U.S. Fish & Wildlife Service
Seal Beach National Wildlife Refuge
Thin Layer Salt Marsh Sediment
Augmentation Project
Construction and Lessons Learned
Rick NyeRick Nye -- Refuge BiologistRefuge Biologist -- Seal Beach NWRSeal Beach NWR
U.S. Fish & Wildlife Service
ProblemProblem
•• 965 acre refuge965 acre refuge
-- 59% (565 acres)59% (565 acres)
intertidal salt marshintertidal salt marsh
•• Subsidence rate:Subsidence rate:
-- 4.13mm/4.13mm/yryr
(SE(SE ++ 1.21 mm/1.21 mm/yryr))
•• Relative Sea Level RiseRelative Sea Level Rise
6.23 mm/6.23 mm/yryr
•• Subtidal in 60 yearsSubtidal in 60 years
U.S. Fish & Wildlife Service
Dredge Material OpportunityDredge Material Opportunity
U.S. Fish & Wildlife Service
Research & MonitoringResearch & Monitoring
Timeline:Timeline:
66--mos Premos Pre--augmentation toaugmentation to
55--yrs Postyrs Post--augmentationaugmentation
•• Site elevationsSite elevations
•• Sediment depth overtimeSediment depth overtime
•• Compaction rateCompaction rate
•• Tidal creek reformationTidal creek reformation
•• Vegetation % coverVegetation % cover
•• Species compositionSpecies composition
•• BiomassBiomass
•• Cordgrass assessmentCordgrass assessment
•• Plant PhysiologyPlant Physiology
•• Invertebrate speciesInvertebrate species
•• Eelgrass healthEelgrass health
•• Ridgeway’s RailsRidgeway’s Rails
•• other avian activityother avian activity
•• Carbon sequestrationCarbon sequestration
U.S. Fish & Wildlife Service
MitigationMitigation MeasuresMeasures
•• Relocate rail nesting platformsRelocate rail nesting platforms
•• Haze birds off project siteHaze birds off project site
•• Minimize avian predator perchingMinimize avian predator perching
•• Patrol pipeline for leaks, sea turtles, and marine mammalsPatrol pipeline for leaks, sea turtles, and marine mammals
•• Conduct eelgrass surveys (pre, 1 year, 2 year)Conduct eelgrass surveys (pre, 1 year, 2 year)
•• Vegetated “Buffer zone” of 50 ft. from waters edgeVegetated “Buffer zone” of 50 ft. from waters edge
•• Silt barriers on augmentation siteSilt barriers on augmentation site
•• InIn--water silt curtains for dredge operationswater silt curtains for dredge operations
•• Monitor turbidityMonitor turbidity
•• Minimize eelgrass impactMinimize eelgrass impact
•• Keep bioKeep bio--monitor on sitemonitor on site
U.S. Fish & Wildlife Service
ConstructionConstruction RequirementsRequirements
•• PrePre--augmentation RTK surveyaugmentation RTK survey
•• Install 10m gridInstall 10m grid
•• Implement mitigation measuresImplement mitigation measures
•• Test application methodsTest application methods
•• Install sediment barrierInstall sediment barrier
•• Install silt fencingInstall silt fencing
•• Maintain 50 ft. bufferMaintain 50 ft. buffer
•• Apply 10” sedimentApply 10” sediment
++ 1” at grid poles1” at grid poles
++ 1.8” between poles1.8” between poles
•• Respond to unexpected issuesRespond to unexpected issues
•• PostPost--augmentationaugmentation
photogrammetry surveyphotogrammetry survey
U.S. Fish & Wildlife Service
Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
Photo by Kirk Gilligan/USFWSPhoto by Kirk Gilligan/USFWS
Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWSPhoto by Kirk Gilligan/USFWSPhoto by Kirk Gilligan/USFWS
Construction EquipmentConstruction Equipment
U.S. Fish & Wildlife Service
Photo by Curtin MaritimePhoto by Curtin Maritime
Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
NozzleNozzle SelectionSelection
Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
Photo by Kirk Gilligan/USFWSPhoto by Kirk Gilligan/USFWS
U.S. Fish & Wildlife Service
Source MaterialSource Material
•• Better sampling of grain sizeBetter sampling of grain size
•• Avoid pockets of garbageAvoid pockets of garbage
•• Contract required trash pickContract required trash pick--upup
Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
U.S. Fish & Wildlife Service
Spraying ImpactsSpraying Impacts
Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
•• Birds relatively undeterredBirds relatively undeterred
•• Noise level ~60dBNoise level ~60dB
•• Ridgeway’s rail hiding near equipmentRidgeway’s rail hiding near equipment
Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
U.S. Fish & Wildlife Service
Sediment BarriersSediment Barriers
