How to install plumbing system of new housebuiltify
Installation of plumbing system in a new house is typically difficult. A wrong connection may create a vast problem in future. To know more go through https://blog.builtify.in/2019/08/Tips-to-install-plumbing-system-in-new-house-uiltify.html
How to install plumbing system of new housebuiltify
Installation of plumbing system in a new house is typically difficult. A wrong connection may create a vast problem in future. To know more go through https://blog.builtify.in/2019/08/Tips-to-install-plumbing-system-in-new-house-uiltify.html
sanitation and its importance is explained along with drainage system , principles of drainage system , types of pipes , traps and their uses and sanitary fittings.
08 Building Water Supply and Sanitary Fixturesakashpadole
The presentation has prepared as per the syllabus of Mumbai University.
Go through the presentation, if you like it then share it with your friends and classmates.
Thank you :)
ALL TYPE OF SANITARY FITTING SHOULD BE FIXED AGAINST AN EXTERNAL WALLS , SO THAT THE APARTMENT IN WHICH THEY ARE PLACED CAN BE PROVIDED WITH NATURAL LIGHT AND AIR, AND ALSO THERE WASTES CAN BE EASILY COLLECTED IN DRAIN.
it is a brief introductory part of what is house drainage system , its components with their classification , types of system of plumbing aided with principles of drainage design.
sanitation and its importance is explained along with drainage system , principles of drainage system , types of pipes , traps and their uses and sanitary fittings.
08 Building Water Supply and Sanitary Fixturesakashpadole
The presentation has prepared as per the syllabus of Mumbai University.
Go through the presentation, if you like it then share it with your friends and classmates.
Thank you :)
ALL TYPE OF SANITARY FITTING SHOULD BE FIXED AGAINST AN EXTERNAL WALLS , SO THAT THE APARTMENT IN WHICH THEY ARE PLACED CAN BE PROVIDED WITH NATURAL LIGHT AND AIR, AND ALSO THERE WASTES CAN BE EASILY COLLECTED IN DRAIN.
it is a brief introductory part of what is house drainage system , its components with their classification , types of system of plumbing aided with principles of drainage design.
New York City Department of Buildings Filing rep course_104Safe Rise
Course 104 (Download Course Materials)
Asbestos Forms and Compliance
Sanitary and Storm Connections Filing Procedures
Licensing
Civil Penalties for Work Without a Permit Violations
Padlock Enforcement
Unsafe Buildings Unit
Emergency Declarations
Records and Records Room Operation
S13c18 chapter 18-different blocks in the model village (auto cad drawings).Shivu P
In this chapter the various plans for the model village and the model nation are given as the prototype. The original drawings are in auto cad drawing. This chapter is an over view of the plans of the model village and model nation. Various blocks like office block, school blocks, sports blocks, residence, hospital blocks, cow keeping blocks, agriculture product processing block, and so on are mentioned. It is planned in such a way that, no one need not utilize any type of vehicle inside the village to reach different blocks, as the inter building bridges brings all the needy places in walk able distance, thus we can reduce the utilization of vehicle and the fuel to maximum level, thus the pollution and traffic congestion.
its about the detailed view of points to be remembered during selection of pumps and the laying work done during plumbing work and about the safety precaution to be followed during plumbing work
Plumbing services in high rise building and group housingRohit Bhatt
As well as the comforts and luxuries of modern living Plumbing systems protect the community from disease.
Invisible organisms that swim around in a watery environment was beyond imagination until a few centuries ago, it was only in the late 19th century that scientists discovered and isolated specific microbes of particular a disease, cholera, has proven one of history’s most virulent killers.
Mankind began to understand that the evil spirits causing its woes were microscopic creatures that could be defeated by plumbers and sanitary engineers. With well designed plumbing and draining systems.
As we go about our everyday lives it is comforting to know that people’s lives are protected by having Correctly Installed and maintained Plumbing Gasfitting and Draining Systems.
