SlideShare a Scribd company logo
1 of 24
Site Report: Measurement 1
Building Materials
Construction Technology
Lecturers: Sr Ang Fuey Lin
Hasmanira Mokhtar
Leong Boon Tik
Muhd. Syafiq bin Hj Abd Zariful
0314702
Bachelor in Quantity Surveying
MarchIntake 2014
Acknowledgement
First, i would like to express my sincere gratitude to Ms Ang
Fuey Lin, Mr Leong Boon Tik, and Ms Hasmanira Mokhtar for
guiding me and my friends, giving us some useful tips for this
study and also teaching us before, during, and after the site trip
which has helped me to complete this project more efficiently.
I would also like to thank to the contractor and every other
person involved in the site trip for taking their time to guide and
teach us students during our visit.
Introduction
We were given an assignment that invloves the three modules that is Measurement 1,
Construction Technology 1, and Building Materials, where every individual needs to
write a report on a site visit to a construction site. Ms Ang Fuey Lin organized the site
visit for us students to visit there on the 20th of June 2014 (Friday). The construction
site is located at Jalan Kelang Lama in Mukim Petaling.
About 60 students attended the site visit where everyone needs to be there outside the
site at the promised time 8:30 AM.
After everyone is assembled Ms Ang then guided us to a place with small buildings
around the construction site where the buildings are used exclusively for the
accommodation of workers in which we are to meet with the person in charge, which
is the contractor, to brief us on this site visit. Throughout the whole trip the contractor
and the safety officer gave us detailed explanations of the construction time by time in
every session. My friends and i are allowed to ask questions from them in which we
were able to get as much information as to understand more about the building. We
went as far as going to the upper floors from the lower ground level and then return
back to the ground floor by going down through the scaffolding. After that all of us
went into the meeting room for more discussion and to hold Question & Answer
session with the contractor. That is considered as the last thing that we will do before
the site trip ended. Before we leave, all of us students expressed our gratitude to the
contractor for allowing us to conduct this site trip and after that we took a group
picture before going back to Taylor's university with the bus provided.
Objective
To let us experience the actual working environment as a Quantity Surveyor
understanding the situations in dealing with unsure circumstances such as weather
conditions where at times some workers stop working when it happens and other risks
that may happen on site, this will help us where we can adapt easily once we start to
do work as a Quantity Surveyor in the near future.
To gain more knowledge in understanding what we've known from what we have
studied and also undertanding new things that we haven't studied before, which we
can see in real life at the construction site such that it can increase our knowledge on
the basic construction process by observing the workers and other informations that
are carried on site
Observe the usage of the construction equipment on site including mechanical plants.
To have an understanding of how the building is constructed in relating with the
drawings.
To understand and be aware of the importance of safety on site where we need to take
care by following the safety precautions and other instructions that will help us avoid
any accidents or injuries that can happen in the future once we enter into a constuction
site.
Details of the project
-25 storeys
-to be completed next november
-type of foundation: piling
-project cost: approximately RM100million
-2 basement floors of carpark, levels 1-2 for commercial ares, ;evel 3-6 for another
carpark area, levels 7-24 for apartments
-AIKBEE TIMBERS (employer), LT LEONG SEKUTU (architect), PERUNDING
MAJUJAYA (civil & structural engineer), KEW & ASSOCIATES (mechanical &
electrical engineer), PCM COST PERUNDING (quantity surveyor), ENCORP
CONSTRUCT (main contractor)
Content/Technical observation
This is the view of the site that i took when we firstarrived from he bus. The
construction is already in the structural works progress where you can see columns
and scaffoldings.
When we approach to one of the temporary buildings i saw these posters to tell us
about the main contractor's company that also includes some safety precautions as a
reminder of how important it is such that we always must wear a safety helmet and
other things when visiting a site.
This building is an accomodation for workers in which this is an office and it is where
we met the person in charge of our trip that is the contractor
Beside the officeis a schedule
where it shows a schedule,
rebar, casting, material
delivery, tower crane usage
and the contact number of the
relevant people
Based on my study, i quickly
identifued this as one of those
'temporary works' that i've
learned in construction
technology, These toilets are
mostly found outside the