Photo by Kirk Gilligan/USFWSPhoto by Kirk Gilligan/USFWS
Photo by Curtin MaritimePhoto by Curtin Maritime
Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
U.S. Fish & Wildlife Service
•• New sediment compactionNew sediment compaction
–– 20% to 30% during 120% to 30% during 1stst 7272 hrshrs
•• Variances in underlyingVariances in underlying
marsh compactionmarsh compaction
•• Coring verificationCoring verification
–– AccessAccess
–– Labor intensiveLabor intensive
•• Bathtub/Lava effectBathtub/Lava effect
•• Consistent pole installationConsistent pole installation
standardsstandards
–– Research TeamResearch Team
–– ContractorContractor
–– >500 grid + research poles>500 grid + research poles
Estimating Depths During ConstructionEstimating Depths During Construction
U.S. Fish & Wildlife Service
Final ElevationsFinal Elevations
Photogrammetry surveyPhotogrammetry survey ––
●● 0.10.1 -- 0.050.05 ftft accuracyaccuracy
Calculated sediment depthCalculated sediment depth ––
●● 9.6” on average9.6” on average
●● 40% of poles were 10” + 1”40% of poles were 10” + 1”
●● 6363% of poles were 10” + 2”% of poles were 10” + 2”
●● Large depth varianceLarge depth variance
across 40% of the siteacross 40% of the site
U.S. Fish & Wildlife Service
Estimation ErrorsEstimation Errors
Construction timelineConstruction timeline ––
Estimated: 1 monthEstimated: 1 month
Actual: 1Actual: 1stst thirdthird -- 22 mosmos
Remainder: 2Remainder: 2 wkswks
●● Equipment breakdownsEquipment breakdowns
●● Sediment barrierSediment barrier
maintenancemaintenance
Sediment volumeSediment volume ––
Estimated:Estimated:
13,500 yd13,500 yd33 for 10.0 acfor 10.0 ac
Actual:Actual:
16,875 yd16,875 yd33 for 7.87 acfor 7.87 ac
Better estimate would be:Better estimate would be:
22,000 yd22,000 yd33 for 10.0 acfor 10.0 ac
U.S. Fish & Wildlife Service
Funding and TimelinesFunding and Timelines
•• Contractor bill for dredging and placementContractor bill for dredging and placement::
-- $$1.35 million1.35 million
•• Time for planning, funding requests and permitting:Time for planning, funding requests and permitting:
-- 2.5 years2.5 years
•• PostPost--augmentation research and evaluation:augmentation research and evaluation:
-- 5 years5 years
-- $1.5 million (includes monitoring during construction)$1.5 million (includes monitoring during construction)
U.S. Fish & Wildlife Service
DataData Dissemination & OutreachDissemination & Outreach
•• Publish postPublish post--construction monitoring reports annuallyconstruction monitoring reports annually
•• Refuge webpage to provide quarterly updates, reports,Refuge webpage to provide quarterly updates, reports,
photos, & time lapse videophotos, & time lapse video
•• Conduct a workshop/webinar to present monitoring resultsConduct a workshop/webinar to present monitoring results
•• Prepare a final report with lessons learned andPrepare a final report with lessons learned and
recommendations for future projectsrecommendations for future projects
•• Research team regularly present their efforts atResearch team regularly present their efforts at
conferencesconferences
U.S. Fish & Wildlife Service
Big pictureBig picture
Implement and evaluate thin layer placement as a adaptationImplement and evaluate thin layer placement as a adaptation
strategy for regional sea level rise and climate change.strategy for regional sea level rise and climate change.
Be able to use this strategy at regular intervals for long termBe able to use this strategy at regular intervals for long term
sustainability of Pacific coast marshes.sustainability of Pacific coast marshes.
U.S. Fish & Wildlife Service
ForFor further information contactfurther information contact::
Kirk GilliganKirk Gilligan
Refuge ManagerRefuge Manager –– Seal Beach NWRSeal Beach NWR
kkirk_gilligan@fws.govirk_gilligan@fws.gov
562562--598598--10241024
OrOr
Vicki TouchstoneVicki Touchstone
Refuge PlannerRefuge Planner –– San Diego NWR ComplexSan Diego NWR Complex
vvictoria_touchstone@fws.govictoria_touchstone@fws.gov
619619--476476--9150 Ext. 1039150 Ext. 103
Reports and time lapse videos:Reports and time lapse videos:
www.fws.gov/refuge/seal_beach/what_we_do/resourwww.fws.gov/refuge/seal_beach/what_we_do/resour
ce_management/Sediment_Pilot_Project.htmlce_management/Sediment_Pilot_Project.html

