PROJECT CONSOLIDATION OF SEWAGE DISPOSAL
ACTIVITIES IN KUJANG AND ANBYON CITIES
Gran Contract –External Actions of the European Union – DCI-FOOD/2012/308-855
Eng. Jose Miguel Ruiz Verona -Land and Water Management Engineer, B.Sc.,M.Sc.
Head of Project & Technical Advisor
Timeline
Duration: 3 years, starting from February 1th, 2013 till February
2016:
• Inception phase including inception and planning workshop:
March - December 2013
• Steering Committee establishment (SC) – November 2013.
• Signing of Memorandum of Understanding with MoCM &
People’s Committee– January 2014.
• Implementation of the physical actions in the project sites: since
April 2014
Project objective and expected results
Strengthen the resilience of urban communities, including social and health institutions,
in Kujang City (North Pyong‘an Province) and Anbyon City (Kangwon Province) by
improving food security, health and hygiene situation.
Results:
Urban water supply networks and sanitation facilities in private houses and
social/health institutions are rehabilitated and reinstalled.
Decentralized storage units and sewage disposal systems (DEWATS) are developed and
constructed.
A locally adapted concept in respect of reutilization of sewage waste products for
agriculture is defined and methods are applied.
The capacities of the users/operators are strengthened by implementation measures.
Target population,
counterparts and other
implementing partners
Target population:
• Anbyon City 27.500 inhabitants
• Kujang City 29.290 inhabitants
Counterparts:
• Ministry of City Management (MoCM)
• People’s Committee/Department of City Planning & Household Group
Other implementing partners:
• MoPH/DoPH, MoA/PAMC, MoE/PEMC, PED and Anti- epidemiological
Station
INCEPTION PHASE March – December 2013
• Ex-ante baseline survey: W&S coverages, water related diseases and
malnutrition recurrence, water consumption and availability (Q&Q) and
effluents pollution load.
• Assessment, designing, feasibility and cost estimation of the different
interventions.
• Operational Plan adjustment upon the findings and needs.
• Inception and Planning Workshop.
What is new in the project as a result of the assessment
conducted during the inception phase
Under result 3 new issues were identified not included yet in the
project:
• Stormwater management (flood hazard map development and
drainage)
• Flood control and prevention (river stabilization and regulation
measures)
Performed activities per expected result
REHABILITATION OF WSS
《SAFE DRINKING WATER SUPPLY》
WATER INTAKE AND
TRANSMISION PIPELINE
OVERHEAD TANKS
DISTRIBUTION
NETWORK AND
INHOUSE GRID
WATER QUALITY
TESTIN RUTINE
WATER INTAKE 2014
LEAKING DAM DAMAGED WATER METER
INEFFICIENT WATER FILTERWATER FILTER AREA
IMPROVED WATER INTAKE COMPONENTS & IMPROVED
WATER QUALITY
MODELLING OF THE RIVER CHANNEL SECTIONS FOR SUSPENSIN
BRIDGE DESIGN
(PEAK FLOW 150 mᶟ/s)
REHAB OF PUMP
STATION IN KUJANG
PUMP STATION
NEWLY INSTALLED CONTROL BOX
& VOLTAGE REGULATOR
REPLACEMENT OF PUMPS
INSTALLAATION OF TRANSFORMER
PIPELINE PROTECTION STRUCTURE
REPLACEMENT OF FITTINGS AT HH LEVEL
OLD FITTINGS
WATER INTAKE PROTECTION STRUCTURE
AND RIVER CHANNEL STABILIZATION WORK
SANITATION FACILITIES
• CONSTRUCTION OF DOUBLE PIT VIP LATRINES (550
units)
• CONSTRUCTION OF COMMUNITY SANITATION
CENTER (4)
• INSTALLATION OF INDOOR TOILETS AND
DOWNPIPES (500 units)
• INTALLATION OF INDOOR TOILETS AT
SOCIAL/PUBLIC BUILDINGS
DOUBLE PIT VIP LATRINE
COMMUNITY SANITATION
CENTER (CSC)
OLD CSC
CSC UNDER CONSTRUCTION
NEWLY CONSTRUCTED
INDOOR TOILET
330 HH IN KUJANG
170HH IN ANBYONOLD INDOOR TOILET
REHABILITATED INDOOR & OUTDOOR TOILETS
IN ANBYON HOSPITAL
REHABILITATED OUTDOOR TOILET
IN HAKSONG SCHOOL (BENEFICIARIES: 350 PP)
REHABILITATED INDOOR TOILETS IN SOCIAL/HEALTH INSTITUTIONS
INDOOR TOILET IN
ANBYON GUEST HOUSE
REHABILITATED INDOOR
TOILET IN ANBYON ANTI-
EPIDEMIOLOGICAL CENTER
Wastewater treatment,
reuse and disposal
• Simplified sewer system (Kujang): 1 full flash DEWATS
constructed, 8 under construction.
• Solid free sewer systems (Anbyon): 12 septic tanks
constructed and 4 DEWATS constructed, 4 under
construction.
Simplified sewer system
conceptual model design
Solid free sewer system
conceptual model design
WASTEWATER TREATMENT,
REUSE AND DISPOSAL
KUJANG COUNTY
DEWATS 9
BENEFICIARIES 5093
DRYING BED 456 ㎡
ANBYON COUNTY
DEWATS 8
BENEFICIARIES 3479
DRYING BED 240㎡
DEWATS design sector 18 – 182 families
KUJANG DEWATS IN OPERATION
DEWATS 182 HH/DAY
OUTLET
SLUDGE CHECK
SETTLER
HOUSE CONNECTION AND
INSPECTION CHAMBER
DEWATS 303 HH UNDER CONSTRUCTION
CONSTRUCTION SITE
CONSTRUCTION UNDER DEVELOPMENT
FINALIZED DEWATS TREATMENT UNIT
SEPTIC TANKS IN ANBYON (18)
CONSTRUCTION OF DRAINAGE CHANNEL FOR FLOOD MANAGEMENT
SETTLER, DRAINAGE CHANNEL AND REGULATION STRUCTURES
(STORMWATER MANAGEMENT)
Reutilization of sewage
waste products
• Composting yard site selected, designed and construction
materials in process of procurement.
• Conduct a meeting with PC, MoA/AMC to define the use of
sewage products for agriculture/horticulture production,
aquaculture and environmental purposes
• Risk chain assessment scheme for the unsuitable use of
sludge an untreated excretes as fertilizer for horti/agriculture
production
SLUDGE DRYING BEDS IN ANBYON AND
KUJANG
ITEMS FOR THE SAFE HANDLING OF SLUDGE
SOLAR GREENHOUSE IN ANBYON
CITY
Capacity building
• Onsite concrete workshops ( 2 events)
• DEWATS design and construction (2 events)
• O&M of the water supply systems (2 events)
• O&M of DEWATS, reuse of wastewater (2 events)
• Hydraulic calculation for the design of WSS (2 events)
• Catchment hydrology (1 event)
• Hygiene promotion campaign (2 events)
• Water quality testing ( 2 events)
HYGIENE PROMOTION CAMPAIGN
THANK YOU FOR LISTENING

