SCHEDULE OF MATERIALS
The Importance of Construction
Scheduling
Proper planning and scheduling are
needed to ensure that a construction
project is completed on time and within
budget. A well planned construction
schedule not only helps in outlining the
pace of work but also how the work will
get done.
The schedule helps in defining the
methods and sequence in which the
materials are going to be put in
place. Preparing a construction
schedule is not an easy job as the
scheduler needs to think of many
elements to design the right
schedule.
The scheduler needs to take into
account overall scope of work as well
as connections between different
components to create a construction
schedule that works for everyone. A
well-designed construction scheduling
helps in maximizing efficiency and
productivity. Here is a list of some of
the major benefits of making a
construction schedule before the work
begins.
One of the biggest advantages of
preparing a construction schedule
before beginning the construction work
is that you get fewer surprises down the
road as everything is outlined in great
detail in the schedule. Creating a
schedule allows you to have complete
control over all of your projects and it
will enable you to plan your business
operations down to the lowest level.
Another advantage of scheduling is
that it allows you to maximize quality
control measures as you can properly
sequence the work and make sure the
right quality and quantity of material
are used at each step. It also helps you
with the planning of various resources
including equipment and labor, among
other things.
A big construction project requires a lot
of building materials, which means you
can use a schedule to buy the right
materials at the right time allowing you
to complete the project on time. You
need to submit a variety of samples,
data sheets and other types of
drawings in time to complete the project
and a schedule allows you to do the
same with ease and efficiency.
Proper construction scheduling also allows
you to give time to various parties
including your clients, designers, vendors
as well as subcontractors so they can
better plan their activities. Safety is a big
concern in any construction project and
planning all the activities with the help of a
schedule allows you to improve safety
performance and ensure proper protection
for all the
workers at the construction site. Proper
scheduling also allows you to save
money as you will know the activities
that need to be done during cold
weather allowing you to put pricing
protection measures in place. A proper
scheduling system also helps you
achieve high efficiency and complete
the project in a reasonable time frame.
MATERIAL SCHEDULES
• To help in finishing a construction job
within the time limit of the contract,
the contractor sets up a schedule of
materials. This schedule is based on
the contractor’s idea of the best way
to men, money, machinery and
materials.
The contractor lists each part of the
work along with an estimate of time.
He/she then sets up the schedule.
The schedule is changed from time
to time because of events on the job
or because of change in order from
the owner, architect or the engineer.
Why You Need a Material
Schedule for Construction
While some clients are well aware and
may be in possession of materials
schedule as issued to them by a
professional, deliberately, they put
aside the materials schedule and go
ahead to do or use that which suits
them.
This can lead to a number of structural
defects including building collapse. While
making careful use of the material
schedule is of utmost importance in every
building construction, a sound supervision
of the construction project to ensure
adequate and quality usage of the
specified materials is a key to attaining the
desired result.
To achieve a good quality building
construction project, capable of standing
the test of time, some experts in
construction industry have this to say;
“Sometimes the use of direct labour in
conjunction with supervisory and quality
control inputs from one or two
professionals is seen as a more budget-
friendly approach to the delivery of a
project, especially small-scale projects.
“Other times, the project owner may
choose to be engaged directly in
purchasing and organizing the supply of
construction materials to their site, also in
a bid to save cost. Whatever the case may
be, whether it’s your personal project or as
a group, it is important to know what and
what you should expect on completion of
the project. You don’t plant grapes and
expect to reap blueberries.
“A building development project is essentially a
product of the use of materials and
workmanship. You don’t order for tiles and
expect to see epoxy flooring; neither would you
see a classic brick wall when you actually paid
for blocks.
“The usefulness of a material schedule is not in
contention. You may never know it until you
lose money buying the wrong or a substandard
material at the same price as the original or
even more”.
Specifically, “Material schedule is that piece of
document that shows you the types, sizes,
quantities, quality specifications and sometimes
current price of all the materials you would
need for a project from start to finish. It is not
the same as a Bill of Quantities (B.O.Q) or Priced
Bill of Quantities which gives brief details of all
the items of work in a construction project and
cost included respectively, it doesn’t give you
the work item or work processes, it only deals
with the materials aspect.
The material schedule is presented in
such a way that the user can easily
identify with what materials to be used
in the construction of his/her project
and it often reveals approximate
quantity estimates of all the materials
needed with minimal allowance for
wastage.
“Usually the material schedule is a
construction document prepared after all
the relevant designs/drawings have been
completed and a thorough market survey
has been done to check availability/current
prices of the required materials, so that at
no point is any material omitted due to
incomplete architectural and engineering
details. It is often done in conjunction with
the owner’s specifications.
“When engaging a contractor, it is
important to ask for a material schedule so
that you can follow up on the quality of
materials used for your work. If the
materials used are not those you have
agreed on as duly reflected on the material
schedule in the absence of a pro-work
variation, you can call for a replacement.
“But if there are no documents to show
material specifications, then you can
expect anything.
Sometimes regrets may follow; this is
particularly the case when a supplier is
engaged without a material schedule
to back up your claims on the
specifications of the materials ordered
for.
“Take for instance, you need a simple
timber (wood) to construct your roof
structure, if you don’t specify the product
type, size and condition (e.g. Mahogany
Hardwood, 50 x 75mm full lengths, new
and smooth) but just say supply me ‘wood
for roofing’. Who takes the blame when a
truckload of used fragile softwood is
brought to your site and workers begin
installing them? Although the material
schedule comes at a cost, it is worth it”.
Schedule of materials sample
Outlines for schedules of materials are
supplied by architects. In brief, a
schedule of materials includes: A
description of materials to be used.
This includes sizes, quantity, quality,
brand names , style and specification
numbers.
Item description quality quantity unit Unit price Total
12mm reinforcement rods
16mm reinforcement rods
Mild steel
High yield steel
20
30
Pc
Pc
18,000/=
22,000/=
360,000/=
660,000/=
Total 1,020,000/=
Schedule of materials 2