buildings where this one is
taken right beside the water
storage
This symbol indicates that
there's a fire extinguisher
inside which will help in
case of an emergency where
you need to use it
Before we go in further in the building the contractor gives us a
short brief about safety where it is what they have to do every
time when there is a visitor.
This scaffolding is placed at the center
of the building (void) where it started
from the ground floor and leads to
higher floors. From what i've heard, the
void that is located there is to be used
for escalators. It will be constructed
once structural works are complete.
Steel bars arranged together
waiting to be used
Steel bars that are no
longer in use and is
grouped together for
recycling
Loads of timber materials waiting to be used, laid beside the building
Delivery vehicle, used to
transport materials such as
reinforcement bars
New fabric reinforcement
just delivered right when
our trip ended
Plastic and Steel
pipes found in the
building
A temporary work
for the workers
where it is found in
the 1st basement
floor. Most of the
rooms has electricity
which provides
lighting and power.
There are those
temporary works
that i've found here
which are used for
material storage and
other purposes.
Some are used for a
place for praying
(surau) for the
muslim workers
Indepent scaffolding found on the basement floor where we can see the workers
doing the plastering of the ceiling.
One of the types of temporary works. I noticed that you could find these
temporary buildings in most areas of the construction site that includes
the ground floor and the basement
Bags of cement in
the building
Pile foundation that supports the base of the building
The picture above shows the
steel bars that are gathered
on the floor waiting to be
used. Whereas the picture
on the left shows the
reinforcement bars for the
car parks
The exterior
scaffolding used to
access the floors or to
transport materials.
During the sessions we
used this scaffolding
to go down to the
ground floor
The construction workers use
the formwork to bend the bars; i
find that very interesting, it's
like another type of bar bending
methods.
Bent bars found at the upper floors
3m long pipes for
transportation of concrete,
there will need to be more
pipes added if they
transport the concrete to
the upper levels
Machine used to push the concrete along the pipe, even pushing it upward
The formwork for sides
and soffits of staircase
Water storage for the construction workers, placed outside the building and it is
used for laundry and toilets
The production of spacers, which
are used to determin the concrete
cover
This picture shows a
worker separating the
damp concrete to the right
measurement
Tower cranes used to carry
materials to the upper floors
Safety warnings
This is a temporary
office that is mostly
used for the
consultants and other
workers, as they're
so many drawings
that we found on the
table. The large table
is effectively used
for meetings and
discussions. On our
site trip, this is the
place where the
contractor holds a Q
& A session where
studentd get to ask
the contractor about
what they want to
know.
Conclusion
A site trip that lasts for about two in a half hours, i've come to understand how
important that safety is where you must always remember the safety rules and
precautions to avoid and damages or injuries such that every students that attended the
site visit wore safety helmets as instructed from the safety officer (those who doesn't
wear one will not be allowed to enter the site for safety measures). We were also told
to watch our steps as they're sometimes nails and open holes that are hard to notice on
the floor. In any case, i'm glad that we have a safety officer to brief us about it before
our trip to go inside the building.
I've also understood and was able to have a clear vision of how the construction
works where before this i was only able to understand through studies from notes or
books. The fact that there are at least one question asked from the students in every
session where the contractor answered every one of them helped an individual like me
in which he gave us some detailed explanations when answering, this was also thanks
to the students for asking some valuable questions in which we all share our
knowledge together. i was able to identify and recognize the the building components
such as the temporary works and the machineries that i see from the ones that i've
known from the notes and lecture slides. Communicating with them was a bit nervy
but as the time goes i feel very composed and was able to think clearly while not
feeling stiff or pressured, it was a great opportunity.
The site visit was an amazing experience, one of the first of many but this is one that
i'll never forget for it is the site trip that has made me understand more of the things
that i cannot even learn in class. This trip has greatly improved my knowledge in
many categories, especially knowing about the construction process. i am very
grateful for this opportunity provided for us first years.

