SlideShare a Scribd company logo
1
A
D
31
E1
2
B
C
4'-01/2"8'-1"4'-01/2"
16'-2"
2' - 0" 7' - 0" 7' - 0" 2' - 0"
8' - 4"
9' - 0"
18' - 0"
6' - 1"
10' - 1"
14' - 0"
60°
W12X30
TMP1 (6 REQ'D)TYP.
4 1/2"
TYP.
4 1/2"
TYP.
73/4"
TYP.
73/4"
1"81/2"10"
2'-0"2'-0"
TOP OF TMPL EL. -2' - 7 7/8"
1
E2
1
A
D
32
B
C
5' - 1" 3' - 10" 5' - 1"
4'-31/2"7'-7"4'-31/2"
W12X14W12X14
W12X14
W12X14W12X14
W12X14
W12X14
W12X14
W12X14
W12X14
W12X14W12X14
W12X14
W12X14
14' - 0"
7' - 0" 7' - 0"
3' - 6" 3' - 6" 3' - 6" 3' - 6"
EL 20' - 0" T.O.S TYP.
B8
B7
B12
B13
B10
B9
B1
B4
B3B2
B5B6
16'-2"
8'-1"
3"
3"
C4
C6
C1
C2
C5
C3
W12X30
W12X30
W12X30
W12X30
W12X30
W12X30
2
E2
KEEP
3' - 6"
E1
2
E1
3
B11
4
E3
B24
BR1
HSS4X4X3/8
HSS4X4X3/8
BR2
BR2
HSS4X4X3/8
HSS4X4X3/8
BR1BR2
HSS4X4X3/8
BR1
HSS4X4X3/8
1
E2
1
A
D
32
B
C
2' - 3" 2' - 10" 3' - 10" 2' - 10" 2' - 3"
7' - 0" 7' - 0"
2' - 3" 9' - 6" 2' - 3"
3'-91/2"3'-91/2"
3"7'-7"3"
14' - 0"
16'-2"
4'-01/2"8'-1"4'-01/2"
W12X14W12X14W12X14
W12X14
W12X14
W12X14
W12X14
W12X14
W12X14W12X14
W12X14
W12X14
W12X14 W12X14
W12X14
W12X14
W12X14 W12X14
W12X14
W12X14
W12X14
2
E2
B16
B23
B23B23
B23B23
B17
B25
B24
B26
B13
B12
B27
B28
B19B18
B15
B14
EL 30' - 0" T.O.S TYP.
W12X30
W12X30
W12X30
W12X30
W12X30
W12X30
HSS4X4X3/8
HSS4X4X3/8
HSS4X4X3/8 HSS4X4X3/8
C7C8
C8
C7
4
E1
SIM
B20
B21
B22
B23
L01
1
E2
1
A
D
32
B
C
W12X14
W12X14
W12X14B31
W12X14W12X14
B30
B29
4' - 9" 4' - 9"
9' - 6"
3"7'-7"3"
HSS4X4X3/8
HSS4X4X3/8
HSS4X4X3/8
HSS4X4X3/8
C8
C8
B32
W12X14
C7
C7
SLOPING
SLOPING
EL 39' - 6" T.O.S EL. 41' - 10 1/2" T.O.S
SEE E3 FOR BT PLA LAYOUT
3" / 12"
Grade Level
0"
Level A
4 1/2"
2'-9"1'-3"
1'-0"4'-0"
W12X30
PL 1/2 x 12 x 1' - 6 1/2"LG
W/ 4- 5/8"Ø ANCH BOLTS x 1'-0 LG
1" GROUT
FOOTING PER PLAN
STEAM WALL
1"1'-61/2"
1 1/2" 9" 1 1/2"
1' - 0"
PL 1/2 x 12 x 1' - 6 1/2"LG
W/ 4- 5/8"Ø ANCH BOLTS x 1'-0 LG
5"
11/2"1'-31/2"11/2"
1"
11"
81/2"10"
W12X14
W12X30
3"
30°
120°
PL 3/8 x 3 1/2 x 0' - 9"LG
W/ (3 )3/4"Ø T.C.B A325
W12X14
W12X14
W12X14
W12X14
W12X14
PL 3/8 x 3 1/2 x 0' - 9"LG
W/ (3) 3/4"Ø T.C.B. A325
W12X30
10"
4"
3"
2 1/4"
PL 3/4 x 4 x 0' - 10"LG
W/ (4) 1/2"Ø T.C.B A325W12X14
W12X14 W12X14
11/2"
FIELD CUT GRATING
AROUND HSS
21/4"
W12X14
W12X14
HSS4X4X3/8
PL 3/4 x 4 x 0' - 10"LG
W/ (4) 1/2"Ø T.C.B A325
PL3/8 x 3 1/2 x 0' - 11 3/8"LG
W/ (4) 3/4"Ø T.C.B A325
2 1/4 x 3/16 Grating x 6' - 0"LG
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:27PM
E1
ANTENNA TOWER FRAMING PLANS
STADIUM PARK 2/3/2017
WM
SC
9449 FRIARS ROAD
SAN DIEGO, CA 92108
ANCHOR BOLT SETTING PLAN LEVEL B FRAMING PLAN
LEVEL C FRAMING PLAN LEVEL E FRAMING PLAN
1
TYPICAL BASE PLATE DETAIL
2
TYPICAL BEAM CONNECTION AT COLUMN
3
COLUMN FLANGE PERPENDICULAR TO BEAM CONNECTION
4
ROOF COLUMN CONNECTION AT ANTENNA LEVEL
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
LEVEL B
20' - 0"
BC
LEVEL C
30' - 0"
HSS4X4X3/8
E2
3
W12X30
W12X30
8' - 1"
E2
4
HSS4X4X3/8
HSS4X4X3/8
Grade Level
0"
1 3
LEVEL B
20' - 0"
14' - 0"
2
LEVEL C
30' - 0"
LEVEL D
37' - 0"
LEVEL E
44' - 0"
Level A
4 1/2"
20'-0"10'-0"7'-0"7'-0"
1'-0"
2'-9"
4'-0"44'-0"
9'-6"
4' - 9"4' - 9"
11'-101/2"
1'-0"
7' - 0"7' - 0"
HSS4X4X3/8
HSS4X4X3/8
W12X30
HSS4X4X3/8
HSS4X4X3/8
W12X30
W12X30
W12X14
W12X14
1' - 0"
3"
C8
C7
BR2
BR1
W12X14
E2
6
HSS4X4X3/8
PL 3/8 x 10 x 1' - 1 1/16"LG
PL 3/8 x 3 1/2 x 0' - 9"LG
W/ (3) 3/4"Ø T.C.B A325
3/4"Ø T.C.B x 0' - 5 1/4"LG
W12x30 COL. WEB
CL BM
PL 3/8 x 3 1/2 x 0' - 9"LG
2 1/4 x 3/16 Grating x 6' - 0"LG
1
1/2"
5
1/2"
1/2"
3/16" 5
TYP.
