LECTURE OVERVIEW
1. Water supply to high rise building
2. Materials for piping
3. Piping and fitting sizing of cold water
pipes
4. Sanitary appliances
5. Sanitary appliances for disabled people
1. Water supply to high rise
building
Pneumatic Cylinder System
How does it works:
1. Compressed air in the cylinder forces water up
to the float valves and drinking water outlets on
the upper floor.
2. As the cylinder empties a low pressure switch
engages the duty pump.
3. When the pump has refilled the cylinder, a high
pressure switch disengages the pump.
4. In the same time, some air is absorbed by the
water.
Pneumatic Cylinder System
5. A float switch detects the high water level in
the cylinder and activates an air compressor to
regulate the correct volume of air.
6. Break pressure cisterns supply from the storage
cisterns at the roof level or from the rising
main.
2. Material for Piping
PIPE MATERIALS:-
• COPPER
• PLASTIC
• CAST IRON
• CONCRETE
• STEEL
• GALVANISED STEEL
Materials:-
• Suitability.
• Fit for purpose – no adverse affect on the health
and safety of the building.
• Consult water supplier at an early stage.
• Check the character of the water supply and
ground conditions.
• Some water are aggressive to certain type of
soils.
• Water consultant able to advise on local
conditions.
Continued:-
• Dissimilar pipe materials should not be
connected together.
• Temperature limits for pipes and fittings:-
oCold water installation – 40ºC Degree
Celsius.
oHot water installation - 95ºC Degree
Celsius.
• Installation should be capable of operating
effectively.
Factors affecting choices of materials
1. Effect on water quality
2. Cost, service life and maintenance needs
3. Internal and external corrosion
4. Compatibility of materials
5. Temperature effect. (Plastic)
6. Vibration, stress
7. Internal water pressure.
Copper pipes
• Found at specially constructed service ducts.
• by forming joints and bronze welding them
• specially manufactured brazing fitting
Advantages and Disadvantages of copper pipes
Soft metal, easy to bend.
Installed using less fasteners and connectors
Less hardware used, easier to install.
×Expensive compare with plastic.
×Only suitable for water that has a PH between
6.5 to 8.5. Water come from well may be too
acidic.
Plastic pipes
• Widely used for domestic water supply and
drainage, waste and vent pipe.
• Polyvinyl chloride (PVC)
• Chlorinated polyvinyl chloride (CPVC)
• Polypropylene (PP)
• Polybutlyene (PB)
• Polyethylene (PE)
• Malaysia Standard Code of Practice for the
installation of Piping System and Appliances.
Polyvinyl chloride (PVC) & Chlorinated polyvinyl
chloride (CPVC)
• Rigid plastic pipes similar to PVC drain pipes.
• With thicker walls to deal with water pressure
• PVC can be used for cold water only or for
ventilation.
• CPVC can be used for hot and cold potable water
supply
• Connection – primers and solvent cements are
required by code.
PVC & CPVC Pipes
PBT -Polybutylene Terephthalate
• Flexible plastic pipe.
• Attached to barbed fitting.
• Secured in place with copper crimp ring.
PEX - Cross-linked polyethylene
• Mechanically joined fittings.
• Employing barbs and crimped steel or copper
fittings.
PEX Aqua – PEX-AL-PEX
• Aluminum sandwich.
• Aluminum pipe sandwiched between
layers of PEX and connected with brass
compression fittings.
Poly Tanks
• Plastic polyethylene cisterns.
• Underground water tanks, above ground
water tanks.
• Made of linear polyethylene
• Suitable as potable water storage tank.
Advantages and Disadvantages of plastic pipe
Light weight, tough, resistant to chemical attack.
Available in large lengths.
Reduce cost of handling, transportation and
installation.
Less number of joints facilitate the speed and
reduced chances of leakage.
Rust resistant, good elastic properties.
Their adaptability to earth movements.
Smooth internal surface of the pipes offer less
friction, it saves the energy in the conveyance of
water.
Non-decomposing.
Advantages and Disadvantages of plastic pipe
×Plastic pipes are not installed in high
temperature.
×Easily cracked.
×At higher temperatures, the strength of
plastic pipes reduces.
Other pipes
• Galvanized iron pipe is a pipe commonly used
for potable water and sewage distribution.
• Better pipe materials for underground pipes.
• Stronger and more fracture resistant.
3. Piping and fitting sizing of cold
water pipes
Pipe standard BS EN 1057
Malaysia Standard Code MS
• Malaysian Standard MS 1058 (PE pipe and fittings)
MS 1063 (PVC pipes) etc.
Standard Pipe Size Schedule
Graphical Symbols for Pipe Fittings
Problem occurs to pipe
• Loss of seal – when a full-bore flow occurs
in a main branch discharge pipe, creating
a negative pressure in the discharge pipe
from the trap.
Loss of seal caused by - Siphonage
1. Self siphonage – as an appliance discharges,
the water fill the waste pipe and create a
vacuum to draw out the seal.
2. Induced siphonage – the discharge from one
appliance draws out the seal in the trap of an
adjacent appliance by creating a vacuum in
that appliance’s branch pipe.
Self Siphonage
Loss of seal caused by – Back pressure, Capillary action,
Wavering out
3. Back pressure – compression occurs due to resistance to
flow at the base of a stack. The positive pressure displaces
water in the lowest trap.
Loss of seal caused by – Back pressure, Capillary action,
Wavering out
4. Capillary action – a piece of rag, string or hair caught on the
trap outlet.
5. Wavering out – gusts of wind blowing over the top of the
stack can cause a partial vacuum to disturb water seals.
Capillary action Wavering out
To overcome loss of seal problem
• A separate pipe of smaller diameter is
attached to the traps, which connects the
trap to the vent pipe.
• This pipe is known as anti-siphonage pipe.
• It supplies air to the short branch pipe of
the lower fixture, at the time of suction,
otherwise it acts as a vent pipe of the
lower fixtures.
4. Sanitary Appliances
5. Sanitary appliances for disabled
people
5. Sanitary appliances for disabled
people
• Facilities for disabled people should be provided
within conventional separate sex WC and
washroom compartment.
• A suitable compartment contain some
appliances fitted with support rails
• Sufficient space to accommodate persons with
impaired leg movement and with crutches
• Compartment door opens outwards.
A disabled toilet should have:-
• An emergency release device, operated from the
outside
• A horizontal bar for closing, fitted to the inside.
• Passageway width, minimum 1200mm, WC
compartment size, minimum 2200x1500mm
• Door into compartment, minimum 1000mm clear
width.
• Support/grab rails of 50mm minimum diameter, each
side of a wash basin.
• Hinged or drop-drown rail at least 300mm long on
the exposed side of a WC.
• WC positioned to allow lateral transfer from a
wheelchair.
• WC seat of rigid and robust material, set to a height
of 480mm above finished floor level.
• Means for flushing, maximum 1200mm above
finished floor level.
• Wash basin height maximum 750mm and
reachable whilst seated on WC pan.
• Wash basin taps of the quarter turn lever type, or
an electric sensor operated discharge. Water
temperature at 35 degree Celsius maximum.
• Emergency alarm cord suspended from the ceiling,
as close as possible to a wall.
Thank You
CHILDREN ARE QUICK AND ALWAYS SPEAK THEIR MINDS
Teacher: Donald, what is the chemical formula for water?
Donald: H I J K L M N O.
Teacher: what are you talking about?
Donald: Yesterday you said it’s H to O.

