Objective : To contribute efficiently in successful project implementation, utilising my
diverse experience on EPC and PMC Estimates, Contractual Claims for Scope
Variations by active participation in Project Execution from Conceptual to
Commissioning stages. During Bidding and Execution proposed Optimisation ideas
to Plant Layouts, Technical Specifications and Supply Chain strategies thereby
achieving significant Time and Cost Savings to Project Cost.
Career Profile : I am a Graduate Mechanical Engineer with wide experience in Field & Home
Office for Estimating LSTK and EPCM Projects in Oil & Gas (Offshore&
Onshore), Upstream, Down Stream and Mining Industry. I have been working in
EPCM as well PMC Contracts for last 8 years and in past successfully led
proposals in reputed organizations, with projects ranging from Conceptualisation,
FEED through EPC Bids for Grass-root and Brown field Projects. I also gained
general experience in other functions like Contracts Administration, Cost & Risk
Analysis and negotiating Contractual Claims during PMC assignments. Having
worked in GCC Middle East for more than 21 years, South East Asia, Canada
and South America makes me quite adaptable to work with any multi-cultural team.
Nationality : India
Education : Bachelor of Engineering (Mechanical)
Software Skills : KBase Aspen (Estimating Software) & MS Office
Page 2 of 5
EXPERIENCE :
Since 2011 AMEC (now AMEC Foster Wheeler) Intl. Ltd, Abu Dhabi, UAE.
Senior Cost Estimator (May 2011 till date)
 ZADCO-Zakum Development Company, is one of the ADNOC’s (Abu Dhabi National
Oil Company) OFFSHORE Operating Company. Worked as a key member of PMC
Project Controls Department & IPMT (Integrated Project Management Team) for the
Upper Zakum 750K Development Project worth US$ 10 Billion. Project consists of
developing Major Off-Shore Production facilities onconstructed Articifial Islands,
Processing Facilities, Horizontal Drilling of Wells, Subsea pipelines, Island Logisticsand
Infrastructures to produce and process 1 Million Barrels per day of Crude Oil.
 Before the Tender packages were issued to Bidders, I was involved in validation of
FEED Estimates for 4 (Four) EPC Packages on UZ750K Project and assisted in
establishing Corporate Budgets for Share Holders.
 Developed LSTK BIDs’ Pricing Preambles and Contratual terms for EPC
Packages’ Pricing and Unit Rates Schedules for Variation of Work, Manpower,
Equipment, Marine Spreads and Office FAcilities.
 Performed Commercial analysis of Unit Rates submitted by Bidders. Unit Rates
were challenged and negotiated with Lowest Bidder. Also assisted in finalising
Award Recommendation to ADNOC’s Tender Board.
 Validated Techno-Commercial and Contractual variation claims and Site
Instructions as submitted by EPC Contractors and Sub-contractors during project
execution phase. Negotiate and settle the claims favourbly for Client.
2006-2011 SNC-LAVALIN INC., Calgary, Alberta, Canada.
Lead Mechanical & Piping Lead Estimator
 Valentines Iron Ore Project, Uruguay.(December 2010 till May 2011) Project worth
approx. US 2.5 Billion. Work responsibilities consisted of :
 Estimating Mechanical and Piping works for Sub-contract Packages during FEED.
 Estimating Indirect Costs for Site Facilities and associated infrastructures at Mining
Site, Process plant, Marine and Habour Areas.
 QATALUM Aluminium Smelter Project, Qatar. (February 2009 till November
2010)Project worth approx. US 6.3 Billion. PMC Team member responsibleon behalf
of Qatalum consisted of :
Page 3 of 5
 Negotiating Contractors’ claimed amounts based on Techno-Commercial scope
changes thereby achieving Cost Savings of Approx. US$ 7.5 Millions..
 Conducted Cost Optimsation and Time Saving Initiatives for the project
 Established Work Unit Rates based on local Market’s Pricing levels.
 Husky Oil Operations Limited, Sunrise Oil Sands Project, Fort McMurray, Alberta,
Canada, (May 2008 – February’ 2009). Project worth approx. US$3.0 Billion. Duties and
responsibilities included:
 Developing Piping and Mechanical Estimates for CPF (Central Processing
Facilities) South Oil Processing unit and CPF North Steam Generation unit.
 Bench marking and reconciling Estimates based on modified and optimized plot
plans as well design changes.
 EMAL, Emirates Aluminium Smelter Project, Abu Dhabi, United Arab Emirates
(March 2008 – April 2008). Project worth US$ 6.2 Billion.PMC Duties and
responsibilities included:
 Developing Super Trend Estimates based on local market Rates related to material
procurement, sub-contracting and construction labour supplies.
 Updating EPC Project Budget with respect to Engineering Growths, In-situ