PL 3/8 x 3 1/2 x 0' - 9"LG
W/ (3) 3/4"Ø T.C.B A325
HSS4X4X3/8
3/4"Ø T.C.B x 0' - 5 1/4"LG
PL 3/8 x 10 x 1' - 1 1/16"LG
PL 3/8 x 3 1/2 x 0' - 9"LG
W/ (3 )3/4"Ø T.C.B A325
W12X14
5
1/2"
1
1/2"
W12x30
1/2"
3/16' 5
TYP.
PL3/8 x 3 1/2 x 0' - 11 3/8"LG
W/ (3) 3/4"Ø T.C.B. A325
PL 3/8 x 2 x 0' - 11 3/8"LG
HSS4X4X3/8
1/4"
TYP.
W12X14
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:35PM
E2
TOWER SECTION AND BRACE DETAILS
STADIUM PARK 2/3/2017
WM
SC
9449 FRIARS ROAD
SAN DIEGO, CA 92108
2
SECTION AT HSS BRACE
1
Working View
3
BRACE CONNECTION AT ANTENNA LEVEL
4
BRACE CONNECTION AT LEVEL B
TOWER ISO
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
6
HSS COLUMN TO BEAM CONNECTION
4
E3
7"MIN.
3' - 6"
4'-11/2"
L01
LADDER
W/ 1/2x 3 STRINGGER
4' - 0"
3'-21/4"
GR1
1/4"
TYP.
Grade Level
0"
A
LEVEL B
20' - 0"
B
LEVEL C
30' - 0"
Level A
4 1/2"
E3
3
22'-1"7'-4"
3'-63/8"
9 3/4"
L01
LADDER
W/ 1/2x 3 STRINGGER
CAGE
W/ PL1/4 x 2 VERTICAL BANDS
E/ PL 1/4x 3 HORZ BANDS
E3
2
3'-81/4"
3'-6"
HSS1.5X.120
4'-0"
1"
L4 x 2 x 1/2 x 0' - 2"LG
W/ (1)3/8"Ø HILTI KB-TZ
4"
LADDER
W/ 1/2x 3 STRINGGER
2"
BT PL3/8 x 2 x 1' - 0 3/4"LG
EACH SIDE OF LADDER
9 5/8"
31/2"
BT PL3/8 x 2 x 1' - 0 3/4"LG
EACH SIDE OF LADDER
1/4"
TYP.
W12X14
3'-81/4"
3'-6"21/4"
6"6"6"6"6"6"
41/2"
2 1/4" BAR GRATING
HSS1.5X.120
4' - 0"
1/4"
TYP.
1
E2
1
A
D
32
B
C
2'-0"
13°
18' - 0"
TYP.
BPL2
(28 REQ'D)
SLOPPING
E3
6
10"
2"6"2"
1' - 0"
BT. PL 1/4 x 10 x 1'-1 3/4
STAINLESS STEEL
6"
4"
1/2"Ø FIBER GLASS BOLT
(BY OTHERS)
6 x 6 x 1/4 FIBER GLASS TUBE
(BY OTHERS)
1' - 0"
LOUVERS
(BY OTHERS) BT. PL 1/4 x 10 x 1'-1 3/4
STAINLESS STEEL
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:38PM
E3
LADDER AND RAIL DETAILS
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
1
LADDER PLAN VIEW
4
LADDER SECTION
3
LADDER ANCHOR
2
LADDER BRACKET
5
TYPICAL PIPE GUARDRAILS
LEVEL E SS BT PLATE LAYOUT
6
STAINLESS STEEL BT PLATE AT ROOF
10"2"
1'-0"
ab1
(4 REQ'D)
5/8"Ø STD. HOOK x 1' - 0"LG
6 - TEMPLATE - TMP1
11/2"1'-31/2"11/2"
1 1/2" 9" 1 1/2"
1'-61/2"
1' - 0"
"Ø HLS
11/16"
"Ø HLS
11/16"
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:53PM
TMP1
TEMPLATE
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
11/16'Ø
BILL OF MATERIALS - TMP1
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
ab1 24 5/8"Ø STD. HOOK 1'-0"
TMP1 6 TEMPLATE 12 GA x 12 1'-6 1/2"
NO. DATE DESCRIPTION
"B"
"A"
6" 6"
32'-71/2"1/2"
11/2"
3"
22'-71/2"10'-0"
22'-41/2"32'-41/2"
11/2"
3"
W12X30
EL -2' - 8"
0"
20' - 0"
30' - 0"
CP1
(FS)
CP3
(NS)
CP3
ONE - COLUMN - C1
(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
3"
11/2"
1015/16"
11/2"22'-41/2"31'-59/16"
32'-41/2"
3"
11/2"
(FS)
CP3
(FS)
CP3"B"
SIM
"B"
SIM
"A""A"
"B"
"A""A""A"
715/16"3"
11/2"11/2"
3"
3"
10"8 1/2"
11/2"
3"
3"
11/2"
11/2"
22'-41/2"32'-41/2"
22'-41/2"31'-59/16"32'-41/2"
CP3
(BS)
CP3
(BS)
CP3
(BS)
CP3
CP3
CP1
MK;
EXTERIOR
5/8"
5/8"
30°
5/8"
30° CP3
CP3
CP3
30°
1/4"
TYP.
