SUMMARY OF EXPERIENCE:
Over forty years’ experience in the construction industry which includes overall business
accountability and project management responsibilities in the Project Management and
Construction Management of EPC (Engineering, Procurement and Construction – “Self
Perform”) and EPCM (Engineering, Procurement and Construction Management) Projects.
Overall Construction industry background includes:
 7 years Project Director (accountable for P&L and execution of assigned projects),
 11 years Project Management (accountable for P&L and execution of assigned
projects),
 5 years Consulting (supported clients or projects in specific business development /
execution activities),
 5 years Construction Management (responsible for all site Construction activities),
 4 years Construction Engineering,
 1 year Managing Estimating teams,
 4 years Detailed Civil Structural and Architectural (CSA) estimating and
 3 year’s general project execution experience.
The value of the various projects managed to date has ranged from $½ M to $550MM and
latest Mega Refinery Project assignment in Malaysia was valued at $26B.
Industries supported to date: Oil & Gas, Energy and Chemicals, Mining, Power, Electronic,
Pharmaceutical, Industrial, Food, Commercial, Government, and Demolition. Labor posture
for projects executed was typically contingent on geographical area and was performed
predominately as Merit Shop however; both Open Shop, Closed Shop approach’s have
been implemented successfully.
Project management teams have been dependent on project size and work force. Non
mega projects site craft levels have ranged from 60 to 1,500. Project safety records include;
One - 2MM Safe Work Hour Project, Three – 1MM+ safe work-hour projects without a Lost
Time Accident and multiple Fluor Safety Star Awards including three Tri-Star Awards for
projects ranging from 100K to 1.2MM Safe work-hours.
The above project experience and diversity of industries has allowed for a broad knowledge
base and understanding of the requirements to effectively manage and control projects
financially as well as support, coach and manage all the various phases of a project’s
planning, execution, and completion from conceptual design, construction, start-up,
commissioning, validation and turn over to the client.
178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc
Page 1 of 6
Glen E Dimick
Professional Summary
Site based experience has included Five Expat assignments in seven countries (Malaysia,
Chile/ Argentina, Qatar / Bahrain, Puerto Rico and Estonia) which have provided a good
understanding of the requirements to work effectively in an International multi-cultural
environment.
PROFESSIONAL LICENSE/CERTIFICATE:
 Fluor Power Services - SME (Subject
Mater Expert) Proposals and Proposal
Management
 Fluor Ethics Certified – current 2016
 General Contractor - License for Colorado
Springs, Colorado – expired
 Fluor OSR Certified – current 2015
 PMI – PMP Certification – (in Process)  SS Code of Business Conduct and Ethics
 Department of Defense Civilian Grade -
GS 12
 Security Clearance - “Secret”
EDUCATION & CONSTRUCTION INDUSTRY SPECIFIC TRAINING:
 BS Degree Construction Management,
Kansas State University, Manhattan,
Kansas - 1975
 Project Management - University of Denver
 Daniel Management Program - 3-month
program - Greenville S.C.
 Kepner–Trego, (Management Decision
making Processes)
 General Electric Management Workshop  Fluor Business Simulation
 Using Leadership Stiles to Maximize
Results
 Fluor Business Management
 Commercial and Legal Terms and
Conditions for Contracts
 Project Management Excellence
 Legal and Commercial Terms  Advanced Project Management Execution
 Bidding and Execution of Risk Projects  Controlling Your Project (CYP)
 Business Risk Management Framework
(BRMF)
 Project Execution / Excellence in Execution
 HSE Leadership Training  Human Performance Fundamentals
 Management Safety and Liability
Awareness
 O&M - OSR / OSIP / Toolbox Refresher
 Field Assignment Safety Guidelines  Conducting Client Reviews
178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc
Page 2 of 6
Glen E Dimick
Professional Summary
Professional Work History