situations, Change Orders and latest procurement sensitivities.
Lead Estimator (February 2006 till February 2008)
 Shaybah Central Processing Facilities Project (GOSP), Saudi Aramco, Saudi Arabia.
Project worth US$ 800M.Led the multi-disciplinary team and was responsible for:
 Unique contract structure of Converted LSTK selected by client. Developed initial
Estimate at First Bid Stage for EPC phase to obtain Board Approval for bidding.
 Successfully managed estimation at Second Stage of Conversion to LSTK by
preparing Open Book Estimate and actively participated in overall price
negotiations with Client.
 Required close monitoring of technical scope and understanding of contract
conditions to develop final LSTK Price.
 Petroleum Development Oman L.L.C. (Shell JV), Qarn Alam Steam Surface Facilities
Proposal, Oman (SAGD facilities) February 2006 – July 2006.
 Duties and responsibilities included:
 Bidding as JV with Saipem to develop EPC LS Price
 Developed estimation plans, JV split of responsibilities’ matrix, corporate risk
studies, sensitivities and risk analysis.
Page 4 of 5
1994 – 2006 AL HASSAN ENGINEERING CO., Muscat, Sultanate of Oman
Al Hassan isone of the leading EPC companies inOman engaged inOil & Gas Projects for Petroleum
Development Oman,PowerGeneration& Transmission for MEW, Water Treatment, and Pipelines for
PDO. AHEC has very strong direct procurement and constructioncapabilities.
Proposals Manager
Managed the department and led preparation of proposals valued in excess of US $ 3.5
Billion and Claims, Variations on secured Contracts.Worked towards a success rate of
1 of every 3 bids on average
 Some of the major contracts secured were:
 710 MCFD Saih Nihayda Gas Processing Plant for PDO, Oman, in association
with M/s. SNC-Lavalin Inc. and valued at US $150 million.
 100 MCFD Shams Gas Processing Plant for PTTEP, Oman, in JV with M/s.
Hanover and valued at US $80 million.
 390 MW Mukhaizna and Qarn Alam Ph-2 Gas based Power Plants with M/s.
BHEL, India and valued at US $200million.
 Oman Polypropylene Plant, Sohar, Oman for Complete civil, structural,
mechanical and piping works as Major Sub-contractor to M/s. LG Engg. Co.
 48” x 265 km Gas Export Pipeline from Saih Nihayda to Sur for PDO, Oman, as
JV with M/s. Punj Lloyd Ltd. and valued US $60 million.
 EPC Sadad Gather Station worth approx.US $ 50 Million Greenfield Contract
1992 – 1993 AL HAMMAM CO., Ras Tanura, Kingdom of Saudi Arabia
Al Hammam is among the ten largest Industrial Contractors based in Saudi Arabia
Senior Estimation Engineer
 Estimation of Mechanical and Piping proposals for Tenders issued by Saudi Arabian
Oil Company (Saudi Aramco), SCECO and SABIC.
 Projects included Off-shore and On-shore EPC as well Maintenance and Revamping
Tenders worth more than US $350 million.
 Assisted in Contractual claims management.
Page 5 of 5
1992 BLACK CAT CONSTRUCTION WLL., Doha, Qatar
Black Cat Engg.&Constructionis a leading EPIC &Maintenance Contractor,Qatar
Project Engineer
 Duties and responsibilities included:
 Managing Site Construction works of Point ‘E’ Stations’ upgrade
 Replacing of 30” dia. inlet manifold, Installing new facilities like separators, drain
vessel, 39000” Dia. piping, 33 kV switchgear extensions, 675 tons Str. St, 2,250 cu.
m concreting, Install New DCS and SCADA System and associated works
including testing and commissioning.
1988-1991 SHAPOORJI PALLONJI ADVANCED CONT. & ENGGS., Mumbai, India
Senior Planning Engineer
 Site Planning Engineer for Installation of Polypropylene plant for IPCL–MGCC at
Nagothane which included installation of mechanical equipments (2,850 tons), plant
piping (175,000” dia.), Structural Steel (1,750 tons), 8,750 M3 concreting and related
Electrical and Inst. works.
 Led the Contractual Claims of IPCL-MGCC Contract for Variations in Scope and later
actively participated in Estimating new Tenders at Corporate Office.
1984-1988 KONDENSING EQUIPMENTS, Gujarat, India
Project Engineer
 Managed various functions and activities related to oil and gas projects i.e. Assisting in
Estimation of new Bids, workshop fabrication, site transportation arrangements, site
erection including rigging plan verification of heavy structural steel.
1979-1983 WESTERWORK PROJECTS LTD., Mumbai, India
Mechanical Engineer
 Lead Mechanical Engineer for Two (2) Major Sites at TELCO and BAJAJ Auto Ltd.,
Pune-India. These were JV Projects in collaboration with Ludwig Ofag Indugas
(Germany). Supervised complete Site erection and commissioning of fully Automatic
Continuous Carburising Furnaces which included pre-heating, oil quenching and
tempering furnaces along with Hydraulic Conveyor systems.
July’ 2016

