Supercritical Units: Efficiency Advantage



Improvements in the efficiency of pulverized coal (P.C.) fired boiler/steam
turbine power plants have been pursued since the introduction of P.C. fired
boilers in the 1920’s.


This led eventually in the late 1960’s to the introduction of supercritical boilers
operating at about 570 Deg C (1060qF) superheat/reheat temperatures and 24
MPa (3400 psi) pressure for the steam.

Presently boilers with 300bar and 700 Deg C are being adopted for many of the
recent power plants.

Since at these pressures and temperatures there is no distinct differences
between the water and steam phases, no drums are required in the same.


                                         Dr. Himadri Banerji:Conference on
                                                Plant Commissioning Kuala
                                             Lumpur 1st and 2nd Nov 2010     10/29/2010   1
The new
                                                                             generation of
                                                                             power plants
                                                                             operate at
Conventional steam                                                           pressures higher
power plants operate at a                                                    than the critical
steam pressures in the                                                       pressure.
range of 170 bar and 565
Deg C.

These are Subcritical                                                        These are
power plants.                                                                Supercritical
                                                                             power plants.

                                                                             The operating
                                                                             pressures are in
                                                                             the range of 230
                                                                             to 265 bar. And
                                                                             565 Deg C
The next generation of
power plants will
operate with Steam
Pressures in the range
of 300 bar and
              630-
Temperatures 630-
700 Deg Centigrade.

These are the Ultra
Super Critical Power
Plants.
Plants.




                            Dr. Himadri Banerji:Conference on
                                   Plant Commissioning Kuala
                                Lumpur 1st and 2nd Nov 2010     10/29/2010                   2
The lower part of the boiler furnace is arranged in a spiral
configuration such that the fluid path wraps around the boiler
as it travels up the furnace.




                               Dr. Himadri Banerji:Conference on
                                      Plant Commissioning Kuala
                                   Lumpur 1st and 2nd Nov 2010     10/29/2010   3
Comparison of Allowable Stresses between Conventional and Advanced
Stainless Steel Tubes, Advanced CrMo Steel Pipes


                                  Dr. Himadri Banerji:Conference on
                                         Plant Commissioning Kuala
                                      Lumpur 1st and 2nd Nov 2010     10/29/2010   4
Advantages of Oxygenated Treatment OT of Supercritical Boilers

The benefits from a once-through supercritical boiler on OT include:

• Lowering overall corrosion rates by forming a protective, double-oxide layer
with a controlled amount of oxygen present in the condensate (This protective
layer is considered to be more stable than the oxide layer formed using AVT.)

• Decreasing boiler chemical cleaning frequency due to reduced amounts of
iron transport and deposition

• Allowing quicker, cleaner start ups and reduced corrosion product transport
rates during cold and hot start ups

• Allowing boiler operation at lower pH with overall objective of minimizing
chemical costs

• Eliminating feeding, handling, and storage of oxygen scavenger products
EPC Contractor’s Chemistry Challenges



Most once-through supercritical boilers have been converted from
previously predominant AVT to OT, with new facilities almost
exclusively using OT.

                                 all-
This chemistry change requires all-ferrous metallurgy in the feed
                                        copper-
water train, and precludes copper or copper-based alloy feed water
heat exchangers in system design and bronze impellers in
condensate pumps and valve trims in the condensate system. This is
primarily the challenge to the engineering group og the EPC
contractor to ensure that this is strictly adhered..all steels contain
traces of copper and zinc.



                                   Dr. Himadri Banerji:Conference on
                                          Plant Commissioning Kuala
                                       Lumpur 1st and 2nd Nov 2010     10/29/2010   6
coal-
Shows the pressure drop history of a coal-fired supercritical plant in Japan that changed the water
chemistry from AVT to OWT in 1996.

After 7 years operation since the change, there has been no significant increase in pressure drop.

This plant has not required acid cleaning since the change, and no future cleaning
is planned.




                                                   Dr. Himadri Banerji:Conference on
                                                          Plant Commissioning Kuala
                                                       Lumpur 1st and 2nd Nov 2010     10/29/2010     7
RISK MANAGEMENT
                   Plant Commissioning




SUPERCRITICAL UNITS: EPC CONTRACTOR’S CHEMISTRY CONTROL PARADIGM




                                   Dr. Himadri Banerji:Conference on
                                          Plant Commissioning Kuala
                                       Lumpur 1st and 2nd Nov 2010     10/29/2010   8
EPC Contractor’s Chemistry Challenges

Some once-through supercritical boiler manufacturers have instituted penalties
against the allowable pressure drop during initial boiler performance testing, an
additional complication that may impact start up and commissioning activities.