1/4"
TYP.
11/2"1'-31/2"11/2"
1 1/2"9"1 1/2"
1'-61/2"
1' - 0"
CP1
W12X30
81/2"10"
6"6"
"Ø HLS
15/16"
"Ø HLS
15/16"
1/4"
TYP.
11/2"3"3"11/2"
1 1/2"2"
3 1/2"
9"
CP3
"Ø HLS
13/16"
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:47PM
C1
COLUMN
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
BILL OF MATERIALS - C1
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
C1 1 W12X30 32'-7 1/2"
CP1 1 PL 1/2 x 12 1'-6 1/2"
CP3 8 PL 3/8 x 3 1/2 0'-9"
SECTION "B"
SECTION "A"
PLATE DETAIL - CP3
GALVANIZED
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
TYPICAL HL 13/16"Ø
10"8 1/2"
CP1
3"
11/2"
11"11/2"
3"
11/2"
CP3
(BS)
CP3
(BS)
CP3
(BS)
CP3
CP3
22'-41/2"23'-31/2"32'-41/2"
MK; EXTERIOR
3"
1/2"32'-71/2"
3"
11/2"
11/2"
11/2"
11/2"
W12X30
22'-41/2"23'-31/2"32'-41/2"
(NS)
CP3
(FS)
CP3(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(NS)
CP3
-2' - 8"
0"
20' - 0"
91/2"3"
30' - 0"
CP1
6"6"
ONE - COLUMN - C2
SIM
"A"
"B"
"B"
"B"
"B"
11/2"1'-31/2"11/2"
1 1/2"9"1 1/2"
1'-61/2"
1' - 0"
CP1
W12X30
81/2"10"
6"6"
"Ø HLS
15/16"
"Ø HLS
15/16"
1/4"
TYP.
11/2"3"3"11/2"
1 1/2"2"
3 1/2"
9"
CP3
"Ø HLS
13/16"
5/8"
5/8"
5/8"
30°
30°
30°
CP3CP3
CP3
1/4"
TYP.
1/4"
TYP.
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:51PM
C2
COLUMN
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
BILL OF MATERIALS - C2
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
C2 1 W12X30 32'-7 1/2"
CP1 1 PL 1/2 x 12 1'-6 1/2"
CP3 8 PL 3/8 x 3 1/2 0'-9"
SECTION "A"
PLATE- DETAIL - CP3
GALVANIZED
SECTION "B"
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
TYPICAL HL 13/16"Ø
32'-71/2"1/2"
6"6"
(BS)
CP1
W12X30
11"11/2"
3"
(NS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(NS)
CP3
3"
3"
11/2"
11/2"
22'-41/2"23'-31/2"32'-41/2"
-2' - 8"
20' - 0"
30' - 0"
ONE - COLUMN - C3
"A"
"B"
"B"
SIM
"B"
3"
11/2"
3"
11/2"
11"11/2"
22'-41/2"32'-41/2"
CP3
(BS)
CP3
(BS)
CP3
CP3
(BS)
CP3
CP1
8 1/2" 10"
11/2"1'-31/2"11/2"
1 1/2"9"1 1/2"
1'-61/2"
1' - 0"
CP1
W12X30
81/2"10"
6"6"
"Ø HLS
15/16"
"Ø HLS
15/16"
1/4"
TYP.
5/8"
5/8"
30°
5/8"
30° CP3
CP3
CP3
30°
1/4"
TYP.
1/4"
TYP.
11/2"3"3"11/2"
1 1/2"2"
3 1/2"
9"
CP3
"Ø HLS
13/16"
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:55PM
C3
COLUMN
STADIUM PARK 2/3/2017
WM
SC
9449 FRIARS ROAD
SAN DIEGO, CA 92108
BILL OF MATERIALS - C3
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
C3 1 W12X30 32'-7 1/2"
CP1 1 PL 1/2 x 12 1'-6 1/2"
CP3 8 PL 3/8 x 3 1/2 0'-9"
MK; EXTERIOR
SECTION "A"
SECTION "B"
PLATE- DETAIL - CP3
GALVANIZED
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
TYPICAL HL 13/16"Ø
6" 6"
11/2"
3"1015/16"3"
11/2"
1/2"32'-71/2"
CP1
(NS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(NS)
CP3
(FS)
CP3
22'-41/2"31'-59/16"32'-41/2"
W12X30
-2' - 8"
20' - 0"
30' - 0"
2' - 0"
ONE - COLUMN - C4
"A"
"B"
"B"
"B"
SIM
11/2"
(FS)
CP3
3"
11/2"
3"
11/2"
(BS)
CP3
(BS)
CP3
(BS)
CP3
CP3
CP3
CP1
8 1/2" 10"
MK: EXTERIOR
11/2"1'-31/2"11/2"
1 1/2"9"1 1/2"
1'-61/2"
1' - 0"
CP1
W12X30
81/2"10"
6"6"
"Ø HLS
15/16"
"Ø HLS
15/16"
1/4"
TYP.