More Related Content

What's hot

Building services water supply
Building services   water supplyBuilding services   water supply
Building services water supply
Dipesh Jain
 
Sanitation and plumbing
Sanitation and plumbing Sanitation and plumbing
Sanitation and plumbing
Hansa katare
 
04 plumbing fixtures II
04 plumbing fixtures   II04 plumbing fixtures   II
04 plumbing fixtures II
Hena Dutt
 
Sem 2 bs1 cold water supply 1
Sem 2 bs1 cold water supply   1Sem 2 bs1 cold water supply   1
Sem 2 bs1 cold water supply 1
Est
 
Plumbing
PlumbingPlumbing
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building
Aroh Thombre
 
DRAINAGE SYSTEM FOR BUILDING AND TRAPS
DRAINAGE SYSTEM FOR BUILDING AND TRAPSDRAINAGE SYSTEM FOR BUILDING AND TRAPS
DRAINAGE SYSTEM FOR BUILDING AND TRAPS
Karan Patel
 
08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures
akashpadole
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02
Bolin Loong
 
Building Services
Building ServicesBuilding Services
Building Services
Radhika Munshi
 
Manholes, by mayank agrawal
Manholes, by mayank agrawalManholes, by mayank agrawal
Manholes, by mayank agrawal
Mayank Agrawal
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENT
XinYee Khoo
 
CMA433-Water Supply System.ppt
CMA433-Water Supply System.pptCMA433-Water Supply System.ppt
CMA433-Water Supply System.ppt
athirah77
 
Water supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvestingWater supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvesting
Ayushi Agrawal
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
M. Arkam C. Munaaim Adj. Prof, PhD, PEPC, IntPE.
 
