Brownfields Remediation                                                   CanBuild
                                                                      June 22, 2010
Amendments to O.Reg. 153/04




 Cette publication hautement spécialisé n’est disponible qu’en
 anglais en vertu du règlement 441/97 qui en exempte
 l’application de la Loi sur les services en français. Pour obtenir
 de l’aide en français, veuillez communiquer avec le ministère de
 l’Environnement au (416) 327-5953.




                                                                          PIBS 7755e
Overview

           This presentation will cover:
           ► Policy Context
           ► Basic Contents of O. Reg 153/04
           ► Plans for Education & Training, and
             Supports




                                                   2
Evolving Policy

► Ontario’s Brownfield policies have been steadily evolving:


  ● 2001 – Brownfield Statute Law Amendment Act - first publication of
    guidelines and standards
  ● 2004 – O. Reg 153/04 becomes law
  ● 2007 –Budget Bill announces brownfields reforms
  ● 2007 – Start of consultation on updates to O. Reg 153/04 standards
    and procedures
  ● 2009 – Amendments to O. Reg 153/04 filed Dec 29.
       – 2010 (June) – Regulation amended to correct errors and omissions




                                                             3
Ontario Policy Context
► Brownfield Policies and program operate within a wider
   context:
    ● Economic recovery just beginning
    ● Province (and Federal) government in significant deficit for much
      of next decade.
► Ontario pursuing long-term strategy to make Ontario one
   of the developed world’s most tax-competitive
   jurisdictions for new business investment
    ● Delivering strategic improvements to business tax climate
► Key Ontario investment priorities supporting economic
   strategy:
    ● Health, Education, Infrastructure



                                                          4
Policy Objectives
► Ontario has several inter-related policy objectives
   that affect brownfields:
    ● Environmental Quality
    ● Growth Management
    ● Economic Development
    ● Innovation

► Amended Brownfields Regulations under EPA mainly
   affect the Environmental Quality objective, but given
   complexities of brownfields have implications for
   economic development, growth and innovation.



                                                 5
Voluntary Clean-up – Brownfields Redevelopment
 Brownfields are underdeveloped or previously developed properties that may be
contaminated. They are usually, but not exclusively, former industrial or commercial
       properties that may be underutilized, derelict or vacant (PPS, 2005).

►   There may be as many as 30,000 to 100,000 brownfields sites in Canada.

►   They include old and abandoned refineries, former railway yards, old waterfronts, crumbling
    warehouses, abandoned gas stations, former drycleaners and other commercial properties where toxic
    substances may have been used or stored.


►   The land may need to be cleaned up before it can be redeveloped.
     ●   Left idle and unmanaged, brownfields pose risks to human health and the environment because of
         the toxic materials left behind
     ●   Idle brownfields can also negatively affect surrounding property values and community vitality

►   In Ontario, the legislative framework for brownfields was established in 2001 through the Brownfields
    Statute Law Amendment Act 2001.




                                                                                                            6
Benefits of cleaning up brownfields

Benefits to cleaning up brownfields include:
► Contributes to clean healthy
   environment, including:
    ● improved air, water and soil quality,
       increased land preservation, less urban
       sprawl and increased preservation of
       open spaces.

► Eliminates health and safety hazards.
► Restores impacted lands so they can be reused.
► Promotes strong communities.
► Provides tremendous social and economic benefits by emphasizing urban
   intensification.
► Helps curb urban sprawl thereby protecting valuable green spaces and agricultural
   lands.
► Encourages efficient re-use of lands, buildings and infrastructure.




                                                                                      7
Brownfields Reform – 2007 Legislative Changes

•   In the 2007 Budget, the government announced a reform package that would
    address identified barriers to brownfield redevelopment. The reforms received
    Royal Assent on May 17, 2007 as part of the Budget Measures and Interim
    Appropriation Act, 2007.

•   Reforms fit into four key areas:
    1. Provincial Lands – demonstrating provincial leadership through the clean-up of
       provincial lands.
    2. Financing Tools – removing provincial crown liens on abandoned properties;
       leveraging investment in brownfield redevelopment where municipal property tax
       incentives are insufficient.
    3. Regulatory Liability Protection – reviewing the possibility of addressing remaining
       liability barriers.
    4. Environmental Regulatory Improvements – updating environmental standards;
       improving and clarifying the existing regulatory framework.




                                                                                             8
Consultations on Regulatory Amendments

•   Extensive consultations were undertaken and amendments reflect stakeholder
    and First Nations concerns. Consultation and engagement activities included:
     •   EBR Posting of Proposed Soil and Groundwater Standards (March 2007 –
         60 days)
     •   EBR Posting (Oct. 2008 – Feb. 2009), 87 submissions received
     •   20 face-to-face information sessions
     •   First Nations Information Sessions – January 2009, November 2009
     •   Working groups for modified generic (Tier 2) risk assessment and
         environmental site assessment
     •   Desktop Demonstration Pilots to test proposed changes in specific sites




                                                                                   9
Brownfields Reforms - “Current”
•   The Ministry of the Environment regulatory amendments to move O. Reg.
    153/04 forward:



      1. Record of Site Condition                 3. Traditional Risk Assessment
                (RSC)                             Lengthy approvals for risk assessment
    Need for clear and transparent                and few alternatives for meeting site-
    process for submitting RSCs and               specific conditions.
    clearer ESA requirements.


