SlideShare a Scribd company logo
Seismic Structural
 Considerations
      JCC Training

            by
 Paul W. McMullin, SE, PhD
       October 15, 2009
The Paper Clip Test




© Dunn Associates Inc, 2009
Concept of Selected Deformation




© Dunn Associates Inc, 2009
Early Use of Moment Connections


          Flatiron Building, NYC
           • One of the first steel frame
             buildings
           • Portal frame moment
             connections at all wind girders.
          Early Steel Frames- all
          moment connected




© Dunn Associates Inc, 2009
Construction Changes that led to
                                    Northridge Failures


          Fewer, but larger moment
          frames
           • Heavier connections
          Changed from Riveted to
          Welded construction
          Used lower toughness
          welding rod
           • Welds went down fast
           • Not permitted in pipelines
          Quality control problems




© Dunn Associates Inc, 2009
Acceleration Record from Northridge




                                From the Strong Motion Database (SMDB, 2000a)


© Dunn Associates Inc, 2009
Northridge Earthquake


          Magnitude 6.7                     Building Inventory
           • Estimated Economic             Damage
           • Loss = $49.3 billion            • 100 buildings with minor
                                               fractures
                                             • 100 buildings with major
                                               fractures
                                             • 30 buildings with
                                               major fractures in 90%
                                               of all connections




© Dunn Associates Inc, 2009
Fracture Causes


          Welding
           • Low Toughness Weld Metal
           • Slag Inclusions
           • Lack of fusion
          Mismatched Yield Strengths
          Erroneous Joint Detailing
          Weld Constraint by Heavy
          Sections
          Slab Interaction with Column




© Dunn Associates Inc, 2009
Changes: Code


          Code limited approved filler
          metals
          Inspection requirements
          tightened
          Limited connection types
          Quality control significantly
          increased




© Dunn Associates Inc, 2009
Changes: Weld Access Hole




© Dunn Associates Inc, 2009
Connections: WUF-W




© Dunn Associates Inc, 2009
Connections: Extended Flange




© Dunn Associates Inc, 2009
Connections: Flange Cover Plate




© Dunn Associates Inc, 2009
Connections: Reduced Beam
                                       Section




© Dunn Associates Inc, 2009
Connections: Bolted End Plate




© Dunn Associates Inc, 2009
Connections: SidePlate




© Dunn Associates Inc, 2009
Protected Zone Requirements


          No discontinuities in           Get protected zone from
          protected zone                  drawings or engineer
           •   Arc Strikes                Mark protected zones with
           •   Erection Aids              bright paint after erection and
           •   Air-arc Gouging            after fire coating
           •   Thermal Cutting
          Not permitted
           •   Welded studs
           •   Shot pins
           •   Screws
           •   Welds
           •   Holes



© Dunn Associates Inc, 2009
Protected Zones: Dog Bone




© Dunn Associates Inc, 2009
Protected Zones:
                              Concentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Concentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Eccentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Eccentric Braced Frame




© Dunn Associates Inc, 2009
Connections


          Bolted End Plate


          Reduced Beam
          Section (“Dog
          Bone”)


          SidePlate™




© Dunn Associates Inc, 2009
Reduced Beam Section Connection


                                            Advantages
                                            • Approved
                                            • Reduces column-beam weld
                                              stresses
                                            Disadvantages
                                            • Milling of beam flange
                                            • 80%-90% reliable
                                            • Looks odd




© Dunn Associates Inc, 2009
Reduced Beam Section Connection


                                            Watch for:
                                            • Protected Zone (nicks, arc
                                              strikes, shot pins, welds)
                                            • Smoothness of Cut
                                            • Bracing just outside cut




© Dunn Associates Inc, 2009
SidePlate Connection



                                       Advantages
                                        • Approved- seismic &
                                          progressive collapse
                                        • Eliminates beam-column weld
                                        • High reliability
                                        • Looks strong
                                       Disadvantages
                                        • Licensing fee
                                        • Flip columns in shop




