SlideShare a Scribd company logo
1 of 2
Travis Both
 (973) 534-0382  Travis.Both@gmail.com  5654 Harborside Drive, Tampa, FL 33615
SUMMARY
 Soil and Groundwater Remediation/Enhanced Bioremediation
 Technical Report Writing/Environmental Regulations/Data Interpretation
 Task Management/Construction Management
 RCRA Hazardous Waste Management/Site Characterization
 Environmental Health and Safety (EHS)
PROFESSIONAL EXPERIENCE
General
• Maintained records of activities and personnel for five simultaneous projects.
• Supervised, scheduled, and trained up to 10 staff members on a daily basis.
• Prepare and executed contracts with subcontractors up to $200,000 and negotiated cost.
• Ensured client satisfaction on multiple projects totaling over $5 million.
• Revived and enhanced client relationship through enhanced communication.
BTEX Soil and Groundwater Remediation/Excavation
• Performed field oversight of excavation, and sheeting.
• Ensured engineering controls installed in compliance with engineering specification, and project was
completed on time and budget.
• Managed and supervised construction of stream bypass system, soil excavation, and revetment to ensure
efficient and timely execution of all activities.
• Performed detailed site inspections, coordinated day-to-day resources and schedule, and escorted
regulators during inspections.
• Field team lead for enhanced fluid recovery including staffing, scheduling, and executing a rigorous
schedule with logistical hurdles.
• Developed staff on recovery/treatment technologies and implementation.
• Performed chemical oxidation injections to remediate impacted groundwater plumes.
• Prepared Remedial Action Report documenting sampling activities, analytical results, and an evaluation
of the effectiveness of the remedial program.
• Prepared Discharge to Groundwater Permit By Rule Application for the performance of a Denitrification
Based Bioremediation pilot program.
Chlorinated Solvent Groundwater/Vapor Remediation
• Developed CSM and designed in-situ groundwater remediation program for multiple bedrock aquifers
using subsurface data.
• Prepared permit application and performed full scale enhanced bioremediation program utilizing
Molasses, EVO, and bioaugmentation on projects up to $1.2 million as project geologist
• Performed oversight and installation of a SSDS, slab sealing, vapor extraction points, vacuum
monitoring points, vapor barrier, and smoke testing in structures up to 400,000 square feet.
• Performed transducer data reduction to determine connectivity of bedrock fractures.
• Oversight of up to 380-foot bedrock well installation.
• Interpreted down hole geophysical log of a 250-foot bedrock well.
• Conducted packer testing to achieve vertical delineation of chlorinated solvent groundwater plume.
• Installed blank flute liner to prevent vertical migration of contaminated groundwater.
Underground Storage Tank System Closure
• Contracted and coordinated subcontractors based on cost and technical evaluation.
• Designed and implemented road closure detour plan in accordance with NJDOT regulations.
• Site Supervisor and Safety Officer for removal of UST system, hydraulic pistons, and sump, to restore
site to pre-existing conditions.
• Prepared closure report and received unrestricted use from state.
Travis Both
 (973) 534-0382  Travis.Both@gmail.com  5654 Harborside Drive, Tampa, FL 33615
Contaminated Pond Remediation
• Site supervisor/Project geologist for bank stabilization and drum removal from contaminated pond.
• Directed divers in drum removal, decon procedures, and health and safety measures.
• Implemented bank stabilization design.
Storm Sewer Investigation
• Managed contractor for storm sewer inspection of 600,000 linear feet.
• Coordinate with federal air force base personnel for access to restricted areas.
Construction Management
• Completed daily reports detailing project activities.
• Tracked soil movement to prevent cross contamination.
• Ensured procedures adhered to OSHA standards and adhered to HASP.
• Directed and trained staff on protocol and procedures.
• Coordinated with general contractor regarding activities.
Environmental Health and Safety (EHS)
Prepared Health and Safety plans implemented during environmental and construction projects with
emphasis on the following EHS aspects:
• Personal Protective Equipment (PPE) • Decontamination
• Hazardous Material Handling and Storage • Job Hazard Analysis
• Spill Control and Prevention • Safety
• Hazardous Waste Management
EMPLOYMENT HISTORY
Senior Staff Geologist, EWMA January 2015 to August 2016
Staff Geologist, BEM Systems Inc. March 2012 to December 2014
Roofing Technician - Kraft Roofing Co. Inc. June 2005 – March 2012
CERTIFICATIONS
 Hazardous Waste Operations and Emergency Response (HAZWOPER) 40-hour Training
 HAZWOPER 8-hour Refresher Training
 HAZWOPER Supervisor Certification
 OSHA 30-hour Supervisor Construction Safety Certification
EDUCATION
Stockton University, Galloway, NJ
 Bachelor of Arts Degree – Geology
Sussex County Community College, Newton, NJ
 Associate’s Degree – Liberal Arts