More Related Content

What's hot

Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Fu Michael Justin
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Ekonnect
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04HartTWI
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)Stephen Flood
 
Writing Sample - Draft EIR
Writing Sample - Draft EIRWriting Sample - Draft EIR
Writing Sample - Draft EIRSharanya Ganesh
 
Overview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene powerOverview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene powerInternational WaterCentre
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...India UK Water Centre (IUKWC)
 
2014 Annual Report FINAL
2014 Annual Report FINAL2014 Annual Report FINAL
2014 Annual Report FINALSheila O'Connor
 
Sept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesSept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesCityofEvanston2
 

What's hot (20)

Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
 
Low impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigationLow impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigation
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Future projection of surface water resources of the Ganges coastal zone of Ba...
Future projection of surface water resources of the Ganges coastal zone of Ba...Future projection of surface water resources of the Ganges coastal zone of Ba...
Future projection of surface water resources of the Ganges coastal zone of Ba...
 
Current surface water resources of the Ganges coastal zone of Bangladesh
Current surface water resources of the Ganges coastal zone of BangladeshCurrent surface water resources of the Ganges coastal zone of Bangladesh
Current surface water resources of the Ganges coastal zone of Bangladesh
 
Soil Aquifer treatment system
Soil Aquifer treatment systemSoil Aquifer treatment system
Soil Aquifer treatment system
 
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
 
Writing Sample - Draft EIR
Writing Sample - Draft EIRWriting Sample - Draft EIR
Writing Sample - Draft EIR
 
Area39 pic 1 panels final
Area39 pic 1 panels finalArea39 pic 1 panels final
Area39 pic 1 panels final
 
Overview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene powerOverview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene power
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
Planning of irrigation system
Planning of irrigation systemPlanning of irrigation system
Planning of irrigation system
 
Area36 final pic1 boards
Area36 final pic1 boardsArea36 final pic1 boards
Area36 final pic1 boards
 
2014 Annual Report FINAL
2014 Annual Report FINAL2014 Annual Report FINAL
2014 Annual Report FINAL
 
Gec 1997
Gec 1997Gec 1997
Gec 1997
 
Sept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - UtilitiesSept 30 2013 council goals presentation - Utilities
Sept 30 2013 council goals presentation - Utilities
 

Viewers also liked

Knowledge Transfer and the Quality Management System to upscale DEWATS in Ind...
Knowledge Transfer and the Quality Management System to upscale DEWATS in Ind...Knowledge Transfer and the Quality Management System to upscale DEWATS in Ind...
Knowledge Transfer and the Quality Management System to upscale DEWATS in Ind...Oswar Mungkasa
 
BehrDanielle Final Powerpoint
BehrDanielle Final PowerpointBehrDanielle Final Powerpoint
BehrDanielle Final PowerpointDanielle Behr
 
وانةى سييةم
وانةى سييةموانةى سييةم
وانةى سييةمChia Barzinje
 
5 reasons why cloud computing for small business
5 reasons why cloud computing for small business5 reasons why cloud computing for small business
5 reasons why cloud computing for small businessdinCloud Inc.
 
Pharmanex Antioxidant Scanner
Pharmanex Antioxidant ScannerPharmanex Antioxidant Scanner
Pharmanex Antioxidant ScannerBill Muth
 
How DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakesHow DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakesbiomeshubha
 
20081217 01 Busaba Value Creation Of New Yellow Pigments Produced By An Uniqu...
20081217 01 Busaba Value Creation Of New Yellow Pigments Produced By An Uniqu...20081217 01 Busaba Value Creation Of New Yellow Pigments Produced By An Uniqu...
20081217 01 Busaba Value Creation Of New Yellow Pigments Produced By An Uniqu...Monascus2008
 
Anaerobic Baffled Reactor - A Review
Anaerobic Baffled Reactor - A ReviewAnaerobic Baffled Reactor - A Review
Anaerobic Baffled Reactor - A ReviewBill Barber
 
DEWATS Decentralized waste water treatment technology
DEWATS Decentralized waste water treatment  technologyDEWATS Decentralized waste water treatment  technology
DEWATS Decentralized waste water treatment technologyRajneesh Gautam
 
Continuous Delivery - Voxxed Days Bucharest 2017
Continuous Delivery - Voxxed Days Bucharest 2017Continuous Delivery - Voxxed Days Bucharest 2017
Continuous Delivery - Voxxed Days Bucharest 2017Rafał Leszko
 
Waste water management technologies
Waste water management technologiesWaste water management technologies
Waste water management technologiesmohammad adil
 

Viewers also liked (19)

Knowledge Transfer and the Quality Management System to upscale DEWATS in Ind...
Knowledge Transfer and the Quality Management System to upscale DEWATS in Ind...Knowledge Transfer and the Quality Management System to upscale DEWATS in Ind...
Knowledge Transfer and the Quality Management System to upscale DEWATS in Ind...
 