Primary Employer - Fluor Enterprises, (1978 to Present)
Current Position - Project Manager IV
Position, Title From / To Project Assignments
Project Manager IV 03/14 to 05/16 Petronas (Petroliam Nasional Berhad), RAPID Project;
⊗ Kuala Lumpur Malaysia & Pengerang, Malaysia
– Site Development & Infrastructure Team
Project Manager IV 09/12 to 08/13 Barrick Gold Corp, Pascua Lama Project,
⊗ Santiago, Chile
– Project Management and Environmental Project
Procedures and Execution Plan & Planning
Proposal Manager 12/11 to 09/12 Power Services Office, Spring Valley Rd,
⊗ Dallas, TX
– Proposal Manager for LS & T&M proposals and contract
negotiations ranging from $65MM to $280MM
Project Manager /
Consultant
01/11 to 12/11 Oklahoma Gas & Electric (OGE) Corporation, 321 N Harvey,
⊗ Oklahoma City, Ok
– Consultant to OGE Management Team to Upgrade their
existing Project Management Practices to be consistent
with current “Best in Class” PMI (Project Management
Institute) and mentor two high potential Jr. Project
Managers on capital projects.
Proposal Manager 05/08 to 01/11 Power Services Office, Spring Valley Rd,
⊗ Dallas, TX
– Proposal Manager for LS & T&M proposals and contract
negotiations ranging from $65MM to $280MM
Project Director 04/07 to 04/08 Alcoa Metals – Warrick Power Plant, Strategic Environmental
Project, Newburgh, IN
– Project Director for $489MM EPCM project, responsible for
all Project activities
Site Manager 02/06 to 4/07 Kentucky Utilities, SO2 Compliance Program,
⊗ Ghent KY
– Site Manager for $540MM, EPC project
Project Manager /
Proposal Manager
09/04 to 12/05 Hitachi Global Storage Technologies, Hitachi Consolidation
Project and Business Development Support,
⊗ San Jose, CA
– Work with Owner Management to define / develop detailed
“BMP” Best Management Practices for their projects
– Proposal Manager for proposal to demolish 6 multi-story
buildings (1.6MM SF) and restore approx. 130 acres of the
existing 260-acre site in San Jose, CA
Director of Project
Management
08/04 to 09/04 China Construction Second Engineering, Bureau,
⊗ Doha, Qatar
– Provide Contract Review and Analysis of CCSEB’s
proposal to Qatar - Minister of Arts and Science
– Provide third party support for their final contractual
negotiations with the country of Qatar.
178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc
Page 3 of 6
Glen E Dimick
Professional Summary
Position, Title From / To Project Assignments
Director of Project
Management
03/04 to 08/04 United Technologies Corporation, Decontamination and
Demolition Project,
⊗ San Jose CA.
– Pratt and Whitney’s $198MM solid rocket fuel plant
decontamination and demolition of project,
Site Project
Manager
06/03 to 12/03 US Air Force, Expeditionary Village Project USAF Air Base
Housing Project,
⊗ Doha Qatar
– 92 Billet Expeditionary Village for US Air Force
Site Project
Manager
03/03 to 06/03 US Air Force, Expeditionary Village Project USAF Air Base
Housing Project, Sheikh Isa,
⊗ Bahrain
– 28 Billet Expeditionary Village for US Air Force
– Canceled mid-stream and moved to Qatar
Site Manager 03/01 to 10/02 BP Chemical, BP Pasadena 15 Vision Project
Chemical Plant Expansion and Rehab, Pasadena, TX
– Site Manager - pre-turnaround activities for $73MM-EPC
upgrade project
Site Manager 07/00 to 02/01 Frito-Lay, Frito-Lay TC-2000 Project, Expansion to existing
Facility,
⊗ Beloit WI.
– Site Manager - Self Perform upgrade of plant for new
product line
Project Manager 05/00 to 06/00 Roche Colorado, Boulder Colorado
– Manage Proposal for Expansion to Existing Facility
Project Director 05/99 to 05/00 Eli Lilly Pharmaceutical Co,
⊗ Indianapolis Indiana
– Project Director for $250MM EPCM expansion to existing
facility for multiple new product’s
Site Manager 10/98 to 4/99 Witco Chemicals, Multi Project Expansion to Existing Facility,
⊗ Memphis, TN
– Site Manager for $41MM - EPCM project
Site Manager 2/98 to 10/98 Witco Chemicals, Glycerin Still Expansion / Renovation
⊗ Mapleton, IL
– Site Manager for $12MM EPCM plant expansion
Proposal Manager 11/97 to 2/98) Raisio Industries, Staest 4 Foods Grass Roots Facility,
⊗ Charleston, SC
– Proposal Manager for New $125MM Grass Roots Facility
Project Manager 07/97 to 11/97 Janssen Pharmaceutical, Plant Expansion, Gurabo, PR