More Related Content

What's hot (20)

OGP Awards 2011
OGP Awards 2011OGP Awards 2011
OGP Awards 2011
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
CV_Romeo_2016Latest
CV_Romeo_2016LatestCV_Romeo_2016Latest
CV_Romeo_2016Latest
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 
DCG_CV
DCG_CVDCG_CV
DCG_CV
 
kp 103777 kp
kp 103777 kpkp 103777 kp
kp 103777 kp
 
R3 CV_GLG-doc
R3 CV_GLG-docR3 CV_GLG-doc
R3 CV_GLG-doc
 
Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)
 
Pic Profile
Pic ProfilePic Profile
Pic Profile
 
Dimick, Glen Resume_Summary_July 2016
Dimick, Glen Resume_Summary_July 2016Dimick, Glen Resume_Summary_July 2016
Dimick, Glen Resume_Summary_July 2016
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Akin Akinsipe CV.doc
Akin Akinsipe CV.docAkin Akinsipe CV.doc
Akin Akinsipe CV.doc
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
ResumeR - VishwasBShende 7th Sep 16
ResumeR - VishwasBShende 7th Sep 16ResumeR - VishwasBShende 7th Sep 16
ResumeR - VishwasBShende 7th Sep 16
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls Specialist
 
CV
CVCV
CV
 
chesbro resume
chesbro resumechesbro resume
chesbro resume
 
k4_Engg_profile_New
k4_Engg_profile_Newk4_Engg_profile_New
k4_Engg_profile_New
 
Maher Taha- CV-Oct 2015
Maher Taha- CV-Oct 2015Maher Taha- CV-Oct 2015
Maher Taha- CV-Oct 2015
 
Cameron
CameronCameron
Cameron
 

Viewers also liked

Nick Martin Resume Estimator
Nick Martin   Resume EstimatorNick Martin   Resume Estimator
Nick Martin Resume Estimator
nm3343
 
Iya emn-dokumentation-ke ko
Iya emn-dokumentation-ke koIya emn-dokumentation-ke ko
Iya emn-dokumentation-ke ko
plvisit
 
FSF Philosophy
FSF PhilosophyFSF Philosophy
FSF Philosophy
_Fatma_
 
Diapositive Tesi di Laurea Elena Rosaria Borrelli
Diapositive Tesi di Laurea Elena Rosaria BorrelliDiapositive Tesi di Laurea Elena Rosaria Borrelli
Diapositive Tesi di Laurea Elena Rosaria Borrelli
Elena Borrelli
 

Viewers also liked (20)

Nick Martin Resume Estimator
Nick Martin   Resume EstimatorNick Martin   Resume Estimator
Nick Martin Resume Estimator
 
Handout from Higher Ed. Conference
Handout from Higher Ed. ConferenceHandout from Higher Ed. Conference
Handout from Higher Ed. Conference
 
E-Worker il nuovo veicolo della gamma elettrica di AIXAM
E-Worker  il nuovo veicolo della gamma elettrica di AIXAME-Worker  il nuovo veicolo della gamma elettrica di AIXAM
E-Worker il nuovo veicolo della gamma elettrica di AIXAM
 