More Related Content

What's hot

Prachi Vohra-Resume
Prachi Vohra-ResumePrachi Vohra-Resume
Prachi Vohra-ResumePrachi Vohra
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...Lakeland Resources Inc. (TSXv: LK)
 
Chinook Consulting-general services_updated_2015
Chinook Consulting-general services_updated_2015Chinook Consulting-general services_updated_2015
Chinook Consulting-general services_updated_2015Chinook Consulting Services
 
Study Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish AquifersStudy Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish AquifersTexas Alliance of Groundwater Districts
 
Rogun rockfill dam (335 m). Summary of final report of experts with brief aft...
Rogun rockfill dam (335 m). Summary of final report of experts with brief aft...Rogun rockfill dam (335 m). Summary of final report of experts with brief aft...
Rogun rockfill dam (335 m). Summary of final report of experts with brief aft...Yury Lyapichev
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNew Jersey Future
 
Bryan Herrin Resume
Bryan Herrin ResumeBryan Herrin Resume
Bryan Herrin ResumeBryan Herrin
 
Water Quality Presentation
Water Quality PresentationWater Quality Presentation
Water Quality Presentationriseagrant
 
Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed A. Baquerizo
 
LCW Restoration Plan & EIR- Public Workshop #2
LCW Restoration Plan & EIR- Public Workshop #2LCW Restoration Plan & EIR- Public Workshop #2
LCW Restoration Plan & EIR- Public Workshop #2TidalInlfluence
 
Andrew Gorman resume 2015
Andrew Gorman resume 2015Andrew Gorman resume 2015
Andrew Gorman resume 2015Andrew Gorman
 
Microsoft Word - Georgie Scott
Microsoft Word - Georgie ScottMicrosoft Word - Georgie Scott
Microsoft Word - Georgie ScottGeorgia Scott
 

What's hot (20)

Prachi Vohra-Resume
Prachi Vohra-ResumePrachi Vohra-Resume
Prachi Vohra-Resume
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
 
Bell Creek, USA
Bell Creek, USABell Creek, USA
Bell Creek, USA
 
Chinook Consulting-general services_updated_2015
Chinook Consulting-general services_updated_2015Chinook Consulting-general services_updated_2015
Chinook Consulting-general services_updated_2015
 
Study Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish AquifersStudy Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
 
Repa_Resume 2015
Repa_Resume 2015Repa_Resume 2015
Repa_Resume 2015
 
DIRK HESEMAN CV
DIRK HESEMAN CV DIRK HESEMAN CV
DIRK HESEMAN CV
 
DennisAnthonySchaffer_Resume
DennisAnthonySchaffer_ResumeDennisAnthonySchaffer_Resume
DennisAnthonySchaffer_Resume
 
Rogun rockfill dam (335 m). Summary of final report of experts with brief aft...
Rogun rockfill dam (335 m). Summary of final report of experts with brief aft...Rogun rockfill dam (335 m). Summary of final report of experts with brief aft...
Rogun rockfill dam (335 m). Summary of final report of experts with brief aft...
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - Mahon
 
Bryan Herrin Resume
Bryan Herrin ResumeBryan Herrin Resume
Bryan Herrin Resume
 
Water Quality Presentation
Water Quality PresentationWater Quality Presentation
Water Quality Presentation
 
EA Internship 2014
EA Internship 2014EA Internship 2014
EA Internship 2014
 
Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)
 
Project Summary Mochizuki
Project Summary MochizukiProject Summary Mochizuki
Project Summary Mochizuki
 
2016 CBresume
2016 CBresume2016 CBresume
2016 CBresume
 
LCW Restoration Plan & EIR- Public Workshop #2
LCW Restoration Plan & EIR- Public Workshop #2LCW Restoration Plan & EIR- Public Workshop #2
LCW Restoration Plan & EIR- Public Workshop #2
 
Andrew Gorman resume 2015
Andrew Gorman resume 2015Andrew Gorman resume 2015
Andrew Gorman resume 2015
 