More Related Content

What's hot

civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
Nikhil Kumar
 
Primavera p6 18.8 planning and scheduling guide r3
Primavera p6 18.8 planning and  scheduling guide r3Primavera p6 18.8 planning and  scheduling guide r3
Primavera p6 18.8 planning and scheduling guide r3
Matiwos Tsegaye
 
Introduction To Primavera (P6)
Introduction To Primavera (P6)Introduction To Primavera (P6)
Introduction To Primavera (P6)
Sandip Kumar Verma
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
Shourya Puri
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
A Makwana
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
Rajat Nainwal
 
RIBA plan of work
RIBA plan of workRIBA plan of work
RIBA plan of work
sithirumanamperi
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
Manit Agarwal
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
Kabilan Kabi
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentation
Nithin Dev
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
RajeshPV12
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
AB MAKASANA
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
Muhammad Aljalali
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
Namrata Agnihotri
 
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptChapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
ssuserb4074f
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
Wilden How
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
Shabaz Khan
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
Ar Naveen Naveen
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
Sze Ting Kuek
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
Ali Juma Albahrani
 

What's hot (20)

civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Primavera p6 18.8 planning and scheduling guide r3
Primavera p6 18.8 planning and  scheduling guide r3Primavera p6 18.8 planning and  scheduling guide r3
Primavera p6 18.8 planning and scheduling guide r3
 
Introduction To Primavera (P6)
Introduction To Primavera (P6)Introduction To Primavera (P6)
Introduction To Primavera (P6)
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
RIBA plan of work
RIBA plan of workRIBA plan of work
RIBA plan of work
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentation
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptChapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
 

Similar to Schedule of materials 2

Creating a Cost-Effective Construction Project
Creating a Cost-Effective Construction ProjectCreating a Cost-Effective Construction Project
Creating a Cost-Effective Construction Project
Joe Harks
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.ppt
DejeneTsegaye6
 
Suvarna consultancy services
Suvarna consultancy services Suvarna consultancy services
Suvarna consultancy services
Ashok Tundare
 