More Related Content

What's hot

Brownfields Remediation
Brownfields RemediationBrownfields Remediation
Brownfields Remediation
mohammadchowdhury
 
LCW Restoration Plan & EIR- Public Workshop #2
LCW Restoration Plan & EIR- Public Workshop #2LCW Restoration Plan & EIR- Public Workshop #2
LCW Restoration Plan & EIR- Public Workshop #2
TidalInlfluence
 
EW_Select_Project_List_1
EW_Select_Project_List_1EW_Select_Project_List_1
EW_Select_Project_List_1Eric Wetzstein
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
Lakeland Resources Inc. (TSXv: LK)
 
Moffett Restoration Advisory Board Hangar One Update July 14, 2011
Moffett Restoration Advisory Board Hangar One Update July 14, 2011Moffett Restoration Advisory Board Hangar One Update July 14, 2011
Moffett Restoration Advisory Board Hangar One Update July 14, 2011
Steve Williams
 
Amendments To O Reg 153 04
Amendments To O Reg 153 04Amendments To O Reg 153 04
Amendments To O Reg 153 04
mohammadchowdhury
 
Andrew Gorman resume 2015
Andrew Gorman resume 2015Andrew Gorman resume 2015
Andrew Gorman resume 2015Andrew Gorman
 
Jessop - Example OtterTail Projects_160317
Jessop - Example OtterTail Projects_160317Jessop - Example OtterTail Projects_160317
Jessop - Example OtterTail Projects_160317Mark Jessop
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther
 
Moffett Hangar One Update to the Restoration Advisory Board
Moffett Hangar One Update to the Restoration Advisory BoardMoffett Hangar One Update to the Restoration Advisory Board
Moffett Hangar One Update to the Restoration Advisory BoardSteve Williams
 
ATEF CV Updated in June 2015
ATEF CV Updated in June 2015ATEF CV Updated in June 2015
ATEF CV Updated in June 2015Atef Farouk
 

What's hot (11)

Brownfields Remediation
Brownfields RemediationBrownfields Remediation
Brownfields Remediation
 
LCW Restoration Plan & EIR- Public Workshop #2
LCW Restoration Plan & EIR- Public Workshop #2LCW Restoration Plan & EIR- Public Workshop #2
LCW Restoration Plan & EIR- Public Workshop #2
 
EW_Select_Project_List_1
EW_Select_Project_List_1EW_Select_Project_List_1
EW_Select_Project_List_1
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
 
Moffett Restoration Advisory Board Hangar One Update July 14, 2011
Moffett Restoration Advisory Board Hangar One Update July 14, 2011Moffett Restoration Advisory Board Hangar One Update July 14, 2011
Moffett Restoration Advisory Board Hangar One Update July 14, 2011
 