– Project Manager $145MM expansion program (canceled at
completion of estimate)
Project Manager 8/95 to 8/97 Buckbee Mears Cortland Inc., BMC Cortland Line 4 & 5
Expansion,
⊗ Cortland, NY
– Project Manager $107 MM Process Chemical EPCM Plant
Expansion
178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc
Page 4 of 6
Glen E Dimick
Professional Summary
Position, Title From / To Project Assignments
Project Manager /
Consultant
01/94 to 08/95 Sun Company Inc., Philadelphia, PA, Sunoco Renovation of
1400 Dist. Centers,
⊗ North East U.S.,
– Project Manager/Consultant to Manager of Retail &
Distribution for development of Project Management and
Project Execution Procedures for their three-year $300MM
expansion program of 1,400 Food Store / Service Stations
throughout a 12-state region in northeast U.S.
Site Manager 10/92 to 12/93 U.S. Army CORPS of Engineers, Eastern Europe Embassy
Renovation Project,
⊗ Tallinn, Estonia
– Site Manager renovation of 6 story American Embassy
Project Manager 11/90 to 10/92 Food and Consumer Products Group,
⊗ Dallas, Texas.
– Multiple Clients, Food Processing Plants, Multiple Projects,
Various locations, North America
CSA Construction
Manager
02/90 to 11/90 HRV/Clorox Companies, Food Processing Plant, Grass Roots
Facility (1990)
⊗ Reno, NV
– Civil Contracts Construction Manager
Construction
Manager
05/88 to 10/89 Molecular Biosystems, Pharmaceutical Laboratory Production
Facility,
⊗ San Diego, CA
– Construction Project Manager
Site Engineering
Manager
1988 Occidental Chemical Corp., Plant Expansion
⊗ Tacoma, WA
– Site Engineering Manager
Construction
Project Manager
1986 to 1987 Synergen Bio-Tech, Research and Development Lab.
⊗ Boulder, CO
– Construction Project Manager
Civil Engineering
Manager
1982 to 1983 Conoco Oil Co, Oil Refinery Expansion, $300MM Sour Crude
Coker Project
⊗ Lake Charles, LA
– Civil Engineering Manager
Permit Manager 1981 to 1982 Union Oil Company, Oil Shale Mine Retort & Refinery
⊗ Parachute, CO
– Permit Manager
Site Project
Manager
1981 Natl. Semiconductor, Inc. National Semiconductor
⊗ Arlington, TX
– Site Project Manager
Site Project
Manager
1979 to 1980 Mostek Corporation, Electronic Chip Manufacturing Facility,
⊗ Colorado Springs, CO
– Site Project Manager
Estimator 1978 to 1979 Multiple Projects
⊗ Little Rock, AR
– Project Estimator
Non - Fluor / Fluor Daniel Experience
Estimator 1985 to 1986 General Interior Construction - Multiple Projects / Clients
⊗ Colorado Springs, CO
– Project Estimator
178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc
Page 5 of 6
Glen E Dimick
Professional Summary
Position, Title From / To Project Assignments
Estimator 1984 to 1985 Hubcon Corporation - Multiple Projects / Clients
⊗ Colorado Springs, CO
– Project Estimator
Site Construction
Manager
1983 to 1984 Bruce Hughes Construction Company, Maintenance/Fuel
System Dock, Peterson Air Force Base, Department of the
Army
⊗ Colorado Springs, CO
– Site Construction Manager
Project Estimator /
Superintendent
1976 to 1978 Harris Construction Company, Multiple Projects / Clients
⊗ Lawrence, KS
– Project Estimator / Superintendent
Project Estimator /
Superintendent
1975 to 1976 B.A Green Construction Company Inc. - Multiple Projects /
Clients
⊗ Lawrence, KS
– Project Estimator / Superintendent
End of Work History
178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc
Page 6 of 6
Glen E Dimick
Professional Summary
Position, Title From / To Project Assignments
Estimator 1984 to 1985 Hubcon Corporation - Multiple Projects / Clients
⊗ Colorado Springs, CO
– Project Estimator
Site Construction
Manager
1983 to 1984 Bruce Hughes Construction Company, Maintenance/Fuel
System Dock, Peterson Air Force Base, Department of the
Army
⊗ Colorado Springs, CO
– Site Construction Manager
Project Estimator /
Superintendent
1976 to 1978 Harris Construction Company, Multiple Projects / Clients
⊗ Lawrence, KS
– Project Estimator / Superintendent
Project Estimator /
Superintendent
1975 to 1976 B.A Green Construction Company Inc. - Multiple Projects /
Clients
⊗ Lawrence, KS
– Project Estimator / Superintendent
End of Work History
178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc
Page 6 of 6