5/8"
5/8"
5/8"
30°
30°
30°
CP3CP3
CP3
1/4"
TYP.
1/4"
TYP.
11/2"3"3"11/2"
1 1/2"2"
3 1/2"
9"
CP3
"Ø HLS
13/16"
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:59PM
C4
COLUMN
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
BILL OF MATERIALS - C4
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
C4 1 W12X30 32'-7 1/2"
CP1 1 PL 1/2 x 12 1'-6 1/2"
CP3 8 PL 3/8 x 3 1/2 0'-9"
SECTION "A"
SECTION "B"@ C4
PLATE- DETAIL - CP3
GALVANIZED
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
TYPICAL HL 13/16"Ø
8 1/2" 10"
3"
11/2"
1015/16"
11/2"
3"
11/2"22'-41/2"31'-59/16"
32'-41/2"
(BS)
CP3
(BS)
CP3
(BS)
CP3
6" 6"
1/2"32'-71/2"
3"1015/16"
11/2"11/2"22'-41/2"31'-59/16"32'-41/2"
W12X30
11/2"
3"
-2' - 8"
20' - 0"
30' - 0"
ONE - COLUMN - C5
CP1
(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
"B"
"B"
"B"
11/2"1'-31/2"11/2"
1 1/2"9"1 1/2"
1'-61/2"
1' - 0"
CP1
W12X30
81/2"10"
6"6"
"Ø HLS
15/16"
"Ø HLS
15/16"
1/4"
TYP.
5/8"
5/8"
61/8"
61/8"
30°
30°
CP3CP3
1/4"
TYP.
11/2"3"3"11/2"
1 1/2"2"
3 1/2"
9"
CP3
"Ø HLS
13/16"
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:03PM
C5
COLUMN
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
BILL OF MATERIALS - C5
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
C5 1 W12X30 32'-7 1/2"
CP1 1 PL 1/2 x 12 1'-6 1/2"
CP3 6 PL 3/8 x 3 1/2 0'-9"
SECTION "A"
SECTION "B"
PLATE- DETAIL - CP3
GALVANIZED
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
TYPICAL HL 13/16"Ø
10"8 1/2"
CP1
22'-41/2"23'-31/2"32'-41/2"
3"
11/2"
CP3
(BS)
CP3
1 1/2" 2"
11"11/2"
11/2"
1 1/2" 2"
CP3
(BS)
CP3
(BS)
CP3
32'-71/2"1/2"
3"
11/2"
11/2"11"
11/2"
3"
-2' - 8"
20' - 0"
30' - 0"
W12X30
22'-41/2"23'-31/2"32'-41/2"
ONE - COLUMN - C6
6"6"
(FS)
CP3
CP1
(FS)
CP3
(NS)
CP3
(FS)
CP3
(FS)
CP3
(FS)
CP3
(NS)
CP3
(FS)
CP3
"B"
"C"
"B"
11/2"1'-31/2"11/2"
1 1/2"9"1 1/2"
1'-61/2"
1' - 0"
CP1
W12X30
81/2"10"
6"6"
"Ø HLS
15/16"
"Ø HLS
15/16"
1/4"
TYP.
5/8"
5/8"
1/8"
61/8"
61/8"
CP3
CP3
CP3
2"11/2"
30°
30°
1/4"
TYP.
1/4"
TYP.
5/8"
5/8"
61/8"
61/8"
CP3
CP3
30°
30°
1/4"
TYP.
11/2"3"3"11/2"
1 1/2"2"
3 1/2"
9"
CP3
"Ø HLS
13/16"
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:07PM
C6
COLUMN
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
BILL OF MATERIALS - C6
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
C6 1 W12X30 32'-7 1/2"
CP1 1 PL 1/2 x 12 1'-6 1/2"
CP3 8 PL 3/8 x 3 1/2 0'-9"
SECTION "A"
SECTION "B"
SECTION "C"
PLATE- DETAIL - CP3
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
GALVANIZEDTYPICAL HL 13/16"Ø
"A"
5"5"
10'-97/8"3/4"
HSS4X4X3/8
2 - COLUMN - C7
CP2
2" 2"
CP2
MARK NORTH; N 0'
1 1/2" 7" 1 1/2"
10"
7/8"21/4"7/8"
4"
3/16
TYP.
TYP.
CP2
2" 2"
CP2
MARK NORTH; N 0'
8'-53/8"3/4"
5"5"
HSS4X4X3/8
CP2
"A"
2 - COLUMN - C8
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:12PM
C7&C8
COLUMN
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
NO. Revision Date DESCRIPTION
BILL OF MATERIALS - C7
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
C7 2 HSS4X4X3/8 10'-9 7/8"
CP2 2 PL 3/4 x 4 0'-10"
SECTION "A"
GALVANIZEDTYPICAL HL 9/16"Ø
BILL OF MATERIALS - C8
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
C8 2 HSS4X4X3/8 8'-5 3/8"
CP2 2 PL 3/4 x 4 0'-10"
2 5/16"
2 5/16"
7/8" 1' - 1 1/16"
60°
60°
Gp1
2"2"
3/16"
3/16"
TYP.
8' - 1 13/16"
3"3"3"2"3"3"2"
10 3/16" 2 7/8"
71/4"23/4"
9 3/16" 3 7/8"
1' - 1 1/16"
10"
Gp1
613/16"33/16"
2 13/16"
2 13/16"7' - 10 15/16"
3"3"3"
ONE - BEAM - B1
W12X14
1 11/16"
1 11/16"
7/8"
(AS SHOWN )
ONE - BEAM - B4 (OPP HAND)
1 15/16" 11 1/16"
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:23PM
B1 & B4
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B1
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B1 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
BILL OF MATERIALS - B4
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B4 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
(OPP HAND)
(AS SHOWN)
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
2 5/16" 2 1/4"
60°
60°
60°
3' - 10 5/8"5/8"3' - 10"
P2
4' - 0 1/4"
2"2"
Gp1
1' - 1 1/16" 7/8"
(FS)
P2
1/4"
3 SIDES 3/16"
3/16"
TYP.
