Patrick KearonPatrick Kearon
The Bristol Port CompanyThe Bristol Port Company
BackgroundBackground
• Global warming – we all need to reduce COGlobal warming – we all need to reduce CO22 outputoutput
from our activitiesfrom our activities
• UK Target = 20% reduction in 1990 COUK Target = 20% reduction in 1990 CO22 levels bylevels by
20102010
• South West Target = 11-15% of electricity fromSouth West Target = 11-15% of electricity from
renewable sourcesrenewable sources
• Dependence on finite fossil fuels & increasingDependence on finite fossil fuels & increasing
energy costsenergy costs
• UK is Europe’s windiest country - average meanUK is Europe’s windiest country - average mean
wind speeds >7m/s (18mph)wind speeds >7m/s (18mph)
Imperative for TheImperative for The
Bristol Port Company toBristol Port Company to
develop a localdevelop a local
renewable energyrenewable energy
source to supply portsource to supply port
demanddemand
The AnswerThe Answer
Outline of ProposalsOutline of Proposals
• Erect 3 wind turbines (up to 3 MW),Erect 3 wind turbines (up to 3 MW), includingincluding
associated bases and cablesassociated bases and cables
• Construct control building & access waysConstruct control building & access ways
• Combined 9 MW = up to 75% of port’s electricityCombined 9 MW = up to 75% of port’s electricity
demanddemand
• Development site is 8.5 hectares of reclaimedDevelopment site is 8.5 hectares of reclaimed
land in Avonmouth Dockland in Avonmouth Dock
• Adjacent to Severn EstuaryAdjacent to Severn Estuary
Site LocationSite Location
Site Selection - AlternativesSite Selection - Alternatives
• 9 potential locations short-listed and tested9 potential locations short-listed and tested
against 3 key factors:against 3 key factors:
– Wind generating potentialWind generating potential
– Aviation safety (Filton Airfeld)Aviation safety (Filton Airfeld)
– Possible impacts on birds using the estuaryPossible impacts on birds using the estuary
• This location in Avonmouth Docks was identifiedThis location in Avonmouth Docks was identified
as optimum siteas optimum site
• Turbine location finely adjusted to not interfereTurbine location finely adjusted to not interfere
with air safety & bird migration routeswith air safety & bird migration routes
The Preferred SiteThe Preferred Site
Typical Wind Turbine DimensionsTypical Wind Turbine Dimensions
Hub height
85 metres
279 feet
Rotor diameter
70 metres (35m
radius)
120m
393 ft
Environmental IssuesEnvironmental Issues
• Geology/Ground ConditionsGeology/Ground Conditions
• Hydrology/HydrogeologyHydrology/Hydrogeology
• EcologyEcology
• Landscape and visual impactsLandscape and visual impacts
• ArchaeologyArchaeology
• Traffic and transportTraffic and transport
• Noise and vibrationNoise and vibration
• TelecommunicationsTelecommunications
• Air trafficAir traffic
• Marine navigationMarine navigation
Landscape and VisualLandscape and Visual
ImpactsImpacts
• Evaluate effect on local landscapeEvaluate effect on local landscape
• Turbines located in low-lying, heavily industrialisedTurbines located in low-lying, heavily industrialised
landscape, with many tall structures & buildingslandscape, with many tall structures & buildings
• Landform, structures & woodlands restrict visibilityLandform, structures & woodlands restrict visibility
• Turbines will be visible from:Turbines will be visible from:
– Avonmouth Village (partial, restricted views, changeAvonmouth Village (partial, restricted views, change
inevitable in places)inevitable in places)
– Pill (noticeable, but not intrusive)Pill (noticeable, but not intrusive)
– Higher elevations e.g. Lawrence Weston & ShirehamptonHigher elevations e.g. Lawrence Weston & Shirehampton