                                                       4. Technical Amendments
             2. Old Standards                          Need for technical amendments
    In need of updating to reflect best               supporting implementation of the
    science and leading jurisdictions.                new legislation (e.g. requirements
                                                       for soil quality, reclassification of
                                                                 land uses, etc.).




                                                                                               10
Brownfields Reforms - “New”




    1. Enhanced Record of Site                3. Risk Assessment &
        Condition Integrity              Introduce Streamlined “Tier 2”
  Predictable and transparent process    Timely approvals for modified generic
  for submitting RSCs and clearer ESA    (Tier 2) risk assessment.
  requirements.



        2. Updated Standards                      Other Technical
  Reflect current science and are                  Amendments
  consistent with other jurisdictions.     (e.g. clarify standard for quality of
                                                soil brought to property)




                                                                                   11
1. Enhanced Record of Site Condition Integrity
        PURPOSE                                AMENDMENT                                BENEFITS


   ●   To provide a more
                                 •   Clear and transparent RSC                •   Provides reliability and
       transparent, timely and                                                    transparency to RSC
                                     submission process clarifying what
       efficient regulatory                                                       regime, and greater
       process                       work must be done to submit a RSC
                                     and timeline (next slide).                   confidence by creditors,
   ●   To enhance                                                                 municipalities, and others
       environmental             •   Clear Environmental Site
       protection through            Assessment (ESA) requirements            •   Reduces health and
                                     which reflect best practices.                safety risks
       more provincial
       oversight                 •   Clear provisions for Qualified
                                                                              •   Ensures reviewed RSCs
                                                                                  with deficiencies are not
                                     Persons (QP) including Conflict of
                                                                                  filed to the Brownfields
                                     Interest provisions.
                                                                                  Environmental Site
                                 •   Soil quality standard defining the           Registry
                                     quality of soil that can be brought to
                                     RSC properties                           •   Improves and increases
                                                                                  stakeholder support for
                                                                                  enhanced MOE oversight




                                                                                                               12
RSC Submission Process (see EPA 168.4)

                            RSC Submitted



                            If Complete, 30
                              business day
                              period starts



   Acknowledgement     RSC has not been
                                                           Notice of Review   Could include
   of date RSC Filed     completed in                                         Field work
                        accordance with
                           regulation

                                                                     Acknowledgement
                                              Notice of Defect(s)
                                                                     of date RSC Filed




                                                                                              13
Environmental Site Assessments – Whats New?

     Examples of Phase One ESA Changes                        Examples of Phase Two ESA Changes
► Increased direction for phase one ESA:                 ► Increased direction for phase two ESA:

   ● Records to be checked during records review            ● Sampling and analysis plan
           – Mandatory databases to be checked              ● Quality assurance and quality control
             during records review                            sampling
           – Minimum search distance                        ● Ground water sampling where required or
                                                              advisable
   ● Persons to be interviewed
                                                            ● Reporting format
   ● Activities to undertake during site
     reconnaissance                                         ● Report attachments
   ● Reporting format                                    ► Introduction of:

   ● Report attachments                                     ● Phase two conceptual site model
► Introduction of:                                          ● Mandatory ground water sampling in some
                                                              situations
   ● Potentially contaminating activities that trigger
     a phase two ESA                                        ● Requirements for delineation of contaminants
   ● A phase one conceptual site model



                                                                                                         14
2. Updated Standards
        PURPOSE                                    AMENDMENT                                    BENEFITS
•   Standards need to         •    Revised standards for 120 chemicals in             •   Protects human and
    reflect current science        total, to reflect current science and strengthen       environmental health
    and be consistent with         protection of human health and the                     according to best science,
    other jurisdictions.           environment.                                           through updated
                                                                                          standards.
                                     New Standards           Compared to Old
                                      (chemicals)            Standards (2004)         •   Provides greater flexibility
                                                                                          in remediation, while
                                  Less stringent                  23% (27)                protecting environmental
                                                                                          and human health.
                                  More stringent                  65% (78)
                                  Equally stringent                8% (9)             •   New standards are
                                                                                          comparable to other
                                  Standards removed                    -                  jurisdictions that recently
                                  New standards                    5% (6)                 updated their standards
                              •    Provide a flexible approach to standards:
                                   increased number of generic tables for more
                                   simple application (from 6 tables to 9 tables).
                              •    Increased coverage: Standards provided for
                                   6 additional Contaminants of Concern
                              •    Provide a new standard model as a basis
                                   for modified generic (Tier 2) risk assessment
                                   submissions (next slide)


                                                                                                                         15
3. Modified Generic “Tier 2” Risk Assessments
► Risk assessment provides property owners an alternative to meeting standards specified
   in the regulation.

► Options for standards to meet for filing a RSC, include:

   ● Tier 1: generic standards
   ● Tier 2: streamlined risk assessment that uses simple modifications to the models used
     to generate the generic standards (i.e. modified generic approach)
   ● Tier 3: full risk assessment that provides the widest range of options in how standards
     may be developed

► Standards specified in a risk assessment are equally protective as the generic standards;
   they may also permit use of risk management measures, such as paving a site to block
   the contaminant pathways

► Standards specified in a risk assessment must be accepted by the Director following MOE
   review of the risk assessment.

► The streamlined risk assessment (Tier 2) was considered by stakeholders to be a key
   component of the amendments.