More Related Content

What's hot

Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaPankaj Kisnadwala
 
al dabney resume
al dabney resumeal dabney resume
al dabney resumealcdabney
 
JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07Joanne Perez
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resumeRAJINDER KUMAR
 
BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10Barry Draycott
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEankush kumar
 
2016 07 Henry Campbell
2016 07 Henry Campbell2016 07 Henry Campbell
2016 07 Henry CampbellHarry Campbell
 
Ladresume2016-rev2
Ladresume2016-rev2Ladresume2016-rev2
Ladresume2016-rev2Luis Diaz
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerDermawan Lumban Gaol
 
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019Jefferson Tomas Tulabot
 

What's hot (20)

M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
al dabney resume
al dabney resumeal dabney resume
al dabney resume
 
Dudley 2-7-2017
Dudley 2-7-2017Dudley 2-7-2017
Dudley 2-7-2017
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resume
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
2016 07 Henry Campbell
2016 07 Henry Campbell2016 07 Henry Campbell
2016 07 Henry Campbell
 
Ladresume2016-rev2
Ladresume2016-rev2Ladresume2016-rev2
Ladresume2016-rev2
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
 

Viewers also liked

Development of an adaptive and a switched beam
Development of an adaptive and a switched beamDevelopment of an adaptive and a switched beam
Development of an adaptive and a switched beammarwaeng
 
Energy efficient platform designed for sdma applications in mobile wireless ...
Energy efficient platform designed for sdma applications in mobile  wireless ...Energy efficient platform designed for sdma applications in mobile  wireless ...
Energy efficient platform designed for sdma applications in mobile wireless ...marwaeng
 
Trabajo individual silvia jerez
Trabajo individual  silvia  jerezTrabajo individual  silvia  jerez
Trabajo individual silvia jerezjerez_juliana
 
Actividad preguntas economia politica y social
Actividad preguntas economia politica y socialActividad preguntas economia politica y social
Actividad preguntas economia politica y socialworks ontime
 
Savour the trees with forest bathing
Savour the trees with forest bathingSavour the trees with forest bathing
Savour the trees with forest bathingKirsten Searles
 
менеджмент у підприємницькій діяльності
менеджмент у підприємницькій діяльностіменеджмент у підприємницькій діяльності
менеджмент у підприємницькій діяльностіLiliia Kuba
 
20160621 T Deora Presentation for FTC
20160621 T Deora Presentation for FTC20160621 T Deora Presentation for FTC
20160621 T Deora Presentation for FTCTanuj Deora
 

Viewers also liked (17)

Lagos de moreno, jalisco
Lagos de moreno, jaliscoLagos de moreno, jalisco
Lagos de moreno, jalisco
 
Wes Anderson
Wes AndersonWes Anderson
Wes Anderson
 
Development of an adaptive and a switched beam
Development of an adaptive and a switched beamDevelopment of an adaptive and a switched beam
Development of an adaptive and a switched beam
 
Energy efficient platform designed for sdma applications in mobile wireless ...
Energy efficient platform designed for sdma applications in mobile  wireless ...Energy efficient platform designed for sdma applications in mobile  wireless ...
Energy efficient platform designed for sdma applications in mobile wireless ...
 