These penalties are based on extended operation on all volatile treatment
reducing (AVT[R]) during start up and commissioning.

The reducing environment (negative oxidation reduction potential [ORP])
present when operating on AVT(R) may contribute to increased iron transport,
subsequently increasing the pressure drop through the boiler.

These pressure drop correction penalties will be fervently debated by the EPC
contractor during commissioning and challenged by both owners and plant
operators.



                                        Dr. Himadri Banerji:Conference on
                                               Plant Commissioning Kuala
                                            Lumpur 1st and 2nd Nov 2010     10/29/2010   9
WARRANTY IMPLICATIONS

Steam turbine suppliers are also setting limits, in the
equipment contract, on the number of hours a turbine can be
operated with out-of-specification chemistry. These limits are
typically listed in an action-level These limits are typically
listed in an action-level format where minor chemistry
excursions are allowable for predetermined time
periods without violating the equipment warranty.
                                                           up—
                          Steam Purity Limits During Start up— EPC
                                                           Once-
                          Contractor Recommendation for Once-Through
                          Boilers...usually one week




                                   Dr. Himadri Banerji:Conference on
                                          Plant Commissioning Kuala
                                       Lumpur 1st and 2nd Nov 2010     10/29/2010   10
EPC Contractor’s Chemistry Challenges
During steam-side start up and commissioning, the EPC contractor is mostly
interested in main and reheat steam chemistry.

Table below lists EPRI recommendations for once-through boilers operating under
OT, including normal target value and action levels 1, 2, and 3.

                                       Although recommendations listed in Table are
                                       acceptable for targeted chemistry limits during
                                       operation, EPC contractors would like to see the
                                                                            table:
                                       following two columns added to this table:

                                       • Allowable chemistry excursions during
                                       hot start up

                                       • Allowable chemistry excursions during
                                       cold start up




                         Feed Water   Dr. Himadri Banerji:Conference on
                                             Plant Commissioning Kuala
                                          Lumpur 1st and 2nd Nov 2010                 10/29/2010
                                                                                                   11
What Are Action Levels 1, 2, 3




                       Dr. Himadri Banerji:Conference on
                              Plant Commissioning Kuala
                           Lumpur 1st and 2nd Nov 2010     10/29/2010   12
EPC CONTRACTOR’S CHEMISTRY CONTROL PROGRAM


Start up chemistry guidelines should primarily focus on main steam chemistry
targets, including

cation conductivity: it warns of salts and acids that may cause turbine corrosion

silica :   silicate scaling may contribute to turbine capacity and efficiency losses.

sodium: critical for avoiding corrosion because uncontrolled sodium hydroxide
        concentrations are known to cause corrosion damage failures in boiler
        tubes.


Targets for chlorides, sulphates, and organic compounds should be
deferred until the end of the commissioning cycle.

Degassed cation conductivity is the preferred conductivity to be
measured during commissioning since system air leaks are still
being discovered and sealed during the start up and commissioning
phase. The measurement of degassed cation conductivity will aid in
differentiating between air leaks and other contamination sources
                                            Dr. Himadri Banerji:Conference on
                                                   Plant Commissioning Kuala
                                                Lumpur 1st and 2nd Nov 2010     10/29/2010   13
EPC Contractor’s Chemistry Challenges

The two most important parameters in Table are feed water cation
conductivity and pH.

Cation conductivity should be maintained below 0.15 µS/cm during
operation on OT. Normal pH range for feed water under OT is 8.0 to 8.5.



          The EPC contractor is challenged with controlling
          pH when feed water cation conductivity increases
          to concentration levels listed in Table , action levels
          1, 2, and 3 (≤0.3 µS/cm, ≤0.6 µS/cm, >0.6 µS/cm,
          respectively).




                                     Dr. Himadri Banerji:Conference on
                                            Plant Commissioning Kuala
                                         Lumpur 1st and 2nd Nov 2010     10/29/2010   14
EPC Contractor’s Chemistry Challenges



The pH/conductivity relationship is crucial for once-through cycles on OT;
thus, the EPC contractor implements the chemistry control at its own risk.



Important issues to be addressed when implementing OT include:

• At what point during the start up and commissioning process should the
chemistry regime be switched from AVT to OT to prevent frequent switching back
and forth between a reducing and an oxidizing environment?

• What would be the “detrimental effects” of going from an oxidizing atmosphere to
a reducing (or close to reducing) atmosphere, for temporary periods?

• How can these “detrimental effects” be quantified and addressed during design
and equipment procurement?