                                                                                               16
3. Modified Generic (Tier 2) Risk Assessments
        PURPOSE                             AMENDMENT                                 BENEFITS


•   To provide an            • Introduce a new Streamlined Risk              • At applicable sites
    alternative to meeting     Assessment (Tier 2):                            provides timelier and more
    the ministry generic                                                       cost-effective option for
    standards and the           • allows for the development of site           risk assessment
    traditional risk              specific standards using a model which,
    assessment process            when site conditions allow, removes             •   Faster review (after
    (Tier 3)                      inherent conservatism of the generic                July 1, 2011) – 8
                                  standards, while retaining protection of            week review
                                  public health and the environment.                  timeline
                                • Provide proponents with a web-based        • Allows proponents to opt
                                  tool for development of site specific        for simple risk
                                  standards.                                   management measure(s)
                                                                               designed and published
                                                                               by the Ministry




                                                                                                             17
Conceptual Site Model (including Site Specific Conditions + Soil
Vapour Screening + Risk Management)

                                                                                                                                                  Legend

                                                                                                                                         Groundwater       Contaminated
                                                                                            Human Health -                                                 Groundwater
                                                                                           Ingestion, Dermal                                               Contaminated
                                                                                            Contact & Odour                              Soil              Soil

                                     Ecotoxicity           Human Health -
                                                             Inhalation                                                            GW2     Component


                                                                                                                                            Exposure Pathway


                                 Cement                                                Cement

                                                                                                                                    Distance = 200m
                                                                                      S2
                                                                            S1
                                                                                                     S-Nose                                                      SURFACE
                               X 1000                                                                                                                             WATER
               Plants & Soil              Mammal                                                                     groundwater
                                                      X 1000
  Depth = 6m




               Invertebrates              s & Birds
                                                                                 S3                                    ingestion



                                  Contaminated Soil
                                                           S-IA
                                                                  X 100
                                                                                           S-GW1    S-GW3                                                        Ecotoxicity -
                                                                                                                                                                 Aquatic Life


                               Contaminated Groundwater              GW2
                                                                            X 100                              GW1
                                                                                                                            GW3

                                AQUIFER
4. Implementation and Grandfathering
         ISSUES                            AMENDMENT                                  BENEFITS


•   To provide balanced     ► The regulatory amendments allow:              •   Provides proponents with
    and fair approach by                                                        projects currently
                                  an 18 month extension for the use of
    allowing projects                                                           underway an opportunity
                                  2004 standards can be provided for
    currently underway to                                                       to use old standards
                                  sites where work is underway. The
    use old standards.
                                  extension must be requested (new form     •   Allows for quicker
                                  for extension) between July 1, 2010 and       implementation of ESA
                                  December 31, 2010; and                        requirements and
                                                                                improvements to RSC
                                  for projects to be grandfathered (to
                                                                                submission and filing
                                  Dec. 31, 2012)
                                                                                process
                                    Grandfathering only for soil, ground
                                    water and sediment standards (not for
                                                                            •   Sunset date ensures new
                                                                                standards are used for all
                                    the new ESA requirements).
                                                                                projects after 3 years
                                  Owners may also choose to meet
                                  more stringent standards earlier than
                                  July 1, 2011 (i.e. number must be
                                  lower than current (2004) standards).




                                                                                                             19
Next Steps – Implementation

► Ontario strategy for Education based on training key specialists:

  ● MOE District Office staff – Jan-Feb 2010
  ● QP’s and other technical specialists – March – May 2010
  ● Other key stakeholder groups – May to December 2010.
► Wide variety of supporting documents and technical bulletins already published
  by MOE.
► Ontario will keep in formal contact with brownfield stakeholders through regular
  MAH Brownfield Stakeholder Group meetings.
► MOE brownfields website to be updated to allow for quick navigation to relevant
  information. Public will be able to "sign up" for e-mail updates.
► MOE to work with pertinent stakeholder groups when developing guidance
  documents and technical bulletins.



                                                                                     20
Contacts
                    Ministry of Environment

                                      Rosemary Ash
            Team Lead/Brownfields Filing and Review
                        Ministry of the Environment
                                       416-314-9058
                         Rosemary.Ash@ontario.ca


Web: www.ene.gov.on.ca/en/land/brownfields/index.php




             Brownfields Ontario - MMAH

              Office of the Brownfields Coordinator
              Ministry of Municipal Affairs and Housing
                             777 Bay Street, 3rd Floor
                               Toronto, ON M5G 2E5
                                    Tel: 416.585.6635
                                    Fax: 416.585.7292
             E-mail: Brownfieldsontario@ontario.ca or
                          chris.thompson@ontario.ca


                 Website: www.ontario.ca/brownfields

                                                          21

More Related Content

What's hot

Four Rules Update
Four Rules UpdateFour Rules Update
Four Rules UpdateAll4 Inc.
 