8' - 1 13/16"
2 13/16"
2 13/16"
1 5/8"1 11/16"
3"3"3"
2"3"3"2"
1 15/16"
10"
33/16"613/16"
3 7/8" 9 3/16"
2 7/8" 10 3/16"
23/4"71/4"
Gp1
1' - 1 1/16"
ONE - BEAM - B2
W12X14
(NS)
P2
3"3"3"
7' - 2 11/16"
2" 1 1/2"
3 1/2"
3"3"3"25/8"
23/4"
1 5/8"
5/8"
113/8"
(FS)
P2
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:26PM
B2
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B2
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B2 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P2 1 PL 3/8 x 3 1/2 0'-11 3/8"
PLATE DETAIL - P2
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
2 1/4" 2 5/16"
60°
60°
3' - 11 1/4" 3' - 10"
4' - 1 1/2"
60°
P2
Gp1
2"2"
1' - 1 1/16"7/8"
3/16"
3/16"
TYP.
1/4"
3 SIDES
3"3"3"
2"3"3"2"
10"3"3"3"
1 15/16"
9 3/16" 3 7/8"
10 3/16" 2 7/8"
10"
71/4"23/4"
613/16"33/16"
Gp1
8' - 1 3/4"
2 13/16"
1 11/16"
2 13/16"
1 11/16"
(NS)
P2
ONE - BEAM - B3
W12X14
11 1/16"
7' - 10 15/16"
2" 1 1/2"
3 1/2"
3"3"3"25/8"
23/4"
1 5/8"
5/8"
113/8"
(FS)
P2
T&B
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:30PM
B3
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B3
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B3 1 W12X14 8'-1 3/4"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P2 1 PL 3/8 x 3 1/2 0'-11 3/8"
PLATE DETAIL - P2
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
2 1/4" 2' - 1 5/16" 5' - 7 15/16" 2 5/16"
5/8"
60°
P2
2' - 3 9/16" 1' - 1 1/16" 7/8"
Gp1
60°
60°
3/16"
3/16"
TYP.
1/4"
3 SIDES
2"3"3"2"3"3"3"
33/16"
613/16"
23/4"71/4"
101/4"
2 7/8" 10 3/16"
1 15/16"
9 3/16"3 7/8"
3"3"3"
(FS)
P2
8' - 1 13/16"
2 13/16"
2"
2 13/16"
1 11/16"
2' - 3 9/16" 7' - 10 15/16"
Gp1
W12X14
ONE - BEAM - B5
7' - 2 11/16"
2" 1 1/2"
3 1/2"
3"3"3"25/8"
23/4"
1 5/8"
5/8"
113/8"
(FS)
P2
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:32PM
B5 & B6
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B5
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B5 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P2 1 PL 3/8 x 3 1/2 0'-11 3/8"
ONE - BEAM - B6
(AS SHOWN)
(OPP HAND)
BILL OF MATERIALS - B6
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B6 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P2 1 PL 3/8 x 3 1/2 0'-11 3/8"
(OPP HAND)
(AS SHOWN)
PLATE DETAIL - P2
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
2 5/16" 2 5/16"4' - 5 5/16" 1' - 11 15/16" 1' - 10 5/8" 4' - 5 11/16"
4' - 7 9/16" 6' - 7 1/2" 8' - 6 1/8"
P1P1
P1
60°
60°
2 5/8"
4' - 7 9/16" 6' - 7 7/16" 8' - 6 1/8" 12' - 11 7/16"
2 5/8"
1 1/2"
1 1/2"
13' - 2 1/8"
(NS)
P1 (FS)
P1
(NS)
P1
3"3"3"
3"3"3"
"B" "A"
ONE - BEAM - B7
W12X14
"B"
1 1/2" 2"
23/4"
3"3"3"211/16"
117/16"
3 1/2"
5/8"
1 5/8"
P1
1/4"
TYP.
