The 2008 NEC establishes very specific requirements in order to ensure
continuity of power for a fire pump. NEC 695.4(B) permits an
overcurrent device between the remote power source and the fire pump
controller or transfer switch. It even gets more specific about selecting
and sizing the overcurrent device between the generator and the fire
pump controller.
…Overcurrent protective devices between an on-site standby
generator and a fire pump controller shall be selected and sized
according to 430.62 to provide short-circuit protection only…
A common misunderstanding is that “short-circuit protection only” is equated
to “instantaneous trip circuit breaker.” This drives an incorrect specification
for equipment which establishes an NEC compliance issue. During the
development of the 2002 NEC a proposal was made to permit
instantaneous trip circuit breakers for this requirement in the NEC. After
many comments explaining that instantaneous devices are Recognized
Components (Not Listed) and do not have a marked short-circuit current
rating by themselves, NEC Code Panel 15 rejected the idea of an
instantaneous circuit breaker for this application. The entire discussion can
be found in the Report on Comments for the 2002 NEC. NEC 430.52(C)(3)
also reinforces this same restriction on the instantaneous trip circuit breaker
where it is only permitted as part of a listed combination motor controller.
Sizing the Short Circuit Protective Device
for a Fire Pump on a Generator
How do I size the circuit breaker for a generator to comply with
NEC 695.4(B)? NEC 695.4(B) points back to NEC 430.62 for sizing the
overcurrent device for the generator fed fire pump. Remember that if the fire
pump is fed by a service, the circuit breaker is sized to carry locked rotor
(approx 6 times FLC) indefinitely. Where a generator serves the fire pump,
NEC 430.62 permits you to use the values in Table 430.52 instead of setting
the circuit breaker at locked rotor (approx 6 times FLC). Table 430.52 sizes
the circuit breaker at a maximum of 250 percent of the largest motor. Then
the FLC of all the other motors (jockey pumps) that are being fed by the
generator must be added.
NEC®
Article 695 requires careful reading to ensure compliance of the fire
pump installation is addressed.
Date: 1/2008
Author: Alan Manche
Document Number: 0100DB0711
Cedar Rapids, Iowa, USA
www.us.schneider-electric.com/codes
Keywords: Fire Pump,
Instantaneous,
Circuit Breaker,
NEC 695
Fire Pump Circuit Breaker Feeders 0100DB0711
Electrical Shortz Date: 1/2008
“Electrical Shortz” are produced by the Schneider Electric North America Codes and
Standards Group. These documents provide general guidance on a specific issue.
Circumstances regarding particular installation issues may need furter consideration.
© 2008 Schneider Electric All Rights Reserved
Schneider Electric USA
3700 6th Street S.W.
Cedar Rapids, Iowa 52404 USA
1-888-SquareD (1-888-778-2733)
www.us.SquareD.com
For More Information: For more information, see the following references:
2008 NEC®
Sections 430.52, 430.62 and 695.4
Visit the Schneider Electric North America
Codes and Standards Electrical Shortz website: www.us.schneider-electric.com/codes/industrystandards/publications/electricalshortz

More Related Content

What's hot

AUTOMATIC BOTTLE FILLING
AUTOMATIC BOTTLE FILLING AUTOMATIC BOTTLE FILLING
AUTOMATIC BOTTLE FILLING
rehaan ukaye
 
9. aircraft electrical systems
9. aircraft electrical systems9. aircraft electrical systems
9. aircraft electrical systems
Tauseef khan
 
Battery electric vehicle ppt
Battery electric vehicle pptBattery electric vehicle ppt
Battery electric vehicle ppt
nehachandel23
 
Effect of bird strike on Jet Engine
Effect of bird strike on Jet EngineEffect of bird strike on Jet Engine
Effect of bird strike on Jet Engine
Mahendra Gehlot
 
Electrical Isolation procedure onboard ship
Electrical Isolation procedure onboard shipElectrical Isolation procedure onboard ship
Electrical Isolation procedure onboard ship
Shoaib Ahmed
 
Gear shifter
Gear shifterGear shifter
Gear shifter
PRATHAMESH DESHPANDE
 
Air conditioning in indian railways PEE
Air conditioning in indian railways PEEAir conditioning in indian railways PEE
Air conditioning in indian railways PEE
irkportal
 