                                          Dr. Himadri Banerji:Conference on
                                                 Plant Commissioning Kuala
                                              Lumpur 1st and 2nd Nov 2010     10/29/2010   15
Stringent steam quality limits implemented by steam turbine
suppliers, boiler manufacturers have tightened limits on feed water
chemistry.


Yet EPC contractor requires standards to be relaxed during
commissioning to permit timely unit start up.


 The challenge also is in determining the appropriate time to switch
 from AVT to OT
                 Once cation conductivity levels are stable below 0.15 µS/cm,
                 EPRI recommends operation on OT with oxygen injection in a
                 pH range of 8.0 to 8.5. EPRI guidelines also state that oxygen injection
                 into feed water may continue with pH controlled between 9.2 and 9.6
                                                         µS/cm          µS/cm.
                 and cation conductivity between 0.15 µS/cm and 0.3 µS/cm. However,
                                                                µS/cm,
                 at cation conductivity levels greater than 0.3 µS/cm, EPRI recommends
                 that oxygen injection be terminated and AVT resumed. Upsets in
                 cation conductivity may lead to serious corrosion problems if oxygen
                  is continuously fed during upset conditions.


                                           Dr. Himadri Banerji:Conference on
                                                  Plant Commissioning Kuala
                                               Lumpur 1st and 2nd Nov 2010     10/29/2010   16
Comparison of Start-up Systems




                      Dr. Himadri Banerji:Conference on
                             Plant Commissioning Kuala
                          Lumpur 1st and 2nd Nov 2010     10/29/2010   17
Dr. Himadri Banerji:Conference on
       Plant Commissioning Kuala
    Lumpur 1st and 2nd Nov 2010     10/29/2010   18
The turbine bypass system was designed to minimize the start-up
time by controlling the main steam pressure and temperature before
turbine rolling, and enabling the steam to flow through the super
heater sections at a short time after light-off.

The low-load recirculation system was designed to recover residual
heat during start-up by circulation of the un-evaporated water from
the furnace back to the economizer inlet, which also can assist in
reducing start-up time.

As this system is automatically operated, the start-up process is as
simple as with a natural circulation (NC) boiler.




                                   Dr. Himadri Banerji:Conference on
                                          Plant Commissioning Kuala
                                       Lumpur 1st and 2nd Nov 2010     10/29/2010   19
EPC Contractor Guidelines on Feed Water Chemistry


                                      Startup

Start up Steam Chemistry Limits




                                     Turbine Rolling Continued AVT(O)




                                    Dr. Himadri Banerji:Conference on
                                           Plant Commissioning Kuala
                                        Lumpur 1st and 2nd Nov 2010     10/29/2010   20
Turbine Rolling Continued
Balance of Commissioning Period Chemistry Limits




                       Dr. Himadri Banerji:Conference on
                              Plant Commissioning Kuala
                           Lumpur 1st and 2nd Nov 2010     10/29/2010   21
Operation Guidelines with AVT R and AVT O




AVT(R) Feed water Chemistry Control Guidelines




                                                   AVT(O) Feed water Chemistry Control Guidelines



                                                 Dr. Himadri Banerji:Conference on
                                                        Plant Commissioning Kuala
                                                     Lumpur 1st and 2nd Nov 2010     10/29/2010   22
Suggested Start up Feed water Chemistry
    Guidelines for Once-Through Cycles Without Deaerators
                   Once-




Practical start up chemistry guidelines should be established by
consensus among the turbine manufacturer, boiler manufacturer,
and EPC contractor early on in project development and outlined
in equipment contracts.

                                    Dr. Himadri Banerji:Conference on
                                           Plant Commissioning Kuala
                                        Lumpur 1st and 2nd Nov 2010     10/29/2010   23
ROLE OF CONDENSATE POLISHERS
DURING COMMISSIONING




               Dr. Himadri Banerji:Conference on
                      Plant Commissioning Kuala
                   Lumpur 1st and 2nd Nov 2010     10/29/2010   24
Once-through supercritical boilers are commonly installed with
full-flow
condensate polishers to control corrosive impurities concentration
in condensate and feed water systems.
              The presence of impurities in feed water will
              significantly affect feed water chemistry, potentially
              exceeding boiler supplier feed water limits and
              turbine supplier steam purity specifications.




                                  Dr. Himadri Banerji:Conference on
                                         Plant Commissioning Kuala
                                      Lumpur 1st and 2nd Nov 2010     10/29/2010   25
Impurities shaken loose during start up may cause a chemistry hold, where
plant load increases are temporarily halted until these impurities are
removed from the system.

For a once-through supercritical boiler, impurities are removed exclusively
by condensate polishers subsequent to chemical cleaning and boiler flush.