(more visible, but distant & panoramic, not intrusive)(more visible, but distant & panoramic, not intrusive)
Photomontage of LandscapePhotomontage of Landscape
Ecology and BirdsEcology and Birds
• No valuable habitats on site, but next to SevernNo valuable habitats on site, but next to Severn
Estuary SPA, SSSI and Ramsar siteEstuary SPA, SSSI and Ramsar site
• Ecological surveys to inform assessment of impactsEcological surveys to inform assessment of impacts
on wildlife, includingon wildlife, including
– Extended Phase 1 habitat surveyExtended Phase 1 habitat survey
– Bird surveys (e.g. High tide/low tide counts, night time,Bird surveys (e.g. High tide/low tide counts, night time,
migration and breeding surveys)migration and breeding surveys)
• Key potential impacts on birds are Disturbance &Key potential impacts on birds are Disturbance &
CollisionsCollisions
• With mitigation no adverse impact duringWith mitigation no adverse impact during
constructionconstruction
• 5 years monitoring (review in 2 years)5 years monitoring (review in 2 years)
Bird MovementsBird Movements
ArchaeologyArchaeology
• Assessment of archaeological remains in theAssessment of archaeological remains in the
vicinity of the development site:vicinity of the development site:
– Terrestrial archaeologyTerrestrial archaeology
– Maritime archaeology and historic activityMaritime archaeology and historic activity
• Borehole assessmentBorehole assessment
• No known sites or monuments affected by theNo known sites or monuments affected by the
developmentdevelopment
• Construction of turbines includes 30 metre pilesConstruction of turbines includes 30 metre piles
into made groundinto made ground
• Mitigation/Monitoring – archaeological recordingMitigation/Monitoring – archaeological recording
Historic MappingHistoric Mapping
Balance of EffectsBalance of Effects
• No major adverse environmental impactsNo major adverse environmental impacts
• Potential disturbance of SPA birds and changedPotential disturbance of SPA birds and changed
views from areas of Avonmouth Villageviews from areas of Avonmouth Village
• All other negative impacts avoided or reduced byAll other negative impacts avoided or reduced by
mitigation and design measuresmitigation and design measures
• 17-26% of south west’s renewable energy target17-26% of south west’s renewable energy target
• Provision of up to 75% of Port’s electricityProvision of up to 75% of Port’s electricity
• Significant reduction in green house gassesSignificant reduction in green house gasses
(18,319 tonnes CO(18,319 tonnes CO22 /plus SO/plus SO22 & NO& NOxx))
Construction & OperationConstruction & Operation
• Construction end 2006Construction end 2006
• Construction programmeConstruction programme
about 36 weeksabout 36 weeks
• In operation this time inIn operation this time in
20072007
• Operational life of 25 yearsOperational life of 25 years
• Turbines then eitherTurbines then either
replaced, refurbished orreplaced, refurbished or
removed & site reinstatedremoved & site reinstated
The Way ForwardThe Way Forward
• BPC agreement with Ecotricity who will construct,BPC agreement with Ecotricity who will construct,
own and operate the turbinesown and operate the turbines
• BPC provided with energy for life of turbinesBPC provided with energy for life of turbines
• ““Overspill” electricity is publicly available - seeOverspill” electricity is publicly available - see ((
http://www.ecotricity.co.ukhttp://www.ecotricity.co.uk))
• We all need to do more to tackle global warmingWe all need to do more to tackle global warming
problemproblem
• Wind turbines can contribute to the renewableWind turbines can contribute to the renewable
energy solutionenergy solution