Amendments To O Reg 153 04
Amendments To O Reg 153 04Amendments To O Reg 153 04
Amendments To O Reg 153 04
 
Andrew Gorman resume 2015
Andrew Gorman resume 2015Andrew Gorman resume 2015
Andrew Gorman resume 2015
 
Jessop - Example OtterTail Projects_160317
Jessop - Example OtterTail Projects_160317Jessop - Example OtterTail Projects_160317
Jessop - Example OtterTail Projects_160317
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr Resume
 
Moffett Hangar One Update to the Restoration Advisory Board
Moffett Hangar One Update to the Restoration Advisory BoardMoffett Hangar One Update to the Restoration Advisory Board
Moffett Hangar One Update to the Restoration Advisory Board
 
ATEF CV Updated in June 2015
ATEF CV Updated in June 2015ATEF CV Updated in June 2015
ATEF CV Updated in June 2015
 

Viewers also liked

Investigating the impact of silt on habitat
Investigating the impact of silt on habitatInvestigating the impact of silt on habitat
Investigating the impact of silt on habitatlearningfforlife
 
Silt: Lessons Learned
Silt: Lessons LearnedSilt: Lessons Learned
Silt: Lessons Learned
ESUG
 
Rocks And Sand Earth Science Lesson Portfolio
Rocks And Sand Earth Science Lesson PortfolioRocks And Sand Earth Science Lesson Portfolio
Rocks And Sand Earth Science Lesson Portfoliooliviaioannou
 
Kajaria Gres Tough
Kajaria Gres ToughKajaria Gres Tough
Kajaria Gres Tough
Sunil Pal
 
(classification of soil)
(classification of soil)(classification of soil)
(classification of soil)
Ezra Sharin Marato
 
Classification of soil
Classification of soilClassification of soil
Classification of soil
Kavin Raval
 
Properties of soils (teach)
Properties of soils (teach) Properties of soils (teach)
Properties of soils (teach)
Moira Whitehouse
 
Sand Dune Ecosystems
Sand Dune EcosystemsSand Dune Ecosystems
Sand Dune Ecosystems
jacksonthree
 
Biosphere : Sand Dune Succession
Biosphere : Sand Dune SuccessionBiosphere : Sand Dune Succession
Biosphere : Sand Dune SuccessionValVannet
 
types of soil
types of soiltypes of soil
types of soil
mehanas
 
Coastal Protection Methods
Coastal Protection MethodsCoastal Protection Methods
Coastal Protection Methodsguesta38fc29
 
Detailed Lesson Plan (ENGLISH, MATH, SCIENCE, FILIPINO)
Detailed Lesson Plan (ENGLISH, MATH, SCIENCE, FILIPINO)Detailed Lesson Plan (ENGLISH, MATH, SCIENCE, FILIPINO)
Detailed Lesson Plan (ENGLISH, MATH, SCIENCE, FILIPINO)
Junnie Salud
 

Viewers also liked (13)

Investigating the impact of silt on habitat
Investigating the impact of silt on habitatInvestigating the impact of silt on habitat
Investigating the impact of silt on habitat
 
Silt: Lessons Learned
Silt: Lessons LearnedSilt: Lessons Learned
Silt: Lessons Learned
 
Fase 1
Fase 1Fase 1
Fase 1
 
Rocks And Sand Earth Science Lesson Portfolio
Rocks And Sand Earth Science Lesson PortfolioRocks And Sand Earth Science Lesson Portfolio
Rocks And Sand Earth Science Lesson Portfolio
 
Kajaria Gres Tough
Kajaria Gres ToughKajaria Gres Tough
Kajaria Gres Tough
 
(classification of soil)
(classification of soil)(classification of soil)
(classification of soil)
 
Classification of soil
Classification of soilClassification of soil
Classification of soil
 
Properties of soils (teach)
Properties of soils (teach) Properties of soils (teach)
Properties of soils (teach)
 