BehrDanielle Final Powerpoint
BehrDanielle Final PowerpointBehrDanielle Final Powerpoint
BehrDanielle Final Powerpoint
 
Statistic
StatisticStatistic
Statistic
 
Computer
ComputerComputer
Computer
 
وانةى سييةم
وانةى سييةموانةى سييةم
وانةى سييةم
 
Biophotonic Scanner & ARMD
Biophotonic Scanner & ARMDBiophotonic Scanner & ARMD
Biophotonic Scanner & ARMD
 
Mohammed Atif Khan
Mohammed Atif KhanMohammed Atif Khan
Mohammed Atif Khan
 
5 reasons why cloud computing for small business
5 reasons why cloud computing for small business5 reasons why cloud computing for small business
5 reasons why cloud computing for small business
 
IJETR022025
IJETR022025IJETR022025
IJETR022025
 
Pharmanex Antioxidant Scanner
Pharmanex Antioxidant ScannerPharmanex Antioxidant Scanner
Pharmanex Antioxidant Scanner
 
How DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakesHow DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakes
 
20081217 01 Busaba Value Creation Of New Yellow Pigments Produced By An Uniqu...
20081217 01 Busaba Value Creation Of New Yellow Pigments Produced By An Uniqu...20081217 01 Busaba Value Creation Of New Yellow Pigments Produced By An Uniqu...
20081217 01 Busaba Value Creation Of New Yellow Pigments Produced By An Uniqu...
 
Anaerobic Baffled Reactor - A Review
Anaerobic Baffled Reactor - A ReviewAnaerobic Baffled Reactor - A Review
Anaerobic Baffled Reactor - A Review
 
DEWATS Decentralized waste water treatment technology
DEWATS Decentralized waste water treatment  technologyDEWATS Decentralized waste water treatment  technology
DEWATS Decentralized waste water treatment technology
 
Bab i
Bab iBab i
Bab i
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Carnival
CarnivalCarnival
Carnival
 
Continuous Delivery - Voxxed Days Bucharest 2017
Continuous Delivery - Voxxed Days Bucharest 2017Continuous Delivery - Voxxed Days Bucharest 2017
Continuous Delivery - Voxxed Days Bucharest 2017
 
Waste water management technologies
Waste water management technologiesWaste water management technologies
Waste water management technologies
 

Similar to Presentation 2015 EN PRK 1055

Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christijeshaml10
 
Iwm case studies (standard)
Iwm case studies (standard)Iwm case studies (standard)
Iwm case studies (standard)biometrust
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Fairfax County
 
Water Audit, Water accounting presentation.pptx
Water Audit, Water accounting presentation.pptxWater Audit, Water accounting presentation.pptx
Water Audit, Water accounting presentation.pptxBalakrishnaBedudoori
 
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...Rajnish Bajaj
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresPrasad Thanthratey
 
Biological Sludge Reduction
Biological Sludge ReductionBiological Sludge Reduction
Biological Sludge ReductionLisa Freeman
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)Alankar jaiswal
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...LeenaMujahed
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Fairfax County
 
Critical Study on Kochi Barrage
Critical Study on Kochi BarrageCritical Study on Kochi Barrage
Critical Study on Kochi BarrageIRJET Journal
 
Introduction to water supply scheme required
Introduction to water supply scheme requiredIntroduction to water supply scheme required
Introduction to water supply scheme requiredHarshadaWagh7
 

Similar to Presentation 2015 EN PRK 1055 (20)

Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christi
 
Water supply
Water supplyWater supply
Water supply
 
National Water Mission
National Water MissionNational Water Mission
National Water Mission
 
EWB-SFP/UC Berkeley Project: Water Pumping, Storage, and Distribution System...
EWB-SFP/UC Berkeley Project: Water Pumping, Storage, and  Distribution System...EWB-SFP/UC Berkeley Project: Water Pumping, Storage, and  Distribution System...
EWB-SFP/UC Berkeley Project: Water Pumping, Storage, and Distribution System...
 