More Related Content

Similar to 2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port Company

Coastline2
Coastline2Coastline2
Coastline2
cnxsolutions
 
Coastline
CoastlineCoastline
Coastline
cnxsolutions
 
Geoscience in Offshore Renewables
Geoscience in Offshore RenewablesGeoscience in Offshore Renewables
Geoscience in Offshore Renewables
Farida Ismayilova
 
SPE-132931-MS
SPE-132931-MSSPE-132931-MS
SPE-132931-MS
Kevin C. Scott
 
Environmental Management Presentation for Graduate Induction
Environmental Management Presentation for Graduate InductionEnvironmental Management Presentation for Graduate Induction
Environmental Management Presentation for Graduate Induction
Simon Bell MSc AIEMA
 
Mms csl nabfinal 2002 ld
Mms csl nabfinal 2002 ldMms csl nabfinal 2002 ld
Mms csl nabfinal 2002 ld
cnxsolutions
 
Emision from ship
Emision from shipEmision from ship
Emision from ship
Oladokun Sulaiman Olanrewaju
 
Valuing and assessing roadside environments
Valuing and assessing roadside environmentsValuing and assessing roadside environments
Valuing and assessing roadside environments
Neil Dufty
 
2014 12 david hall
2014   12 david hall2014   12 david hall
2014 12 david hall
SevernEstuary
 
Emision from ship
Emision from shipEmision from ship
Emision from ship
Olanrewaju O Sulaiman
 
Zero Discharge Willow Wastewater Evapotranspiration Systems - Billeberga, Swe...
Zero Discharge Willow Wastewater Evapotranspiration Systems - Billeberga, Swe...Zero Discharge Willow Wastewater Evapotranspiration Systems - Billeberga, Swe...
Zero Discharge Willow Wastewater Evapotranspiration Systems - Billeberga, Swe...
Arne Backlund
 
Karachi nuclear power plant (kANUPP)
Karachi nuclear power plant (kANUPP)Karachi nuclear power plant (kANUPP)
Karachi nuclear power plant (kANUPP)
Awais Ahmad
 
Es3
Es3Es3
Overview shale gas in UK
Overview shale gas in UKOverview shale gas in UK
Overview shale gas in UK
Mark Linder
 
Juliet long, Environment Agency
Juliet long, Environment Agency   Juliet long, Environment Agency
Juliet long, Environment Agency
IES / IAQM
 
Ecology in Practice - Thomas Wright, Senior Ecologist, AECOM
Ecology in Practice - Thomas Wright, Senior Ecologist, AECOMEcology in Practice - Thomas Wright, Senior Ecologist, AECOM
Ecology in Practice - Thomas Wright, Senior Ecologist, AECOM
Hawkesdale P12 College
 
Nrsi can wea2010_cut_in_speeds(stephenson)
Nrsi can wea2010_cut_in_speeds(stephenson)Nrsi can wea2010_cut_in_speeds(stephenson)
Nrsi can wea2010_cut_in_speeds(stephenson)
nm2allen
 
SBNWR Sediment Augmentation Lessons Learned
SBNWR Sediment Augmentation Lessons LearnedSBNWR Sediment Augmentation Lessons Learned
SBNWR Sediment Augmentation Lessons Learned
Rick Nye
 
Planetary Boundaries
Planetary BoundariesPlanetary Boundaries
Planetary Boundaries
Michael Newbold
 
Environmental Aspect of Uranium Mining
Environmental Aspect of Uranium MiningEnvironmental Aspect of Uranium Mining
Environmental Aspect of Uranium Mining
junaid ahmad
 

Similar to 2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port Company (20)

Coastline2
Coastline2Coastline2
Coastline2
 
Coastline
CoastlineCoastline
Coastline
 
Geoscience in Offshore Renewables
Geoscience in Offshore RenewablesGeoscience in Offshore Renewables
Geoscience in Offshore Renewables
 
SPE-132931-MS
SPE-132931-MSSPE-132931-MS
SPE-132931-MS
 
Environmental Management Presentation for Graduate Induction
Environmental Management Presentation for Graduate InductionEnvironmental Management Presentation for Graduate Induction
Environmental Management Presentation for Graduate Induction
 
Mms csl nabfinal 2002 ld
Mms csl nabfinal 2002 ldMms csl nabfinal 2002 ld
Mms csl nabfinal 2002 ld
 
Emision from ship
Emision from shipEmision from ship
Emision from ship
 
Valuing and assessing roadside environments
Valuing and assessing roadside environmentsValuing and assessing roadside environments
Valuing and assessing roadside environments
 
2014 12 david hall
2014   12 david hall2014   12 david hall
2014 12 david hall
 
Emision from ship
Emision from shipEmision from ship
Emision from ship
 
Zero Discharge Willow Wastewater Evapotranspiration Systems - Billeberga, Swe...
Zero Discharge Willow Wastewater Evapotranspiration Systems - Billeberga, Swe...Zero Discharge Willow Wastewater Evapotranspiration Systems - Billeberga, Swe...
Zero Discharge Willow Wastewater Evapotranspiration Systems - Billeberga, Swe...
 