Fraternidadfabricio
FraternidadfabricioFraternidadfabricio
Fraternidadfabricio
 
Iya emn-dokumentation-ke ko
Iya emn-dokumentation-ke koIya emn-dokumentation-ke ko
Iya emn-dokumentation-ke ko
 
Business Connections Diagrams
Business Connections DiagramsBusiness Connections Diagrams
Business Connections Diagrams
 
Monitoring Scale-up of Health Practices and Interventions
Monitoring Scale-up of Health Practices and InterventionsMonitoring Scale-up of Health Practices and Interventions
Monitoring Scale-up of Health Practices and Interventions
 
Trabajo sobre los plasmas !!
Trabajo sobre los plasmas !!Trabajo sobre los plasmas !!
Trabajo sobre los plasmas !!
 
Business Analyst lecture
Business Analyst lectureBusiness Analyst lecture
Business Analyst lecture
 
FSF Philosophy
FSF PhilosophyFSF Philosophy
FSF Philosophy
 
Los portatiles
Los portatilesLos portatiles
Los portatiles
 
Diapositive Tesi di Laurea Elena Rosaria Borrelli
Diapositive Tesi di Laurea Elena Rosaria BorrelliDiapositive Tesi di Laurea Elena Rosaria Borrelli
Diapositive Tesi di Laurea Elena Rosaria Borrelli
 
OrientDB and Hazelcast
OrientDB and HazelcastOrientDB and Hazelcast
OrientDB and Hazelcast
 
마음의 선순환 (Korean)
마음의 선순환 (Korean)마음의 선순환 (Korean)
마음의 선순환 (Korean)
 
IVMS Neurobiology Review | Overview Notes
IVMS Neurobiology Review | Overview NotesIVMS Neurobiology Review | Overview Notes
IVMS Neurobiology Review | Overview Notes
 
Konferencija 09.12. ph d Nenad Kaludjerovic
Konferencija 09.12. ph d Nenad KaludjerovicKonferencija 09.12. ph d Nenad Kaludjerovic
Konferencija 09.12. ph d Nenad Kaludjerovic
 
Poslovna komunikacija HAC NCS
Poslovna komunikacija HAC NCSPoslovna komunikacija HAC NCS
Poslovna komunikacija HAC NCS
 
International morse code
International morse codeInternational morse code
International morse code
 
Bellus Corporate Presentation July 2016
Bellus Corporate Presentation July 2016Bellus Corporate Presentation July 2016
Bellus Corporate Presentation July 2016
 
Handling Billions of Edges in a Graph Database
Handling Billions of Edges in a Graph DatabaseHandling Billions of Edges in a Graph Database
Handling Billions of Edges in a Graph Database
 

Similar to Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala

R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
R S Rajaram
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
Srinivas Sirigineedi
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).doc
Sreejith Nair
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
ehsan nazeer
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
ehsan nazeer
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
krishna kumar
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
Edward Byrne
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
Larry Smock
 

Similar to Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala (20)

R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).doc
 
CV PMG
CV PMGCV PMG
CV PMG
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Work Experience
Work ExperienceWork Experience
Work Experience
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
 

Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala

  • 1. Page 1 of 5 RESUME Pankaj Kisnadwala Contact Details: Address: 25, Panamount Crescent, NW, Calgary, Alberta T3K5L7, Canada. Cell (UAE) : +971 50 8125618 Home (India) : +919920019699 E-mail : pankajnk@gmail.com Objective : To contribute efficiently in successful project implementation, utilising my diverse experience on EPC and PMC Estimates, Contractual Claims for Scope Variations by active participation in Project Execution from Conceptual to Commissioning stages. During Bidding and Execution proposed Optimisation ideas to Plant Layouts, Technical Specifications and Supply Chain strategies thereby achieving significant Time and Cost Savings to Project Cost. Career Profile : I am a Graduate Mechanical Engineer with wide experience in Field & Home Office for Estimating LSTK and EPCM Projects in Oil & Gas (Offshore& Onshore), Upstream, Down Stream and Mining Industry. I have been working in EPCM as well PMC Contracts for last 8 years and in past successfully led proposals in reputed organizations, with projects ranging from Conceptualisation, FEED through EPC Bids for Grass-root and Brown field Projects. I also gained general experience in other functions like Contracts Administration, Cost & Risk Analysis and negotiating Contractual Claims during PMC assignments. Having worked in GCC Middle East for more than 21 years, South East Asia, Canada and South America makes me quite adaptable to work with any multi-cultural team. Nationality : India Education : Bachelor of Engineering (Mechanical) Software Skills : KBase Aspen (Estimating Software) & MS Office
  • 2. Page 2 of 5 EXPERIENCE : Since 2011 AMEC (now AMEC Foster Wheeler) Intl. Ltd, Abu Dhabi, UAE. Senior Cost Estimator (May 2011 till date)  ZADCO-Zakum Development Company, is one of the ADNOC’s (Abu Dhabi National Oil Company) OFFSHORE Operating Company. Worked as a key member of PMC Project Controls Department & IPMT (Integrated Project Management Team) for the Upper Zakum 750K Development Project worth US$ 10 Billion. Project consists of developing Major Off-Shore Production facilities onconstructed Articifial Islands, Processing Facilities, Horizontal Drilling of Wells, Subsea pipelines, Island Logisticsand Infrastructures to produce and process 1 Million Barrels per day of Crude Oil.  Before the Tender packages were issued to Bidders, I was involved in validation of FEED Estimates for 4 (Four) EPC Packages on UZ750K Project and assisted in establishing Corporate Budgets for Share Holders.  Developed LSTK BIDs’ Pricing Preambles and Contratual terms for EPC Packages’ Pricing and Unit Rates Schedules for Variation of Work, Manpower, Equipment, Marine Spreads and Office FAcilities.  Performed Commercial analysis of Unit Rates submitted by Bidders. Unit Rates were challenged and negotiated with Lowest Bidder. Also assisted in finalising Award Recommendation to ADNOC’s Tender Board.  Validated Techno-Commercial and Contractual variation claims and Site Instructions as submitted by EPC Contractors and Sub-contractors during project execution phase. Negotiate and settle the claims favourbly for Client. 2006-2011 SNC-LAVALIN INC., Calgary, Alberta, Canada. Lead Mechanical & Piping Lead Estimator  Valentines Iron Ore Project, Uruguay.(December 2010 till May 2011) Project worth approx. US 2.5 Billion. Work responsibilities consisted of :  Estimating Mechanical and Piping works for Sub-contract Packages during FEED.  Estimating Indirect Costs for Site Facilities and associated infrastructures at Mining Site, Process plant, Marine and Habour Areas.  QATALUM Aluminium Smelter Project, Qatar. (February 2009 till November 2010)Project worth approx. US 6.3 Billion. PMC Team member responsibleon behalf of Qatalum consisted of :
  • 3. Page 3 of 5  Negotiating Contractors’ claimed amounts based on Techno-Commercial scope changes thereby achieving Cost Savings of Approx. US$ 7.5 Millions..  Conducted Cost Optimsation and Time Saving Initiatives for the project  Established Work Unit Rates based on local Market’s Pricing levels.  Husky Oil Operations Limited, Sunrise Oil Sands Project, Fort McMurray, Alberta, Canada, (May 2008 – February’ 2009). Project worth approx. US$3.0 Billion. Duties and responsibilities included:  Developing Piping and Mechanical Estimates for CPF (Central Processing Facilities) South Oil Processing unit and CPF North Steam Generation unit.  Bench marking and reconciling Estimates based on modified and optimized plot plans as well design changes.  EMAL, Emirates Aluminium Smelter Project, Abu Dhabi, United Arab Emirates (March 2008 – April 2008). Project worth US$ 6.2 Billion.PMC Duties and responsibilities included:  Developing Super Trend Estimates based on local market Rates related to material procurement, sub-contracting and construction labour supplies.  