Sand Dune Ecosystems
Sand Dune EcosystemsSand Dune Ecosystems
Sand Dune Ecosystems
 
Biosphere : Sand Dune Succession
Biosphere : Sand Dune SuccessionBiosphere : Sand Dune Succession
Biosphere : Sand Dune Succession
 
types of soil
types of soiltypes of soil
types of soil
 
Coastal Protection Methods
Coastal Protection MethodsCoastal Protection Methods
Coastal Protection Methods
 
Detailed Lesson Plan (ENGLISH, MATH, SCIENCE, FILIPINO)
Detailed Lesson Plan (ENGLISH, MATH, SCIENCE, FILIPINO)Detailed Lesson Plan (ENGLISH, MATH, SCIENCE, FILIPINO)
Detailed Lesson Plan (ENGLISH, MATH, SCIENCE, FILIPINO)
 

Similar to SBNWR Sediment Augmentation Lessons Learned

James riverpartnership2003
James riverpartnership2003James riverpartnership2003
2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port...
2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port...2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port...
2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port...
SevernEstuary
 
reservoir surveillance for oil and gas document
reservoir surveillance for oil and gas documentreservoir surveillance for oil and gas document
reservoir surveillance for oil and gas document
TarekGanat1
 
Water Quality Presentation
Water Quality PresentationWater Quality Presentation
Water Quality Presentation
riseagrant
 
Nisqually Shellfish Growing Area Upgrades
Nisqually Shellfish Growing Area UpgradesNisqually Shellfish Growing Area Upgrades
Nisqually Shellfish Growing Area Upgrades
Nisqually River Council
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
Global CCS Institute
 
5.1 sampling issues in river health assessment en
5.1 sampling issues in river health assessment en5.1 sampling issues in river health assessment en
5.1 sampling issues in river health assessment enInternational WaterCentre
 
5.1 sampling issues in river health assessment en
5.1 sampling issues in river health assessment en5.1 sampling issues in river health assessment en
5.1 sampling issues in river health assessment enInternational WaterCentre
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Global CCS Institute
 
Erosion and Sediment Control - Faga’alu, American Samoa
Erosion and Sediment Control - Faga’alu, American SamoaErosion and Sediment Control - Faga’alu, American Samoa
Erosion and Sediment Control - Faga’alu, American Samoa
Steven Curtis
 
Cumulative Impact Summary 1997-2010 HPAs
Cumulative Impact Summary 1997-2010 HPAsCumulative Impact Summary 1997-2010 HPAs
Cumulative Impact Summary 1997-2010 HPAsBSH Admin
 
From Field to Stream: Measuring Sediment and Nutrient Losses - Kuehner
From Field to Stream: Measuring Sediment and Nutrient Losses - KuehnerFrom Field to Stream: Measuring Sediment and Nutrient Losses - Kuehner
From Field to Stream: Measuring Sediment and Nutrient Losses - Kuehner
Soil and Water Conservation Society
 
Reservoir engineering.ppt
Reservoir engineering.pptReservoir engineering.ppt
Reservoir engineering.ppt
YusufAdamu10
 
Pacific Netting Products (1)
Pacific Netting Products (1)Pacific Netting Products (1)
Pacific Netting Products (1)Andy Peters
 
Hydrography for Maximising Port Capacity
Hydrography for Maximising Port CapacityHydrography for Maximising Port Capacity
Hydrography for Maximising Port Capacity
Neil Hewitt
 

Similar to SBNWR Sediment Augmentation Lessons Learned (20)

James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port...
2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port...2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port...
2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port...
 
reservoir surveillance for oil and gas document
reservoir surveillance for oil and gas documentreservoir surveillance for oil and gas document
reservoir surveillance for oil and gas document
 
cgts_services
cgts_servicescgts_services
cgts_services
 
Seminar Series_final
Seminar Series_finalSeminar Series_final
Seminar Series_final
 
LEO RESUME FINAL
LEO RESUME FINALLEO RESUME FINAL
LEO RESUME FINAL
 
Résumé-Finlayson
Résumé-FinlaysonRésumé-Finlayson
Résumé-Finlayson
 
Water Quality Presentation
Water Quality PresentationWater Quality Presentation
Water Quality Presentation
 