Work scheduling(2)
Work scheduling(2)Work scheduling(2)
Work scheduling(2)
ngiyari
 
Construction project management
Construction project managementConstruction project management
Construction project management
saif hasan
 
Construction Compliance Consultants
Construction Compliance ConsultantsConstruction Compliance Consultants
Construction Compliance Consultants
bfitzsimons1974
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in construction
Saravana murthy
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
wendyteosy
 
Critical Path Method Scheduling for DOT
Critical Path Method Scheduling for DOT Critical Path Method Scheduling for DOT
Critical Path Method Scheduling for DOT
William Brooks
 
COE
COECOE
construction project planing
 construction project planing construction project planing
construction project planing
SANJEEV Wazir
 
Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiled
Arthur Wilson
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
ijtsrd
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET Journal
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel
 
Project management
Project managementProject management
Project management
Benjamin Tan
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
AprilRosal1
 
12
1212
Precon Phase Services
Precon Phase ServicesPrecon Phase Services
Precon Phase Services
Lee Maserian R.D.I.
 

Similar to Schedule of materials 2 (20)

Creating a Cost-Effective Construction Project
Creating a Cost-Effective Construction ProjectCreating a Cost-Effective Construction Project
Creating a Cost-Effective Construction Project
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.ppt
 
Suvarna consultancy services
Suvarna consultancy services Suvarna consultancy services
Suvarna consultancy services
 
Work scheduling(2)
Work scheduling(2)Work scheduling(2)
Work scheduling(2)
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Construction Compliance Consultants
Construction Compliance ConsultantsConstruction Compliance Consultants
Construction Compliance Consultants
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in construction
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
 
Critical Path Method Scheduling for DOT
Critical Path Method Scheduling for DOT Critical Path Method Scheduling for DOT
Critical Path Method Scheduling for DOT
 
COE
COECOE
COE
 
construction project planing
 construction project planing construction project planing
construction project planing
 
Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiled
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of scheduleJ.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
 
Project management
Project managementProject management
Project management
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
 
12
1212
12
 
Precon Phase Services
Precon Phase ServicesPrecon Phase Services
Precon Phase Services
 

Recently uploaded

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 

Recently uploaded (20)