© Dunn Associates Inc, 2009
Step 1: Column Tree Assembly




         Rotate Column to Column1intoColumn Sub-Assembly (Not Shown Here).
            Bring inRotate Applyand andPosition Weld intoTack into Place
                    Side Plates Weld 2Weld 2, toSide Plates Apply
                     Bring in Sidewith to Bring in Temporary Plates
                                     Horiz. Other Alignment,
     Bring in Horizontal Shear Plates, Tack, CheckApply Other Dogs Welds 1 and 3
                     Apply Welds Apply 3, Tack NS/FS. Position
                            Begin Plates, Shear Plates,
                      After that, Column Sub-Assembly Complete.
© Dunn Associates Inc, 2009
Step 2: Full-Length Beam Assembly




               Begin Full-Length Full-LengthTack & and into Position 5 Shown)
                   Bring inFull-Length Beam Beam Weld Inverted As
                          Rotate Beam Assembly Tack Apply Position
                           Bring in Cover Plates, (Beam into Weld
                            Erection Angle, Assembly Complete




© Dunn Associates Inc, 2009
Step 3: Erect Column Trees & Full-Length Beams with six 7/8” A325 Bolts Each End




© Dunn Associates Inc, 2009
SidePlate Connection




© Dunn Associates Inc, 2009
SidePlate Connection


                                                 Watch for:
                                                 1) Joint Gap
                                                 2) Protected Zone (nicks, arc
                                                    strikes, shot pins, welds)
                                                 3) SidePlate attachments

                              1

                                  3       2




© Dunn Associates Inc, 2009
SidePlate Protected Zone




© Dunn Associates Inc, 2009
SidePlate: WELDING OK




© Dunn Associates Inc, 2009
What keeps us from backtracking?


          Special Inspection                Good Communication
           •   Ensure done well              • RFIs that are researched &
           •   Ultrasonic                      propose solutions
           •   Mag Particle ends             • Notify us ahead of certain
                                               activities (pours, fire coating)
          Shop Drawings                      • Tell us about problems as soon
           •   Complete                        as you know (even your screw-
           •   Well detailed                   ups)
           •   Contractor review             Think/Plan Ahead
          Shop vs Field Welds                • Catch problems
           • Define up-front                 • Give us time to determine a
                                               solution
           • Shop welds- faster, higher
             quality
           • Field welds- some pieces too
             big for shop

© Dunn Associates Inc, 2009
Our Liability


          STRUCTURAL ENGINEER                     CONTRACTOR
          Becomes liable when:                    Becomes liable when:
           • Omit information                     • Deviate from approved plans
           • Don’t follow the State of the          and specs
             Art (code is minimum)                • Material/workmanship/Quality
                                                    problems



                Regardless of who is liable, if
                there is a problem, we all get
                   dragged into the mess
© Dunn Associates Inc, 2009

More Related Content

What's hot

Schaum_s Outline of Structural Steel Design (Load and Resistance Factor Metho...
Schaum_s Outline of Structural Steel Design (Load and Resistance Factor Metho...Schaum_s Outline of Structural Steel Design (Load and Resistance Factor Metho...
Schaum_s Outline of Structural Steel Design (Load and Resistance Factor Metho...JrSaldaa1
 
Column base plates_prof_thomas_murray
Column base plates_prof_thomas_murrayColumn base plates_prof_thomas_murray
Column base plates_prof_thomas_murrayAlberto Rosado
 
Type Of Connection
Type Of Connection Type Of Connection
Type Of Connection Arfat Patel
 
Residual stresses in steel
Residual stresses in steelResidual stresses in steel
Residual stresses in steelKoppolu Abishek
 
CE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersCE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersFawad Najam
 
A short course in foundation engineering
A short course in foundation engineeringA short course in foundation engineering
A short course in foundation engineeringZaid Majed
 
aisc-bolting-and-welding
aisc-bolting-and-weldingaisc-bolting-and-welding
aisc-bolting-and-weldingtecnidibujos
 
ACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdfACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdffjimmy
 
Torsional response of assymetric multy story building thesis
Torsional response of assymetric multy story building thesisTorsional response of assymetric multy story building thesis
Torsional response of assymetric multy story building thesispolojunc
 
Analysis and design of shear wall transfer beam structure
Analysis and design of shear wall   transfer beam structureAnalysis and design of shear wall   transfer beam structure
Analysis and design of shear wall transfer beam structurephamtraoag
 
Webinar Slides | Wood Beam Design to NDS 2018 | ClearCalcs
Webinar Slides | Wood Beam Design to NDS 2018 | ClearCalcsWebinar Slides | Wood Beam Design to NDS 2018 | ClearCalcs
Webinar Slides | Wood Beam Design to NDS 2018 | ClearCalcsClearCalcs
 
CE 72.52 - Lecture 8b - Retrofitting of RC Members
CE 72.52 - Lecture 8b - Retrofitting of RC MembersCE 72.52 - Lecture 8b - Retrofitting of RC Members
CE 72.52 - Lecture 8b - Retrofitting of RC MembersFawad Najam
 
Strong form and weak form explanation through examples of a bar(en no 19565...
Strong form and weak form   explanation through examples of a bar(en no 19565...Strong form and weak form   explanation through examples of a bar(en no 19565...
Strong form and weak form explanation through examples of a bar(en no 19565...Dhamu Vankar
 
Design of Precast Elements
Design of Precast ElementsDesign of Precast Elements
Design of Precast ElementsRahul Biswas
 
Bridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabsBridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabsEva Lantsoght
 
211.4 r 93 guide for selecting proportions for high-strength
211.4 r 93 guide for selecting proportions for high-strength 211.4 r 93 guide for selecting proportions for high-strength
211.4 r 93 guide for selecting proportions for high-strength MOHAMMED SABBAR
 
Structure Analysis-Deflection using SAP2000
Structure Analysis-Deflection using  SAP2000Structure Analysis-Deflection using  SAP2000
Structure Analysis-Deflection using SAP2000Batoul Alshamali
 

What's hot (20)

Schaum_s Outline of Structural Steel Design (Load and Resistance Factor Metho...
Schaum_s Outline of Structural Steel Design (Load and Resistance Factor Metho...Schaum_s Outline of Structural Steel Design (Load and Resistance Factor Metho...
Schaum_s Outline of Structural Steel Design (Load and Resistance Factor Metho...
 
Column base plates_prof_thomas_murray
Column base plates_prof_thomas_murrayColumn base plates_prof_thomas_murray
Column base plates_prof_thomas_murray
 
Type Of Connection
Type Of Connection Type Of Connection
Type Of Connection
 
Residual stresses in steel
Residual stresses in steelResidual stresses in steel
Residual stresses in steel
 
CE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC MembersCE 72.52 - Lecture 8a - Retrofitting of RC Members
CE 72.52 - Lecture 8a - Retrofitting of RC Members
 
A short course in foundation engineering
A short course in foundation engineeringA short course in foundation engineering
A short course in foundation engineering
 
L20
L20L20
L20
 
aisc-bolting-and-welding
aisc-bolting-and-weldingaisc-bolting-and-welding
aisc-bolting-and-welding
 
ACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdfACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdf
 
Torsional response of assymetric multy story building thesis
Torsional response of assymetric multy story building thesisTorsional response of assymetric multy story building thesis
Torsional response of assymetric multy story building thesis
 
Bridge defects
Bridge defectsBridge defects
Bridge defects
 
Analysis and design of shear wall transfer beam structure
Analysis and design of shear wall   transfer beam structureAnalysis and design of shear wall   transfer beam structure
Analysis and design of shear wall transfer beam structure
 
infilled frame
infilled frame infilled frame
infilled frame
 
Webinar Slides | Wood Beam Design to NDS 2018 | ClearCalcs
Webinar Slides | Wood Beam Design to NDS 2018 | ClearCalcsWebinar Slides | Wood Beam Design to NDS 2018 | ClearCalcs
Webinar Slides | Wood Beam Design to NDS 2018 | ClearCalcs
 