Once impurities are removed, the chemistry hold is lifted and the plant is
allowed to continue to ramp up to full load without exceeding allowable
boiler or turbine chemistry limits.




                                      Dr. Himadri Banerji:Conference on
                                             Plant Commissioning Kuala
                                          Lumpur 1st and 2nd Nov 2010     10/29/2010   26
Steam and Water Analysis System (SWAS) shall be furnished for continuous
monitoring and control of water and steam purity in the plant cycle




                                       Dr. Himadri Banerji:Conference on
                                              Plant Commissioning Kuala
                                           Lumpur 1st and 2nd Nov 2010     10/29/2010   27
Dr. Himadri Banerji:Conference on
       Plant Commissioning Kuala
    Lumpur 1st and 2nd Nov 2010     10/29/2010   28
EPC Contractor Responsibility includes that Chemistry limits are before, during
and after once-through supercritical boilers commissioning


• Control system component cleanliness during shop fabrication
• Control system component cleanliness during construction
• Flush system components prior to start-up
• Implement stringent water quality requirements for hydro testing
• Perform boiler and feed water system chemical cleaning
• Flush system components thoroughly following chemical cleaning
• Perform steam blows to obtain steam cycle cleanliness
• Implement time-based, progressively improving feed water and steam
chemistry targets




                                       Dr. Himadri Banerji:Conference on
                                              Plant Commissioning Kuala
                                           Lumpur 1st and 2nd Nov 2010     10/29/2010   29

More Related Content

What's hot

Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
Madhan kumar Thangaraj (International Relationship)
 
Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)
1000kv technologies
 
Eda Presentation Aug2009 E
Eda Presentation Aug2009 EEda Presentation Aug2009 E
Eda Presentation Aug2009 EJoe Miller
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
Gensol Engineering Limited
 
Len Andersen Water Swirled into Gas Turbine Technology 914-237-7689 patent 8,...
Len Andersen Water Swirled into Gas Turbine Technology 914-237-7689 patent 8,...Len Andersen Water Swirled into Gas Turbine Technology 914-237-7689 patent 8,...
Len Andersen Water Swirled into Gas Turbine Technology 914-237-7689 patent 8,...
Len Andersen BSChE Engineer Looking for work CWI - ASCE
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13Moore Sarah
 
DoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_versionDoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_versionDana Ray Nilsson (Swalla)
 
Wind Energy For Geoscience Students
Wind Energy For Geoscience Students Wind Energy For Geoscience Students
Wind Energy For Geoscience Students Keshav Letourneau
 

What's hot (10)

madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)
 
Eda Presentation Aug2009 E
Eda Presentation Aug2009 EEda Presentation Aug2009 E
Eda Presentation Aug2009 E
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Len Andersen Water Swirled into Gas Turbine Technology 914-237-7689 patent 8,...
Len Andersen Water Swirled into Gas Turbine Technology 914-237-7689 patent 8,...Len Andersen Water Swirled into Gas Turbine Technology 914-237-7689 patent 8,...
Len Andersen Water Swirled into Gas Turbine Technology 914-237-7689 patent 8,...
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 
DoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_versionDoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_version
 
Wind Energy For Geoscience Students
Wind Energy For Geoscience Students Wind Energy For Geoscience Students
Wind Energy For Geoscience Students
 

Viewers also liked

Fukushima-Daiichi Learning from Experience: Nuclear Power Risks
Fukushima-Daiichi Learning from Experience: Nuclear Power RisksFukushima-Daiichi Learning from Experience: Nuclear Power Risks
Fukushima-Daiichi Learning from Experience: Nuclear Power Risks
HIMADRI BANERJI
 
High pressure boilers 050,18,48
High pressure boilers 050,18,48High pressure boilers 050,18,48
High pressure boilers 050,18,48
Maharshi Soni
 
Fouling effects on boiler
Fouling effects on boilerFouling effects on boiler
Fouling effects on boiler
Maharshi Soni
 
Supercritical steam generators
Supercritical steam generatorsSupercritical steam generators
Supercritical steam generatorsAshutosh Katti
 
Supercritical boiler ntpc sipat
Supercritical boiler ntpc sipatSupercritical boiler ntpc sipat
Supercritical boiler ntpc sipat
pratikguptateddy
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
Ashvani Shukla
 
Steam generator part 2
Steam generator part 2Steam generator part 2
Steam generator part 2
Mohammad Shoeb Siddiqui
 
Steam generator part 1
Steam generator part 1Steam generator part 1
Steam generator part 1
Mohammad Shoeb Siddiqui
 
