1. RESUME
R.DHANASEKARAN
Email ID: dhansmech@gmail.com, dhana_cit@rediffmail.com
UAE:+971- 0552907810 India:+91-9003524155
PROFESSIONAL SUMMARY
Around 13 years of experience in Project Planning & Scheduling area of project
controls for oil & gas projects involving Conceptual study, FEED, EPC phase and
Shutdown works.
Experienced in scheduling software Primavera for preparing the Level 2 and Level 4
plans, Project Risk Analysis, Resource histograms, S-Curves etc…
FEED Experience:
TAWEELAH Gas Compression Project for GASCO
Gas Turbine replacement Project for GASCO (ASAB and Bu Hasa)
10 MMTPA LNG regasification for IOCL
Detailed ENGINEERING:
TOTAL Refinery, Belgium for TOTAL
EPC Experience:
15 MMTPA Green Field Refinery Project for IOCL
18 MMTPA LNG Trains for Qatar GAS
Revamping and Up gradation of onshore Project for Saudi Aramco
Steel Plant Expansion for ESSAR Groups
EXPERIENCE
Organization Designation Duration
Tebodin Middle East Limited, Abu Dhabi
Senior Project Control
Engineer
Aug’14 – Till date
FOSTER WHEELER India Limited, Chennai –
India
Senior Project Control
Engineer
Aug’09 – Aug’14
ChiyodaTechnipJoint Venture (CTJV) –Qatar Planning Engineer Sep’08 –Aug’09
SAIPEM SA /SNC LavalinJoint Venture –
SaudiArabia
Planning Engineer Jun’07 – Aug ’08
ESSAR Constructions (I) Ltd
Surat – India
Senior Planning Engineer Jul’04 – Jun ’07
Jackson Engineers Ltd (L&T Ltd)
Surat – India
Planning Engineer Jun ’03 – Jun’04
2. TECHNICAL DETAILS
Project Management Tools Primavera Project Planner – 3.1 & 7, Milestone Professional
Project Supporting Tools ABAX (Cost Management System), WEBDMS
Design Tools AutoCAD, Micro station V8.1
EXPERIENCE With Tebodin, ABUDHABI:
Project : TAWEELAH Gas Compression FEED Project Tendering
Client : GASCO, Abu Dhabi
Duration : July 2015 to Till date
My Contribution:
Review of GASCO Tender documents (SOS and SOR)
Review of Bidders pre bid Clarifications and response to bidders.
Review of Bids and participate Post Bid clarification meetings with Bidders.
Preparation of Post Bid exceptions/clarifications response
Project : Gas Turbine Replacement (GTR) FEED Project
Client : GASCO, Abu Dhabi
Duration : Aug 2014 to Jun 2015
Description:
The Project is for Gas Turbine Replacement FEED Project for ASAB and Bu Hasa
location.
My Contribution:
Working as a Senior Project Controls Engineer for this project as a responsible for following
functions,
Finalization of progress measurement philosophy for the preparation of progress S-
curves to monitor Plan Vs Actual progress.
Tracking / monitoring of committed schedules, evaluation of actual progress,
highlighting slippages and suggesting catch-up plans to avoid further delays.
Analysis of areas of concern, progress variance, productivity and forecast trends.
Analysis of man-hour consumption, productivity and forecast hours with respect to the
budget.
Participation in management project review meetings and Lead Engineers meetings.
To prepare the schedule performance letter, Client Monthly report and Client
Presentation.
Review of EPC Scope of Work and prepare the EPC schedule along with SBM and
Project Risk Analysis.
Preparation of +/- 15% Cost Estimate for EPC cost.
Finalization of PDR final Dossier as per COMPANY ITT requirements.
3. Preparation of Business Model for share holders presentation.
EXPERIENCE WITH FOSTER WHEELER INDIA LIMITED, CHENNAI:
Project : TOTAL Refinery, Belgium
Client : TOTAL, France
Duration : Jun 2013 to Aug 2014
Project : FEED and EPCm for IOCL Paradip Refinery Project, Orissa
Client : Indian Oil Corporation Limited (IOCL)
Duration : Aug 2009 to Aug 2014
Project : FEED for ENNORE LNG, Chennai
Client : Indian Oil Corporation Limited (IOCL)
Duration : 30th
Sep 2011 to 30th
June 2012
Description:
The Refinery Project covers the FEED and EPCC (Engineering, Procurement, Construction &
Commissioning) of 15MMTPA Refinery and Petrochemical Complex.
My Contribution:
Working as a Senior Project Controls Engineer for Process, Offsite& Utilities systemfor the
whole refinery complex in Paradip Refinery Project. Responsible for following functions,
Establish and implement procedures for managing Project Control work
Development of detailed logical schedules with interface milestones.
Finalization of progress measurement philosophy for the preparation of progress S-
curves to monitor Plan Vs Actual progress.