CE 72.52 - Lecture 8b - Retrofitting of RC Members
CE 72.52 - Lecture 8b - Retrofitting of RC MembersCE 72.52 - Lecture 8b - Retrofitting of RC Members
CE 72.52 - Lecture 8b - Retrofitting of RC Members
 
Strong form and weak form explanation through examples of a bar(en no 19565...
Strong form and weak form   explanation through examples of a bar(en no 19565...Strong form and weak form   explanation through examples of a bar(en no 19565...
Strong form and weak form explanation through examples of a bar(en no 19565...
 
Design of Precast Elements
Design of Precast ElementsDesign of Precast Elements
Design of Precast Elements
 
Bridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabsBridging the gap between one way and two-way shear in slabs
Bridging the gap between one way and two-way shear in slabs
 
211.4 r 93 guide for selecting proportions for high-strength
211.4 r 93 guide for selecting proportions for high-strength 211.4 r 93 guide for selecting proportions for high-strength
211.4 r 93 guide for selecting proportions for high-strength
 
Structure Analysis-Deflection using SAP2000
Structure Analysis-Deflection using  SAP2000Structure Analysis-Deflection using  SAP2000
Structure Analysis-Deflection using SAP2000
 

Viewers also liked

Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracingsuddal
 
03 2frame Str Steel Jan07sbq&C2213&42
03 2frame Str Steel  Jan07sbq&C2213&4203 2frame Str Steel  Jan07sbq&C2213&42
03 2frame Str Steel Jan07sbq&C2213&42nik kin
 
Seismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsSeismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsPaul McMullin
 
Seismic retrofit methods
Seismic retrofit methodsSeismic retrofit methods
Seismic retrofit methodsPaul McMullin
 
Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structuresRizwan Khurram
 
Steel connections
Steel connectionsSteel connections
Steel connectionsbabunaveen
 
Aisc 341 05+supliment
Aisc 341 05+suplimentAisc 341 05+supliment
Aisc 341 05+suplimentUTCB
 
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016Jo Gijbels
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesMike Whaling
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistantKris Kiran
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...Hiroyuki Nakaji
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Hajar Ch
 
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...Full Scale Dynamics
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonNishkianDean
 
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Maurizio Pollino
 
Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016IRS srl
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringPieter Jan Jordaens
 

Viewers also liked (20)

Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracing
 
03 2frame Str Steel Jan07sbq&C2213&42
03 2frame Str Steel  Jan07sbq&C2213&4203 2frame Str Steel  Jan07sbq&C2213&42
03 2frame Str Steel Jan07sbq&C2213&42
 
Seismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsSeismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural Elements
 
Seismic retrofit methods
Seismic retrofit methodsSeismic retrofit methods
Seismic retrofit methods
 
Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structures
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Aisc 341 05+supliment
Aisc 341 05+suplimentAisc 341 05+supliment
Aisc 341 05+supliment
 
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing Properties
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistant
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111
 
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, Oregon
 
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
 
Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016
 
Green Retrofitting 101
Green Retrofitting 101Green Retrofitting 101
Green Retrofitting 101
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoring
 
Retrofitting and rehabilitation
Retrofitting and rehabilitationRetrofitting and rehabilitation
Retrofitting and rehabilitation
 
Considerations for Seismic Retrofitting
Considerations for Seismic RetrofittingConsiderations for Seismic Retrofitting
Considerations for Seismic Retrofitting
 

Similar to Seismic Structural Considerations in Steel

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fastenersklubbering
 
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009mikeasavage
 
Flexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsFlexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsDesign World
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)dgonano
 

Similar to Seismic Structural Considerations in Steel (7)

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fasteners
 
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
 
Bogner Industrial
Bogner IndustrialBogner Industrial
Bogner Industrial
 
Flexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsFlexibile vs. Rigid Couplings
Flexibile vs. Rigid Couplings
 