Electric vehicle batteries
Electric vehicle batteriesElectric vehicle batteries
Electric vehicle batteries
Justin Sunny
 
Hybrid engine
Hybrid engineHybrid engine
Hybrid engine
Craig Kielb
 
Electric Vehicle University - 103 EV ARCHITECTURE, COMPONENTS
Electric Vehicle University - 103 EV ARCHITECTURE, COMPONENTSElectric Vehicle University - 103 EV ARCHITECTURE, COMPONENTS
Electric Vehicle University - 103 EV ARCHITECTURE, COMPONENTS
EVANNEX Aftermarket Tesla Accessories
 
Engine management system
Engine management systemEngine management system
Engine management system
Nizam Anuar
 
Hydro-Pneumatic Suspension with Intelligent Active Suspensioning System
Hydro-Pneumatic Suspension with Intelligent Active Suspensioning SystemHydro-Pneumatic Suspension with Intelligent Active Suspensioning System
Hydro-Pneumatic Suspension with Intelligent Active Suspensioning System
ijtsrd
 
Internship ppt format (1) (1).pptx
Internship ppt format (1) (1).pptxInternship ppt format (1) (1).pptx
Internship ppt format (1) (1).pptx
JagadeeshJaya
 
Plc based automatic bottle filling system
Plc based automatic bottle filling systemPlc based automatic bottle filling system
Plc based automatic bottle filling system
kl university
 
automotive 101 presentation
automotive 101 presentationautomotive 101 presentation
automotive 101 presentation
Geotermal Informative TV
 
Flying windmills Presentation
Flying windmills PresentationFlying windmills Presentation
Flying windmills Presentation
Himanshu Rajput
 
EASA Part 66 Module 5.10 : Fibre Optic
EASA Part 66 Module 5.10 : Fibre OpticEASA Part 66 Module 5.10 : Fibre Optic
EASA Part 66 Module 5.10 : Fibre Optic
soulstalker
 
Architecture of EV and HEV
Architecture of EV and HEVArchitecture of EV and HEV
Architecture of EV and HEV
Venkatesh Vulavala
 
SRS systems
SRS systemsSRS systems
SRS systems
Craig Kielb
 

What's hot (20)

AUTOMATIC BOTTLE FILLING
AUTOMATIC BOTTLE FILLING AUTOMATIC BOTTLE FILLING
AUTOMATIC BOTTLE FILLING
 
9. aircraft electrical systems
9. aircraft electrical systems9. aircraft electrical systems
9. aircraft electrical systems
 
Battery electric vehicle ppt
Battery electric vehicle pptBattery electric vehicle ppt
Battery electric vehicle ppt
 
Effect of bird strike on Jet Engine
Effect of bird strike on Jet EngineEffect of bird strike on Jet Engine
Effect of bird strike on Jet Engine
 
Electrical Isolation procedure onboard ship
Electrical Isolation procedure onboard shipElectrical Isolation procedure onboard ship
Electrical Isolation procedure onboard ship
 
Gear shifter
Gear shifterGear shifter
Gear shifter
 
Air conditioning in indian railways PEE
Air conditioning in indian railways PEEAir conditioning in indian railways PEE
Air conditioning in indian railways PEE
 
Electric vehicle batteries
Electric vehicle batteriesElectric vehicle batteries
Electric vehicle batteries
 
Hybrid engine
Hybrid engineHybrid engine
Hybrid engine
 
Electric Vehicle University - 103 EV ARCHITECTURE, COMPONENTS
Electric Vehicle University - 103 EV ARCHITECTURE, COMPONENTSElectric Vehicle University - 103 EV ARCHITECTURE, COMPONENTS
Electric Vehicle University - 103 EV ARCHITECTURE, COMPONENTS
 
Engine management system
Engine management systemEngine management system
Engine management system
 
Hydro-Pneumatic Suspension with Intelligent Active Suspensioning System
Hydro-Pneumatic Suspension with Intelligent Active Suspensioning SystemHydro-Pneumatic Suspension with Intelligent Active Suspensioning System
Hydro-Pneumatic Suspension with Intelligent Active Suspensioning System
 