Ha Jin -The Past
Ha Jin -The PastHa Jin -The Past
Ha Jin -The Past
 
Trabajo individual silvia jerez
Trabajo individual  silvia  jerezTrabajo individual  silvia  jerez
Trabajo individual silvia jerez
 
Preventing Bad Breath
Preventing Bad BreathPreventing Bad Breath
Preventing Bad Breath
 
FOUXIAN
FOUXIANFOUXIAN
FOUXIAN
 
Actividad preguntas economia politica y social
Actividad preguntas economia politica y socialActividad preguntas economia politica y social
Actividad preguntas economia politica y social
 
El estado de ppc
El estado de ppcEl estado de ppc
El estado de ppc
 
La pc 2
La pc 2La pc 2
La pc 2
 
Mi ple
Mi pleMi ple
Mi ple
 
Trabajo de bienes y servicios
Trabajo de bienes y serviciosTrabajo de bienes y servicios
Trabajo de bienes y servicios
 
Savour the trees with forest bathing
Savour the trees with forest bathingSavour the trees with forest bathing
Savour the trees with forest bathing
 
Keila las faltas (2)
Keila  las faltas (2)Keila  las faltas (2)
Keila las faltas (2)
 
менеджмент у підприємницькій діяльності
менеджмент у підприємницькій діяльностіменеджмент у підприємницькій діяльності
менеджмент у підприємницькій діяльності
 
20160621 T Deora Presentation for FTC
20160621 T Deora Presentation for FTC20160621 T Deora Presentation for FTC
20160621 T Deora Presentation for FTC
 

Similar to Dimick, Glen Resume_Summary_July 2016

Similar to Dimick, Glen Resume_Summary_July 2016 (20)

E profile
E profileE profile
E profile
 
Scott Kursevich Resume 161114
Scott Kursevich Resume 161114Scott Kursevich Resume 161114
Scott Kursevich Resume 161114
 
CV- bala qa
CV- bala qaCV- bala qa
CV- bala qa
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)
 
Akin Akinsipe CV.doc
Akin Akinsipe CV.docAkin Akinsipe CV.doc
Akin Akinsipe CV.doc
 
Edward_Piekut-3
Edward_Piekut-3Edward_Piekut-3
Edward_Piekut-3
 
alan_morrison_resume (15)
alan_morrison_resume (15)alan_morrison_resume (15)
alan_morrison_resume (15)
 
Tringale Resume 9-2-14
Tringale Resume 9-2-14Tringale Resume 9-2-14
Tringale Resume 9-2-14
 
Final Mukesh Resume
Final Mukesh Resume Final Mukesh Resume
Final Mukesh Resume
 
alexander_cartwright_resume_v34
alexander_cartwright_resume_v34alexander_cartwright_resume_v34
alexander_cartwright_resume_v34
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
 
16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development
 
CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)
 
Zuhair Alshawaf - Resume as of May 2015
Zuhair Alshawaf - Resume as of May 2015Zuhair Alshawaf - Resume as of May 2015
Zuhair Alshawaf - Resume as of May 2015
 
CV Jadid iPms
CV Jadid  iPms CV Jadid  iPms
CV Jadid iPms
 
Resume S&B
Resume S&BResume S&B
Resume S&B
 
Updated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa TsemtsidisUpdated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa Tsemtsidis
 
Graeme Donaldson_Resume_2015a
Graeme Donaldson_Resume_2015aGraeme Donaldson_Resume_2015a
Graeme Donaldson_Resume_2015a
 
David R Gambrell Resume
David R Gambrell ResumeDavid R Gambrell Resume
David R Gambrell Resume
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CV
 

