Precast/Prefabricated Structures
Presented by
Nishant Kumar
Introduction
Building construction is an ancient human activity. It
began with the purely functional need for a controlled
environment to moderate the effects of climate.
Constructed shelters were one means by which human
beings were able to adapt themselves to a wide variety
of climates and become a global species
Precasting/Prefabrication
• Prefabrication is the process of assembling components of a
structure in a factory or other manufacturing site and transporting
these complete or sub assemblies to the construction site.
• The work is carried out in two stages.
1. Casting, curing
2. Transportation and erection in process
Casting Curing
Transportation Erection
Concept of Precasting
1. Producing large quantity of structure and shipping them to
site
2. Independent of weather condition
3. Hardened before being used on site
4. Casted according to the required size and shape
5. Casted in the factory conditions or controlled weather
6. Casted in the moulds
Precast Components
• Precast beams
1. Internal beams
• support for the slab on the both sides
• Used Internally
2. External beams
• Support for the slab only in one side
• Used on the edges of structure.
Precast Components
• Precast beams
1. Internal beams
• Precast beams
2. External beams
Precast Components
• Precast column
1. Edge Column
edge column can support 3 beams
2. Internal Column
internal column can support 4 beams
3. Corner column
corner column can support 2 beams
• Precast column
Precast Components
• Precast Slab
1. Hollow cored slab
2. Solid plate slab
2. Double tee slab
3. Single tee slab
Precast Components
• Precast Slab
Precast Construction System
1. Large panel system(fig.1)
2. Frame system(fig.2)
3. Slab column system(fig.3)
Fig.(1) Fig.(2) Fig.(3)
Connection between precast
components
There are three types of connection to
connect precast component with each other.
1. Column to column connection.
2. Beam to column connection.
3. Slab to beam connection.
Column to column connection
Metal bearing plates and embedded anchor bolts are cast into the ends of the columns.
After the columns are mechanically joined, the connection is grouted to provide full
bearing between elements and protect the metal components from fire and corrosion.
Beam to column connection
Beams are set on bearing pads on the column corbels. Steel angles are welded to metal
plates cast into the beams and columns and the joint is grouted solid.
Slab to beam connection
Hollow core slabs are set on bearing pads on precast beams. Steel reinforcing bars are
in inserted into the slab keyways to span the joint. The joint is grouted solid. The slab
may remain untopped as shown, or topped with several inches of cast in place concrete
Slab to beam connection
Why precast not cast in situ ?
• Quality can be controlled and monitored much more easily
• Weather is eliminated as a factor-you can cast in any
weather and get the same results
• Less labour is required and that labour can be less skilled
• On site, precast can be installed immediately
• The precast structures can be dismantled, when required
and they can then be suitably used elsewhere.
Thank you
Presented by
NishantKumar
10BTD5010317

More Related Content

What's hot

Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
Aishwarya Deopujari
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
AbhishekM45
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
Shailja km
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
Boopathi Raja
 
Pre stressed concrete construction
Pre stressed concrete constructionPre stressed concrete construction
Pre stressed concrete construction
JenilPatel22
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
Eyad Reda
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
Ravi Savani
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
Bilal Ansari
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete9833356555
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
Kush Agarwal
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
Sofia Rajesh
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
Akshay Revekar
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
Rajesh Burde
 
Precast structure
Precast structurePrecast structure
Precast structure
piyush9392
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
Karthik Suresh
 
Pre-stressed concrete
Pre-stressed concrete Pre-stressed concrete
Pre-stressed concrete
aishwaryasanap
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication system
Arun Arun
 

What's hot (20)

Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
 
Pre stressed concrete construction
Pre stressed concrete constructionPre stressed concrete construction
Pre stressed concrete construction
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Precast structure
Precast structurePrecast structure
Precast structure
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
Pre-stressed concrete
Pre-stressed concrete Pre-stressed concrete
Pre-stressed concrete
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication system
 

Similar to Precast and Prefabricated components and structures and the connection between them.

Special structure
Special structureSpecial structure
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
Manisha Singh
 
B tech individual report
B tech individual reportB tech individual report
B tech individual reportong93
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
Jy Chong
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
Ong Shi Hui
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
ijsrd.com
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
chongyih2
 
Precast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examplesPrecast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examples
SayedaAmrin
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
Hanzlahakhlaq
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered building
AnchitSharma17
 
Lectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptxLectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptx
2020CEB005POTNURUSAI
 
Comparitive study on rcc and composite (cft) multi storeyed buildings
Comparitive study on rcc and composite (cft) multi storeyed buildingsComparitive study on rcc and composite (cft) multi storeyed buildings
Comparitive study on rcc and composite (cft) multi storeyed buildings
eSAT Journals
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
Vinayak247538
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
LokeswarSaha1
 
various connection of steel structure
various connection of steel structurevarious connection of steel structure
various connection of steel structure
mridupawan khanikar
 
national building code
national building codenational building code
national building code
Ruhiya Garg
 