Internship ppt format (1) (1).pptx
Internship ppt format (1) (1).pptxInternship ppt format (1) (1).pptx
Internship ppt format (1) (1).pptx
 
Plc based automatic bottle filling system
Plc based automatic bottle filling systemPlc based automatic bottle filling system
Plc based automatic bottle filling system
 
automotive 101 presentation
automotive 101 presentationautomotive 101 presentation
automotive 101 presentation
 
Flying windmills Presentation
Flying windmills PresentationFlying windmills Presentation
Flying windmills Presentation
 
EASA Part 66 Module 5.10 : Fibre Optic
EASA Part 66 Module 5.10 : Fibre OpticEASA Part 66 Module 5.10 : Fibre Optic
EASA Part 66 Module 5.10 : Fibre Optic
 
Basic plc
Basic plcBasic plc
Basic plc
 
Architecture of EV and HEV
Architecture of EV and HEVArchitecture of EV and HEV
Architecture of EV and HEV
 
SRS systems
SRS systemsSRS systems
SRS systems
 

Similar to Size a circuit breaker for a fire pump

Fire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution AspectsFire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution Aspects
James S Nasby
 
Selective Coordination
Selective CoordinationSelective Coordination
Selective Coordination
michaeljmack
 
Understanding type 2 coordinated protection in motor branch circuit
Understanding type 2 coordinated protection in motor branch circuitUnderstanding type 2 coordinated protection in motor branch circuit
Understanding type 2 coordinated protection in motor branch circuit
Bassam Gomaa
 
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Franco Moriconi
 
Nec emergency requirements
Nec emergency requirementsNec emergency requirements
Nec emergency requirements
michaeljmack
 
Power Supplies for Electric Motor Driven Fire Pumps
Power Supplies for Electric Motor Driven Fire PumpsPower Supplies for Electric Motor Driven Fire Pumps
Power Supplies for Electric Motor Driven Fire Pumps
James S Nasby
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
Solar Reference
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41Habib Ali Khan
 
Schneider Harmonics abstract IEEE_STD_519_1992vs2014.pdf
Schneider Harmonics abstract IEEE_STD_519_1992vs2014.pdfSchneider Harmonics abstract IEEE_STD_519_1992vs2014.pdf
Schneider Harmonics abstract IEEE_STD_519_1992vs2014.pdf
Sekar80689
 
Improvement of Transient Stability in Doubly Fed Induction Wind Generator usi...
Improvement of Transient Stability in Doubly Fed Induction Wind Generator usi...Improvement of Transient Stability in Doubly Fed Induction Wind Generator usi...
Improvement of Transient Stability in Doubly Fed Induction Wind Generator usi...
IRJET Journal
 
Life Cycle of Big Data Analysis by using MapReduce Algorithm
Life Cycle of Big Data Analysis by using MapReduce AlgorithmLife Cycle of Big Data Analysis by using MapReduce Algorithm
Life Cycle of Big Data Analysis by using MapReduce Algorithm
IRJET Journal
 
3.10 eet in_electrical_systems[1] - copy
3.10 eet in_electrical_systems[1] - copy3.10 eet in_electrical_systems[1] - copy
3.10 eet in_electrical_systems[1] - copybrbbanro
 
3.10 eet in electrical systems
3.10 eet in electrical systems3.10 eet in electrical systems
3.10 eet in electrical systemsAnup Kiran
 
Converting Solidly to HRG
Converting Solidly to HRGConverting Solidly to HRG
Converting Solidly to HRGEdmundo Perich
 
Application data explusion links
Application data explusion linksApplication data explusion links
Application data explusion links
ing_eliali4748
 
PT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enPT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enMunir Kaderbhai
 
EV Charger SMPS Based.pdf
EV Charger SMPS Based.pdfEV Charger SMPS Based.pdf
EV Charger SMPS Based.pdf
LalitKapoor7
 

Similar to Size a circuit breaker for a fire pump (20)

Fire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution AspectsFire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution Aspects
 
NAPT-5675-EN
NAPT-5675-ENNAPT-5675-EN
NAPT-5675-EN
 
NAPT-5675-EN
NAPT-5675-ENNAPT-5675-EN
NAPT-5675-EN
 
Selective Coordination
Selective CoordinationSelective Coordination
Selective Coordination
 