More Related Content

Viewers also liked

Effective Meetings (Assignment)
Effective Meetings (Assignment)Effective Meetings (Assignment)
Effective Meetings (Assignment)umailaila
 
Mid term assignment of audit and assurance
Mid term assignment of audit and assuranceMid term assignment of audit and assurance
Mid term assignment of audit and assuranceArslan Akram
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgementkaranj212
 
Social psychology video assignment report
Social psychology video assignment reportSocial psychology video assignment report
Social psychology video assignment reportChin Tze Wei
 
ENT300 Business Proposal
ENT300 Business ProposalENT300 Business Proposal
ENT300 Business ProposalAlia Najiha
 
Acknowledgment
AcknowledgmentAcknowledgment
AcknowledgmentAsama Kiss
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgementhothp
 
93639430 additional-mathematics-project-work-2013
93639430 additional-mathematics-project-work-201393639430 additional-mathematics-project-work-2013
93639430 additional-mathematics-project-work-2013Rashmi R Rashmi R
 
Sample Acknowledgement of Project Report
Sample Acknowledgement of Project ReportSample Acknowledgement of Project Report
Sample Acknowledgement of Project ReportMBAnetbook.co.in
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgementferdzzz
 
Summer internship project hr mba mms
Summer internship project hr mba mmsSummer internship project hr mba mms
Summer internship project hr mba mmsSria
 
Project report on Performance Appraisal of BSNL
Project report on Performance Appraisal of BSNLProject report on Performance Appraisal of BSNL
Project report on Performance Appraisal of BSNLVipul Sachan
 
A project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in indiaA project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in indiaProjects Kart
 

Viewers also liked (20)

Example of acknowledgment
Example of acknowledgmentExample of acknowledgment
Example of acknowledgment
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgement
 
Effective Meetings (Assignment)
Effective Meetings (Assignment)Effective Meetings (Assignment)
Effective Meetings (Assignment)
 
Mid term assignment of audit and assurance
Mid term assignment of audit and assuranceMid term assignment of audit and assurance
Mid term assignment of audit and assurance
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgement
 
C Programming
C ProgrammingC Programming
C Programming
 
Social psychology video assignment report
Social psychology video assignment reportSocial psychology video assignment report
Social psychology video assignment report
 
Psychology video assignment report
Psychology video assignment reportPsychology video assignment report
Psychology video assignment report
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgement
 
ENT300 Business Proposal
ENT300 Business ProposalENT300 Business Proposal
ENT300 Business Proposal
 
GROOMING ASSIGNMENT
GROOMING ASSIGNMENTGROOMING ASSIGNMENT
GROOMING ASSIGNMENT
 
Acknowledgment
AcknowledgmentAcknowledgment
Acknowledgment
 
Acknowledgment
AcknowledgmentAcknowledgment
Acknowledgment
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgement
 
93639430 additional-mathematics-project-work-2013
93639430 additional-mathematics-project-work-201393639430 additional-mathematics-project-work-2013
93639430 additional-mathematics-project-work-2013
 
Sample Acknowledgement of Project Report
Sample Acknowledgement of Project ReportSample Acknowledgement of Project Report
Sample Acknowledgement of Project Report
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgement
 
Summer internship project hr mba mms
Summer internship project hr mba mmsSummer internship project hr mba mms
Summer internship project hr mba mms
 
Project report on Performance Appraisal of BSNL
Project report on Performance Appraisal of BSNLProject report on Performance Appraisal of BSNL
Project report on Performance Appraisal of BSNL
 
A project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in indiaA project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in india
 

Similar to Measurement assignment site report

site report
site reportsite report
site reportszelun
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1Zi Shan
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportXinYee Khoo
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site reportw ss
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visitPui San
 
Site report
Site reportSite report
Site reportvaylu
 
Site report 1 sem1
Site report 1 sem1Site report 1 sem1
Site report 1 sem1JamesMoy7
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShareYung Kai
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015Joyce HweeMin
 
Site report
Site reportSite report
Site reportYunshi94
 
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorAssignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorKai Yun Pang
 

Similar to Measurement assignment site report (20)

site report
site reportsite report
site report
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
 
Site report
Site reportSite report
Site report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
Site report
Site reportSite report
Site report
 
Site report 1 sem1
Site report 1 sem1Site report 1 sem1
Site report 1 sem1
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Site report
Site reportSite report
Site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
Site report
Site reportSite report
Site report
 
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorAssignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
 

More from Syafiq Zariful

Conference paper-11-9-2017
Conference paper-11-9-2017Conference paper-11-9-2017
Conference paper-11-9-2017Syafiq Zariful
 
Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)Syafiq Zariful
 
07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-dericSyafiq Zariful
 
Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2Syafiq Zariful
 
Research proposal final draft
Research proposal final draftResearch proposal final draft
Research proposal final draftSyafiq Zariful
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentationSyafiq Zariful
 
Community service-report-syafiq-2
Community service-report-syafiq-2Community service-report-syafiq-2
Community service-report-syafiq-2Syafiq Zariful
 
1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updatedSyafiq Zariful
 
Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4Syafiq Zariful
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2Syafiq Zariful
 
Compiled fm assignment (complete)
Compiled fm assignment (complete)Compiled fm assignment (complete)
Compiled fm assignment (complete)Syafiq Zariful
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationSyafiq Zariful
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group reportSyafiq Zariful
 
Presentation measurement part 2
Presentation measurement part 2Presentation measurement part 2
Presentation measurement part 2Syafiq Zariful
 