Developments Under the Clean Air Act Implications and Ramifications
Developments Under the Clean Air Act  Implications and RamificationsDevelopments Under the Clean Air Act  Implications and Ramifications
Developments Under the Clean Air Act Implications and RamificationsQuarles & Brady
 
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPARange Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPAMarcellus Drilling News
 
Special General Meeting Presentation
Special General Meeting PresentationSpecial General Meeting Presentation
Special General Meeting PresentationNovaCopper
 
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Kevin Perry
 
News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek...
News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...
News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek...Lakeland Resources Inc. (TSXv: LK)
 
Baseline Environmental Assessment for Riverside Park
Baseline Environmental Assessment for Riverside ParkBaseline Environmental Assessment for Riverside Park
Baseline Environmental Assessment for Riverside ParkCityOfDetroit
 
The nia piag cy 2012 year end report
The nia  piag cy 2012 year end reportThe nia  piag cy 2012 year end report
The nia piag cy 2012 year end reportcherreg1piag
 
Tiffani Kavalec, Ohio EPA, Ohio Division of Surface Water Updates, Midwest En...
Tiffani Kavalec, Ohio EPA, Ohio Division of Surface Water Updates, Midwest En...Tiffani Kavalec, Ohio EPA, Ohio Division of Surface Water Updates, Midwest En...
Tiffani Kavalec, Ohio EPA, Ohio Division of Surface Water Updates, Midwest En...Kevin Perry
 
The NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end reportThe NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end reportcherreg1piag
 
Retreating ice uncovers major discovery potential for CRD-Porphyry system at ...
Retreating ice uncovers major discovery potential for CRD-Porphyry system at ...Retreating ice uncovers major discovery potential for CRD-Porphyry system at ...
Retreating ice uncovers major discovery potential for CRD-Porphyry system at ...Stephan Bogner
 
Environmental Assessments for Energy, Infrastructure and Resource projects ...
Environmental Assessments for Energy, Infrastructure and Resource projects   ...Environmental Assessments for Energy, Infrastructure and Resource projects   ...
Environmental Assessments for Energy, Infrastructure and Resource projects ...This account is closed
 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfBappy114
 

What's hot (20)

Four Rules Update
Four Rules UpdateFour Rules Update
Four Rules Update
 
Developments Under the Clean Air Act Implications and Ramifications
Developments Under the Clean Air Act  Implications and RamificationsDevelopments Under the Clean Air Act  Implications and Ramifications
Developments Under the Clean Air Act Implications and Ramifications
 
Deq notes linden
Deq notes lindenDeq notes linden
Deq notes linden
 
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPARange Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
 
Special General Meeting Presentation
Special General Meeting PresentationSpecial General Meeting Presentation
Special General Meeting Presentation
 
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
 
News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek...
News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...
News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek...
 
Bell Creek, USA
Bell Creek, USABell Creek, USA
Bell Creek, USA
 
Baseline Environmental Assessment for Riverside Park
Baseline Environmental Assessment for Riverside ParkBaseline Environmental Assessment for Riverside Park
Baseline Environmental Assessment for Riverside Park
 
The nia piag cy 2012 year end report
The nia  piag cy 2012 year end reportThe nia  piag cy 2012 year end report
The nia piag cy 2012 year end report
 
Tiffani Kavalec, Ohio EPA, Ohio Division of Surface Water Updates, Midwest En...
Tiffani Kavalec, Ohio EPA, Ohio Division of Surface Water Updates, Midwest En...Tiffani Kavalec, Ohio EPA, Ohio Division of Surface Water Updates, Midwest En...
Tiffani Kavalec, Ohio EPA, Ohio Division of Surface Water Updates, Midwest En...
 
FONSI
FONSIFONSI
FONSI
 
The NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end reportThe NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end report
 
La parrilla_43-101
 La parrilla_43-101 La parrilla_43-101
La parrilla_43-101
 
Retreating ice uncovers major discovery potential for CRD-Porphyry system at ...
Retreating ice uncovers major discovery potential for CRD-Porphyry system at ...Retreating ice uncovers major discovery potential for CRD-Porphyry system at ...
Retreating ice uncovers major discovery potential for CRD-Porphyry system at ...
 
Environmental Assessments for Energy, Infrastructure and Resource projects ...
Environmental Assessments for Energy, Infrastructure and Resource projects   ...Environmental Assessments for Energy, Infrastructure and Resource projects   ...
Environmental Assessments for Energy, Infrastructure and Resource projects ...
 
GCD's - Joint and Regional Planning_Velma Danielson
GCD's - Joint and Regional Planning_Velma DanielsonGCD's - Joint and Regional Planning_Velma Danielson
GCD's - Joint and Regional Planning_Velma Danielson
 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
 
MDE Stormwater Permitting Requirements
MDE Stormwater Permitting Requirements MDE Stormwater Permitting Requirements
MDE Stormwater Permitting Requirements
 
MDE's Stormwater Permitting Requirements
MDE's Stormwater Permitting RequirementsMDE's Stormwater Permitting Requirements
MDE's Stormwater Permitting Requirements
 

Viewers also liked

Falhas do contrato do Simop
Falhas do contrato do SimopFalhas do contrato do Simop
Falhas do contrato do SimopRoberta Soares
 
Analisis keputusan lease vs buy part 2
Analisis keputusan lease vs buy part 2Analisis keputusan lease vs buy part 2
Analisis keputusan lease vs buy part 2Futurum2
 
Hire Rightt - Brochure
Hire Rightt - BrochureHire Rightt - Brochure
Hire Rightt - BrochureNimmy Cleetus
 
Aula 5 java script
Aula 5   java scriptAula 5   java script
Aula 5 java scriptandreluizlc
 
Math
MathMath
Mathdsora
 
Intro Comparative POL 252 SP16
Intro Comparative POL 252 SP16Intro Comparative POL 252 SP16
Intro Comparative POL 252 SP16atrantham
 