Understanding type 2 coordinated protection in motor branch circuit
Understanding type 2 coordinated protection in motor branch circuitUnderstanding type 2 coordinated protection in motor branch circuit
Understanding type 2 coordinated protection in motor branch circuit
 
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
 
Nec emergency requirements
Nec emergency requirementsNec emergency requirements
Nec emergency requirements
 
Power Supplies for Electric Motor Driven Fire Pumps
Power Supplies for Electric Motor Driven Fire PumpsPower Supplies for Electric Motor Driven Fire Pumps
Power Supplies for Electric Motor Driven Fire Pumps
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
 
Slide 1.pdf
Slide 1.pdfSlide 1.pdf
Slide 1.pdf
 
Schneider Harmonics abstract IEEE_STD_519_1992vs2014.pdf
Schneider Harmonics abstract IEEE_STD_519_1992vs2014.pdfSchneider Harmonics abstract IEEE_STD_519_1992vs2014.pdf
Schneider Harmonics abstract IEEE_STD_519_1992vs2014.pdf
 
Improvement of Transient Stability in Doubly Fed Induction Wind Generator usi...
Improvement of Transient Stability in Doubly Fed Induction Wind Generator usi...Improvement of Transient Stability in Doubly Fed Induction Wind Generator usi...
Improvement of Transient Stability in Doubly Fed Induction Wind Generator usi...
 
Life Cycle of Big Data Analysis by using MapReduce Algorithm
Life Cycle of Big Data Analysis by using MapReduce AlgorithmLife Cycle of Big Data Analysis by using MapReduce Algorithm
Life Cycle of Big Data Analysis by using MapReduce Algorithm
 
3.10 eet in_electrical_systems[1] - copy
3.10 eet in_electrical_systems[1] - copy3.10 eet in_electrical_systems[1] - copy
3.10 eet in_electrical_systems[1] - copy
 
3.10 eet in electrical systems
3.10 eet in electrical systems3.10 eet in electrical systems
3.10 eet in electrical systems
 
Converting Solidly to HRG
Converting Solidly to HRGConverting Solidly to HRG
Converting Solidly to HRG
 
Application data explusion links
Application data explusion linksApplication data explusion links
Application data explusion links
 
PT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enPT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-en
 
EV Charger SMPS Based.pdf
EV Charger SMPS Based.pdfEV Charger SMPS Based.pdf
EV Charger SMPS Based.pdf
 

More from Bassam Gomaa

Power management for a changing world
Power management for a changing worldPower management for a changing world
Power management for a changing world
Bassam Gomaa
 
Digital Twin In Hospitals
Digital Twin In HospitalsDigital Twin In Hospitals
Digital Twin In Hospitals
Bassam Gomaa
 
Power tag Catalogue
Power tag CataloguePower tag Catalogue
Power tag Catalogue
Bassam Gomaa
 
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building SolutionValve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Bassam Gomaa
 
Product selection guide - Ecostruxure building Solution
Product selection guide - Ecostruxure building SolutionProduct selection guide - Ecostruxure building Solution
Product selection guide - Ecostruxure building Solution
Bassam Gomaa
 
The impact of power management on building performance and energy costs
The impact of power management on building performance and energy costsThe impact of power management on building performance and energy costs
The impact of power management on building performance and energy costs
Bassam Gomaa
 
Seven steps to reduce the risk of infectious disease in hospitals
Seven steps to reduce the risk of infectious disease in hospitalsSeven steps to reduce the risk of infectious disease in hospitals
Seven steps to reduce the risk of infectious disease in hospitals
Bassam Gomaa
 
Leveraging cloud based building management systems for multi-site facilities
Leveraging cloud based building management systems for multi-site facilitiesLeveraging cloud based building management systems for multi-site facilities
Leveraging cloud based building management systems for multi-site facilities
Bassam Gomaa
 

More from Bassam Gomaa (8)

Power management for a changing world
Power management for a changing worldPower management for a changing world
Power management for a changing world
 
Digital Twin In Hospitals
Digital Twin In HospitalsDigital Twin In Hospitals
Digital Twin In Hospitals
 