Overmold Design Guide
Overmold Design GuideOvermold Design Guide
Overmold Design Guide
 
Fasteners Presentation
Fasteners PresentationFasteners Presentation
Fasteners Presentation
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)
 

Recently uploaded

Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themmadhavlakhanpal29
 
BIT- Pinal .H. Prajapati Graphic Designer
BIT- Pinal .H. Prajapati  Graphic DesignerBIT- Pinal .H. Prajapati  Graphic Designer
BIT- Pinal .H. Prajapati Graphic Designerbitwgin12
 
Claire's designing portfolio presentation
Claire's designing portfolio presentationClaire's designing portfolio presentation
Claire's designing portfolio presentationssuser8fae18
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxAlecAnidul
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfSudhanshuMandlik
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.rrimika1
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationJaime Brown
 
Pitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyPitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyJaime Brown
 
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdfSpring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdfJon Freach
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxadityakushalsaha
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdffabianavillanib
 
Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasanasabutalha2013
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionPixel poets
 
Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3Remy Rey De Barros
 

Recently uploaded (14)

Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
BIT- Pinal .H. Prajapati Graphic Designer
BIT- Pinal .H. Prajapati  Graphic DesignerBIT- Pinal .H. Prajapati  Graphic Designer
BIT- Pinal .H. Prajapati Graphic Designer
 
Claire's designing portfolio presentation
Claire's designing portfolio presentationClaire's designing portfolio presentation
Claire's designing portfolio presentation
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & Application
 
Pitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyPitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in Technology
 
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdfSpring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptx
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anas
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to Fashion
 
Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3
 

Seismic Structural Considerations in Steel

  • 1. Seismic Structural Considerations JCC Training by Paul W. McMullin, SE, PhD October 15, 2009
  • 2. The Paper Clip Test © Dunn Associates Inc, 2009
  • 3. Concept of Selected Deformation © Dunn Associates Inc, 2009
  • 4. Early Use of Moment Connections Flatiron Building, NYC • One of the first steel frame buildings • Portal frame moment connections at all wind girders. Early Steel Frames- all moment connected © Dunn Associates Inc, 2009
  • 5. Construction Changes that led to Northridge Failures Fewer, but larger moment frames • Heavier connections Changed from Riveted to Welded construction Used lower toughness welding rod • Welds went down fast • Not permitted in pipelines Quality control problems © Dunn Associates Inc, 2009
  • 6. Acceleration Record from Northridge From the Strong Motion Database (SMDB, 2000a) © Dunn Associates Inc, 2009
  • 7. Northridge Earthquake Magnitude 6.7 Building Inventory • Estimated Economic Damage • Loss = $49.3 billion • 100 buildings with minor fractures • 100 buildings with major fractures • 30 buildings with major fractures in 90% of all connections © Dunn Associates Inc, 2009
  • 8. Fracture Causes Welding • Low Toughness Weld Metal • Slag Inclusions • Lack of fusion Mismatched Yield Strengths Erroneous Joint Detailing Weld Constraint by Heavy Sections Slab Interaction with Column © Dunn Associates Inc, 2009
  • 9. Changes: Code Code limited approved filler metals Inspection requirements tightened Limited connection types Quality control significantly increased © Dunn Associates Inc, 2009
  • 10. Changes: Weld Access Hole © Dunn Associates Inc, 2009
  • 11. Connections: WUF-W © Dunn Associates Inc, 2009
  • 12. Connections: Extended Flange © Dunn Associates Inc, 2009
  • 13. Connections: Flange Cover Plate © Dunn Associates Inc, 2009
  • 14. Connections: Reduced Beam Section © Dunn Associates Inc, 2009
  • 15. Connections: Bolted End Plate © Dunn Associates Inc, 2009
  • 16. Connections: SidePlate © Dunn Associates Inc, 2009
  • 17. Protected Zone Requirements No discontinuities in Get protected zone from protected zone drawings or engineer • Arc Strikes Mark protected zones with • Erection Aids bright paint after erection and • Air-arc Gouging after fire coating • Thermal Cutting Not permitted • Welded studs • Shot pins • Screws • Welds • Holes © Dunn Associates Inc, 2009
  • 18. Protected Zones: Dog Bone © Dunn Associates Inc, 2009
  • 19. Protected Zones: Concentric Braced Frame © Dunn Associates Inc, 2009
  • 20. Protected Zones: Concentric Braced Frame © Dunn Associates Inc, 2009
  • 21. Protected Zones: Eccentric Braced Frame © Dunn Associates Inc, 2009
  • 22. Protected Zones: Eccentric Braced Frame © Dunn Associates Inc, 2009
  • 23. Connections Bolted End Plate Reduced Beam Section (“Dog Bone”) SidePlate™ © Dunn Associates Inc, 2009
  • 24. Reduced Beam Section Connection Advantages • Approved • Reduces column-beam weld stresses Disadvantages • Milling of beam flange • 80%-90% reliable • Looks odd © Dunn Associates Inc, 2009
  • 25. Reduced Beam Section Connection Watch for: • Protected Zone (nicks, arc strikes, shot pins, welds) • Smoothness of Cut • Bracing just outside cut © Dunn Associates Inc, 2009
  • 26. SidePlate Connection Advantages • Approved- seismic & progressive collapse • Eliminates beam-column weld • High reliability • Looks strong Disadvantages • Licensing fee • Flip columns in shop © Dunn Associates Inc, 2009
  • 27. Step 1: Column Tree Assembly Rotate Column to Column1intoColumn Sub-Assembly (Not Shown Here). Bring inRotate Applyand andPosition Weld intoTack into Place Side Plates Weld 2Weld 2, toSide Plates Apply Bring in Sidewith to Bring in Temporary Plates Horiz. Other Alignment, Bring in Horizontal Shear Plates, Tack, CheckApply Other Dogs Welds 1 and 3 Apply Welds Apply 3, Tack NS/FS. Position Begin Plates, Shear Plates, After that, Column Sub-Assembly Complete. © Dunn Associates Inc, 2009
  • 28. Step 2: Full-Length Beam Assembly Begin Full-Length Full-LengthTack & and into Position 5 Shown) Bring inFull-Length Beam Beam Weld Inverted As Rotate Beam Assembly Tack Apply Position Bring in Cover Plates, (Beam into Weld Erection Angle, Assembly Complete © Dunn Associates Inc, 2009
  • 29. Step 3: Erect Column Trees & Full-Length Beams with six 7/8” A325 Bolts Each End © Dunn Associates Inc, 2009
  • 30. SidePlate Connection © Dunn Associates Inc, 2009
  • 31. SidePlate Connection Watch for: 1) Joint Gap 2) Protected Zone (nicks, arc strikes, shot pins, welds) 3) SidePlate attachments 1 3 2 © Dunn Associates Inc, 2009
  • 32. SidePlate Protected Zone © Dunn Associates Inc, 2009
  • 33. SidePlate: WELDING OK © Dunn Associates Inc, 2009
  • 34. What keeps us from backtracking? Special Inspection Good Communication • Ensure done well • RFIs that are researched & • Ultrasonic propose solutions • Mag Particle ends • Notify us ahead of certain activities (pours, fire coating) Shop Drawings • Tell us about problems as soon • Complete as you know (even your screw- • Well detailed ups) • Contractor review Think/Plan Ahead Shop vs Field Welds • Catch problems • Define up-front • Give us time to determine a solution • Shop welds- faster, higher quality • Field welds- some pieces too big for shop © Dunn Associates Inc, 2009
  • 35. Our Liability STRUCTURAL ENGINEER CONTRACTOR Becomes liable when: Becomes liable when: • Omit information • Deviate from approved plans • Don’t follow the State of the and specs Art (code is minimum) • Material/workmanship/Quality problems Regardless of who is liable, if there is a problem, we all get dragged into the mess © Dunn Associates Inc, 2009