Centralized ac system
Centralized ac systemCentralized ac system
Centralized ac system
Febin Siby
 
Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)
Jackytiongleesong
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
Rohit Bhatt
 
Hot Water Supply Report BS1
Hot Water Supply Report BS1Hot Water Supply Report BS1
Hot Water Supply Report BS1
Syafiq Zariful
 
House plumbing
House plumbingHouse plumbing
House plumbing
lobsang jampa
 

What's hot (20)

Building services water supply
Building services   water supplyBuilding services   water supply
Building services water supply
 
Sanitation and plumbing
Sanitation and plumbing Sanitation and plumbing
Sanitation and plumbing
 
04 plumbing fixtures II
04 plumbing fixtures   II04 plumbing fixtures   II
04 plumbing fixtures II
 
Sem 2 bs1 cold water supply 1
Sem 2 bs1 cold water supply   1Sem 2 bs1 cold water supply   1
Sem 2 bs1 cold water supply 1
 
Plumbing
PlumbingPlumbing
Plumbing
 
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building
 
DRAINAGE SYSTEM FOR BUILDING AND TRAPS
DRAINAGE SYSTEM FOR BUILDING AND TRAPSDRAINAGE SYSTEM FOR BUILDING AND TRAPS
DRAINAGE SYSTEM FOR BUILDING AND TRAPS
 
08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures08 Building Water Supply and Sanitary Fixtures
08 Building Water Supply and Sanitary Fixtures
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02
 
Building Services
Building ServicesBuilding Services
Building Services
 
Manholes, by mayank agrawal
Manholes, by mayank agrawalManholes, by mayank agrawal
Manholes, by mayank agrawal
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENT
 
CMA433-Water Supply System.ppt
CMA433-Water Supply System.pptCMA433-Water Supply System.ppt
CMA433-Water Supply System.ppt
 
Water supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvestingWater supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvesting
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
 
Centralized ac system
Centralized ac systemCentralized ac system
Centralized ac system
 
Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)
 
Plumbing services in high rise building and group housing
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
 
Hot Water Supply Report BS1
Hot Water Supply Report BS1Hot Water Supply Report BS1
Hot Water Supply Report BS1
 
House plumbing
House plumbingHouse plumbing
House plumbing
 

Similar to Sem 2 bs1 cold water supply 2

pipes and fittings
pipes and fittingspipes and fittings
pipes and fittings
sharath pabba
 
Iimt college of polytechic, ppt
Iimt college of polytechic,   pptIimt college of polytechic,   ppt
Iimt college of polytechic, ppt
IIMT COLLEGE OF POLYTECHNIC
 
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfmPLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
McKevinVargas
 
Pipes, fittings-fixtures and appliance
Pipes, fittings-fixtures and appliancePipes, fittings-fixtures and appliance
Pipes, fittings-fixtures and appliance
Harsha Singh
 
Fitting and fixtures
Fitting and fixturesFitting and fixtures
Fitting and fixtures
Nikhar Mehra
 
Module-3_Bce_Building_Services.pptx
Module-3_Bce_Building_Services.pptxModule-3_Bce_Building_Services.pptx
Module-3_Bce_Building_Services.pptx
SilasChaudhari
 
Know about pipes and fittings
Know about pipes and fittingsKnow about pipes and fittings
Know about pipes and fittings
Neha Vargeez
 
House drainage
House drainageHouse drainage
Domestic sewage
Domestic sewageDomestic sewage
Domestic sewage
NIKAMVN
 
Plumbing presentation
Plumbing presentationPlumbing presentation
Plumbing presentation
Christine Gabasa
 
House connection from mains, laying and joints in pipes
House connection from mains, laying and joints in pipesHouse connection from mains, laying and joints in pipes
House connection from mains, laying and joints in pipes
krishnacp
 
Pipe water distribution system2
Pipe water distribution system2Pipe water distribution system2
Pipe water distribution system2
AKHIL KM
 
Che 4 house drainage system
Che 4 house drainage systemChe 4 house drainage system
Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story
Vj NiroSh
 