The arrangemnet provided in a house or building, for collecting and conveying waste
water through drain pipes, by gravity, to join either a public sewer or a domestic
septic tank, is termed as house drainage or building drainage.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
1. Plumbing
Works Done in Residential Buildings
AMMAR RIZVI
P.S.G.V.P.Mandal’s D. N. Patel College Of
Engineering
Guidance :-
Prof. S. I. Chopda
2. WHAT IS PLUMBING ?
• The art and science of creating and maintaining sanitary conditions in
buildings
Or
The art and science of installing, repairing and servicing of pipes, fixtures and
appurtenances necessary for bringing in water supply, distributing it within
and removing the liquid and water-borne wastes.
It includes fresh water pipes; fixtures and fixture traps; soil and waste pipes;
vent pipes; building drain and building sewer; storm drainage pipes, their
devices, appurtenances and connections to all within or adjacent to the
building.
• The word Plumbing is originated from the Latin word PLUMBUM for Lead
as pipes were made for lead. But now a days pipes are lead free, as lead is
not good for health.
• "Plumbing" often denotes the supply and waste system of an individual
building, distinguishing it from water supply and sewage systems that serve
a group of buildings.
3. OBJECTIVES OF PLUMBING
Before an engineer is set out to design the plumbing services of any
project, it is necessary that he has well defined aims and objectives
in order to install an efficient and economical plumbing system.
•Plumbing is an important part of any type of building, as it may be
residential, commercial, industry etc.
•To provide the fresh water for drinking, cooking, washing utensils.
•Plumbing also plays an important role in the removal of waterborne
waste.
•Adequate pressure of water should be received for water storage
tanks for bathing, flushing system.
•While plumbing in residential building minimum number of fixtures
should be used.
•All sanitary drainage system should be connected to the nearest
public sewer system.
•The drainage system should be so designed as to guard against
fouling, deposit of solids and clogging.
4.
5. The Basic Plumbing Components of any building:
1.Water supply distributing pipes
2.Fixture and fixture traps
3.Soil, waste and vent pipes
4.Storm water drainage
6. PLUMBING WORK DETAIL
After the one hand plaster for plumbing work the wall of buildings
cut by means of grinder. The fresh water pipes from water tank are
made concealed in walls. The drainage pipes are done in open.
Where plumbing work is done :-
1.In Kitchen :- For Cooking, Washing utensils, Drinking water.
In kitchen there are two points from pipe. In one point water coming
from the overhead water tank & and in second point water from
municipality or from bore well done.
2.In Bathroom :- For Bathing
In bathroom there are 4 points of pipe. Three points are in triangle
shape where water taps are fitted and in one point overhead shower is
fitted.
3.In Toilets :- For flushing, for drainage.
In toilets there are around 3 points, one for flushing, one for taking
water. If there is an European sheet for flushing FLUSH TANK is used,
Push Shower, Zet Spary connection is done from that point.
For Ventilation purpose of system vent pipe is used.
7. PLUMBING WORK DETAIL
The Middle Class Peoples make the plumbing system very
economical. They do the nominal plumbing work which can fulfill
their needs of plumbing.
But the Higher Class People makes there bathroom very lavishe.
They include the Bath tub, Shower panel, Steamer, Jacuzzi etc.
For the Shower Panel installed in bathroom the special Pressure
Pump is used for water pressure. If pressure pump is not installed
then shower panel cannot work. In our area peoples don’t use this
system, as it is costly and the main reason for not using this is
HARD WATER which is present in bore wells.
17. • Smooth joints
• Avoid noise transmission
• Avoid formation of air locks
• Avoid unsightly arrangement
• Economy in labour and materials
• No piping under wastewater pipes
• Gradual size and direction changes
• Maximum pressure of water should be obtained from pipes
• Good adhesive should be used for joining the pipes
• No back-flow towards the source of supply
• Wholesome water supply for drinking and culinary purposes
• The level of W.C. should not be less than the bathroom level, if is less
then water from bathroom will come in W.C. and will kill the bacteria and
no gases will form and the sludge will settle down there only.
• No cross-connection between pure and contaminated water pipes
• Sufficient strength of pipes underground or under traffic loads or frost
• Insulating pipe should be used for supplying hot water from solar heater.