Karachi nuclear power plant (kANUPP)
Karachi nuclear power plant (kANUPP)Karachi nuclear power plant (kANUPP)
Karachi nuclear power plant (kANUPP)
 
Es3
Es3Es3
Es3
 
Overview shale gas in UK
Overview shale gas in UKOverview shale gas in UK
Overview shale gas in UK
 
Juliet long, Environment Agency
Juliet long, Environment Agency   Juliet long, Environment Agency
Juliet long, Environment Agency
 
Ecology in Practice - Thomas Wright, Senior Ecologist, AECOM
Ecology in Practice - Thomas Wright, Senior Ecologist, AECOMEcology in Practice - Thomas Wright, Senior Ecologist, AECOM
Ecology in Practice - Thomas Wright, Senior Ecologist, AECOM
 
Nrsi can wea2010_cut_in_speeds(stephenson)
Nrsi can wea2010_cut_in_speeds(stephenson)Nrsi can wea2010_cut_in_speeds(stephenson)
Nrsi can wea2010_cut_in_speeds(stephenson)
 
SBNWR Sediment Augmentation Lessons Learned
SBNWR Sediment Augmentation Lessons LearnedSBNWR Sediment Augmentation Lessons Learned
SBNWR Sediment Augmentation Lessons Learned
 
Planetary Boundaries
Planetary BoundariesPlanetary Boundaries
Planetary Boundaries
 
Environmental Aspect of Uranium Mining
Environmental Aspect of Uranium MiningEnvironmental Aspect of Uranium Mining
Environmental Aspect of Uranium Mining
 

More from SevernEstuary

Explore the Severn
Explore the SevernExplore the Severn
Explore the Severn
SevernEstuary
 
Sue Kidd - Cross-border Marine Planning in the North West - Challenges and Op...
Sue Kidd - Cross-border Marine Planning in the North West - Challenges and Op...Sue Kidd - Cross-border Marine Planning in the North West - Challenges and Op...
Sue Kidd - Cross-border Marine Planning in the North West - Challenges and Op...
SevernEstuary
 
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
SevernEstuary
 
Alex Bellisario - Citizan in the Severn
Alex Bellisario - Citizan in the SevernAlex Bellisario - Citizan in the Severn
Alex Bellisario - Citizan in the Severn
SevernEstuary
 
2006 09 10,000 Years of Change, Richard Brunning
2006 09 10,000 Years of Change, Richard Brunning2006 09 10,000 Years of Change, Richard Brunning
2006 09 10,000 Years of Change, Richard Brunning
SevernEstuary
 
2006 08 Tidal Severn Flood Risk Management Strategy and Avonmouth Scheme - Ni...
2006 08 Tidal Severn Flood Risk Management Strategy and Avonmouth Scheme - Ni...2006 08 Tidal Severn Flood Risk Management Strategy and Avonmouth Scheme - Ni...
2006 08 Tidal Severn Flood Risk Management Strategy and Avonmouth Scheme - Ni...
SevernEstuary
 
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine 2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
SevernEstuary
 
2006 05 Severn Estuary Perspective - Roger Wade, Environment Agency
2006 05 Severn Estuary Perspective - Roger Wade, Environment Agency 2006 05 Severn Estuary Perspective - Roger Wade, Environment Agency
2006 05 Severn Estuary Perspective - Roger Wade, Environment Agency
SevernEstuary
 
2006 04 Regional Perspective - Sarah Hendell-Blackford, SW Climate Change Imp...
2006 04 Regional Perspective - Sarah Hendell-Blackford, SW Climate Change Imp...2006 04 Regional Perspective - Sarah Hendell-Blackford, SW Climate Change Imp...
2006 04 Regional Perspective - Sarah Hendell-Blackford, SW Climate Change Imp...
SevernEstuary
 
2006 03 National Predictions - David Woolf, National Oceanographic Centre
2006 03 National Predictions - David Woolf, National Oceanographic Centre 2006 03 National Predictions - David Woolf, National Oceanographic Centre
2006 03 National Predictions - David Woolf, National Oceanographic Centre
SevernEstuary
 