Dimick, Glen Resume_Summary_July 2016

  • 1. Glen E Dimick Professional Summary Glen E Dimick 298 Virginia Lee Dr. Cotter, AR. 72626 Home Phone – (870) 435-2576 Cell Phone – (870) 421-2130 Email – gedimick@gmail.com SUMMARY OF EXPERIENCE: Over forty years’ experience in the construction industry which includes overall business accountability and project management responsibilities in the Project Management and Construction Management of EPC (Engineering, Procurement and Construction – “Self Perform”) and EPCM (Engineering, Procurement and Construction Management) Projects. Overall Construction industry background includes:  7 years Project Director (accountable for P&L and execution of assigned projects),  11 years Project Management (accountable for P&L and execution of assigned projects),  5 years Consulting (supported clients or projects in specific business development / execution activities),  5 years Construction Management (responsible for all site Construction activities),  4 years Construction Engineering,  1 year Managing Estimating teams,  4 years Detailed Civil Structural and Architectural (CSA) estimating and  3 year’s general project execution experience. The value of the various projects managed to date has ranged from $½ M to $550MM and latest Mega Refinery Project assignment in Malaysia was valued at $26B. Industries supported to date: Oil & Gas, Energy and Chemicals, Mining, Power, Electronic, Pharmaceutical, Industrial, Food, Commercial, Government, and Demolition. Labor posture for projects executed was typically contingent on geographical area and was performed predominately as Merit Shop however; both Open Shop, Closed Shop approach’s have been implemented successfully. Project management teams have been dependent on project size and work force. Non mega projects site craft levels have ranged from 60 to 1,500. Project safety records include; One - 2MM Safe Work Hour Project, Three – 1MM+ safe work-hour projects without a Lost Time Accident and multiple Fluor Safety Star Awards including three Tri-Star Awards for projects ranging from 100K to 1.2MM Safe work-hours. The above project experience and diversity of industries has allowed for a broad knowledge base and understanding of the requirements to effectively manage and control projects financially as well as support, coach and manage all the various phases of a project’s planning, execution, and completion from conceptual design, construction, start-up, commissioning, validation and turn over to the client. 178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc Page 1 of 6
  • 2. Glen E Dimick Professional Summary Site based experience has included Five Expat assignments in seven countries (Malaysia, Chile/ Argentina, Qatar / Bahrain, Puerto Rico and Estonia) which have provided a good understanding of the requirements to work effectively in an International multi-cultural environment. PROFESSIONAL LICENSE/CERTIFICATE:  Fluor Power Services - SME (Subject Mater Expert) Proposals and Proposal Management  Fluor Ethics Certified – current 2016  General Contractor - License for Colorado Springs, Colorado – expired  Fluor OSR Certified – current 2015  PMI – PMP Certification – (in Process)  SS Code of Business Conduct and Ethics  Department of Defense Civilian Grade - GS 12  Security Clearance - “Secret” EDUCATION & CONSTRUCTION INDUSTRY SPECIFIC TRAINING:  BS Degree Construction Management, Kansas State University, Manhattan, Kansas - 1975  Project Management - University of Denver  Daniel Management Program - 3-month program - Greenville S.C.  Kepner–Trego, (Management Decision making Processes)  General Electric Management Workshop  Fluor Business Simulation  Using Leadership Stiles to Maximize Results  Fluor Business Management  Commercial and Legal Terms and Conditions for Contracts  Project Management Excellence  Legal and Commercial Terms  Advanced Project Management Execution  Bidding and Execution of Risk Projects  Controlling Your Project (CYP)  Business Risk Management Framework (BRMF)  Project Execution / Excellence in Execution  HSE Leadership Training  Human Performance Fundamentals  Management Safety and Liability Awareness  O&M - OSR / OSIP / Toolbox Refresher  Field Assignment Safety Guidelines  Conducting Client Reviews 178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc Page 2 of 6