Updating EPC Project Budget with respect to Engineering Growths, In-situ situations, Change Orders and latest procurement sensitivities. Lead Estimator (February 2006 till February 2008)  Shaybah Central Processing Facilities Project (GOSP), Saudi Aramco, Saudi Arabia. Project worth US$ 800M.Led the multi-disciplinary team and was responsible for:  Unique contract structure of Converted LSTK selected by client. Developed initial Estimate at First Bid Stage for EPC phase to obtain Board Approval for bidding.  Successfully managed estimation at Second Stage of Conversion to LSTK by preparing Open Book Estimate and actively participated in overall price negotiations with Client.  Required close monitoring of technical scope and understanding of contract conditions to develop final LSTK Price.  Petroleum Development Oman L.L.C. (Shell JV), Qarn Alam Steam Surface Facilities Proposal, Oman (SAGD facilities) February 2006 – July 2006.  Duties and responsibilities included:  Bidding as JV with Saipem to develop EPC LS Price  Developed estimation plans, JV split of responsibilities’ matrix, corporate risk studies, sensitivities and risk analysis.
  • 4. Page 4 of 5 1994 – 2006 AL HASSAN ENGINEERING CO., Muscat, Sultanate of Oman Al Hassan isone of the leading EPC companies inOman engaged inOil & Gas Projects for Petroleum Development Oman,PowerGeneration& Transmission for MEW, Water Treatment, and Pipelines for PDO. AHEC has very strong direct procurement and constructioncapabilities. Proposals Manager Managed the department and led preparation of proposals valued in excess of US $ 3.5 Billion and Claims, Variations on secured Contracts.Worked towards a success rate of 1 of every 3 bids on average  Some of the major contracts secured were:  710 MCFD Saih Nihayda Gas Processing Plant for PDO, Oman, in association with M/s. SNC-Lavalin Inc. and valued at US $150 million.  100 MCFD Shams Gas Processing Plant for PTTEP, Oman, in JV with M/s. Hanover and valued at US $80 million.  390 MW Mukhaizna and Qarn Alam Ph-2 Gas based Power Plants with M/s. BHEL, India and valued at US $200million.  Oman Polypropylene Plant, Sohar, Oman for Complete civil, structural, mechanical and piping works as Major Sub-contractor to M/s. LG Engg. Co.  48” x 265 km Gas Export Pipeline from Saih Nihayda to Sur for PDO, Oman, as JV with M/s. Punj Lloyd Ltd. and valued US $60 million.  EPC Sadad Gather Station worth approx.US $ 50 Million Greenfield Contract 1992 – 1993 AL HAMMAM CO., Ras Tanura, Kingdom of Saudi Arabia Al Hammam is among the ten largest Industrial Contractors based in Saudi Arabia Senior Estimation Engineer  Estimation of Mechanical and Piping proposals for Tenders issued by Saudi Arabian Oil Company (Saudi Aramco), SCECO and SABIC.  Projects included Off-shore and On-shore EPC as well Maintenance and Revamping Tenders worth more than US $350 million.  Assisted in Contractual claims management.
  • 5. Page 5 of 5 1992 BLACK CAT CONSTRUCTION WLL., Doha, Qatar Black Cat Engg.&Constructionis a leading EPIC &Maintenance Contractor,Qatar Project Engineer  Duties and responsibilities included:  Managing Site Construction works of Point ‘E’ Stations’ upgrade  Replacing of 30” dia. inlet manifold, Installing new facilities like separators, drain vessel, 39000” Dia. piping, 33 kV switchgear extensions, 675 tons Str. St, 2,250 cu. m concreting, Install New DCS and SCADA System and associated works including testing and commissioning. 1988-1991 SHAPOORJI PALLONJI ADVANCED CONT. & ENGGS., Mumbai, India Senior Planning Engineer  Site Planning Engineer for Installation of Polypropylene plant for IPCL–MGCC at Nagothane which included installation of mechanical equipments (2,850 tons), plant piping (175,000” dia.), Structural Steel (1,750 tons), 8,750 M3 concreting and related Electrical and Inst. works.  Led the Contractual Claims of IPCL-MGCC Contract for Variations in Scope and later actively participated in Estimating new Tenders at Corporate Office. 1984-1988 KONDENSING EQUIPMENTS, Gujarat, India Project Engineer  Managed various functions and activities related to oil and gas projects i.e. Assisting in Estimation of new Bids, workshop fabrication, site transportation arrangements, site erection including rigging plan verification of heavy structural steel. 1979-1983 WESTERWORK PROJECTS LTD., Mumbai, India Mechanical Engineer  Lead Mechanical Engineer for Two (2) Major Sites at TELCO and BAJAJ Auto Ltd., Pune-India. These were JV Projects in collaboration with Ludwig Ofag Indugas (Germany). Supervised complete Site erection and commissioning of fully Automatic Continuous Carburising Furnaces which included pre-heating, oil quenching and tempering furnaces along with Hydraulic Conveyor systems. July’ 2016