Steam boiler
Steam boilerSteam boiler
Steam boiler
Ashish Bandewar
 
Arc Welding Processes 2 1
Arc Welding Processes 2 1Arc Welding Processes 2 1
Arc Welding Processes 2 1guest5be29
 

Viewers also liked (11)

Fukushima-Daiichi Learning from Experience: Nuclear Power Risks
Fukushima-Daiichi Learning from Experience: Nuclear Power RisksFukushima-Daiichi Learning from Experience: Nuclear Power Risks
Fukushima-Daiichi Learning from Experience: Nuclear Power Risks
 
High pressure boilers 050,18,48
High pressure boilers 050,18,48High pressure boilers 050,18,48
High pressure boilers 050,18,48
 
Fouling effects on boiler
Fouling effects on boilerFouling effects on boiler
Fouling effects on boiler
 
Supercritical steam generators
Supercritical steam generatorsSupercritical steam generators
Supercritical steam generators
 
Supercritical boiler ntpc sipat
Supercritical boiler ntpc sipatSupercritical boiler ntpc sipat
Supercritical boiler ntpc sipat
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Steam generator part 2
Steam generator part 2Steam generator part 2
Steam generator part 2
 
Steam generator part 1
Steam generator part 1Steam generator part 1
Steam generator part 1
 
Steam boiler
Steam boilerSteam boiler
Steam boiler
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Arc Welding Processes 2 1
Arc Welding Processes 2 1Arc Welding Processes 2 1
Arc Welding Processes 2 1
 

Similar to Commisioning of Supercritical Power Units: Risks to an EPC Contractor

Adoption of supercritical technology (1)
Adoption of supercritical technology (1)Adoption of supercritical technology (1)
Adoption of supercritical technology (1)
HARSHIT GUPTA
 
Hydro, gas, diesel power plant
Hydro, gas, diesel power plantHydro, gas, diesel power plant
Hydro, gas, diesel power plant
Amol Kokare
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperiencePooja Agarwal
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
Abhinay Angari
 
Makpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in IndiaMakpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in India
Makpower Trans-Systems (P) Ltd.
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
Shishupal03012015
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
Ranjan kumar
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
Aditya Narain
 
Supercritical Power Plants
Supercritical Power PlantsSupercritical Power Plants
Supercritical Power PlantsErwan Yulianto
 
Industrial visit to BHEL, Ranipet
Industrial visit to BHEL, RanipetIndustrial visit to BHEL, Ranipet
Industrial visit to BHEL, Ranipet
PritishTayal
 
Remaining life assessment of refinery furnace tubes using finite element method
Remaining life assessment of refinery furnace tubes using finite element methodRemaining life assessment of refinery furnace tubes using finite element method
Remaining life assessment of refinery furnace tubes using finite element method
Barhm Mohamad
 
SUPER-CRITICAL THERMAL POWER PLANT by Tatyaso Kadam
SUPER-CRITICAL THERMAL POWER PLANT by Tatyaso KadamSUPER-CRITICAL THERMAL POWER PLANT by Tatyaso Kadam
SUPER-CRITICAL THERMAL POWER PLANT by Tatyaso Kadam
tatyasokadam88
 
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementSujit Tharakan
 
Types of generation plant
Types of generation plantTypes of generation plant
Types of generation plant중구 장
 
Save Energy thru ReEngineered Transformers : Indian Railways
Save Energy thru ReEngineered Transformers : Indian Railways Save Energy thru ReEngineered Transformers : Indian Railways
Save Energy thru ReEngineered Transformers : Indian Railways
Ravinder Bhan
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
Udhayakumar Venkataraman
 
Mppkvv company ltd
Mppkvv company ltdMppkvv company ltd
Mppkvv company ltd
DEEPAK PATEL
 
Transformer ppt
Transformer pptTransformer ppt
Transformer ppt
Rakesh Gurjar
 

Similar to Commisioning of Supercritical Power Units: Risks to an EPC Contractor (20)

Adoption of supercritical technology (1)
Adoption of supercritical technology (1)Adoption of supercritical technology (1)
Adoption of supercritical technology (1)
 
Hydro, gas, diesel power plant
Hydro, gas, diesel power plantHydro, gas, diesel power plant
Hydro, gas, diesel power plant
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field Experience
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Makpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in IndiaMakpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in India
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Supercritical Power Plants
Supercritical Power PlantsSupercritical Power Plants
Supercritical Power Plants
 
Industrial visit to BHEL, Ranipet
Industrial visit to BHEL, RanipetIndustrial visit to BHEL, Ranipet
Industrial visit to BHEL, Ranipet
 