Introducing Database Offerings on AWS - Technical 101
Introducing Database Offerings on AWS - Technical 101Introducing Database Offerings on AWS - Technical 101
Introducing Database Offerings on AWS - Technical 101Amazon Web Services
 
Intro to Comparative Politics
Intro to Comparative Politics Intro to Comparative Politics
Intro to Comparative Politics atrantham
 
(SEC326) Security Science Using Big Data
(SEC326) Security Science Using Big Data(SEC326) Security Science Using Big Data
(SEC326) Security Science Using Big DataAmazon Web Services
 
Achieve new levels of performance for Magento e-commerce sites.
Achieve new levels of performance for Magento e-commerce sites.Achieve new levels of performance for Magento e-commerce sites.
Achieve new levels of performance for Magento e-commerce sites.Clustrix
 
(SEC403) Diving into AWS CloudTrail Events w/ Apache Spark on EMR
(SEC403) Diving into AWS CloudTrail Events w/ Apache Spark on EMR(SEC403) Diving into AWS CloudTrail Events w/ Apache Spark on EMR
(SEC403) Diving into AWS CloudTrail Events w/ Apache Spark on EMRAmazon Web Services
 

Viewers also liked (15)

Unstoppable-m1021982-519
Unstoppable-m1021982-519Unstoppable-m1021982-519
Unstoppable-m1021982-519
 
Kaleem MBA Cv
Kaleem MBA Cv Kaleem MBA Cv
Kaleem MBA Cv
 
Falhas do contrato do Simop
Falhas do contrato do SimopFalhas do contrato do Simop
Falhas do contrato do Simop
 
Analisis keputusan lease vs buy part 2
Analisis keputusan lease vs buy part 2Analisis keputusan lease vs buy part 2
Analisis keputusan lease vs buy part 2
 
Hire Rightt - Brochure
Hire Rightt - BrochureHire Rightt - Brochure
Hire Rightt - Brochure
 
Aula 5 java script
Aula 5   java scriptAula 5   java script
Aula 5 java script
 
Math
MathMath
Math
 
Sandra Final Resume
Sandra Final ResumeSandra Final Resume
Sandra Final Resume
 
Intro Comparative POL 252 SP16
Intro Comparative POL 252 SP16Intro Comparative POL 252 SP16
Intro Comparative POL 252 SP16
 
Html (tabela)
Html (tabela)Html (tabela)
Html (tabela)
 
Introducing Database Offerings on AWS - Technical 101
Introducing Database Offerings on AWS - Technical 101Introducing Database Offerings on AWS - Technical 101
Introducing Database Offerings on AWS - Technical 101
 
Intro to Comparative Politics
Intro to Comparative Politics Intro to Comparative Politics
Intro to Comparative Politics
 
(SEC326) Security Science Using Big Data
(SEC326) Security Science Using Big Data(SEC326) Security Science Using Big Data
(SEC326) Security Science Using Big Data
 
Achieve new levels of performance for Magento e-commerce sites.
Achieve new levels of performance for Magento e-commerce sites.Achieve new levels of performance for Magento e-commerce sites.
Achieve new levels of performance for Magento e-commerce sites.
 
(SEC403) Diving into AWS CloudTrail Events w/ Apache Spark on EMR
(SEC403) Diving into AWS CloudTrail Events w/ Apache Spark on EMR(SEC403) Diving into AWS CloudTrail Events w/ Apache Spark on EMR
(SEC403) Diving into AWS CloudTrail Events w/ Apache Spark on EMR
 

Similar to Brownfields Remediation

ONEIA Chris Thompson Presentation
ONEIA Chris Thompson PresentationONEIA Chris Thompson Presentation
ONEIA Chris Thompson PresentationONEIA
 
Remediation, Clean-up and other non-NEPM concepts
Remediation, Clean-up and other non-NEPM conceptsRemediation, Clean-up and other non-NEPM concepts
Remediation, Clean-up and other non-NEPM conceptsPeter Gringinger
 
Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 jlarndt_51
 
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECB. BHASKAR
 
3.-DENR-Compliances-for-Business-Operation.pdf
3.-DENR-Compliances-for-Business-Operation.pdf3.-DENR-Compliances-for-Business-Operation.pdf
3.-DENR-Compliances-for-Business-Operation.pdfAngelaLlauderSantos1
 
Wci Stakeholder Update For January 12 2012
Wci Stakeholder Update For January 12 2012Wci Stakeholder Update For January 12 2012
Wci Stakeholder Update For January 12 2012Nellson LLC
 
CTSCO a Carbon Storage Solution - Surat Basin Hydrogeology - related issues
CTSCO a Carbon Storage Solution - Surat Basin Hydrogeology - related issuesCTSCO a Carbon Storage Solution - Surat Basin Hydrogeology - related issues
CTSCO a Carbon Storage Solution - Surat Basin Hydrogeology - related issuesGlobal CCS Institute
 
The future of EIA - Legislative and regulatory change
The future of EIA - Legislative and regulatory changeThe future of EIA - Legislative and regulatory change
The future of EIA - Legislative and regulatory changeIES / IAQM
 
PA's Nutrient Trading Program
PA's Nutrient Trading ProgramPA's Nutrient Trading Program
PA's Nutrient Trading ProgramCleanH2O
 