2006 02 Intergrated Management and the Severn Estuary - Peter Burbridge, Newc...
2006 02 Intergrated Management and the Severn Estuary - Peter Burbridge, Newc...2006 02 Intergrated Management and the Severn Estuary - Peter Burbridge, Newc...
2006 02 Intergrated Management and the Severn Estuary - Peter Burbridge, Newc...
SevernEstuary
 
2006 01 The Dynamic Severn: Points of View - Chris Wooldridge, Cariff Univers...
2006 01 The Dynamic Severn: Points of View - Chris Wooldridge, Cariff Univers...2006 01 The Dynamic Severn: Points of View - Chris Wooldridge, Cariff Univers...
2006 01 The Dynamic Severn: Points of View - Chris Wooldridge, Cariff Univers...
SevernEstuary
 
2006 00 Severn Estuary Forum: Changing times and tides: the future of the Sev...
2006 00 Severn Estuary Forum: Changing times and tides: the future of the Sev...2006 00 Severn Estuary Forum: Changing times and tides: the future of the Sev...
2006 00 Severn Estuary Forum: Changing times and tides: the future of the Sev...
SevernEstuary
 
2007 09 The Severn Bridges - Andrew Hewett, Severn Bridges Visitor Centre
2007 09 The Severn Bridges - Andrew Hewett, Severn Bridges Visitor Centre2007 09 The Severn Bridges - Andrew Hewett, Severn Bridges Visitor Centre
2007 09 The Severn Bridges - Andrew Hewett, Severn Bridges Visitor Centre
SevernEstuary
 
2007 08 Public Engagement with Tidal Power Options - Mervyn Bramley, Universi...
2007 08 Public Engagement with Tidal Power Options - Mervyn Bramley, Universi...2007 08 Public Engagement with Tidal Power Options - Mervyn Bramley, Universi...
2007 08 Public Engagement with Tidal Power Options - Mervyn Bramley, Universi...
SevernEstuary
 
2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...
2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...
2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...
SevernEstuary
 
2007 06 Climate Change Research Advisory Group - Rhoda Ballinger, Cardiff Uni...
2007 06 Climate Change Research Advisory Group - Rhoda Ballinger, Cardiff Uni...2007 06 Climate Change Research Advisory Group - Rhoda Ballinger, Cardiff Uni...
2007 06 Climate Change Research Advisory Group - Rhoda Ballinger, Cardiff Uni...
SevernEstuary
 
2007 05 Severn River Basin District - Working together - Mark Scott, Environm...
2007 05 Severn River Basin District - Working together - Mark Scott, Environm...2007 05 Severn River Basin District - Working together - Mark Scott, Environm...
2007 05 Severn River Basin District - Working together - Mark Scott, Environm...
SevernEstuary
 
2007 04 Newport Wetlands Centre - Sue Rice, Countryside Council for Wales
2007 04 Newport Wetlands Centre - Sue Rice, Countryside Council for Wales2007 04 Newport Wetlands Centre - Sue Rice, Countryside Council for Wales
2007 04 Newport Wetlands Centre - Sue Rice, Countryside Council for Wales
SevernEstuary
 
2007 03 Natural Heritage of the Severn Estuary - Adrian Jowitt, Natural England
2007 03 Natural Heritage of the Severn Estuary - Adrian Jowitt, Natural England2007 03 Natural Heritage of the Severn Estuary - Adrian Jowitt, Natural England
2007 03 Natural Heritage of the Severn Estuary - Adrian Jowitt, Natural England
SevernEstuary
 

More from SevernEstuary (20)

Explore the Severn
Explore the SevernExplore the Severn
Explore the Severn
 
Sue Kidd - Cross-border Marine Planning in the North West - Challenges and Op...
Sue Kidd - Cross-border Marine Planning in the North West - Challenges and Op...Sue Kidd - Cross-border Marine Planning in the North West - Challenges and Op...
Sue Kidd - Cross-border Marine Planning in the North West - Challenges and Op...
 
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
Claire Sweeney - Delivering Sustainable Network Rail Improvement Schemes for ...
 