Water Woes of Mumbai City by Mr.P.K.Charankar
Water Woes of Mumbai City by Mr.P.K.CharankarWater Woes of Mumbai City by Mr.P.K.Charankar
Water Woes of Mumbai City by Mr.P.K.Charankar
 
Act basin priority project
Act basin priority projectAct basin priority project
Act basin priority project
 
Iwm case studies (standard)
Iwm case studies (standard)Iwm case studies (standard)
Iwm case studies (standard)
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
 
Water Audit, Water accounting presentation.pptx
Water Audit, Water accounting presentation.pptxWater Audit, Water accounting presentation.pptx
Water Audit, Water accounting presentation.pptx
 
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
 
PROJECT PPT.pptx
PROJECT PPT.pptxPROJECT PPT.pptx
PROJECT PPT.pptx
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply Infrastructures
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Biological Sludge Reduction
Biological Sludge ReductionBiological Sludge Reduction
Biological Sludge Reduction
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
water-resources-development-dam-engineering-water-resources-and-dam-engineeri...
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
 
Critical Study on Kochi Barrage
Critical Study on Kochi BarrageCritical Study on Kochi Barrage
Critical Study on Kochi Barrage
 
Introduction to water supply scheme required
Introduction to water supply scheme requiredIntroduction to water supply scheme required
Introduction to water supply scheme required
 