Fluid conductors: Design and selection criteria
Fluid conductors: Design and selection criteriaFluid conductors: Design and selection criteria
Fluid conductors: Design and selection criteria
Anand Prithviraj
 
presentation3-161025132139.pdf
presentation3-161025132139.pdfpresentation3-161025132139.pdf
presentation3-161025132139.pdf
sakshivaswani2
 
Plumbing
PlumbingPlumbing
Plumbing
Ammar Rizvi
 
cold water sanitary plumbing system requirement design for renovation or mino...
cold water sanitary plumbing system requirement design for renovation or mino...cold water sanitary plumbing system requirement design for renovation or mino...
cold water sanitary plumbing system requirement design for renovation or mino...
ALshafiqShuai
 
Water supply.pdf
Water supply.pdfWater supply.pdf
Water supply.pdf
Shyam Raj Jilla
 
4.Pipes & Water Quantity Estimation.pptx
4.Pipes & Water Quantity Estimation.pptx4.Pipes & Water Quantity Estimation.pptx
4.Pipes & Water Quantity Estimation.pptx
Sivaram551990
 

Similar to Sem 2 bs1 cold water supply 2 (20)

pipes and fittings
pipes and fittingspipes and fittings
pipes and fittings
 
Iimt college of polytechic, ppt
Iimt college of polytechic,   pptIimt college of polytechic,   ppt
Iimt college of polytechic, ppt
 
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfmPLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
PLUMBING.pptrfffjedkkxfmk3eldokwndktookedfm
 
Pipes, fittings-fixtures and appliance
Pipes, fittings-fixtures and appliancePipes, fittings-fixtures and appliance
Pipes, fittings-fixtures and appliance
 
Fitting and fixtures
Fitting and fixturesFitting and fixtures
Fitting and fixtures
 
Module-3_Bce_Building_Services.pptx
Module-3_Bce_Building_Services.pptxModule-3_Bce_Building_Services.pptx
Module-3_Bce_Building_Services.pptx
 
Know about pipes and fittings
Know about pipes and fittingsKnow about pipes and fittings
Know about pipes and fittings
 
House drainage
House drainageHouse drainage
House drainage
 
Domestic sewage
Domestic sewageDomestic sewage
Domestic sewage
 
Plumbing presentation
Plumbing presentationPlumbing presentation
Plumbing presentation
 
House connection from mains, laying and joints in pipes
House connection from mains, laying and joints in pipesHouse connection from mains, laying and joints in pipes
House connection from mains, laying and joints in pipes
 
Pipe water distribution system2
Pipe water distribution system2Pipe water distribution system2
Pipe water distribution system2
 
Che 4 house drainage system
Che 4 house drainage systemChe 4 house drainage system
Che 4 house drainage system
 
Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story
 
Fluid conductors: Design and selection criteria
Fluid conductors: Design and selection criteriaFluid conductors: Design and selection criteria
Fluid conductors: Design and selection criteria
 
presentation3-161025132139.pdf
presentation3-161025132139.pdfpresentation3-161025132139.pdf
presentation3-161025132139.pdf
 
Plumbing
PlumbingPlumbing
Plumbing
 
cold water sanitary plumbing system requirement design for renovation or mino...
cold water sanitary plumbing system requirement design for renovation or mino...cold water sanitary plumbing system requirement design for renovation or mino...
cold water sanitary plumbing system requirement design for renovation or mino...
 
Water supply.pdf
Water supply.pdfWater supply.pdf
Water supply.pdf
 
4.Pipes & Water Quantity Estimation.pptx
4.Pipes & Water Quantity Estimation.pptx4.Pipes & Water Quantity Estimation.pptx
4.Pipes & Water Quantity Estimation.pptx
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
Est
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
Est
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
Est
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
Est
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
Est
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
Est
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
Est
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
Est
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
Est
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
Est
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
Est
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
Est
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
Est
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
Est
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
Est
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 

Recently uploaded

final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdffinal-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
Ashfaq Ahmad
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
Forth
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
jennifermiller8137
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
78tq3hi2
 
new-HIFLY-TBR-catalogue size specification
new-HIFLY-TBR-catalogue size specificationnew-HIFLY-TBR-catalogue size specification
new-HIFLY-TBR-catalogue size specification
bosscmn
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
78tq3hi2
 
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdfManual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
GermanValentini1
 