Alex Bellisario - Citizan in the Severn
Alex Bellisario - Citizan in the SevernAlex Bellisario - Citizan in the Severn
Alex Bellisario - Citizan in the Severn
 
2006 09 10,000 Years of Change, Richard Brunning
2006 09 10,000 Years of Change, Richard Brunning2006 09 10,000 Years of Change, Richard Brunning
2006 09 10,000 Years of Change, Richard Brunning
 
2006 08 Tidal Severn Flood Risk Management Strategy and Avonmouth Scheme - Ni...
2006 08 Tidal Severn Flood Risk Management Strategy and Avonmouth Scheme - Ni...2006 08 Tidal Severn Flood Risk Management Strategy and Avonmouth Scheme - Ni...
2006 08 Tidal Severn Flood Risk Management Strategy and Avonmouth Scheme - Ni...
 
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine 2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
 
2006 05 Severn Estuary Perspective - Roger Wade, Environment Agency
2006 05 Severn Estuary Perspective - Roger Wade, Environment Agency 2006 05 Severn Estuary Perspective - Roger Wade, Environment Agency
2006 05 Severn Estuary Perspective - Roger Wade, Environment Agency
 
2006 04 Regional Perspective - Sarah Hendell-Blackford, SW Climate Change Imp...
2006 04 Regional Perspective - Sarah Hendell-Blackford, SW Climate Change Imp...2006 04 Regional Perspective - Sarah Hendell-Blackford, SW Climate Change Imp...
2006 04 Regional Perspective - Sarah Hendell-Blackford, SW Climate Change Imp...
 
2006 03 National Predictions - David Woolf, National Oceanographic Centre
2006 03 National Predictions - David Woolf, National Oceanographic Centre 2006 03 National Predictions - David Woolf, National Oceanographic Centre
2006 03 National Predictions - David Woolf, National Oceanographic Centre
 
2006 02 Intergrated Management and the Severn Estuary - Peter Burbridge, Newc...
2006 02 Intergrated Management and the Severn Estuary - Peter Burbridge, Newc...2006 02 Intergrated Management and the Severn Estuary - Peter Burbridge, Newc...
2006 02 Intergrated Management and the Severn Estuary - Peter Burbridge, Newc...
 
2006 01 The Dynamic Severn: Points of View - Chris Wooldridge, Cariff Univers...
2006 01 The Dynamic Severn: Points of View - Chris Wooldridge, Cariff Univers...2006 01 The Dynamic Severn: Points of View - Chris Wooldridge, Cariff Univers...
2006 01 The Dynamic Severn: Points of View - Chris Wooldridge, Cariff Univers...
 
2006 00 Severn Estuary Forum: Changing times and tides: the future of the Sev...
2006 00 Severn Estuary Forum: Changing times and tides: the future of the Sev...2006 00 Severn Estuary Forum: Changing times and tides: the future of the Sev...
2006 00 Severn Estuary Forum: Changing times and tides: the future of the Sev...
 
2007 09 The Severn Bridges - Andrew Hewett, Severn Bridges Visitor Centre
2007 09 The Severn Bridges - Andrew Hewett, Severn Bridges Visitor Centre2007 09 The Severn Bridges - Andrew Hewett, Severn Bridges Visitor Centre
2007 09 The Severn Bridges - Andrew Hewett, Severn Bridges Visitor Centre
 
2007 08 Public Engagement with Tidal Power Options - Mervyn Bramley, Universi...
2007 08 Public Engagement with Tidal Power Options - Mervyn Bramley, Universi...2007 08 Public Engagement with Tidal Power Options - Mervyn Bramley, Universi...
2007 08 Public Engagement with Tidal Power Options - Mervyn Bramley, Universi...
 
2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...
2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...
2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...
 
2007 06 Climate Change Research Advisory Group - Rhoda Ballinger, Cardiff Uni...
2007 06 Climate Change Research Advisory Group - Rhoda Ballinger, Cardiff Uni...2007 06 Climate Change Research Advisory Group - Rhoda Ballinger, Cardiff Uni...
2007 06 Climate Change Research Advisory Group - Rhoda Ballinger, Cardiff Uni...
 