POINTS TO BE CONSIDERED
18. WHY INSPECTION CHAMBER ?
All underground drainage systems must have access points, to
enable the drains to be inspected on a regular basis and to be
cleaned in the event of a blockage. The most common form of
access is an inspection chamber, often still referred to as a
manhole. In times gone by, manholes were actually large, bricked
up chambers that had iron steps built into the wall, enabling a
person to physically climb down into the drainage system. The main
difference between one of these old manholes and a plastic
inspection chamber is that inspection chambers do not permit
physical entrance into the drains.
When should you use one?
You should use an inspection chamber whenever a branch pipe
joins a main drainage. By these chamber we can inspect the
drainage line and can know where there is blockage in drainage
line.
19. •The inspection chamber
made of concrete are known as
concrete chamber.
•The use of these chamber is
very less due to its construction
cost, maintenance.
•As the inner surface is rough
the deposition of waste gets
started.
•Increasing of these chamber
is very tough job.
•The position of these can not
be changed once fixed.
WHY INSPECTION CHAMBER ?
CONCRETE CHAMBER
20. • These type of inspection
chambers are used now a
days.
• These are very economical
then concrete chamber.
• These are light weighted
chamber. The inner surface of
these chambers are smooth,
deposition doesn’t takes
place.
• The position of these
chambers can be easily
changed, when required.
• Height of these chambers can
be easily increased as per
requirement.
WHY INSPECTION CHAMBER ?
PVC CHAMBER
Riser
21. • The durability of a plumbing system is dependent on the quality of its
component parts and the assembly skills of those who install it. No
plumbing system, however well designed, can be expected to operate safely
or hygienically if the products or materials used are unsatisfactory. The
inverse is also true if the best-quality products or materials are used but are
installed incorrectly, the system will be a failure.
• There are two families of materials available for water pipework systems:
metallic and non-metallic materials. Of these the most commonly used
materials for drinking-water supply piping are,
• Galvanized Iron Pipe & fitting (G.I.)
• Poly Vinyl Chloride (PVC)
• Chlorinated PolyVinyl Chloride (CPVC)
• Soil Waste and Rain Water (SWR)
• Poly Propylene Random (PPR)
• Bendable Multi-Layer Composite Pipe
• Foamcore Pipes
MATERIAL AVAILABLE IN
MARKET
22. • The tank placed at the top of a residential building for supplying
and storing water coming from bore well or municipality is
overhead tank.
• There are two types of overhead water tank used by peoples for
storing water.
1.Cement and Brick Water tank
2.Ready-made Water tank
OVERHEAD WATER TANK
23. •These tanks can be made in
any architectural shape.
•The construction cost of
these tank is very high.
•Chemicals should be added
or applied to these tank for water
proofing.
•The place of these tank
cannot be changed.
•Cracks are formed in these
tanks.
•Load on slab gets increased
due to water pressure in tank.
CEMENT & BRICK OVERHEAD TANK
24. READY-MADE WATER TANK
•The installation of these tank
is very easy.
•Position of these tank can be
easily changed.
•These are light in weight.
•Repairing of these tank is
very easy.
•It is very economical.
•The load of water is not much
on slab as in construction water
tank.
25. • These solar water heater is of
plate type.
• The temperature of water in
solar does not exceed after a
fixed temp
• If height of water tank is not
greater than of solar special
tank of required capacity
should be provided.
• Due to hard water special
solar for hard water should be
used.
• Insulating tank is fitted in solar
by which there is no loss of
temperature of water.
SOLAR WATER HEATER
26. •Now a days, special type of
pipe is available in market which
is used for L.P.G. gas fitting in
residential building.
•These is a composite pipe
consisting of two type of layer.
•Composite Piping System is
manufactured from high grade
Virgin Polyethylene and
Aluminum.
•The Polymer is effectively
bonded in the inside and outside
of the Aluminum core by melt
adhesive. This Aluminum Core
is 100% leak proof for both
liquids and gases making it an
ideal pipe for transporting gases
and liquids.
L.P.G GAS PIPE & FITTING