Nevada
NevadaNevada
Nevada
 
Microsoft Word - Georgie Scott
Microsoft Word - Georgie ScottMicrosoft Word - Georgie Scott
Microsoft Word - Georgie Scott
 

Viewers also liked

C:\Documents And Settings\Invitado\Mis Documentos\Aprendaacomunicarse
C:\Documents And Settings\Invitado\Mis Documentos\AprendaacomunicarseC:\Documents And Settings\Invitado\Mis Documentos\Aprendaacomunicarse
C:\Documents And Settings\Invitado\Mis Documentos\AprendaacomunicarseHeider
 
MauraLavelle_VurfPoster
MauraLavelle_VurfPosterMauraLavelle_VurfPoster
MauraLavelle_VurfPosterMaura Lavelle
 
Educação e Tecnologia
Educação e TecnologiaEducação e Tecnologia
Educação e Tecnologiarenataguchoa
 
TLC15 Colombia anexo ROO
TLC15 Colombia anexo ROOTLC15 Colombia anexo ROO
TLC15 Colombia anexo ROOUniambiental
 
La semana en imágenes del domingo 9 al viernes 15 de mayo
La semana en imágenes del domingo 9 al viernes 15 de mayoLa semana en imágenes del domingo 9 al viernes 15 de mayo
La semana en imágenes del domingo 9 al viernes 15 de mayoguestc42938f
 

Viewers also liked (8)

C:\Documents And Settings\Invitado\Mis Documentos\Aprendaacomunicarse
C:\Documents And Settings\Invitado\Mis Documentos\AprendaacomunicarseC:\Documents And Settings\Invitado\Mis Documentos\Aprendaacomunicarse
C:\Documents And Settings\Invitado\Mis Documentos\Aprendaacomunicarse
 
MauraLavelle_VurfPoster
MauraLavelle_VurfPosterMauraLavelle_VurfPoster
MauraLavelle_VurfPoster
 
Educação e Tecnologia
Educação e TecnologiaEducação e Tecnologia
Educação e Tecnologia
 
TLC15 Colombia anexo ROO
TLC15 Colombia anexo ROOTLC15 Colombia anexo ROO
TLC15 Colombia anexo ROO
 
University Certificate
University CertificateUniversity Certificate
University Certificate
 
La semana en imágenes del domingo 9 al viernes 15 de mayo
La semana en imágenes del domingo 9 al viernes 15 de mayoLa semana en imágenes del domingo 9 al viernes 15 de mayo
La semana en imágenes del domingo 9 al viernes 15 de mayo
 
La pobreza
La pobrezaLa pobreza
La pobreza
 
Euro sfb
Euro sfbEuro sfb
Euro sfb
 

Similar to TBoth_Resume_09.23.2016

Similar to TBoth_Resume_09.23.2016 (20)

Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
Maryse Speckner Resume 2012
Maryse Speckner Resume 2012Maryse Speckner Resume 2012
Maryse Speckner Resume 2012
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
George Leahy Resume
George Leahy  ResumeGeorge Leahy  Resume
George Leahy Resume
 
Ben Adams resume final
Ben Adams resume finalBen Adams resume final
Ben Adams resume final
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone Resume
 
Who Is Talon/LPE?
Who Is Talon/LPE?Who Is Talon/LPE?
Who Is Talon/LPE?
 
MLawson resume Mar2015 rem
MLawson resume Mar2015 remMLawson resume Mar2015 rem
MLawson resume Mar2015 rem
 
NCG Qual Flyers 16
NCG Qual Flyers 16NCG Qual Flyers 16
NCG Qual Flyers 16
 
Long_Resume3-25-15
Long_Resume3-25-15Long_Resume3-25-15
Long_Resume3-25-15
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
Katleho P LETELE CV with picture
Katleho P LETELE CV with pictureKatleho P LETELE CV with picture
Katleho P LETELE CV with picture
 
Wendi Knutsen Resume2
Wendi Knutsen Resume2Wendi Knutsen Resume2
Wendi Knutsen Resume2
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
 
CV 3
CV 3CV 3
CV 3
 
Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 
EIA of offshore drilling and dredging
EIA of  offshore drilling and dredgingEIA of  offshore drilling and dredging
EIA of offshore drilling and dredging
 