  • 3. Glen E Dimick Professional Summary Professional Work History Primary Employer - Fluor Enterprises, (1978 to Present) Current Position - Project Manager IV Position, Title From / To Project Assignments Project Manager IV 03/14 to 05/16 Petronas (Petroliam Nasional Berhad), RAPID Project; ⊗ Kuala Lumpur Malaysia & Pengerang, Malaysia – Site Development & Infrastructure Team Project Manager IV 09/12 to 08/13 Barrick Gold Corp, Pascua Lama Project, ⊗ Santiago, Chile – Project Management and Environmental Project Procedures and Execution Plan & Planning Proposal Manager 12/11 to 09/12 Power Services Office, Spring Valley Rd, ⊗ Dallas, TX – Proposal Manager for LS & T&M proposals and contract negotiations ranging from $65MM to $280MM Project Manager / Consultant 01/11 to 12/11 Oklahoma Gas & Electric (OGE) Corporation, 321 N Harvey, ⊗ Oklahoma City, Ok – Consultant to OGE Management Team to Upgrade their existing Project Management Practices to be consistent with current “Best in Class” PMI (Project Management Institute) and mentor two high potential Jr. Project Managers on capital projects. Proposal Manager 05/08 to 01/11 Power Services Office, Spring Valley Rd, ⊗ Dallas, TX – Proposal Manager for LS & T&M proposals and contract negotiations ranging from $65MM to $280MM Project Director 04/07 to 04/08 Alcoa Metals – Warrick Power Plant, Strategic Environmental Project, Newburgh, IN – Project Director for $489MM EPCM project, responsible for all Project activities Site Manager 02/06 to 4/07 Kentucky Utilities, SO2 Compliance Program, ⊗ Ghent KY – Site Manager for $540MM, EPC project Project Manager / Proposal Manager 09/04 to 12/05 Hitachi Global Storage Technologies, Hitachi Consolidation Project and Business Development Support, ⊗ San Jose, CA – Work with Owner Management to define / develop detailed “BMP” Best Management Practices for their projects – Proposal Manager for proposal to demolish 6 multi-story buildings (1.6MM SF) and restore approx. 130 acres of the existing 260-acre site in San Jose, CA Director of Project Management 08/04 to 09/04 China Construction Second Engineering, Bureau, ⊗ Doha, Qatar – Provide Contract Review and Analysis of CCSEB’s proposal to Qatar - Minister of Arts and Science – Provide third party support for their final contractual negotiations with the country of Qatar. 178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc Page 3 of 6
  • 4. Glen E Dimick Professional Summary Position, Title From / To Project Assignments Director of Project Management 03/04 to 08/04 United Technologies Corporation, Decontamination and Demolition Project, ⊗ San Jose CA. – Pratt and Whitney’s $198MM solid rocket fuel plant decontamination and demolition of project, Site Project Manager 06/03 to 12/03 US Air Force, Expeditionary Village Project USAF Air Base Housing Project, ⊗ Doha Qatar – 92 Billet Expeditionary Village for US Air Force Site Project Manager 03/03 to 06/03 US Air Force, Expeditionary Village Project USAF Air Base Housing Project, Sheikh Isa, ⊗ Bahrain – 28 Billet Expeditionary Village for US Air Force – Canceled mid-stream and moved to Qatar Site Manager 03/01 to 10/02 BP Chemical, BP Pasadena 15 Vision Project Chemical Plant Expansion and Rehab, Pasadena, TX – Site Manager - pre-turnaround activities for $73MM-EPC upgrade project Site Manager 07/00 to 02/01 Frito-Lay, Frito-Lay TC-2000 Project, Expansion to existing Facility, ⊗ Beloit WI. – Site Manager - Self Perform upgrade of plant for new product line Project Manager 05/00 to 06/00 Roche Colorado, Boulder Colorado – Manage Proposal for Expansion to Existing Facility Project Director 05/99 to 05/00 Eli Lilly Pharmaceutical Co, ⊗ Indianapolis Indiana – Project Director for $250MM EPCM expansion to existing facility for multiple new product’s Site Manager 10/98 to 4/99 Witco Chemicals, Multi Project Expansion to Existing Facility, ⊗ Memphis, TN – Site Manager for $41MM - EPCM project Site Manager 2/98 to 10/98 Witco Chemicals, Glycerin Still Expansion / Renovation ⊗ Mapleton, IL – Site Manager for $12MM EPCM plant expansion Proposal Manager 11/97 to 2/98) Raisio Industries, Staest 4 Foods Grass Roots Facility, ⊗ Charleston, SC – Proposal Manager for New $125MM Grass Roots Facility Project Manager 07/97 to 11/97 Janssen Pharmaceutical, Plant Expansion, Gurabo, PR – Project Manager $145MM expansion program (canceled at completion of estimate) Project Manager 8/95 to 8/97 Buckbee Mears Cortland Inc., BMC Cortland Line 4 & 5 Expansion, ⊗ Cortland, NY – Project Manager $107 MM Process Chemical EPCM Plant Expansion 178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc Page 4 of 6