Contaminated land technical_manual_june_2012
Contaminated land technical_manual_june_2012Contaminated land technical_manual_june_2012
Contaminated land technical_manual_june_2012Khaled Tarawneh
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projectsSandeep Kumar
 
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPDCommunity Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPDDesign South East
 

Similar to Brownfields Remediation (20)

ONEIA Chris Thompson Presentation
ONEIA Chris Thompson PresentationONEIA Chris Thompson Presentation
ONEIA Chris Thompson Presentation
 
Remediation, Clean-up and other non-NEPM concepts
Remediation, Clean-up and other non-NEPM conceptsRemediation, Clean-up and other non-NEPM concepts
Remediation, Clean-up and other non-NEPM concepts
 
EIA;- EC
EIA;- ECEIA;- EC
EIA;- EC
 
Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009
 
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
 
3.-DENR-Compliances-for-Business-Operation.pdf
3.-DENR-Compliances-for-Business-Operation.pdf3.-DENR-Compliances-for-Business-Operation.pdf
3.-DENR-Compliances-for-Business-Operation.pdf
 
Bco2 Lfg Ver Project Us
Bco2 Lfg Ver Project UsBco2 Lfg Ver Project Us
Bco2 Lfg Ver Project Us
 
Wci Stakeholder Update For January 12 2012
Wci Stakeholder Update For January 12 2012Wci Stakeholder Update For January 12 2012
Wci Stakeholder Update For January 12 2012
 
CTSCO a Carbon Storage Solution - Surat Basin Hydrogeology - related issues
CTSCO a Carbon Storage Solution - Surat Basin Hydrogeology - related issuesCTSCO a Carbon Storage Solution - Surat Basin Hydrogeology - related issues
CTSCO a Carbon Storage Solution - Surat Basin Hydrogeology - related issues
 
The future of EIA - Legislative and regulatory change
The future of EIA - Legislative and regulatory changeThe future of EIA - Legislative and regulatory change
The future of EIA - Legislative and regulatory change
 
PA's Nutrient Trading Program
PA's Nutrient Trading ProgramPA's Nutrient Trading Program
PA's Nutrient Trading Program
 
Contaminated land technical_manual_june_2012
Contaminated land technical_manual_june_2012Contaminated land technical_manual_june_2012
Contaminated land technical_manual_june_2012
 
Ghg roundup ii_agriculture
Ghg roundup ii_agricultureGhg roundup ii_agriculture
Ghg roundup ii_agriculture
 
007 NCWRM 2011 Nikitas_H2020
007 NCWRM 2011 Nikitas_H2020007 NCWRM 2011 Nikitas_H2020
007 NCWRM 2011 Nikitas_H2020
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Post pn-173
Post pn-173Post pn-173
Post pn-173
 
Bco2 Lfg Ver Project Retuns Financing
Bco2 Lfg Ver Project Retuns FinancingBco2 Lfg Ver Project Retuns Financing
Bco2 Lfg Ver Project Retuns Financing
 
Juneau Wetland Management Plan by Teri Camery and Nicole Jones
Juneau Wetland Management Plan by Teri Camery and Nicole JonesJuneau Wetland Management Plan by Teri Camery and Nicole Jones
Juneau Wetland Management Plan by Teri Camery and Nicole Jones
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
 
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPDCommunity Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
Community Infrastructure Levy- Helen Martin, RTPI West Midlands CPD
 