Tracking / monitoring of committed schedules, evaluation of actual progress,
highlighting slippages and suggesting catch-up plans to avoid further delays.
Updation of schedules and progress S-curves as per project requirement.
Analysis of areas of concern, progress variance, productivity and forecast trends.
Analysis of man-hour consumption, productivity and forecast hours with respect to the
budget.
Updation of committed quantities and forecasting for procurement of Major/Critical
equipment, Bulks for Piping, Electrical & Instrumentation items.
Regular interaction with project team associates for the status updation and exchange
of information.
Participation in management project review meetings and Lead Engineers meetings.
Contract Bids review, comprising of schedules, resource histogram analysis & report
checking,
To prepare the Client Monthly report and Client Presentation.
EXPERIENCE WITH CHIYODA TECHNIP JOINT VENTURE, QATAR:
Project : LNG Plant construction (QG3 & QG4)
4. Client : QCS (Qatar Gas, Conocophilips& Shell)
Duration : Sep 2008 to Aug 2009
Description:
This is one of the expansions of LNG project at RasLaffan, Qatar for Qatar Gas.
(Tr-6 & Tr-7 - 7.8MTPA capacity)
My Contribution:
As a Planning Engineer, was responsible for
Monitoring & updating the Project Current Schedule.
To prepare the Critical Path Analysis based on updated schedule.
Preparing Daily, Weekly & Monthly Report
Updation of Progress Measurement based on actual work at site and prepare the ‘S’
Curve.
Equipment / Bulk items follow up with Procurement team as per site (ROS)
requirement.
Participation in Project Review meeting with Client and Contractor.
EXPERIENCE WITH SAUDI ARABIAN SAIPEM LIMITED, SAUDI ARABIA:
Project : Water Injection Pump Station (WIPS) -On Shore
Client : Saudi Aramco, Saudi Arabia
Duration : Jun 2007 to Aug 2008
Description:
This is one of the expansion Oil & Gas project for Saudi Aramco,
Revamping of existing Turbines,
New Turbine Installation & Civil Buildings,
Replace existing corroded pipes and New Pipe supports & Pipe Installation
My Contribution:
As a Planning Engineer, was responsible for building up the consolidated overall
planning and control the EPC detailed planning for the WIPS project ($ 600 M) in Kingdom of
Saudi Arabia
Preparing Project Plan & Schedule.
To prepare the Critical path analysis and Look Ahead schedules.
Preparing Manpower Histograms and Progress Curves,
Preparing Daily, Weekly & Monthly Report
Coordinating with Procurement and update the material Expedite date at site,
Invoice Preparation and get approvals from Client.
Project Review meeting with Client and Contractors.
5. EXPERIENCE WITH ESSAR CONSTRUCTION (I) LIMITED, SURAT:
Project : Steel Plant Expansion Project (4.6 MTPA)
Client : Essar Steel Plant, Hazira
Duration : 14th
July 2004 to 18th
Jun 2007
Description:
This is one part of the Essar Steel Expansion projects. It includes Electric Arc
Furnace, RH Degasser Unit, Caster plant, Plate shearing line&Material handling
conveyors System.
My Contribution:
As a Planning Engineer, was responsible for
Preparing Project Plan & Schedule
Preparing Daily, Weekly & Monthly Plan, Progress monitoring & Co-ordination
Preparing Manpower Histograms and Progress Curves
Coordination with site in all construction and procurement (Plates, Rolled Sections,
Pipes and pipefitting, Fasteners etc) related activities.
Liaison with client & Sub-Contracts for execution of project.
EXPERIENCE WITH JACKSONS FABRICATORS PVT LIMITED, SURAT:
Project : Fabrication of 250MT Pressure Vessels
Client : SIDEM Consultant, Ras-Al Khaimah, UAE
Description:
Fabrication of Pressure Vessels (Stainless Steel) to convert salt water to soft water
as per requirement of Ras-Al Khaimah, UAE.
Educational Details:
Degree Year Institution Board of Control Grade
M.B.A
(Project Management)
2011
Alagappa University,
Karaigudi
Alagappa University,
Karaigudi
First Class
B.E.
(Mechanical Engineer)
2003
Coimbatore Institute of
Technology, Coimbatore
Bharathiar University,
Coimbatore.
First Class
with
Distinction
Passport Details:
Passport No : Z2632939
Date of Expiry : 23-06-2023
6. Personal Details:
D.O.B : 19.06.1981
Language's Known : English, Hindi, Tamil, Telugu and Malayalam
Marital Status : Married
Nationality : Indian
Current Address : Plot No:71 A, Flat-F4, Chozhan Malli Apartments,
Varadharajan Street, Nehru Nagar,
Chrompet, Chennai-44. Ph: 044-22235204
DECLARATION:
I hereby declare that the information furnished by me as above is true to the best of
my knowledge and no information or details have been intentionally hidden.
R.DHANASEKARAN