  • 5. Glen E Dimick Professional Summary Position, Title From / To Project Assignments Project Manager / Consultant 01/94 to 08/95 Sun Company Inc., Philadelphia, PA, Sunoco Renovation of 1400 Dist. Centers, ⊗ North East U.S., – Project Manager/Consultant to Manager of Retail & Distribution for development of Project Management and Project Execution Procedures for their three-year $300MM expansion program of 1,400 Food Store / Service Stations throughout a 12-state region in northeast U.S. Site Manager 10/92 to 12/93 U.S. Army CORPS of Engineers, Eastern Europe Embassy Renovation Project, ⊗ Tallinn, Estonia – Site Manager renovation of 6 story American Embassy Project Manager 11/90 to 10/92 Food and Consumer Products Group, ⊗ Dallas, Texas. – Multiple Clients, Food Processing Plants, Multiple Projects, Various locations, North America CSA Construction Manager 02/90 to 11/90 HRV/Clorox Companies, Food Processing Plant, Grass Roots Facility (1990) ⊗ Reno, NV – Civil Contracts Construction Manager Construction Manager 05/88 to 10/89 Molecular Biosystems, Pharmaceutical Laboratory Production Facility, ⊗ San Diego, CA – Construction Project Manager Site Engineering Manager 1988 Occidental Chemical Corp., Plant Expansion ⊗ Tacoma, WA – Site Engineering Manager Construction Project Manager 1986 to 1987 Synergen Bio-Tech, Research and Development Lab. ⊗ Boulder, CO – Construction Project Manager Civil Engineering Manager 1982 to 1983 Conoco Oil Co, Oil Refinery Expansion, $300MM Sour Crude Coker Project ⊗ Lake Charles, LA – Civil Engineering Manager Permit Manager 1981 to 1982 Union Oil Company, Oil Shale Mine Retort & Refinery ⊗ Parachute, CO – Permit Manager Site Project Manager 1981 Natl. Semiconductor, Inc. National Semiconductor ⊗ Arlington, TX – Site Project Manager Site Project Manager 1979 to 1980 Mostek Corporation, Electronic Chip Manufacturing Facility, ⊗ Colorado Springs, CO – Site Project Manager Estimator 1978 to 1979 Multiple Projects ⊗ Little Rock, AR – Project Estimator Non - Fluor / Fluor Daniel Experience Estimator 1985 to 1986 General Interior Construction - Multiple Projects / Clients ⊗ Colorado Springs, CO – Project Estimator 178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc Page 5 of 6
  • 6. Glen E Dimick Professional Summary Position, Title From / To Project Assignments Estimator 1984 to 1985 Hubcon Corporation - Multiple Projects / Clients ⊗ Colorado Springs, CO – Project Estimator Site Construction Manager 1983 to 1984 Bruce Hughes Construction Company, Maintenance/Fuel System Dock, Peterson Air Force Base, Department of the Army ⊗ Colorado Springs, CO – Site Construction Manager Project Estimator / Superintendent 1976 to 1978 Harris Construction Company, Multiple Projects / Clients ⊗ Lawrence, KS – Project Estimator / Superintendent Project Estimator / Superintendent 1975 to 1976 B.A Green Construction Company Inc. - Multiple Projects / Clients ⊗ Lawrence, KS – Project Estimator / Superintendent End of Work History 178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc Page 6 of 6
  • 7. Glen E Dimick Professional Summary Position, Title From / To Project Assignments Estimator 1984 to 1985 Hubcon Corporation - Multiple Projects / Clients ⊗ Colorado Springs, CO – Project Estimator Site Construction Manager 1983 to 1984 Bruce Hughes Construction Company, Maintenance/Fuel System Dock, Peterson Air Force Base, Department of the Army ⊗ Colorado Springs, CO – Site Construction Manager Project Estimator / Superintendent 1976 to 1978 Harris Construction Company, Multiple Projects / Clients ⊗ Lawrence, KS – Project Estimator / Superintendent Project Estimator / Superintendent 1975 to 1976 B.A Green Construction Company Inc. - Multiple Projects / Clients ⊗ Lawrence, KS – Project Estimator / Superintendent End of Work History 178d50a2-3e2d-494f-93b2-46339f0df6bb-160923031225.doc Page 6 of 6