Brownfields Remediation

  • 1. Brownfields Remediation CanBuild June 22, 2010 Amendments to O.Reg. 153/04 Cette publication hautement spécialisé n’est disponible qu’en anglais en vertu du règlement 441/97 qui en exempte l’application de la Loi sur les services en français. Pour obtenir de l’aide en français, veuillez communiquer avec le ministère de l’Environnement au (416) 327-5953. PIBS 7755e
  • 2. Overview This presentation will cover: ► Policy Context ► Basic Contents of O. Reg 153/04 ► Plans for Education & Training, and Supports 2
  • 3. Evolving Policy ► Ontario’s Brownfield policies have been steadily evolving: ● 2001 – Brownfield Statute Law Amendment Act - first publication of guidelines and standards ● 2004 – O. Reg 153/04 becomes law ● 2007 –Budget Bill announces brownfields reforms ● 2007 – Start of consultation on updates to O. Reg 153/04 standards and procedures ● 2009 – Amendments to O. Reg 153/04 filed Dec 29. – 2010 (June) – Regulation amended to correct errors and omissions 3
  • 4. Ontario Policy Context ► Brownfield Policies and program operate within a wider context: ● Economic recovery just beginning ● Province (and Federal) government in significant deficit for much of next decade. ► Ontario pursuing long-term strategy to make Ontario one of the developed world’s most tax-competitive jurisdictions for new business investment ● Delivering strategic improvements to business tax climate ► Key Ontario investment priorities supporting economic strategy: ● Health, Education, Infrastructure 4
  • 5. Policy Objectives ► Ontario has several inter-related policy objectives that affect brownfields: ● Environmental Quality ● Growth Management ● Economic Development ● Innovation ► Amended Brownfields Regulations under EPA mainly affect the Environmental Quality objective, but given complexities of brownfields have implications for economic development, growth and innovation. 5
  • 6. Voluntary Clean-up – Brownfields Redevelopment Brownfields are underdeveloped or previously developed properties that may be contaminated. They are usually, but not exclusively, former industrial or commercial properties that may be underutilized, derelict or vacant (PPS, 2005). ► There may be as many as 30,000 to 100,000 brownfields sites in Canada. ► They include old and abandoned refineries, former railway yards, old waterfronts, crumbling warehouses, abandoned gas stations, former drycleaners and other commercial properties where toxic substances may have been used or stored. ► The land may need to be cleaned up before it can be redeveloped. ● Left idle and unmanaged, brownfields pose risks to human health and the environment because of the toxic materials left behind ● Idle brownfields can also negatively affect surrounding property values and community vitality ► In Ontario, the legislative framework for brownfields was established in 2001 through the Brownfields Statute Law Amendment Act 2001. 6
  • 7. Benefits of cleaning up brownfields Benefits to cleaning up brownfields include: ► Contributes to clean healthy environment, including: ● improved air, water and soil quality, increased land preservation, less urban sprawl and increased preservation of open spaces. ► Eliminates health and safety hazards. ► Restores impacted lands so they can be reused. ► Promotes strong communities. ► Provides tremendous social and economic benefits by emphasizing urban intensification. ► Helps curb urban sprawl thereby protecting valuable green spaces and agricultural lands. ► Encourages efficient re-use of lands, buildings and infrastructure. 7
  • 8. Brownfields Reform – 2007 Legislative Changes • In the 2007 Budget, the government announced a reform package that would address identified barriers to brownfield redevelopment. The reforms received Royal Assent on May 17, 2007 as part of the Budget Measures and Interim Appropriation Act, 2007. • Reforms fit into four key areas: 1. Provincial Lands – demonstrating provincial leadership through the clean-up of provincial lands. 2. Financing Tools – removing provincial crown liens on abandoned properties; leveraging investment in brownfield redevelopment where municipal property tax incentives are insufficient. 3. Regulatory Liability Protection – reviewing the possibility of addressing remaining liability barriers. 4. Environmental Regulatory Improvements – updating environmental standards; improving and clarifying the existing regulatory framework. 8
  • 9. Consultations on Regulatory Amendments • Extensive consultations were undertaken and amendments reflect stakeholder and First Nations concerns. Consultation and engagement activities included: • EBR Posting of Proposed Soil and Groundwater Standards (March 2007 – 60 days) • EBR Posting (Oct. 2008 – Feb. 2009), 87 submissions received • 20 face-to-face information sessions • First Nations Information Sessions – January 2009, November 2009 • Working groups for modified generic (Tier 2) risk assessment and environmental site assessment • Desktop Demonstration Pilots to test proposed changes in specific sites 9
  • 10. Brownfields Reforms - “Current” • The Ministry of the Environment regulatory amendments to move O. Reg. 153/04 forward: 1. Record of Site Condition 3. Traditional Risk Assessment (RSC) Lengthy approvals for risk assessment Need for clear and transparent and few alternatives for meeting site- process for submitting RSCs and specific conditions. clearer ESA requirements. 4. Technical Amendments 2. Old Standards Need for technical amendments In need of updating to reflect best supporting implementation of the science and leading jurisdictions. new legislation (e.g. requirements for soil quality, reclassification of land uses, etc.). 10
  • 11. Brownfields Reforms - “New” 1. Enhanced Record of Site 3. Risk Assessment & Condition Integrity Introduce Streamlined “Tier 2” Predictable and transparent process Timely approvals for modified generic for submitting RSCs and clearer ESA (Tier 2) risk assessment. requirements. 2. Updated Standards Other Technical Reflect current science and are Amendments consistent with other jurisdictions. (e.g. clarify standard for quality of soil brought to property) 11
  • 12. 1. Enhanced Record of Site Condition Integrity PURPOSE AMENDMENT BENEFITS ● To provide a more • Clear and transparent RSC • Provides reliability and transparent, timely and transparency to RSC submission process clarifying what efficient regulatory regime, and greater process work must be done to submit a RSC and timeline (next slide). confidence by creditors, ● To enhance municipalities, and others environmental • Clear Environmental Site protection through Assessment (ESA) requirements • Reduces health and which reflect best practices. safety risks more provincial oversight • Clear provisions for Qualified • Ensures reviewed RSCs with deficiencies are not Persons (QP) including Conflict of filed to the Brownfields Interest provisions. Environmental Site • Soil quality standard defining the Registry quality of soil that can be brought to RSC properties • Improves and increases stakeholder support for enhanced MOE oversight 12