T&B
3 1/2"
2" 1 1/2"
23/4"
25/8"3"3"3"
117/16"
P1
1/4"
3 SIDES
2 5/16" 2' - 10 5/16" 3' - 6 9/16" 3' - 6" 2' - 10 11/16" 2 5/16"
6' - 7 1/8" 6' - 6 15/16"
P1
P1 P1P1
60°
60°13' - 2 1/8"
(BS)
P1
(FS)
P1 (FS)
P1
W12X14
ONE - BEAM - B8
3' - 0 9/16" 6' - 7 1/8" 10' - 1 3/16" 12' - 11 7/16"
2 5/8"
1 1/2"
2 5/8"
1 1/2"
3"3"3"
3"3"3"
"C"
"A" "A" 2" 1 1/2"
3 1/2"
3"3"3"
117/16"
1 5/8"
5/8"
23/4"
P1
P1 1/4"
3 SIDES
T&B
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:30PM
B7 & B8
BEAM
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
BILL OF MATERIALS - B7
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B7 1 W12X14 13'-2 1/8"
6 3/4"Ø T.C.B 0'-1 1/2" A325
P1 3 PL3/8 x 3 1/2 0'-11 3/8"
SECTION "A"
SECTION "B"
SECTION "C"
BILL OF MATERIALS - B8
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B8 1 W12X14 13'-2 1/8"
6 3/4"Ø T.C.B 0'-1 1/2" A325
P1 4 PL3/8 x 3 1/2 0'-11 3/8"
GALVANIZEDTYPICAL HL 13/16"Ø
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
1 1/16"1' - 11 1/16"1 7/8"
2 5/16"
2' - 2"
60°
2' - 2"
1 3/4"
3"3"3"
3"3"3"
1 7/8"
3/4"
1 7/8"
1 1/2"
W12X14
ONE - BEAM - B9
T&B
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:34PM
B9 & B10
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
13/16Ø
BILL OF MATERIALS - B9
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B9 1 W12X14 2'-2"
6 3/4"Ø T.C.B 0'-1 1/2" A325
ONE - BEAM - B10
(AS SHOWN)
(OPP HAND)
(OPP HAND)
(AS SHOWN)
BILL OF MATERIALS - B10
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B10 1 W12X14 2'-2"
6 3/4"Ø T.C.B 0'-1 1/2" A325
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
3"3"3"
3"3"3"
W12X14
ONE - BEAM - B11
7' - 5 3/4"
1 7/8"
3/4"
1 1/2"1 1/2" 7' - 4 1/4"
T&B
1 7/8"
3/4"
T&B
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:36PM
B11
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B11
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B11 1 W12X14 7'-5 3/4"
6 3/4"Ø T.C.B 0'-1 1/2" A325
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
1 1/16" 2 5/16"
60°
1 1/2"
3' - 1"
1 3/4"
3"3"3"
1 7/8"
3/4"
3"3"3"
W12X14
T&B
2 - BEAM - B12 (AS SHOWN )
2 - BEAM - B13 (OPP HAND)
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:37PM
B12&B13
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16"Ø
BILL OF MATERIALS - B12
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B12 2 W12X14 3'-1"
12 3/4"Ø T.C.B 0'-1 1/2" A325
(OPP HAND)
(AS SHOWN)
BILL OF MATERIALS - B13
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B13 2 W12X14 3'-1"
12 3/4"Ø T.C.B 0'-1 1/2" A325
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
2 5/16" 2' - 1 5/16" 3' - 3 1/4" 2' - 4 11/16" 2 5/16"
60°
60°
P2 P2
2' - 3 5/8" 5' - 6 7/8"
60°
60°
(FS)
Gp1
2"2"
15/16"
3/16"
3/16"
TYP.
1/4"
3 SIDES
8' - 1 13/16"
3"3"3"
2"3"3"2"
15/16" 1' - 1 1/16"
1 15/16" 2 7/8"
23/4"
10"
613/16"33/16"
9 3/16" 3 7/8"
2 13/16"
Gp1
W12X14
ONE - BEAM - B14
(FS)
P2
(FS)
P2
3"3"3"
1 11/16"
2 7/8"
(AS SHOWN )
ONE - BEAM - B15 (OPP HAND)
11 1/8" 7' - 11"
2" 1 1/2"
3 1/2"
3"3"3"25/8"
23/4"
1 5/8"
5/8"
113/8"
(FS)
P2
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:38PM
B14&B15
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16"Ø
BILL OF MATERIALS - B14
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B14 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P2 2 PL 3/8 x 3 1/2 0'-11 3/8"
PLATE DETAIL - P2
(OPP HAND)
(AS SHOWN)
BILL OF MATERIALS - B15
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B15 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P2 2 PL 3/8 x 3 1/2 0'-11 3/8"
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
1 1/2"2"
3"3"3"25/8"
5/8"
1 5/8"
T & B
117/16"
23/4"
P1
1/4"
3 SIDES
3 1/2"
2 5/16" 3' - 10 11/16" 3' - 10 1/2" 2 5/16"
60°
60°
P1
3/16"
3/16"
TYP.
(FS)
Gp1
"A"
1 15/16"
3 7/8" 9 3/16" 7/8"
3"3"3"
21/4"3"3"
71/16"33/16"
10"
23/4"
2 13/16"
3"3"3"
2 13/16"
8' - 1 13/16"
4' - 1" P1
W12X14
ONE - BEAM - B16
Gp1
2 7/8"
7' - 10 15/16"
7' - 2 11/16"
(AS SHOWN )
ONE - BEAM - B17 (OPP HAND)
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:39PM
B16&B17
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16"Ø
BILL OF MATERIALS - B16
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B16 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P1 1 PL3/8 x 3 1/2 0'-11 3/8"
SECTION "A"
BILL OF MATERIALS - B17
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B17 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P1 1 PL3/8 x 3 1/2 0'-11 3/8"
(OPP HAND)
(AS SHOWN)
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
2 5/16" 2' - 4 11/16" 5' - 4 9/16" 2 5/16"
60°
60°
2' - 6 15/16"
60° 1/4"
3 SIDES
(FS)
Gp1
3/16"
3/16"
3 SIDES
7/8"
8' - 1 13/16"
11 1/16"
7' - 10 15/16" 2 7/8"
2 13/16"
1 15/16" 2 7/8"
9 3/16" 3 7/8"
23/4"
10"
33/16"613/16"
3"3"3"2"3"3"2"
3"3"3"
(NS)
P2
Gp1
W12X14
ONE - BEAM - B18 (AS SHOWN )
(OPP HAND)
ONE - BEAM - B19
2" 1 1/2"
3 1/2"
3"3"3"25/8"
23/4"
1 5/8"
5/8"
113/8"
(FS)
P2
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:40PM
B18&B19
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B18
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B18 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P2 1 PL 3/8 x 3 1/2 0'-11 3/8"
(OPP HAND)
(AS SHOWN)
BILL OF MATERIALS - B19
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B19 1 W12X14 8'-1 13/16"
9 3/4"Ø T.C.B 0'-1 1/2" A325
Gp1 1 PL 3/8 x 10 1'-1 1/16"
P2 1 PL 3/8 x 3 1/2 0'-11 3/8"
PLATE DETAIL - P2
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
2 5/16" 1' - 7 7/8" 4' - 9" 4' - 9" 1' - 7 11/16" 2 5/16"
1' - 10 1/8" 4' - 9" 4' - 9" 1' - 9 15/16"
P1
P1
P1
P1
P1
P1
60°
60°
21/4"
11/8"11/8"
7" 1' - 6 9/16"
21/4"
"Ø HLS
9/16"
"Ø HLS
9/16"
"Ø HLS
9/16"
"Ø HLS
9/16"
3"3"3"
3"3"3"
1' - 10 1/8" 4' - 9" 4' - 9" 1' - 9 15/16"
2 5/8"
2 5/8"
1' - 10 1/8" 6' - 7 1/8" 11' - 4 1/8" 12' - 11 7/16"
13' - 2 1/8"
(BS)
P1
(BS)
P1 (BS)
P1
ONE - BEAM - B20
W12X14
TYP.
