP Events
 
MAPS experiences with long-term low greenhouse gas emission development strat...
MAPS experiences with long-term low greenhouse gas emission development strat...MAPS experiences with long-term low greenhouse gas emission development strat...
MAPS experiences with long-term low greenhouse gas emission development strat...OECD Environment
 
1 transparency mechanism (english)
1 transparency mechanism (english)1 transparency mechanism (english)
1 transparency mechanism (english)Article33
 

Similar to Strategic Consultation Policy Model (20)

Local Initiatives for E-Government (L.I.F.E)
Local Initiatives for E-Government (L.I.F.E)Local Initiatives for E-Government (L.I.F.E)
Local Initiatives for E-Government (L.I.F.E)
 
ESG Framework.pptx
ESG Framework.pptxESG Framework.pptx
ESG Framework.pptx
 
The CLG Customer-Led Service Transformation programme: social media strand
The CLG Customer-Led Service Transformation programme: social media strandThe CLG Customer-Led Service Transformation programme: social media strand
The CLG Customer-Led Service Transformation programme: social media strand
 
201-Hong Infrastructure for evidence based STI policy in Korea
201-Hong Infrastructure for evidence based STI policy in Korea201-Hong Infrastructure for evidence based STI policy in Korea
201-Hong Infrastructure for evidence based STI policy in Korea
 
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan PerezAPR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
 
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan PerezAPR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
 
INTEGRAL BUSINESS @ DETECON
INTEGRAL BUSINESS @ DETECONINTEGRAL BUSINESS @ DETECON
INTEGRAL BUSINESS @ DETECON
 
Icc phase iii cycle i reporting karlskrona
Icc phase iii cycle i reporting karlskronaIcc phase iii cycle i reporting karlskrona
Icc phase iii cycle i reporting karlskrona
 
APR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.Karim
APR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.KarimAPR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.Karim
APR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.Karim
 
APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...
APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...
APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...
 
ImpactAssesment mrichards
ImpactAssesment mrichardsImpactAssesment mrichards
ImpactAssesment mrichards
 
UN Internship Poster for UC Berkeley
UN Internship Poster for UC BerkeleyUN Internship Poster for UC Berkeley
UN Internship Poster for UC Berkeley
 
Management summary presentation
Management summary presentationManagement summary presentation
Management summary presentation
 
Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010
Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010
Chartered Secretaries Risk & Compliance Module 8 - Project Governance - May 2010
 
CV_Summary
CV_SummaryCV_Summary
CV_Summary
 
11 wectorial work group
11 wectorial work group11 wectorial work group
11 wectorial work group
 
2.1 Identifying national gaps and needs and developing a problem tree
2.1 Identifying national gaps and needs and developing a problem tree 2.1 Identifying national gaps and needs and developing a problem tree
2.1 Identifying national gaps and needs and developing a problem tree
 
NAP-GSP Cambodia Stocktaking Mission Debriefing
NAP-GSP Cambodia Stocktaking Mission DebriefingNAP-GSP Cambodia Stocktaking Mission Debriefing
NAP-GSP Cambodia Stocktaking Mission Debriefing
 
MAPS experiences with long-term low greenhouse gas emission development strat...
MAPS experiences with long-term low greenhouse gas emission development strat...MAPS experiences with long-term low greenhouse gas emission development strat...
MAPS experiences with long-term low greenhouse gas emission development strat...
 
1 transparency mechanism (english)
1 transparency mechanism (english)1 transparency mechanism (english)
1 transparency mechanism (english)
 

Recently uploaded

PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933Fahcitycouncil
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenSERUDS INDIA
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单ukyewh
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfMohammed325561
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单ehbuaw
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organizationuptheratios
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxILC- UK
 
CCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptCCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptAsashukla6
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfClaudioTebaldi2
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36JSchaus & Associates
 
“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...Christina Parmionova
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37JSchaus & Associates
 
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...Rahsaan L. Browne
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stopahcitycouncil
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estateoklahomajudicialproc1
 
Presentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantagePresentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantageSwapnajitSahoo1
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptxSERUDS INDIA
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单ehbuaw
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
 

Recently uploaded (20)

PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
CCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptCCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.ppt
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
Presentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantagePresentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantage
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 