Remaining life assessment of refinery furnace tubes using finite element method
Remaining life assessment of refinery furnace tubes using finite element methodRemaining life assessment of refinery furnace tubes using finite element method
Remaining life assessment of refinery furnace tubes using finite element method
 
A Project Report
A Project ReportA Project Report
A Project Report
 
SUPER-CRITICAL THERMAL POWER PLANT by Tatyaso Kadam
SUPER-CRITICAL THERMAL POWER PLANT by Tatyaso KadamSUPER-CRITICAL THERMAL POWER PLANT by Tatyaso Kadam
SUPER-CRITICAL THERMAL POWER PLANT by Tatyaso Kadam
 
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
 
Types of generation plant
Types of generation plantTypes of generation plant
Types of generation plant
 
Save Energy thru ReEngineered Transformers : Indian Railways
Save Energy thru ReEngineered Transformers : Indian Railways Save Energy thru ReEngineered Transformers : Indian Railways
Save Energy thru ReEngineered Transformers : Indian Railways
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
 
Mppkvv company ltd
Mppkvv company ltdMppkvv company ltd
Mppkvv company ltd
 
Transformer ppt
Transformer pptTransformer ppt
Transformer ppt
 

More from HIMADRI BANERJI

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdf
HIMADRI BANERJI
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
HIMADRI BANERJI
 
Gas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxGas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptx
HIMADRI BANERJI
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdf
HIMADRI BANERJI
 
Making Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeMaking Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing Change
HIMADRI BANERJI
 
Case Studies IN Machine Learning
Case Studies IN Machine Learning Case Studies IN Machine Learning
Case Studies IN Machine Learning
HIMADRI BANERJI
 
Program Link to Workshop AI.pdf
Program Link to Workshop AI.pdfProgram Link to Workshop AI.pdf
Program Link to Workshop AI.pdf
HIMADRI BANERJI
 
Brochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfBrochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdf
HIMADRI BANERJI
 
Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...
HIMADRI BANERJI
 
Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012
HIMADRI BANERJI
 
Risk management FSRU himadri banerji
Risk management FSRU himadri banerjiRisk management FSRU himadri banerji
Risk management FSRU himadri banerji
HIMADRI BANERJI
 
FSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLFSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROL
HIMADRI BANERJI
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics
HIMADRI BANERJI
 
Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal
HIMADRI BANERJI
 
Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructure
HIMADRI BANERJI
 
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
HIMADRI BANERJI
 
Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji
HIMADRI BANERJI
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
HIMADRI BANERJI
 
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
HIMADRI BANERJI
 
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
HIMADRI BANERJI
 

More from HIMADRI BANERJI (20)

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdf
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
 
Gas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxGas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptx
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdf
 
Making Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeMaking Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing Change
 
Case Studies IN Machine Learning
Case Studies IN Machine Learning Case Studies IN Machine Learning
Case Studies IN Machine Learning
 
Program Link to Workshop AI.pdf
Program Link to Workshop AI.pdfProgram Link to Workshop AI.pdf
Program Link to Workshop AI.pdf
 
Brochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfBrochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdf
 
Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...
 
Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012
 
Risk management FSRU himadri banerji
Risk management FSRU himadri banerjiRisk management FSRU himadri banerji
Risk management FSRU himadri banerji
 
FSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLFSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROL
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics
 
Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal
 
Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructure
 
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
 
Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
 
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
 

Recently uploaded

An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
daothibichhang1
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 

Recently uploaded (20)