Nisqually Shellfish Growing Area Upgrades
Nisqually Shellfish Growing Area UpgradesNisqually Shellfish Growing Area Upgrades
Nisqually Shellfish Growing Area Upgrades
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
 
5.1 sampling issues in river health assessment en
5.1 sampling issues in river health assessment en5.1 sampling issues in river health assessment en
5.1 sampling issues in river health assessment en
 
5.1 sampling issues in river health assessment en
5.1 sampling issues in river health assessment en5.1 sampling issues in river health assessment en
5.1 sampling issues in river health assessment en
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
 
Erosion and Sediment Control - Faga’alu, American Samoa
Erosion and Sediment Control - Faga’alu, American SamoaErosion and Sediment Control - Faga’alu, American Samoa
Erosion and Sediment Control - Faga’alu, American Samoa
 
Cumulative Impact Summary 1997-2010 HPAs
Cumulative Impact Summary 1997-2010 HPAsCumulative Impact Summary 1997-2010 HPAs
Cumulative Impact Summary 1997-2010 HPAs
 
From Field to Stream: Measuring Sediment and Nutrient Losses - Kuehner
From Field to Stream: Measuring Sediment and Nutrient Losses - KuehnerFrom Field to Stream: Measuring Sediment and Nutrient Losses - Kuehner
From Field to Stream: Measuring Sediment and Nutrient Losses - Kuehner
 
Mp ground water
Mp ground waterMp ground water
Mp ground water
 
Reservoir engineering.ppt
Reservoir engineering.pptReservoir engineering.ppt
Reservoir engineering.ppt
 
Pacific Netting Products (1)
Pacific Netting Products (1)Pacific Netting Products (1)
Pacific Netting Products (1)
 
Hydrography for Maximising Port Capacity
Hydrography for Maximising Port CapacityHydrography for Maximising Port Capacity
Hydrography for Maximising Port Capacity
 

Recently uploaded

UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Innovation and Technology for Development Centre
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
yasmindemoraes1
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
laozhuseo02
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
yadavakashagra
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
RaniJaiswal16
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
CECOS University Peshawar, Pakistan
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
World Resources Institute (WRI)
 
Sustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.pptSustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.ppt
chaitaliambole
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
BanitaDsouza
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
Robin Grant
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
punit537210
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
Robin Grant
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
Open Access Research Paper
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
AhmadKhan917612
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
CIFOR-ICRAF
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
laozhuseo02
 

Recently uploaded (20)

UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
 
Sustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.pptSustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.ppt
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
 