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 

Schedule of materials 2

  • 1. SCHEDULE OF MATERIALS The Importance of Construction Scheduling Proper planning and scheduling are needed to ensure that a construction project is completed on time and within budget. A well planned construction schedule not only helps in outlining the pace of work but also how the work will get done.
  • 2. The schedule helps in defining the methods and sequence in which the materials are going to be put in place. Preparing a construction schedule is not an easy job as the scheduler needs to think of many elements to design the right schedule.
  • 3. The scheduler needs to take into account overall scope of work as well as connections between different components to create a construction schedule that works for everyone. A well-designed construction scheduling helps in maximizing efficiency and productivity. Here is a list of some of the major benefits of making a construction schedule before the work begins.
  • 4. One of the biggest advantages of preparing a construction schedule before beginning the construction work is that you get fewer surprises down the road as everything is outlined in great detail in the schedule. Creating a schedule allows you to have complete control over all of your projects and it will enable you to plan your business operations down to the lowest level.
  • 5. Another advantage of scheduling is that it allows you to maximize quality control measures as you can properly sequence the work and make sure the right quality and quantity of material are used at each step. It also helps you with the planning of various resources including equipment and labor, among other things.
  • 6. A big construction project requires a lot of building materials, which means you can use a schedule to buy the right materials at the right time allowing you to complete the project on time. You need to submit a variety of samples, data sheets and other types of drawings in time to complete the project and a schedule allows you to do the same with ease and efficiency.
  • 7. Proper construction scheduling also allows you to give time to various parties including your clients, designers, vendors as well as subcontractors so they can better plan their activities. Safety is a big concern in any construction project and planning all the activities with the help of a schedule allows you to improve safety performance and ensure proper protection for all the
  • 8. workers at the construction site. Proper scheduling also allows you to save money as you will know the activities that need to be done during cold weather allowing you to put pricing protection measures in place. A proper scheduling system also helps you achieve high efficiency and complete the project in a reasonable time frame.
  • 9. MATERIAL SCHEDULES • To help in finishing a construction job within the time limit of the contract, the contractor sets up a schedule of materials. This schedule is based on the contractor’s idea of the best way to men, money, machinery and materials.
  • 10. The contractor lists each part of the work along with an estimate of time. He/she then sets up the schedule. The schedule is changed from time to time because of events on the job or because of change in order from the owner, architect or the engineer.
  • 11. Why You Need a Material Schedule for Construction While some clients are well aware and may be in possession of materials schedule as issued to them by a professional, deliberately, they put aside the materials schedule and go ahead to do or use that which suits them.
  • 12. This can lead to a number of structural defects including building collapse. While making careful use of the material schedule is of utmost importance in every building construction, a sound supervision of the construction project to ensure adequate and quality usage of the specified materials is a key to attaining the desired result.
  • 13. To achieve a good quality building construction project, capable of standing the test of time, some experts in construction industry have this to say; “Sometimes the use of direct labour in conjunction with supervisory and quality control inputs from one or two professionals is seen as a more budget- friendly approach to the delivery of a project, especially small-scale projects.
  • 14. “Other times, the project owner may choose to be engaged directly in purchasing and organizing the supply of construction materials to their site, also in a bid to save cost. Whatever the case may be, whether it’s your personal project or as a group, it is important to know what and what you should expect on completion of the project. You don’t plant grapes and expect to reap blueberries.
  • 15. “A building development project is essentially a product of the use of materials and workmanship. You don’t order for tiles and expect to see epoxy flooring; neither would you see a classic brick wall when you actually paid for blocks. “The usefulness of a material schedule is not in contention. You may never know it until you lose money buying the wrong or a substandard material at the same price as the original or even more”.
  • 16. Specifically, “Material schedule is that piece of document that shows you the types, sizes, quantities, quality specifications and sometimes current price of all the materials you would need for a project from start to finish. It is not the same as a Bill of Quantities (B.O.Q) or Priced Bill of Quantities which gives brief details of all the items of work in a construction project and cost included respectively, it doesn’t give you the work item or work processes, it only deals with the materials aspect.
  • 17. The material schedule is presented in such a way that the user can easily identify with what materials to be used in the construction of his/her project and it often reveals approximate quantity estimates of all the materials needed with minimal allowance for wastage.
  • 18. “Usually the material schedule is a construction document prepared after all the relevant designs/drawings have been completed and a thorough market survey has been done to check availability/current prices of the required materials, so that at no point is any material omitted due to incomplete architectural and engineering details. It is often done in conjunction with the owner’s specifications.
  • 19. “When engaging a contractor, it is important to ask for a material schedule so that you can follow up on the quality of materials used for your work. If the materials used are not those you have agreed on as duly reflected on the material schedule in the absence of a pro-work variation, you can call for a replacement. “But if there are no documents to show material specifications, then you can expect anything.
  • 20. Sometimes regrets may follow; this is particularly the case when a supplier is engaged without a material schedule to back up your claims on the specifications of the materials ordered for.
  • 21. “Take for instance, you need a simple timber (wood) to construct your roof structure, if you don’t specify the product type, size and condition (e.g. Mahogany Hardwood, 50 x 75mm full lengths, new and smooth) but just say supply me ‘wood for roofing’. Who takes the blame when a truckload of used fragile softwood is brought to your site and workers begin installing them? Although the material schedule comes at a cost, it is worth it”.
  • 22. Schedule of materials sample Outlines for schedules of materials are supplied by architects. In brief, a schedule of materials includes: A description of materials to be used. This includes sizes, quantity, quality, brand names , style and specification numbers.
  • 23. Item description quality quantity unit Unit price Total 12mm reinforcement rods 16mm reinforcement rods Mild steel High yield steel 20 30 Pc Pc 18,000/= 22,000/= 360,000/= 660,000/= Total 1,020,000/=