An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 

Commisioning of Supercritical Power Units: Risks to an EPC Contractor

  • 1. Supercritical Units: Efficiency Advantage Improvements in the efficiency of pulverized coal (P.C.) fired boiler/steam turbine power plants have been pursued since the introduction of P.C. fired boilers in the 1920’s. This led eventually in the late 1960’s to the introduction of supercritical boilers operating at about 570 Deg C (1060qF) superheat/reheat temperatures and 24 MPa (3400 psi) pressure for the steam. Presently boilers with 300bar and 700 Deg C are being adopted for many of the recent power plants. Since at these pressures and temperatures there is no distinct differences between the water and steam phases, no drums are required in the same. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 1
  • 2. The new generation of power plants operate at Conventional steam pressures higher power plants operate at a than the critical steam pressures in the pressure. range of 170 bar and 565 Deg C. These are Subcritical These are power plants. Supercritical power plants. The operating pressures are in the range of 230 to 265 bar. And 565 Deg C The next generation of power plants will operate with Steam Pressures in the range of 300 bar and 630- Temperatures 630- 700 Deg Centigrade. These are the Ultra Super Critical Power Plants. Plants. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 2
  • 3. The lower part of the boiler furnace is arranged in a spiral configuration such that the fluid path wraps around the boiler as it travels up the furnace. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 3
  • 4. Comparison of Allowable Stresses between Conventional and Advanced Stainless Steel Tubes, Advanced CrMo Steel Pipes Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 4
  • 5. Advantages of Oxygenated Treatment OT of Supercritical Boilers The benefits from a once-through supercritical boiler on OT include: • Lowering overall corrosion rates by forming a protective, double-oxide layer with a controlled amount of oxygen present in the condensate (This protective layer is considered to be more stable than the oxide layer formed using AVT.) • Decreasing boiler chemical cleaning frequency due to reduced amounts of iron transport and deposition • Allowing quicker, cleaner start ups and reduced corrosion product transport rates during cold and hot start ups • Allowing boiler operation at lower pH with overall objective of minimizing chemical costs • Eliminating feeding, handling, and storage of oxygen scavenger products
  • 6. EPC Contractor’s Chemistry Challenges Most once-through supercritical boilers have been converted from previously predominant AVT to OT, with new facilities almost exclusively using OT. all- This chemistry change requires all-ferrous metallurgy in the feed copper- water train, and precludes copper or copper-based alloy feed water heat exchangers in system design and bronze impellers in condensate pumps and valve trims in the condensate system. This is primarily the challenge to the engineering group og the EPC contractor to ensure that this is strictly adhered..all steels contain traces of copper and zinc. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 6
  • 7. coal- Shows the pressure drop history of a coal-fired supercritical plant in Japan that changed the water chemistry from AVT to OWT in 1996. After 7 years operation since the change, there has been no significant increase in pressure drop. This plant has not required acid cleaning since the change, and no future cleaning is planned. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 7
  • 8. RISK MANAGEMENT Plant Commissioning SUPERCRITICAL UNITS: EPC CONTRACTOR’S CHEMISTRY CONTROL PARADIGM Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 8
  • 9. EPC Contractor’s Chemistry Challenges Some once-through supercritical boiler manufacturers have instituted penalties against the allowable pressure drop during initial boiler performance testing, an additional complication that may impact start up and commissioning activities. These penalties are based on extended operation on all volatile treatment reducing (AVT[R]) during start up and commissioning. The reducing environment (negative oxidation reduction potential [ORP]) present when operating on AVT(R) may contribute to increased iron transport, subsequently increasing the pressure drop through the boiler. These pressure drop correction penalties will be fervently debated by the EPC contractor during commissioning and challenged by both owners and plant operators. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 9
  • 10. WARRANTY IMPLICATIONS Steam turbine suppliers are also setting limits, in the equipment contract, on the number of hours a turbine can be operated with out-of-specification chemistry. These limits are typically listed in an action-level These limits are typically listed in an action-level format where minor chemistry excursions are allowable for predetermined time periods without violating the equipment warranty. up— Steam Purity Limits During Start up— EPC Once- Contractor Recommendation for Once-Through Boilers...usually one week Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 10
  • 11. EPC Contractor’s Chemistry Challenges During steam-side start up and commissioning, the EPC contractor is mostly interested in main and reheat steam chemistry. Table below lists EPRI recommendations for once-through boilers operating under OT, including normal target value and action levels 1, 2, and 3. Although recommendations listed in Table are acceptable for targeted chemistry limits during operation, EPC contractors would like to see the table: following two columns added to this table: • Allowable chemistry excursions during hot start up • Allowable chemistry excursions during cold start up Feed Water Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 11
  • 12. What Are Action Levels 1, 2, 3 Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 12
  • 13. EPC CONTRACTOR’S CHEMISTRY CONTROL PROGRAM Start up chemistry guidelines should primarily focus on main steam chemistry targets, including cation conductivity: it warns of salts and acids that may cause turbine corrosion silica : silicate scaling may contribute to turbine capacity and efficiency losses. sodium: critical for avoiding corrosion because uncontrolled sodium hydroxide concentrations are known to cause corrosion damage failures in boiler tubes. Targets for chlorides, sulphates, and organic compounds should be deferred until the end of the commissioning cycle. Degassed cation conductivity is the preferred conductivity to be measured during commissioning since system air leaks are still being discovered and sealed during the start up and commissioning phase. The measurement of degassed cation conductivity will aid in differentiating between air leaks and other contamination sources Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 13