Presentation 2015 EN PRK 1055

  • 1. PROJECT CONSOLIDATION OF SEWAGE DISPOSAL ACTIVITIES IN KUJANG AND ANBYON CITIES Gran Contract –External Actions of the European Union – DCI-FOOD/2012/308-855 Eng. Jose Miguel Ruiz Verona -Land and Water Management Engineer, B.Sc.,M.Sc. Head of Project & Technical Advisor
  • 2. Timeline Duration: 3 years, starting from February 1th, 2013 till February 2016: • Inception phase including inception and planning workshop: March - December 2013 • Steering Committee establishment (SC) – November 2013. • Signing of Memorandum of Understanding with MoCM & People’s Committee– January 2014. • Implementation of the physical actions in the project sites: since April 2014
  • 3. Project objective and expected results Strengthen the resilience of urban communities, including social and health institutions, in Kujang City (North Pyong‘an Province) and Anbyon City (Kangwon Province) by improving food security, health and hygiene situation. Results: Urban water supply networks and sanitation facilities in private houses and social/health institutions are rehabilitated and reinstalled. Decentralized storage units and sewage disposal systems (DEWATS) are developed and constructed. A locally adapted concept in respect of reutilization of sewage waste products for agriculture is defined and methods are applied. The capacities of the users/operators are strengthened by implementation measures.
  • 4. Target population, counterparts and other implementing partners Target population: • Anbyon City 27.500 inhabitants • Kujang City 29.290 inhabitants Counterparts: • Ministry of City Management (MoCM) • People’s Committee/Department of City Planning & Household Group Other implementing partners: • MoPH/DoPH, MoA/PAMC, MoE/PEMC, PED and Anti- epidemiological Station
  • 5. INCEPTION PHASE March – December 2013 • Ex-ante baseline survey: W&S coverages, water related diseases and malnutrition recurrence, water consumption and availability (Q&Q) and effluents pollution load. • Assessment, designing, feasibility and cost estimation of the different interventions. • Operational Plan adjustment upon the findings and needs. • Inception and Planning Workshop.
  • 6.
  • 7.
  • 8. What is new in the project as a result of the assessment conducted during the inception phase Under result 3 new issues were identified not included yet in the project: • Stormwater management (flood hazard map development and drainage) • Flood control and prevention (river stabilization and regulation measures)
  • 9.
  • 10. Performed activities per expected result
  • 11. REHABILITATION OF WSS 《SAFE DRINKING WATER SUPPLY》 WATER INTAKE AND TRANSMISION PIPELINE OVERHEAD TANKS DISTRIBUTION NETWORK AND INHOUSE GRID WATER QUALITY TESTIN RUTINE
  • 12. WATER INTAKE 2014 LEAKING DAM DAMAGED WATER METER INEFFICIENT WATER FILTERWATER FILTER AREA
  • 13. IMPROVED WATER INTAKE COMPONENTS & IMPROVED WATER QUALITY
  • 14.
  • 15.