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsWhat Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
Sprinter Gurus
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
vaibhavsrivastava482521
 
Skoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda PerthSkoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda Perth
Perth City Skoda
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
bouvoy
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
jennifermiller8137
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
wstatus456
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
mymwpc
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
eygkup
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
afkxen
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
MarynaYurchenko2
 
Case Study on Failure Product - Tata Nano
Case Study on Failure Product - Tata NanoCase Study on Failure Product - Tata Nano
Case Study on Failure Product - Tata Nano
chaitanyabelgaumkar
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
afkxen
 

Recently uploaded (20)

final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdffinal-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
 
new-HIFLY-TBR-catalogue size specification
new-HIFLY-TBR-catalogue size specificationnew-HIFLY-TBR-catalogue size specification
new-HIFLY-TBR-catalogue size specification
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
 
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdfManual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
 
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsWhat Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
 
Skoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda PerthSkoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda Perth
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
 
Case Study on Failure Product - Tata Nano
Case Study on Failure Product - Tata NanoCase Study on Failure Product - Tata Nano
Case Study on Failure Product - Tata Nano
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
 

Sem 2 bs1 cold water supply 2

  • 1. COLD WATER SUPPLY SYSTEM (PART 2) Subject: Building Services 1 [ BLD 60403]
  • 2. LECTURE OVERVIEW 1. Water supply to high rise building 2. Materials for piping 3. Piping and fitting sizing of cold water pipes 4. Sanitary appliances 5. Sanitary appliances for disabled people
  • 3. 1. Water supply to high rise building
  • 4. Pneumatic Cylinder System How does it works: 1. Compressed air in the cylinder forces water up to the float valves and drinking water outlets on the upper floor. 2. As the cylinder empties a low pressure switch engages the duty pump. 3. When the pump has refilled the cylinder, a high pressure switch disengages the pump. 4. In the same time, some air is absorbed by the water.
  • 5. Pneumatic Cylinder System 5. A float switch detects the high water level in the cylinder and activates an air compressor to regulate the correct volume of air. 6. Break pressure cisterns supply from the storage cisterns at the roof level or from the rising main.
  • 6.
  • 7. 2. Material for Piping PIPE MATERIALS:- • COPPER • PLASTIC • CAST IRON • CONCRETE • STEEL • GALVANISED STEEL
  • 8. Materials:- • Suitability. • Fit for purpose – no adverse affect on the health and safety of the building. • Consult water supplier at an early stage. • Check the character of the water supply and ground conditions. • Some water are aggressive to certain type of soils. • Water consultant able to advise on local conditions.
  • 9.
  • 11. • Dissimilar pipe materials should not be connected together. • Temperature limits for pipes and fittings:- oCold water installation – 40ºC Degree Celsius. oHot water installation - 95ºC Degree Celsius. • Installation should be capable of operating effectively.
  • 12. Factors affecting choices of materials 1. Effect on water quality 2. Cost, service life and maintenance needs 3. Internal and external corrosion 4. Compatibility of materials 5. Temperature effect. (Plastic) 6. Vibration, stress 7. Internal water pressure.
  • 13. Copper pipes • Found at specially constructed service ducts. • by forming joints and bronze welding them • specially manufactured brazing fitting
  • 14. Advantages and Disadvantages of copper pipes Soft metal, easy to bend. Installed using less fasteners and connectors Less hardware used, easier to install. ×Expensive compare with plastic. ×Only suitable for water that has a PH between 6.5 to 8.5. Water come from well may be too acidic.
  • 15. Plastic pipes • Widely used for domestic water supply and drainage, waste and vent pipe. • Polyvinyl chloride (PVC) • Chlorinated polyvinyl chloride (CPVC) • Polypropylene (PP) • Polybutlyene (PB) • Polyethylene (PE) • Malaysia Standard Code of Practice for the installation of Piping System and Appliances.