Bs 2 assignment presentation1
Bs 2 assignment presentation1Bs 2 assignment presentation1
Bs 2 assignment presentation1Syafiq Zariful
 

More from Syafiq Zariful (20)

Conference paper-11-9-2017
Conference paper-11-9-2017Conference paper-11-9-2017
Conference paper-11-9-2017
 
De assignment compile
De assignment compileDe assignment compile
De assignment compile
 
Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
 
Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)
 
07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric
 
Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2
 
Pp2 seminar
Pp2 seminarPp2 seminar
Pp2 seminar
 
Research proposal final draft
Research proposal final draftResearch proposal final draft
Research proposal final draft
 
Software assignment
Software assignmentSoftware assignment
Software assignment
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentation
 
Community service-report-syafiq-2
Community service-report-syafiq-2Community service-report-syafiq-2
Community service-report-syafiq-2
 
1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated
 
Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
 
Fm presentation final
Fm presentation finalFm presentation final
Fm presentation final
 
Compiled fm assignment (complete)
Compiled fm assignment (complete)Compiled fm assignment (complete)
Compiled fm assignment (complete)
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
 
Presentation measurement part 2
Presentation measurement part 2Presentation measurement part 2
Presentation measurement part 2
 
Bs 2 assignment presentation1
Bs 2 assignment presentation1Bs 2 assignment presentation1
Bs 2 assignment presentation1
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 