  • 16. MODELLING OF THE RIVER CHANNEL SECTIONS FOR SUSPENSIN BRIDGE DESIGN (PEAK FLOW 150 mᶟ/s)
  • 17.
  • 18.
  • 19. REHAB OF PUMP STATION IN KUJANG PUMP STATION NEWLY INSTALLED CONTROL BOX & VOLTAGE REGULATOR REPLACEMENT OF PUMPS INSTALLAATION OF TRANSFORMER
  • 21. REPLACEMENT OF FITTINGS AT HH LEVEL OLD FITTINGS
  • 22. WATER INTAKE PROTECTION STRUCTURE AND RIVER CHANNEL STABILIZATION WORK
  • 23. SANITATION FACILITIES • CONSTRUCTION OF DOUBLE PIT VIP LATRINES (550 units) • CONSTRUCTION OF COMMUNITY SANITATION CENTER (4) • INSTALLATION OF INDOOR TOILETS AND DOWNPIPES (500 units) • INTALLATION OF INDOOR TOILETS AT SOCIAL/PUBLIC BUILDINGS
  • 24. DOUBLE PIT VIP LATRINE
  • 25. COMMUNITY SANITATION CENTER (CSC) OLD CSC CSC UNDER CONSTRUCTION NEWLY CONSTRUCTED
  • 26. INDOOR TOILET 330 HH IN KUJANG 170HH IN ANBYONOLD INDOOR TOILET
  • 27. REHABILITATED INDOOR & OUTDOOR TOILETS IN ANBYON HOSPITAL
  • 28. REHABILITATED OUTDOOR TOILET IN HAKSONG SCHOOL (BENEFICIARIES: 350 PP)
  • 29. REHABILITATED INDOOR TOILETS IN SOCIAL/HEALTH INSTITUTIONS INDOOR TOILET IN ANBYON GUEST HOUSE REHABILITATED INDOOR TOILET IN ANBYON ANTI- EPIDEMIOLOGICAL CENTER
  • 30. Wastewater treatment, reuse and disposal • Simplified sewer system (Kujang): 1 full flash DEWATS constructed, 8 under construction. • Solid free sewer systems (Anbyon): 12 septic tanks constructed and 4 DEWATS constructed, 4 under construction.
  • 32. Solid free sewer system conceptual model design
  • 33. WASTEWATER TREATMENT, REUSE AND DISPOSAL KUJANG COUNTY DEWATS 9 BENEFICIARIES 5093 DRYING BED 456 ㎡ ANBYON COUNTY DEWATS 8 BENEFICIARIES 3479 DRYING BED 240㎡
  • 34. DEWATS design sector 18 – 182 families
  • 35.
  • 36. KUJANG DEWATS IN OPERATION DEWATS 182 HH/DAY OUTLET SLUDGE CHECK SETTLER
  • 38. DEWATS 303 HH UNDER CONSTRUCTION CONSTRUCTION SITE CONSTRUCTION UNDER DEVELOPMENT FINALIZED DEWATS TREATMENT UNIT
  • 39. SEPTIC TANKS IN ANBYON (18)
  • 40. CONSTRUCTION OF DRAINAGE CHANNEL FOR FLOOD MANAGEMENT
  • 41. SETTLER, DRAINAGE CHANNEL AND REGULATION STRUCTURES (STORMWATER MANAGEMENT)
  • 42. Reutilization of sewage waste products • Composting yard site selected, designed and construction materials in process of procurement. • Conduct a meeting with PC, MoA/AMC to define the use of sewage products for agriculture/horticulture production, aquaculture and environmental purposes • Risk chain assessment scheme for the unsuitable use of sludge an untreated excretes as fertilizer for horti/agriculture production
  • 43.
  • 44.
  • 45. SLUDGE DRYING BEDS IN ANBYON AND KUJANG ITEMS FOR THE SAFE HANDLING OF SLUDGE
  • 46. SOLAR GREENHOUSE IN ANBYON CITY
  • 47. Capacity building • Onsite concrete workshops ( 2 events) • DEWATS design and construction (2 events) • O&M of the water supply systems (2 events) • O&M of DEWATS, reuse of wastewater (2 events) • Hydraulic calculation for the design of WSS (2 events) • Catchment hydrology (1 event) • Hygiene promotion campaign (2 events) • Water quality testing ( 2 events)
  • 49. THANK YOU FOR LISTENING