1) Soil testing was conducted for a construction project including boreholes up to 10m depth, standard penetration tests, and direct shear tests. 2) Five boreholes were drilled using rotary methods, with standard penetration tests performed every 1m to assess soil strength. No groundwater was found up to 10m. 3) Laboratory tests on soil samples included moisture content, specific gravity, dry density, Atterberg limits, proctor, and direct shear tests to determine soil properties and bearing capacity for foundation design.