2007 05 Severn River Basin District - Working together - Mark Scott, Environm...
2007 05 Severn River Basin District - Working together - Mark Scott, Environm...2007 05 Severn River Basin District - Working together - Mark Scott, Environm...
2007 05 Severn River Basin District - Working together - Mark Scott, Environm...
 
2007 04 Newport Wetlands Centre - Sue Rice, Countryside Council for Wales
2007 04 Newport Wetlands Centre - Sue Rice, Countryside Council for Wales2007 04 Newport Wetlands Centre - Sue Rice, Countryside Council for Wales
2007 04 Newport Wetlands Centre - Sue Rice, Countryside Council for Wales
 
2007 03 Natural Heritage of the Severn Estuary - Adrian Jowitt, Natural England
2007 03 Natural Heritage of the Severn Estuary - Adrian Jowitt, Natural England2007 03 Natural Heritage of the Severn Estuary - Adrian Jowitt, Natural England
2007 03 Natural Heritage of the Severn Estuary - Adrian Jowitt, Natural England
 

Recently uploaded

原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
ramrag33
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 

Recently uploaded (20)

原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 

2006 07 Avonmouth Renewable Energy Project - Patrick Kearon, The Bristol Port Company

  • 1. Patrick KearonPatrick Kearon The Bristol Port CompanyThe Bristol Port Company
  • 2. BackgroundBackground • Global warming – we all need to reduce COGlobal warming – we all need to reduce CO22 outputoutput from our activitiesfrom our activities • UK Target = 20% reduction in 1990 COUK Target = 20% reduction in 1990 CO22 levels bylevels by 20102010 • South West Target = 11-15% of electricity fromSouth West Target = 11-15% of electricity from renewable sourcesrenewable sources • Dependence on finite fossil fuels & increasingDependence on finite fossil fuels & increasing energy costsenergy costs • UK is Europe’s windiest country - average meanUK is Europe’s windiest country - average mean wind speeds >7m/s (18mph)wind speeds >7m/s (18mph)
  • 3. Imperative for TheImperative for The Bristol Port Company toBristol Port Company to develop a localdevelop a local renewable energyrenewable energy source to supply portsource to supply port demanddemand The AnswerThe Answer
  • 4. Outline of ProposalsOutline of Proposals • Erect 3 wind turbines (up to 3 MW),Erect 3 wind turbines (up to 3 MW), includingincluding associated bases and cablesassociated bases and cables • Construct control building & access waysConstruct control building & access ways • Combined 9 MW = up to 75% of port’s electricityCombined 9 MW = up to 75% of port’s electricity demanddemand • Development site is 8.5 hectares of reclaimedDevelopment site is 8.5 hectares of reclaimed land in Avonmouth Dockland in Avonmouth Dock • Adjacent to Severn EstuaryAdjacent to Severn Estuary
  • 6. Site Selection - AlternativesSite Selection - Alternatives • 9 potential locations short-listed and tested9 potential locations short-listed and tested against 3 key factors:against 3 key factors: – Wind generating potentialWind generating potential – Aviation safety (Filton Airfeld)Aviation safety (Filton Airfeld) – Possible impacts on birds using the estuaryPossible impacts on birds using the estuary • This location in Avonmouth Docks was identifiedThis location in Avonmouth Docks was identified as optimum siteas optimum site • Turbine location finely adjusted to not interfereTurbine location finely adjusted to not interfere with air safety & bird migration routeswith air safety & bird migration routes
  • 7. The Preferred SiteThe Preferred Site
  • 8. Typical Wind Turbine DimensionsTypical Wind Turbine Dimensions Hub height 85 metres 279 feet Rotor diameter 70 metres (35m radius) 120m 393 ft
  • 9. Environmental IssuesEnvironmental Issues • Geology/Ground ConditionsGeology/Ground Conditions • Hydrology/HydrogeologyHydrology/Hydrogeology • EcologyEcology • Landscape and visual impactsLandscape and visual impacts • ArchaeologyArchaeology • Traffic and transportTraffic and transport • Noise and vibrationNoise and vibration • TelecommunicationsTelecommunications • Air trafficAir traffic • Marine navigationMarine navigation