SBNWR Sediment Augmentation Lessons Learned

  • 1. U.S. Fish & Wildlife Service Seal Beach National Wildlife Refuge Thin Layer Salt Marsh Sediment Augmentation Project Construction and Lessons Learned Rick NyeRick Nye -- Refuge BiologistRefuge Biologist -- Seal Beach NWRSeal Beach NWR
  • 2. U.S. Fish & Wildlife Service ProblemProblem •• 965 acre refuge965 acre refuge -- 59% (565 acres)59% (565 acres) intertidal salt marshintertidal salt marsh •• Subsidence rate:Subsidence rate: -- 4.13mm/4.13mm/yryr (SE(SE ++ 1.21 mm/1.21 mm/yryr)) •• Relative Sea Level RiseRelative Sea Level Rise 6.23 mm/6.23 mm/yryr •• Subtidal in 60 yearsSubtidal in 60 years
  • 3. U.S. Fish & Wildlife Service Dredge Material OpportunityDredge Material Opportunity
  • 4. U.S. Fish & Wildlife Service Research & MonitoringResearch & Monitoring Timeline:Timeline: 66--mos Premos Pre--augmentation toaugmentation to 55--yrs Postyrs Post--augmentationaugmentation •• Site elevationsSite elevations •• Sediment depth overtimeSediment depth overtime •• Compaction rateCompaction rate •• Tidal creek reformationTidal creek reformation •• Vegetation % coverVegetation % cover •• Species compositionSpecies composition •• BiomassBiomass •• Cordgrass assessmentCordgrass assessment •• Plant PhysiologyPlant Physiology •• Invertebrate speciesInvertebrate species •• Eelgrass healthEelgrass health •• Ridgeway’s RailsRidgeway’s Rails •• other avian activityother avian activity •• Carbon sequestrationCarbon sequestration
  • 5. U.S. Fish & Wildlife Service MitigationMitigation MeasuresMeasures •• Relocate rail nesting platformsRelocate rail nesting platforms •• Haze birds off project siteHaze birds off project site •• Minimize avian predator perchingMinimize avian predator perching •• Patrol pipeline for leaks, sea turtles, and marine mammalsPatrol pipeline for leaks, sea turtles, and marine mammals •• Conduct eelgrass surveys (pre, 1 year, 2 year)Conduct eelgrass surveys (pre, 1 year, 2 year) •• Vegetated “Buffer zone” of 50 ft. from waters edgeVegetated “Buffer zone” of 50 ft. from waters edge •• Silt barriers on augmentation siteSilt barriers on augmentation site •• InIn--water silt curtains for dredge operationswater silt curtains for dredge operations •• Monitor turbidityMonitor turbidity •• Minimize eelgrass impactMinimize eelgrass impact •• Keep bioKeep bio--monitor on sitemonitor on site
  • 6. U.S. Fish & Wildlife Service ConstructionConstruction RequirementsRequirements •• PrePre--augmentation RTK surveyaugmentation RTK survey •• Install 10m gridInstall 10m grid •• Implement mitigation measuresImplement mitigation measures •• Test application methodsTest application methods •• Install sediment barrierInstall sediment barrier •• Install silt fencingInstall silt fencing •• Maintain 50 ft. bufferMaintain 50 ft. buffer •• Apply 10” sedimentApply 10” sediment ++ 1” at grid poles1” at grid poles ++ 1.8” between poles1.8” between poles •• Respond to unexpected issuesRespond to unexpected issues •• PostPost--augmentationaugmentation photogrammetry surveyphotogrammetry survey
  • 7. U.S. Fish & Wildlife Service Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS Photo by Kirk Gilligan/USFWSPhoto by Kirk Gilligan/USFWS Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWSPhoto by Kirk Gilligan/USFWSPhoto by Kirk Gilligan/USFWS Construction EquipmentConstruction Equipment
  • 8. U.S. Fish & Wildlife Service Photo by Curtin MaritimePhoto by Curtin Maritime Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS NozzleNozzle SelectionSelection Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS Photo by Kirk Gilligan/USFWSPhoto by Kirk Gilligan/USFWS
  • 9. U.S. Fish & Wildlife Service Source MaterialSource Material •• Better sampling of grain sizeBetter sampling of grain size •• Avoid pockets of garbageAvoid pockets of garbage •• Contract required trash pickContract required trash pick--upup Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
  • 10. U.S. Fish & Wildlife Service Spraying ImpactsSpraying Impacts Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS •• Birds relatively undeterredBirds relatively undeterred •• Noise level ~60dBNoise level ~60dB •• Ridgeway’s rail hiding near equipmentRidgeway’s rail hiding near equipment Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