Power tag Catalogue
Power tag CataloguePower tag Catalogue
Power tag Catalogue
 
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building SolutionValve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
 
Product selection guide - Ecostruxure building Solution
Product selection guide - Ecostruxure building SolutionProduct selection guide - Ecostruxure building Solution
Product selection guide - Ecostruxure building Solution
 
The impact of power management on building performance and energy costs
The impact of power management on building performance and energy costsThe impact of power management on building performance and energy costs
The impact of power management on building performance and energy costs
 
Seven steps to reduce the risk of infectious disease in hospitals
Seven steps to reduce the risk of infectious disease in hospitalsSeven steps to reduce the risk of infectious disease in hospitals
Seven steps to reduce the risk of infectious disease in hospitals
 
Leveraging cloud based building management systems for multi-site facilities
Leveraging cloud based building management systems for multi-site facilitiesLeveraging cloud based building management systems for multi-site facilities
Leveraging cloud based building management systems for multi-site facilities
 

Recently uploaded

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 

Recently uploaded (20)

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 

Size a circuit breaker for a fire pump

  • 1. 1 ElectricalElectrical ShortzShortz Fire Pump Circuit Breaker Feeders Fire Pump Circuits and Instantaneous Trip Circuit Breakers The 2008 NEC establishes very specific requirements in order to ensure continuity of power for a fire pump. NEC 695.4(B) permits an overcurrent device between the remote power source and the fire pump controller or transfer switch. It even gets more specific about selecting and sizing the overcurrent device between the generator and the fire pump controller. …Overcurrent protective devices between an on-site standby generator and a fire pump controller shall be selected and sized according to 430.62 to provide short-circuit protection only… A common misunderstanding is that “short-circuit protection only” is equated to “instantaneous trip circuit breaker.” This drives an incorrect specification for equipment which establishes an NEC compliance issue. During the development of the 2002 NEC a proposal was made to permit instantaneous trip circuit breakers for this requirement in the NEC. After many comments explaining that instantaneous devices are Recognized Components (Not Listed) and do not have a marked short-circuit current rating by themselves, NEC Code Panel 15 rejected the idea of an instantaneous circuit breaker for this application. The entire discussion can be found in the Report on Comments for the 2002 NEC. NEC 430.52(C)(3) also reinforces this same restriction on the instantaneous trip circuit breaker where it is only permitted as part of a listed combination motor controller. Sizing the Short Circuit Protective Device for a Fire Pump on a Generator How do I size the circuit breaker for a generator to comply with NEC 695.4(B)? NEC 695.4(B) points back to NEC 430.62 for sizing the overcurrent device for the generator fed fire pump. Remember that if the fire pump is fed by a service, the circuit breaker is sized to carry locked rotor (approx 6 times FLC) indefinitely. Where a generator serves the fire pump, NEC 430.62 permits you to use the values in Table 430.52 instead of setting the circuit breaker at locked rotor (approx 6 times FLC). Table 430.52 sizes the circuit breaker at a maximum of 250 percent of the largest motor. Then the FLC of all the other motors (jockey pumps) that are being fed by the generator must be added. NEC® Article 695 requires careful reading to ensure compliance of the fire pump installation is addressed. Date: 1/2008 Author: Alan Manche Document Number: 0100DB0711 Cedar Rapids, Iowa, USA www.us.schneider-electric.com/codes Keywords: Fire Pump, Instantaneous, Circuit Breaker, NEC 695
  • 2. Fire Pump Circuit Breaker Feeders 0100DB0711 Electrical Shortz Date: 1/2008 “Electrical Shortz” are produced by the Schneider Electric North America Codes and Standards Group. These documents provide general guidance on a specific issue. Circumstances regarding particular installation issues may need furter consideration. © 2008 Schneider Electric All Rights Reserved Schneider Electric USA 3700 6th Street S.W. Cedar Rapids, Iowa 52404 USA 1-888-SquareD (1-888-778-2733) www.us.SquareD.com For More Information: For more information, see the following references: 2008 NEC® Sections 430.52, 430.62 and 695.4 Visit the Schneider Electric North America Codes and Standards Electrical Shortz website: www.us.schneider-electric.com/codes/industrystandards/publications/electricalshortz