TBoth_Resume_09.23.2016

  • 1. Travis Both  (973) 534-0382  Travis.Both@gmail.com  5654 Harborside Drive, Tampa, FL 33615 SUMMARY  Soil and Groundwater Remediation/Enhanced Bioremediation  Technical Report Writing/Environmental Regulations/Data Interpretation  Task Management/Construction Management  RCRA Hazardous Waste Management/Site Characterization  Environmental Health and Safety (EHS) PROFESSIONAL EXPERIENCE General • Maintained records of activities and personnel for five simultaneous projects. • Supervised, scheduled, and trained up to 10 staff members on a daily basis. • Prepare and executed contracts with subcontractors up to $200,000 and negotiated cost. • Ensured client satisfaction on multiple projects totaling over $5 million. • Revived and enhanced client relationship through enhanced communication. BTEX Soil and Groundwater Remediation/Excavation • Performed field oversight of excavation, and sheeting. • Ensured engineering controls installed in compliance with engineering specification, and project was completed on time and budget. • Managed and supervised construction of stream bypass system, soil excavation, and revetment to ensure efficient and timely execution of all activities. • Performed detailed site inspections, coordinated day-to-day resources and schedule, and escorted regulators during inspections. • Field team lead for enhanced fluid recovery including staffing, scheduling, and executing a rigorous schedule with logistical hurdles. • Developed staff on recovery/treatment technologies and implementation. • Performed chemical oxidation injections to remediate impacted groundwater plumes. • Prepared Remedial Action Report documenting sampling activities, analytical results, and an evaluation of the effectiveness of the remedial program. • Prepared Discharge to Groundwater Permit By Rule Application for the performance of a Denitrification Based Bioremediation pilot program. Chlorinated Solvent Groundwater/Vapor Remediation • Developed CSM and designed in-situ groundwater remediation program for multiple bedrock aquifers using subsurface data. • Prepared permit application and performed full scale enhanced bioremediation program utilizing Molasses, EVO, and bioaugmentation on projects up to $1.2 million as project geologist • Performed oversight and installation of a SSDS, slab sealing, vapor extraction points, vacuum monitoring points, vapor barrier, and smoke testing in structures up to 400,000 square feet. • Performed transducer data reduction to determine connectivity of bedrock fractures. • Oversight of up to 380-foot bedrock well installation. • Interpreted down hole geophysical log of a 250-foot bedrock well. • Conducted packer testing to achieve vertical delineation of chlorinated solvent groundwater plume. • Installed blank flute liner to prevent vertical migration of contaminated groundwater. Underground Storage Tank System Closure • Contracted and coordinated subcontractors based on cost and technical evaluation. • Designed and implemented road closure detour plan in accordance with NJDOT regulations. • Site Supervisor and Safety Officer for removal of UST system, hydraulic pistons, and sump, to restore site to pre-existing conditions. • Prepared closure report and received unrestricted use from state.
  • 2. Travis Both  (973) 534-0382  Travis.Both@gmail.com  5654 Harborside Drive, Tampa, FL 33615 Contaminated Pond Remediation • Site supervisor/Project geologist for bank stabilization and drum removal from contaminated pond. • Directed divers in drum removal, decon procedures, and health and safety measures. • Implemented bank stabilization design. Storm Sewer Investigation • Managed contractor for storm sewer inspection of 600,000 linear feet. • Coordinate with federal air force base personnel for access to restricted areas. Construction Management • Completed daily reports detailing project activities. • Tracked soil movement to prevent cross contamination. • Ensured procedures adhered to OSHA standards and adhered to HASP. • Directed and trained staff on protocol and procedures. • Coordinated with general contractor regarding activities. Environmental Health and Safety (EHS) Prepared Health and Safety plans implemented during environmental and construction projects with emphasis on the following EHS aspects: • Personal Protective Equipment (PPE) • Decontamination • Hazardous Material Handling and Storage • Job Hazard Analysis • Spill Control and Prevention • Safety • Hazardous Waste Management EMPLOYMENT HISTORY Senior Staff Geologist, EWMA January 2015 to August 2016 Staff Geologist, BEM Systems Inc. March 2012 to December 2014 Roofing Technician - Kraft Roofing Co. Inc. June 2005 – March 2012 CERTIFICATIONS  Hazardous Waste Operations and Emergency Response (HAZWOPER) 40-hour Training  HAZWOPER 8-hour Refresher Training  HAZWOPER Supervisor Certification  OSHA 30-hour Supervisor Construction Safety Certification EDUCATION Stockton University, Galloway, NJ  Bachelor of Arts Degree – Geology Sussex County Community College, Newton, NJ  Associate’s Degree – Liberal Arts