"C"
1' - 6 9/16" 7"
11' - 0 9/16"
11' - 7 9/16"
7"
3"3"3"
2 5/8"
1' - 9 15/16"2' - 10"1' - 11"1' - 11 9/16"2' - 9 7/16"1' - 10 1/8"
2 5/8"1' - 10 1/8" 4' - 7 9/16" 6' - 7 1/8" 8' - 6 1/8" 11' - 4 1/8" 12' - 11 7/16"
3"3"3"
13' - 2 1/8"
ONE - BEAM - B21
W12X14
(BS)
P1
(NS)
P1 (FS)
P1
(NS)
P1
(BS)
P1
"C"
TYP.
"B"
TYP.
"A"
TYP.
1' - 6 9/16" 7"
11' - 0 9/16"
11' - 7 9/16"
7"
2 5/16" 1' - 7 7/8" 2' - 9 7/16" 3' - 10 9/16" 2' - 10" 1' - 7 11/16" 2 5/16"
1' - 10 1/8" 4' - 7 9/16" 6' - 7 1/8" 8' - 6 1/8" 11' - 4 1/8"
P1
P1
P1
P1
P1 P1
P1
60°
60°
11/8"11/8"
21/4"
"Ø HLS
9/16"
"Ø HLS
9/16"
"Ø HLS
9/16" 7"
21/4"
"Ø HLS
9/16"
"Ø HLS
9/16""Ø HLS
9/16"
1 1/2" 2"
23/4"
3"3"3"211/16"
117/16"
3 1/2"
11/16"
1 5/8"
P1
1/4"
3 SIDES
3 1/2"
2" 1 1/2"
23/4"
25/8"3"3"3"
117/16"
P1
1/4"
3 SIDES
2" 1 1/2"
3 1/2"
3"3"3"
117/16"
1 5/8"
5/8"5/8"
1 5/8"
23/4"
P1
P1
1/4"
3 SIDES
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:42:54PM
B20&B21
BEAM
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
BILL OF MATERIALS - B20
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B20 1 W12X14 13'-2 1/8"
8 1/2"Ø T.C.B 0'-2 1/4" A325
6 3/4"Ø T.C.B 0'-1 1/2" A325
P1 6 PL3/8 x 3 1/2 0'-11 3/8"
SECTION "A"
SECTION "B"
SECTION "C"
GALVANIZEDTYPICAL HL 13/16"Ø
NO. Revision Date DESCRIPTION
BILL OF MATERIALS - B21
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B21 1 W12X14 13'-2 1/8"
8 1/2"Ø T.C.B 0'-2 1/4" A325
6 3/4"Ø T.C.B 0'-1 1/2" A325
P1 7 PL3/8 x 3 1/2 0'-11 3/8"
2' - 2 1/2" 6' - 11 1/2" 11' - 8 1/2"
2' - 2 1/2" 4' - 9" 4' - 9" 2' - 2 5/16"
P1 P1
P1
P1
P1P1
13' - 10 13/16"
1 1/2"
3/4"
1 7/8"
3"3"3"
(BS)
P1
(BS)
P1
(BS)
P1
3"3"3"
3/4"
1 7/8"
T&B
T&B
ONE - BEAM - B22
W12X14
"A"
TYP.
1 1/2"13' - 9 5/16"
2" 1 1/2"
3 1/2"
3"3"3"
117/16"
1 5/8"
5/8"5/8"
1 5/8"
23/4"
P1
P1 1/4"
3 SIDES
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:40PM
B22
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16"Ø
BILL OF MATERIALS - B22
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B22 1 W12X14 13'-10
13/16"
6 3/4"Ø T.C.B 0'-1 1/2" A325
P1 6 PL3/8 x 3 1/2 0'-11 3/8"
SECTION "A"
NO. DATE DESCRIPTION
1 1/2"1 1/2"
3' - 8 5/16"
3"3"3"
3"3"3"
W12X14
6 - BEAM - B23
3' - 6 13/16"
1 7/8"
3/4"
1 7/8"
3/4"
T&B T&B
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:42PM
B23
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B23
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B23 6 W12X14 3'-8 5/16"
36 3/4"Ø T.C.B 0'-1 1/2" A325
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
3' - 8 1/4"
1 1/2" 3' - 6 3/4" 1 1/2"
3"3"3"
3"3"3"
1 7/8"
3/4"
T&B
W12X14
2 - BEAM - B24
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:44PM
B24
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B24
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B24 2 W12X14 3'-8 1/4"
12 3/4"Ø T.C.B 0'-1 1/2" A325
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
1 7/8" 1' - 0 1/8" 2 5/16" 1 1/16"
60°
1' - 5 3/8"
1 3/4"1 1/2"
3/4"
1 7/8"
3"3"3"
3"3"3"
ONE - BEAM - B25
W12X14
(AS SHOWN )
ONE - BEAM - B26 (OPP HAND)
1' - 3 5/8"
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:46PM
B25&B26
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B25
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B25 1 W12X14 1'-5 3/8"
6 3/4"Ø T.C.B 0'-1 1/2" A325
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
BILL OF MATERIALS - B26
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B26 1 W12X14 1'-5 3/8"
6 3/4"Ø T.C.B 0'-1 1/2" A325
(OPP HAND)
(AS SHOWN)
1 1/16" 2 5/16"
1 1/16" 1' - 2 3/8"
60°
1 1/2"1 3/4"
3/4"
1 7/8"
3"3"3"
3"3"3"
1' - 5 3/8"
ONE - BEAM - B27
W12X14
3/4"
T&B
(AS SHOWN )
ONE - BEAM - B28 (OPP HAND)
1' - 3 7/8"
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:47PM
B27&B28
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
BILL OF MATERIALS - B27
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B27 1 W12X14 1'-5 3/8"
6 3/4"Ø T.C.B 0'-1 1/2" A325
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
BILL OF MATERIALS - B28
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B28 1 W12X14 1'-5 3/8"
6 3/4"Ø T.C.B 0'-1 1/2" A325
(OPP HAND)
(AS SHOWN)
2 9/16"7' - 6 7/16"2"
7' - 8 7/16"
P1 P1
P3 P3
7' - 8 7/16"
7' - 11"
2" 7' - 6 7/16" 2 9/16"
(NS)
P1
(NS)
P1
ONE - BEAM - B29
W12X14
TYP.