  • 11. U.S. Fish & Wildlife Service Sediment BarriersSediment Barriers Photo by Kirk Gilligan/USFWSPhoto by Kirk Gilligan/USFWS Photo by Curtin MaritimePhoto by Curtin Maritime Photo by Rick Nye//USFWSPhoto by Rick Nye//USFWS
  • 12. U.S. Fish & Wildlife Service •• New sediment compactionNew sediment compaction –– 20% to 30% during 120% to 30% during 1stst 7272 hrshrs •• Variances in underlyingVariances in underlying marsh compactionmarsh compaction •• Coring verificationCoring verification –– AccessAccess –– Labor intensiveLabor intensive •• Bathtub/Lava effectBathtub/Lava effect •• Consistent pole installationConsistent pole installation standardsstandards –– Research TeamResearch Team –– ContractorContractor –– >500 grid + research poles>500 grid + research poles Estimating Depths During ConstructionEstimating Depths During Construction
  • 13. U.S. Fish & Wildlife Service Final ElevationsFinal Elevations Photogrammetry surveyPhotogrammetry survey –– ●● 0.10.1 -- 0.050.05 ftft accuracyaccuracy Calculated sediment depthCalculated sediment depth –– ●● 9.6” on average9.6” on average ●● 40% of poles were 10” + 1”40% of poles were 10” + 1” ●● 6363% of poles were 10” + 2”% of poles were 10” + 2” ●● Large depth varianceLarge depth variance across 40% of the siteacross 40% of the site
  • 14. U.S. Fish & Wildlife Service Estimation ErrorsEstimation Errors Construction timelineConstruction timeline –– Estimated: 1 monthEstimated: 1 month Actual: 1Actual: 1stst thirdthird -- 22 mosmos Remainder: 2Remainder: 2 wkswks ●● Equipment breakdownsEquipment breakdowns ●● Sediment barrierSediment barrier maintenancemaintenance Sediment volumeSediment volume –– Estimated:Estimated: 13,500 yd13,500 yd33 for 10.0 acfor 10.0 ac Actual:Actual: 16,875 yd16,875 yd33 for 7.87 acfor 7.87 ac Better estimate would be:Better estimate would be: 22,000 yd22,000 yd33 for 10.0 acfor 10.0 ac
  • 15. U.S. Fish & Wildlife Service Funding and TimelinesFunding and Timelines •• Contractor bill for dredging and placementContractor bill for dredging and placement:: -- $$1.35 million1.35 million •• Time for planning, funding requests and permitting:Time for planning, funding requests and permitting: -- 2.5 years2.5 years •• PostPost--augmentation research and evaluation:augmentation research and evaluation: -- 5 years5 years -- $1.5 million (includes monitoring during construction)$1.5 million (includes monitoring during construction)
  • 16. U.S. Fish & Wildlife Service DataData Dissemination & OutreachDissemination & Outreach •• Publish postPublish post--construction monitoring reports annuallyconstruction monitoring reports annually •• Refuge webpage to provide quarterly updates, reports,Refuge webpage to provide quarterly updates, reports, photos, & time lapse videophotos, & time lapse video •• Conduct a workshop/webinar to present monitoring resultsConduct a workshop/webinar to present monitoring results •• Prepare a final report with lessons learned andPrepare a final report with lessons learned and recommendations for future projectsrecommendations for future projects •• Research team regularly present their efforts atResearch team regularly present their efforts at conferencesconferences
  • 17. U.S. Fish & Wildlife Service Big pictureBig picture Implement and evaluate thin layer placement as a adaptationImplement and evaluate thin layer placement as a adaptation strategy for regional sea level rise and climate change.strategy for regional sea level rise and climate change. Be able to use this strategy at regular intervals for long termBe able to use this strategy at regular intervals for long term sustainability of Pacific coast marshes.sustainability of Pacific coast marshes.
  • 18. U.S. Fish & Wildlife Service ForFor further information contactfurther information contact:: Kirk GilliganKirk Gilligan Refuge ManagerRefuge Manager –– Seal Beach NWRSeal Beach NWR kkirk_gilligan@fws.govirk_gilligan@fws.gov 562562--598598--10241024 OrOr Vicki TouchstoneVicki Touchstone Refuge PlannerRefuge Planner –– San Diego NWR ComplexSan Diego NWR Complex vvictoria_touchstone@fws.govictoria_touchstone@fws.gov 619619--476476--9150 Ext. 1039150 Ext. 103 Reports and time lapse videos:Reports and time lapse videos: www.fws.gov/refuge/seal_beach/what_we_do/resourwww.fws.gov/refuge/seal_beach/what_we_do/resour ce_management/Sediment_Pilot_Project.htmlce_management/Sediment_Pilot_Project.html