Long Span Structures
Long Span StructuresLong Span Structures
Long Span Structures
RishabhJain572815
 
slides construction engineering 2024.pptx
slides construction engineering 2024.pptxslides construction engineering 2024.pptx
slides construction engineering 2024.pptx
nishalini16
 
Lecture 3 AP and RC MCEM.pptx
Lecture 3 AP and RC MCEM.pptxLecture 3 AP and RC MCEM.pptx
Lecture 3 AP and RC MCEM.pptx
AbdulqadeerZardari
 

Similar to Precast and Prefabricated components and structures and the connection between them. (20)

Special structure
Special structureSpecial structure
Special structure
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
 
B tech individual report
B tech individual reportB tech individual report
B tech individual report
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Precast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examplesPrecast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examples
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
Presentation
PresentationPresentation
Presentation
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered building
 
Lectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptxLectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptx
 
Comparitive study on rcc and composite (cft) multi storeyed buildings
Comparitive study on rcc and composite (cft) multi storeyed buildingsComparitive study on rcc and composite (cft) multi storeyed buildings
Comparitive study on rcc and composite (cft) multi storeyed buildings
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
various connection of steel structure
various connection of steel structurevarious connection of steel structure
various connection of steel structure
 
national building code
national building codenational building code
national building code
 
Long Span Structures
Long Span StructuresLong Span Structures
Long Span Structures
 
slides construction engineering 2024.pptx
slides construction engineering 2024.pptxslides construction engineering 2024.pptx
slides construction engineering 2024.pptx
 
Lecture 3 AP and RC MCEM.pptx
Lecture 3 AP and RC MCEM.pptxLecture 3 AP and RC MCEM.pptx
Lecture 3 AP and RC MCEM.pptx
 

Recently uploaded

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 

Precast and Prefabricated components and structures and the connection between them.

  • 2. Introduction Building construction is an ancient human activity. It began with the purely functional need for a controlled environment to moderate the effects of climate. Constructed shelters were one means by which human beings were able to adapt themselves to a wide variety of climates and become a global species
  • 3. Precasting/Prefabrication • Prefabrication is the process of assembling components of a structure in a factory or other manufacturing site and transporting these complete or sub assemblies to the construction site. • The work is carried out in two stages. 1. Casting, curing 2. Transportation and erection in process
  • 6. Concept of Precasting 1. Producing large quantity of structure and shipping them to site 2. Independent of weather condition 3. Hardened before being used on site 4. Casted according to the required size and shape 5. Casted in the factory conditions or controlled weather 6. Casted in the moulds
  • 7. Precast Components • Precast beams 1. Internal beams • support for the slab on the both sides • Used Internally 2. External beams • Support for the slab only in one side • Used on the edges of structure.
  • 8. Precast Components • Precast beams 1. Internal beams • Precast beams 2. External beams
  • 9. Precast Components • Precast column 1. Edge Column edge column can support 3 beams 2. Internal Column internal column can support 4 beams 3. Corner column corner column can support 2 beams
  • 11. Precast Components • Precast Slab 1. Hollow cored slab 2. Solid plate slab 2. Double tee slab 3. Single tee slab
  • 13. Precast Construction System 1. Large panel system(fig.1) 2. Frame system(fig.2) 3. Slab column system(fig.3) Fig.(1) Fig.(2) Fig.(3)
  • 14. Connection between precast components There are three types of connection to connect precast component with each other. 1. Column to column connection. 2. Beam to column connection. 3. Slab to beam connection.
  • 15. Column to column connection Metal bearing plates and embedded anchor bolts are cast into the ends of the columns. After the columns are mechanically joined, the connection is grouted to provide full bearing between elements and protect the metal components from fire and corrosion.
  • 16. Beam to column connection Beams are set on bearing pads on the column corbels. Steel angles are welded to metal plates cast into the beams and columns and the joint is grouted solid.
  • 17. Slab to beam connection Hollow core slabs are set on bearing pads on precast beams. Steel reinforcing bars are in inserted into the slab keyways to span the joint. The joint is grouted solid. The slab may remain untopped as shown, or topped with several inches of cast in place concrete
  • 18. Slab to beam connection
  • 19. Why precast not cast in situ ? • Quality can be controlled and monitored much more easily • Weather is eliminated as a factor-you can cast in any weather and get the same results • Less labour is required and that labour can be less skilled • On site, precast can be installed immediately • The precast structures can be dismantled, when required and they can then be suitably used elsewhere.