  • 14. EPC Contractor’s Chemistry Challenges The two most important parameters in Table are feed water cation conductivity and pH. Cation conductivity should be maintained below 0.15 µS/cm during operation on OT. Normal pH range for feed water under OT is 8.0 to 8.5. The EPC contractor is challenged with controlling pH when feed water cation conductivity increases to concentration levels listed in Table , action levels 1, 2, and 3 (≤0.3 µS/cm, ≤0.6 µS/cm, >0.6 µS/cm, respectively). Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 14
  • 15. EPC Contractor’s Chemistry Challenges The pH/conductivity relationship is crucial for once-through cycles on OT; thus, the EPC contractor implements the chemistry control at its own risk. Important issues to be addressed when implementing OT include: • At what point during the start up and commissioning process should the chemistry regime be switched from AVT to OT to prevent frequent switching back and forth between a reducing and an oxidizing environment? • What would be the “detrimental effects” of going from an oxidizing atmosphere to a reducing (or close to reducing) atmosphere, for temporary periods? • How can these “detrimental effects” be quantified and addressed during design and equipment procurement? Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 15
  • 16. Stringent steam quality limits implemented by steam turbine suppliers, boiler manufacturers have tightened limits on feed water chemistry. Yet EPC contractor requires standards to be relaxed during commissioning to permit timely unit start up. The challenge also is in determining the appropriate time to switch from AVT to OT Once cation conductivity levels are stable below 0.15 µS/cm, EPRI recommends operation on OT with oxygen injection in a pH range of 8.0 to 8.5. EPRI guidelines also state that oxygen injection into feed water may continue with pH controlled between 9.2 and 9.6 µS/cm µS/cm. and cation conductivity between 0.15 µS/cm and 0.3 µS/cm. However, µS/cm, at cation conductivity levels greater than 0.3 µS/cm, EPRI recommends that oxygen injection be terminated and AVT resumed. Upsets in cation conductivity may lead to serious corrosion problems if oxygen is continuously fed during upset conditions. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 16
  • 17. Comparison of Start-up Systems Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 17
  • 18. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 18
  • 19. The turbine bypass system was designed to minimize the start-up time by controlling the main steam pressure and temperature before turbine rolling, and enabling the steam to flow through the super heater sections at a short time after light-off. The low-load recirculation system was designed to recover residual heat during start-up by circulation of the un-evaporated water from the furnace back to the economizer inlet, which also can assist in reducing start-up time. As this system is automatically operated, the start-up process is as simple as with a natural circulation (NC) boiler. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 19
  • 20. EPC Contractor Guidelines on Feed Water Chemistry Startup Start up Steam Chemistry Limits Turbine Rolling Continued AVT(O) Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 20
  • 21. Turbine Rolling Continued Balance of Commissioning Period Chemistry Limits Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 21
  • 22. Operation Guidelines with AVT R and AVT O AVT(R) Feed water Chemistry Control Guidelines AVT(O) Feed water Chemistry Control Guidelines Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 22
  • 23. Suggested Start up Feed water Chemistry Guidelines for Once-Through Cycles Without Deaerators Once- Practical start up chemistry guidelines should be established by consensus among the turbine manufacturer, boiler manufacturer, and EPC contractor early on in project development and outlined in equipment contracts. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 23
  • 24. ROLE OF CONDENSATE POLISHERS DURING COMMISSIONING Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 24
  • 25. Once-through supercritical boilers are commonly installed with full-flow condensate polishers to control corrosive impurities concentration in condensate and feed water systems. The presence of impurities in feed water will significantly affect feed water chemistry, potentially exceeding boiler supplier feed water limits and turbine supplier steam purity specifications. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 25
  • 26. Impurities shaken loose during start up may cause a chemistry hold, where plant load increases are temporarily halted until these impurities are removed from the system. For a once-through supercritical boiler, impurities are removed exclusively by condensate polishers subsequent to chemical cleaning and boiler flush. Once impurities are removed, the chemistry hold is lifted and the plant is allowed to continue to ramp up to full load without exceeding allowable boiler or turbine chemistry limits. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 26
  • 27. Steam and Water Analysis System (SWAS) shall be furnished for continuous monitoring and control of water and steam purity in the plant cycle Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 27
  • 28. Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 28
  • 29. EPC Contractor Responsibility includes that Chemistry limits are before, during and after once-through supercritical boilers commissioning • Control system component cleanliness during shop fabrication • Control system component cleanliness during construction • Flush system components prior to start-up • Implement stringent water quality requirements for hydro testing • Perform boiler and feed water system chemical cleaning • Flush system components thoroughly following chemical cleaning • Perform steam blows to obtain steam cycle cleanliness • Implement time-based, progressively improving feed water and steam chemistry targets Dr. Himadri Banerji:Conference on Plant Commissioning Kuala Lumpur 1st and 2nd Nov 2010 10/29/2010 29