  • 10. Landscape and VisualLandscape and Visual ImpactsImpacts • Evaluate effect on local landscapeEvaluate effect on local landscape • Turbines located in low-lying, heavily industrialisedTurbines located in low-lying, heavily industrialised landscape, with many tall structures & buildingslandscape, with many tall structures & buildings • Landform, structures & woodlands restrict visibilityLandform, structures & woodlands restrict visibility • Turbines will be visible from:Turbines will be visible from: – Avonmouth Village (partial, restricted views, changeAvonmouth Village (partial, restricted views, change inevitable in places)inevitable in places) – Pill (noticeable, but not intrusive)Pill (noticeable, but not intrusive) – Higher elevations e.g. Lawrence Weston & ShirehamptonHigher elevations e.g. Lawrence Weston & Shirehampton (more visible, but distant & panoramic, not intrusive)(more visible, but distant & panoramic, not intrusive)
  • 12. Ecology and BirdsEcology and Birds • No valuable habitats on site, but next to SevernNo valuable habitats on site, but next to Severn Estuary SPA, SSSI and Ramsar siteEstuary SPA, SSSI and Ramsar site • Ecological surveys to inform assessment of impactsEcological surveys to inform assessment of impacts on wildlife, includingon wildlife, including – Extended Phase 1 habitat surveyExtended Phase 1 habitat survey – Bird surveys (e.g. High tide/low tide counts, night time,Bird surveys (e.g. High tide/low tide counts, night time, migration and breeding surveys)migration and breeding surveys) • Key potential impacts on birds are Disturbance &Key potential impacts on birds are Disturbance & CollisionsCollisions • With mitigation no adverse impact duringWith mitigation no adverse impact during constructionconstruction • 5 years monitoring (review in 2 years)5 years monitoring (review in 2 years)
  • 14. ArchaeologyArchaeology • Assessment of archaeological remains in theAssessment of archaeological remains in the vicinity of the development site:vicinity of the development site: – Terrestrial archaeologyTerrestrial archaeology – Maritime archaeology and historic activityMaritime archaeology and historic activity • Borehole assessmentBorehole assessment • No known sites or monuments affected by theNo known sites or monuments affected by the developmentdevelopment • Construction of turbines includes 30 metre pilesConstruction of turbines includes 30 metre piles into made groundinto made ground • Mitigation/Monitoring – archaeological recordingMitigation/Monitoring – archaeological recording
  • 16. Balance of EffectsBalance of Effects • No major adverse environmental impactsNo major adverse environmental impacts • Potential disturbance of SPA birds and changedPotential disturbance of SPA birds and changed views from areas of Avonmouth Villageviews from areas of Avonmouth Village • All other negative impacts avoided or reduced byAll other negative impacts avoided or reduced by mitigation and design measuresmitigation and design measures • 17-26% of south west’s renewable energy target17-26% of south west’s renewable energy target • Provision of up to 75% of Port’s electricityProvision of up to 75% of Port’s electricity • Significant reduction in green house gassesSignificant reduction in green house gasses (18,319 tonnes CO(18,319 tonnes CO22 /plus SO/plus SO22 & NO& NOxx))
  • 17. Construction & OperationConstruction & Operation • Construction end 2006Construction end 2006 • Construction programmeConstruction programme about 36 weeksabout 36 weeks • In operation this time inIn operation this time in 20072007 • Operational life of 25 yearsOperational life of 25 years • Turbines then eitherTurbines then either replaced, refurbished orreplaced, refurbished or removed & site reinstatedremoved & site reinstated
  • 18. The Way ForwardThe Way Forward • BPC agreement with Ecotricity who will construct,BPC agreement with Ecotricity who will construct, own and operate the turbinesown and operate the turbines • BPC provided with energy for life of turbinesBPC provided with energy for life of turbines • ““Overspill” electricity is publicly available - seeOverspill” electricity is publicly available - see (( http://www.ecotricity.co.ukhttp://www.ecotricity.co.uk)) • We all need to do more to tackle global warmingWe all need to do more to tackle global warming problemproblem • Wind turbines can contribute to the renewableWind turbines can contribute to the renewable energy solutionenergy solution