Measurement assignment site report

  • 1. Site Report: Measurement 1 Building Materials Construction Technology Lecturers: Sr Ang Fuey Lin Hasmanira Mokhtar Leong Boon Tik Muhd. Syafiq bin Hj Abd Zariful 0314702 Bachelor in Quantity Surveying MarchIntake 2014
  • 2.
  • 3. Acknowledgement First, i would like to express my sincere gratitude to Ms Ang Fuey Lin, Mr Leong Boon Tik, and Ms Hasmanira Mokhtar for guiding me and my friends, giving us some useful tips for this study and also teaching us before, during, and after the site trip which has helped me to complete this project more efficiently. I would also like to thank to the contractor and every other person involved in the site trip for taking their time to guide and teach us students during our visit.
  • 4. Introduction We were given an assignment that invloves the three modules that is Measurement 1, Construction Technology 1, and Building Materials, where every individual needs to write a report on a site visit to a construction site. Ms Ang Fuey Lin organized the site visit for us students to visit there on the 20th of June 2014 (Friday). The construction site is located at Jalan Kelang Lama in Mukim Petaling. About 60 students attended the site visit where everyone needs to be there outside the site at the promised time 8:30 AM. After everyone is assembled Ms Ang then guided us to a place with small buildings around the construction site where the buildings are used exclusively for the accommodation of workers in which we are to meet with the person in charge, which is the contractor, to brief us on this site visit. Throughout the whole trip the contractor and the safety officer gave us detailed explanations of the construction time by time in every session. My friends and i are allowed to ask questions from them in which we were able to get as much information as to understand more about the building. We went as far as going to the upper floors from the lower ground level and then return back to the ground floor by going down through the scaffolding. After that all of us went into the meeting room for more discussion and to hold Question & Answer session with the contractor. That is considered as the last thing that we will do before the site trip ended. Before we leave, all of us students expressed our gratitude to the contractor for allowing us to conduct this site trip and after that we took a group picture before going back to Taylor's university with the bus provided.
  • 5. Objective To let us experience the actual working environment as a Quantity Surveyor understanding the situations in dealing with unsure circumstances such as weather conditions where at times some workers stop working when it happens and other risks that may happen on site, this will help us where we can adapt easily once we start to do work as a Quantity Surveyor in the near future. To gain more knowledge in understanding what we've known from what we have studied and also undertanding new things that we haven't studied before, which we can see in real life at the construction site such that it can increase our knowledge on the basic construction process by observing the workers and other informations that are carried on site Observe the usage of the construction equipment on site including mechanical plants. To have an understanding of how the building is constructed in relating with the drawings. To understand and be aware of the importance of safety on site where we need to take care by following the safety precautions and other instructions that will help us avoid any accidents or injuries that can happen in the future once we enter into a constuction site.
  • 6. Details of the project -25 storeys -to be completed next november -type of foundation: piling -project cost: approximately RM100million -2 basement floors of carpark, levels 1-2 for commercial ares, ;evel 3-6 for another carpark area, levels 7-24 for apartments -AIKBEE TIMBERS (employer), LT LEONG SEKUTU (architect), PERUNDING MAJUJAYA (civil & structural engineer), KEW & ASSOCIATES (mechanical & electrical engineer), PCM COST PERUNDING (quantity surveyor), ENCORP CONSTRUCT (main contractor)
  • 7. Content/Technical observation This is the view of the site that i took when we firstarrived from he bus. The construction is already in the structural works progress where you can see columns and scaffoldings. When we approach to one of the temporary buildings i saw these posters to tell us about the main contractor's company that also includes some safety precautions as a reminder of how important it is such that we always must wear a safety helmet and other things when visiting a site.
  • 8. This building is an accomodation for workers in which this is an office and it is where we met the person in charge of our trip that is the contractor Beside the officeis a schedule where it shows a schedule, rebar, casting, material delivery, tower crane usage and the contact number of the relevant people Based on my study, i quickly identifued this as one of those 'temporary works' that i've learned in construction technology, These toilets are mostly found outside the buildings where this one is taken right beside the water storage
  • 9. This symbol indicates that there's a fire extinguisher inside which will help in case of an emergency where you need to use it Before we go in further in the building the contractor gives us a short brief about safety where it is what they have to do every time when there is a visitor.
  • 10. This scaffolding is placed at the center of the building (void) where it started from the ground floor and leads to higher floors. From what i've heard, the void that is located there is to be used for escalators. It will be constructed once structural works are complete. Steel bars arranged together waiting to be used Steel bars that are no longer in use and is grouped together for recycling
  • 11. Loads of timber materials waiting to be used, laid beside the building Delivery vehicle, used to transport materials such as reinforcement bars New fabric reinforcement just delivered right when our trip ended
  • 12. Plastic and Steel pipes found in the building A temporary work for the workers where it is found in the 1st basement floor. Most of the rooms has electricity which provides lighting and power. There are those temporary works that i've found here which are used for material storage and other purposes. Some are used for a place for praying (surau) for the muslim workers
  • 13. Indepent scaffolding found on the basement floor where we can see the workers doing the plastering of the ceiling. One of the types of temporary works. I noticed that you could find these temporary buildings in most areas of the construction site that includes the ground floor and the basement
  • 14.
  • 15. Bags of cement in the building Pile foundation that supports the base of the building
  • 16. The picture above shows the steel bars that are gathered on the floor waiting to be used. Whereas the picture on the left shows the reinforcement bars for the car parks
  • 17. The exterior scaffolding used to access the floors or to transport materials. During the sessions we used this scaffolding to go down to the ground floor
  • 18. The construction workers use the formwork to bend the bars; i find that very interesting, it's like another type of bar bending methods. Bent bars found at the upper floors
  • 19. 3m long pipes for transportation of concrete, there will need to be more pipes added if they transport the concrete to the upper levels
  • 20. Machine used to push the concrete along the pipe, even pushing it upward The formwork for sides and soffits of staircase
  • 21. Water storage for the construction workers, placed outside the building and it is used for laundry and toilets The production of spacers, which are used to determin the concrete cover This picture shows a worker separating the damp concrete to the right measurement
  • 22. Tower cranes used to carry materials to the upper floors Safety warnings
  • 23. This is a temporary office that is mostly used for the consultants and other workers, as they're so many drawings that we found on the table. The large table is effectively used for meetings and discussions. On our site trip, this is the place where the contractor holds a Q & A session where studentd get to ask the contractor about what they want to know.
  • 24. Conclusion A site trip that lasts for about two in a half hours, i've come to understand how important that safety is where you must always remember the safety rules and precautions to avoid and damages or injuries such that every students that attended the site visit wore safety helmets as instructed from the safety officer (those who doesn't wear one will not be allowed to enter the site for safety measures). We were also told to watch our steps as they're sometimes nails and open holes that are hard to notice on the floor. In any case, i'm glad that we have a safety officer to brief us about it before our trip to go inside the building. I've also understood and was able to have a clear vision of how the construction works where before this i was only able to understand through studies from notes or books. The fact that there are at least one question asked from the students in every session where the contractor answered every one of them helped an individual like me in which he gave us some detailed explanations when answering, this was also thanks to the students for asking some valuable questions in which we all share our knowledge together. i was able to identify and recognize the the building components such as the temporary works and the machineries that i see from the ones that i've known from the notes and lecture slides. Communicating with them was a bit nervy but as the time goes i feel very composed and was able to think clearly while not feeling stiff or pressured, it was a great opportunity. The site visit was an amazing experience, one of the first of many but this is one that i'll never forget for it is the site trip that has made me understand more of the things that i cannot even learn in class. This trip has greatly improved my knowledge in many categories, especially knowing about the construction process. i am very grateful for this opportunity provided for us first years.