  • 16. Polyvinyl chloride (PVC) & Chlorinated polyvinyl chloride (CPVC) • Rigid plastic pipes similar to PVC drain pipes. • With thicker walls to deal with water pressure • PVC can be used for cold water only or for ventilation. • CPVC can be used for hot and cold potable water supply • Connection – primers and solvent cements are required by code.
  • 17. PVC & CPVC Pipes
  • 18. PBT -Polybutylene Terephthalate • Flexible plastic pipe. • Attached to barbed fitting. • Secured in place with copper crimp ring.
  • 19. PEX - Cross-linked polyethylene • Mechanically joined fittings. • Employing barbs and crimped steel or copper fittings.
  • 20. PEX Aqua – PEX-AL-PEX • Aluminum sandwich. • Aluminum pipe sandwiched between layers of PEX and connected with brass compression fittings.
  • 21. Poly Tanks • Plastic polyethylene cisterns. • Underground water tanks, above ground water tanks. • Made of linear polyethylene • Suitable as potable water storage tank.
  • 22. Advantages and Disadvantages of plastic pipe Light weight, tough, resistant to chemical attack. Available in large lengths. Reduce cost of handling, transportation and installation. Less number of joints facilitate the speed and reduced chances of leakage. Rust resistant, good elastic properties. Their adaptability to earth movements. Smooth internal surface of the pipes offer less friction, it saves the energy in the conveyance of water. Non-decomposing.
  • 23. Advantages and Disadvantages of plastic pipe ×Plastic pipes are not installed in high temperature. ×Easily cracked. ×At higher temperatures, the strength of plastic pipes reduces.
  • 24. Other pipes • Galvanized iron pipe is a pipe commonly used for potable water and sewage distribution. • Better pipe materials for underground pipes. • Stronger and more fracture resistant.
  • 25. 3. Piping and fitting sizing of cold water pipes Pipe standard BS EN 1057
  • 26. Malaysia Standard Code MS • Malaysian Standard MS 1058 (PE pipe and fittings) MS 1063 (PVC pipes) etc.
  • 27. Standard Pipe Size Schedule
  • 28. Graphical Symbols for Pipe Fittings
  • 29. Problem occurs to pipe • Loss of seal – when a full-bore flow occurs in a main branch discharge pipe, creating a negative pressure in the discharge pipe from the trap.
  • 30. Loss of seal caused by - Siphonage 1. Self siphonage – as an appliance discharges, the water fill the waste pipe and create a vacuum to draw out the seal. 2. Induced siphonage – the discharge from one appliance draws out the seal in the trap of an adjacent appliance by creating a vacuum in that appliance’s branch pipe.
  • 32.
  • 33. Loss of seal caused by – Back pressure, Capillary action, Wavering out 3. Back pressure – compression occurs due to resistance to flow at the base of a stack. The positive pressure displaces water in the lowest trap.
  • 34. Loss of seal caused by – Back pressure, Capillary action, Wavering out 4. Capillary action – a piece of rag, string or hair caught on the trap outlet. 5. Wavering out – gusts of wind blowing over the top of the stack can cause a partial vacuum to disturb water seals. Capillary action Wavering out
  • 35. To overcome loss of seal problem • A separate pipe of smaller diameter is attached to the traps, which connects the trap to the vent pipe. • This pipe is known as anti-siphonage pipe. • It supplies air to the short branch pipe of the lower fixture, at the time of suction, otherwise it acts as a vent pipe of the lower fixtures.
  • 36.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44. 5. Sanitary appliances for disabled people
  • 45. 5. Sanitary appliances for disabled people • Facilities for disabled people should be provided within conventional separate sex WC and washroom compartment. • A suitable compartment contain some appliances fitted with support rails • Sufficient space to accommodate persons with impaired leg movement and with crutches • Compartment door opens outwards.
  • 46. A disabled toilet should have:- • An emergency release device, operated from the outside • A horizontal bar for closing, fitted to the inside. • Passageway width, minimum 1200mm, WC compartment size, minimum 2200x1500mm • Door into compartment, minimum 1000mm clear width.
  • 47. • Support/grab rails of 50mm minimum diameter, each side of a wash basin. • Hinged or drop-drown rail at least 300mm long on the exposed side of a WC. • WC positioned to allow lateral transfer from a wheelchair. • WC seat of rigid and robust material, set to a height of 480mm above finished floor level.
  • 48. • Means for flushing, maximum 1200mm above finished floor level. • Wash basin height maximum 750mm and reachable whilst seated on WC pan. • Wash basin taps of the quarter turn lever type, or an electric sensor operated discharge. Water temperature at 35 degree Celsius maximum. • Emergency alarm cord suspended from the ceiling, as close as possible to a wall.
  • 49. Thank You CHILDREN ARE QUICK AND ALWAYS SPEAK THEIR MINDS Teacher: Donald, what is the chemical formula for water? Donald: H I J K L M N O. Teacher: what are you talking about? Donald: Yesterday you said it’s H to O.