  • 13. RSC Submission Process (see EPA 168.4) RSC Submitted If Complete, 30 business day period starts Acknowledgement RSC has not been Notice of Review Could include of date RSC Filed completed in Field work accordance with regulation Acknowledgement Notice of Defect(s) of date RSC Filed 13
  • 14. Environmental Site Assessments – Whats New? Examples of Phase One ESA Changes Examples of Phase Two ESA Changes ► Increased direction for phase one ESA: ► Increased direction for phase two ESA: ● Records to be checked during records review ● Sampling and analysis plan – Mandatory databases to be checked ● Quality assurance and quality control during records review sampling – Minimum search distance ● Ground water sampling where required or advisable ● Persons to be interviewed ● Reporting format ● Activities to undertake during site reconnaissance ● Report attachments ● Reporting format ► Introduction of: ● Report attachments ● Phase two conceptual site model ► Introduction of: ● Mandatory ground water sampling in some situations ● Potentially contaminating activities that trigger a phase two ESA ● Requirements for delineation of contaminants ● A phase one conceptual site model 14
  • 15. 2. Updated Standards PURPOSE AMENDMENT BENEFITS • Standards need to • Revised standards for 120 chemicals in • Protects human and reflect current science total, to reflect current science and strengthen environmental health and be consistent with protection of human health and the according to best science, other jurisdictions. environment. through updated standards. New Standards Compared to Old (chemicals) Standards (2004) • Provides greater flexibility in remediation, while Less stringent 23% (27) protecting environmental and human health. More stringent 65% (78) Equally stringent 8% (9) • New standards are comparable to other Standards removed - jurisdictions that recently New standards 5% (6) updated their standards • Provide a flexible approach to standards: increased number of generic tables for more simple application (from 6 tables to 9 tables). • Increased coverage: Standards provided for 6 additional Contaminants of Concern • Provide a new standard model as a basis for modified generic (Tier 2) risk assessment submissions (next slide) 15
  • 16. 3. Modified Generic “Tier 2” Risk Assessments ► Risk assessment provides property owners an alternative to meeting standards specified in the regulation. ► Options for standards to meet for filing a RSC, include: ● Tier 1: generic standards ● Tier 2: streamlined risk assessment that uses simple modifications to the models used to generate the generic standards (i.e. modified generic approach) ● Tier 3: full risk assessment that provides the widest range of options in how standards may be developed ► Standards specified in a risk assessment are equally protective as the generic standards; they may also permit use of risk management measures, such as paving a site to block the contaminant pathways ► Standards specified in a risk assessment must be accepted by the Director following MOE review of the risk assessment. ► The streamlined risk assessment (Tier 2) was considered by stakeholders to be a key component of the amendments. 16
  • 17. 3. Modified Generic (Tier 2) Risk Assessments PURPOSE AMENDMENT BENEFITS • To provide an • Introduce a new Streamlined Risk • At applicable sites alternative to meeting Assessment (Tier 2): provides timelier and more the ministry generic cost-effective option for standards and the • allows for the development of site risk assessment traditional risk specific standards using a model which, assessment process when site conditions allow, removes • Faster review (after (Tier 3) inherent conservatism of the generic July 1, 2011) – 8 standards, while retaining protection of week review public health and the environment. timeline • Provide proponents with a web-based • Allows proponents to opt tool for development of site specific for simple risk standards. management measure(s) designed and published by the Ministry 17
  • 18. Conceptual Site Model (including Site Specific Conditions + Soil Vapour Screening + Risk Management) Legend Groundwater Contaminated Human Health - Groundwater Ingestion, Dermal Contaminated Contact & Odour Soil Soil Ecotoxicity Human Health - Inhalation GW2 Component Exposure Pathway Cement Cement Distance = 200m S2 S1 S-Nose SURFACE X 1000 WATER Plants & Soil Mammal groundwater X 1000 Depth = 6m Invertebrates s & Birds S3 ingestion Contaminated Soil S-IA X 100 S-GW1 S-GW3 Ecotoxicity - Aquatic Life Contaminated Groundwater GW2 X 100 GW1 GW3 AQUIFER
  • 19. 4. Implementation and Grandfathering ISSUES AMENDMENT BENEFITS • To provide balanced ► The regulatory amendments allow: • Provides proponents with and fair approach by projects currently an 18 month extension for the use of allowing projects underway an opportunity 2004 standards can be provided for currently underway to to use old standards sites where work is underway. The use old standards. extension must be requested (new form • Allows for quicker for extension) between July 1, 2010 and implementation of ESA December 31, 2010; and requirements and improvements to RSC for projects to be grandfathered (to submission and filing Dec. 31, 2012) process Grandfathering only for soil, ground water and sediment standards (not for • Sunset date ensures new standards are used for all the new ESA requirements). projects after 3 years Owners may also choose to meet more stringent standards earlier than July 1, 2011 (i.e. number must be lower than current (2004) standards). 19
  • 20. Next Steps – Implementation ► Ontario strategy for Education based on training key specialists: ● MOE District Office staff – Jan-Feb 2010 ● QP’s and other technical specialists – March – May 2010 ● Other key stakeholder groups – May to December 2010. ► Wide variety of supporting documents and technical bulletins already published by MOE. ► Ontario will keep in formal contact with brownfield stakeholders through regular MAH Brownfield Stakeholder Group meetings. ► MOE brownfields website to be updated to allow for quick navigation to relevant information. Public will be able to "sign up" for e-mail updates. ► MOE to work with pertinent stakeholder groups when developing guidance documents and technical bulletins. 20
  • 21. Contacts Ministry of Environment Rosemary Ash Team Lead/Brownfields Filing and Review Ministry of the Environment 416-314-9058 Rosemary.Ash@ontario.ca Web: www.ene.gov.on.ca/en/land/brownfields/index.php Brownfields Ontario - MMAH Office of the Brownfields Coordinator Ministry of Municipal Affairs and Housing 777 Bay Street, 3rd Floor Toronto, ON M5G 2E5 Tel: 416.585.6635 Fax: 416.585.7292 E-mail: Brownfieldsontario@ontario.ca or chris.thompson@ontario.ca Website: www.ontario.ca/brownfields 21