Strategic Consultation Policy Model

  • 1. 16.06.11 Consultation for Biro Perekonomian dan SDA Setda Pemprov DIY Policy Model - IDM
  • 2. Consultation Design  Based on „Principles of Ownership“  Theme „Administration Reform and Good Governance“  Scope „ Regional Economic Development“  Consultant-Client relationship:  Education, Accountability, Transformation and Connections.  Area of support include Organizational capacity, Quality policy, and Networking  Consultation Phase:  Assessment  Implementation  Evaluation and Reporting Asssessmen t Implementati on Evaluation and Reporting
  • 3. Agreements  Agreement on Result  CWG Policy Model Policy Paper SOP  CWG Integrated Data Management  Intranet Database  Master Plan  CWG Open Consultation  Mon Ev , Survey, Discussion  Agreement on Objectives  Equipment subsidy Program support IDM hardwares Media info
  • 7. Sector Specific ? (e.g Environment)
  • 8. KRB I KRB II KRB III/ terdampa k langsung Kawasan bebas Hunian, mjd Hutan Lindung/TNGM Kawasan Hunian sangat terbatas KRB III
  • 9. Periode Rehabilitasi & Rekonstruksi Pemulihan Dini (Early Recovery) Periode Darurat Lanjutan/ Penuntasan Periode Darurat Terkendali PRA-BENCANA SAAT KEJADIAN BENCANA PASCA-BENCANA Periode Panik Masa Tanggap Darurat  Situasi tidak terdapat potensi bencana  Situasi terdapat potensi bencana BENCANA Penanggulangan bencana pada tahap pasca bencana Saat ini Transisi 9 Insya Allah Juni 2011 Tanggap darurat dicabut Inpres rehab rekon Source: Coordination Meeting on Rehab/Recon 07.06.2011
  • 11. 28.4.2009Folie 11 - Brundtland Commission (1987): „SD is development that meets the needs of the present without compromising the ability of future generations to meet their own needs.“ Ecology Society Economy Governance Sustainability
  • 12. 12 NO SEKTOR/ SUBSEKTOR Total Kebutuhan Pemulihan 2011-2013 (Rp. Juta) INDIKASI SUMBER PENDANAAN 2011-2013 (Rp. Juta) APBN APBD PROV APBD KAB 1 PERUMAHAN 247.077,05 244.873,05 2.204,00 - 2 INFRASTRUKTUR 417.673,09 323.248,95 47.440,91 46.983,23 3 EKONOMI 222.160,25 201.524,82 15.731,96 4.903,47 4 SOSIAL 149.248,60 144.523,05 3.645,81 1.079,74 5 LINTAS SEKTOR 314.595,96 312.702,21 1.270,00 623,75 Jumlah 1.350.754,95 1.226.872,08 70.292,68 53.590,19 Rekapitulasi Kebutuhan Pendanaan dari Kementerian/Lembaga 2011-2013
  • 13. 13 = KRB III = KRB II = KRB I = endapan awan panas erupsi 2010 = area terdampak letusan 2010 13 Pada daerah terdampak langsung erupsi 2010 = direlokasi  dijadikan Hutan lindung Pada KRB III = Living in harmony with risk  dengan rekayasa sosial dan teknis Sumber: Badan Geologi, Kementerian ESDM, 2011 Peta Kawasan Rawan Bencana dan Terdampak Erupsi Merapi
  • 14. CWG Policy Model vs Application
  • 16. Integrated Data Management  IT Structure Concept: Intranet database. 8 sub-section.  Objective: Digitalization and normalization of paper-based data, partial information, and other pooled info.  Dataset: figures, graph, stats, images, tables, texts etc.  Develop Master Plan 2012.
  • 17. CWG OC  Networking Opportunities ( PPP)  Develop Theme / points of interest  Successful investment on sectors: education, tourism, local SMEs, etc  Exporting services than products, HOW ?  Capacity development; tech transfer, knowledge transfer, training, etc  CSR programs; economic empowerement, env.  Stakeholder Matrix, Disposition to Section, Event Planning (ToR).  Objective: to strengthen cooperation of potential and existing stakeholders supporting regional economic development.
  • 18. Ex. Swedish – CGG Cooperation Stakeholder Matrix. Stakeholder Categories Relevant Stakeholder Characteristi cs Influence Importance Interest Gov. Policy Makers Setda Prov DPRD Kom A Reg.Admin Legalities High Open to investment Implementing Agency Staff CGG UMY BP BKPM Bappeda KADIN DIY Local NGO Local Univ LGU LGU LGU NGO Partners Analysis Legal Facilitator Dev. Regulator Sets annual RKPD Business and investment climate Main facilitator Partnership Staff Executives ( Gov Access Point Budget Commt Support real dev. In line w/ AoR Reputation network Guide policies Gov. Regulator Budget Planning Business Development Intended Beneficieries BP and SKPDs Work force pop Local authorities Policy support Policy Analysis Synchronization to Dev. Plans 2009-2013 Adversely affected persons Competing industries and business player Local- Regional Private Market share Partnership Profit sharing vs risk sharing Org. Interest groups Worker Union local-regional Represent workers Drive social cohesion Direct employment benefit and better wages Civil Society Org. APIKRI (handcrafts) Local communities Implementation, operational . Aspiration window Advocates fair trade of
  • 19. Ex. PPP projects –BAPPENAS 2011
  • 20.
  • 21. Challenges vs Opportunities  Time processing for equipment subsidy proposal (APA).  Translation (Ind-Eng, Eng-Ind); tools, docs, papers, SOP.  Positive support and feedback on IDM from supervisors and staffs. Some sections (business, commerce, industry, SMEs, General Section) have plans toward DGS already (i.e system for electronic financial reporting and auditing, database SME, online business portal).  Integrating IDM with indicator of individual/org work performance is possible. (i.e record of computer usage)  Policy Model have raised already further technical questions on procedures, tools, method, legal framework, and admin.
  • 22.