(FS)
P3
(FS)
P3 "A"
23/4"
3"3"3"
1 5/8"
5/8"
2" 1 1/2"
3 1/2"
2"
113/8"
P1
?
3/16"
3 SIDES
3/16"
3 SIDES
T&B
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:49PM
B29
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
BILL OF MATERIALS - B29
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B29 1 W12X14 7'-11"
P1 2 PL3/8 x 3 1/2 0'-11 3/8"
P3 2 PL 3/8 x 2 0'-11 3/8"
SECTION "A"
7' - 11"
ONE - BEAM - B30
W12X14
(FS)
P1
(FS)
P1
"A"
(NS)
P3
(NS)
P3
TYP.
2 1/2"7' - 6 7/16"2 1/16"
7' - 8 1/2" P1P1
P3 P3
1 1/2" 2"
23/4"
3"3"3"211/16"
117/16"
3 1/2"
11/16"
1 5/8"
P1
3/16"
3 SIDES
T&B
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:51PM
B30
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
SECTION "A"
BILL OF MATERIALS - B30
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B30 1 W12X14 7'-11"
P1 2 PL3/8 x 3 1/2 0'-11 3/8"
P3 2 PL 3/8 x 2 0'-11 3/8"
3 3/4"
2 5/16"
17/16"
33/16"3"3"
3 1/2"
115/16"
115/16"3"3"
3/8"19/16"
3 3/4"
9' - 10 1/2"
9' - 4 13/16"
1 1/2
1 1/2
W12X14
ONE - BEAM - B31
3" / 12"
1' - 0"
3"
3 9/16"
9' - 1 15/16"
2 5/8"
2 3/8"
3 1/2"
9' - 0 3/4"
3 7/8"
ONE - BEAM - B32
3/4"
DESCRIPTION
PROJECT
CONTRACTOR
CHK BYDRAWN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031
FAX: (619) 662-1132TYP. HOLE SIZEFINISH
1. ALL MATERIAL IS A36 U.N.O.
2. ALL HSS A500 GR "B"
3. ALL PIPE A53
4. ALL WF BEAMS A992 GR 50
5. GRIND ALL WELDS TO SMOOTH
ELECTRODE
E70XX
SHOP NOTES JOB NUMBER
WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180
WM SC
2/22/20174:54:52PM
B31&B32
BEAM
STADIUM PARK 2/3/2017
9449 FRIARS ROAD
SAN DIEGO, CA 92108
GALVANIZED 13/16Ø
NO. DATE DESCRIPTION
1 2/12/17 FOR FABRICATION
BILL OF MATERIALS - B31
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B31 1 W12X14 9'-10 1/2"
6 3/4"Ø T.C.B 0'-1 1/2" A325
BILL OF MATERIALS - B32
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
B32 1 W12X14 9'-10 1/2"
6 3/4"Ø T.C.B 0'-1 1/2" A325
13/4"1/2"13/4"
6"
SLOT
13/4"1/2"13/4"
6"
"A"
10'-8
5/16"
2" 2"
3 - BRACE - BR1
HSS4X4X3/8
4"
4"
2 9/16" 6' - 3 5/8" 2 1/2"
31/8"7'-95/8"31/8"
13/4"1/2"13/4"
6"
6"
13/4"1/2"13/4"
SLOT
SLOT
"B"
10'-8
5/16"
HSS4X4X3/8
3 - BRACE - BR2
4"
4"
2" 2"
2 1/2" 6' - 3 5/8" 2 1/2"
6' - 3 5/8"
31/8"7'-95/8"31/8"
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:41PM
BR1&BR2
BEAM
STADIUM PARK 2/3/2017
Author
Checker
9449 FRIARS ROAD
SAN DIEGO, CA 92108
BILL OF MATERIALS - BR1
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
BR1 3 HSS4X4X3/8 10'-8 5/16" BRACE
6 3/4"Ø T.C.B 0'-5 1/4" A325
SECTION "A"
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
BILL OF MATERIALS - BR2
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
BR2 3 HSS4X4X3/8 10'-8 5/16" BRACE
6 3/4"Ø T.C.B 0'-5 1/4" A325
SECTION "B"
GALVANIZEDTYPICAL HL 13/16"Ø
BPL1BPL1
1' - 6"
91/8"7"
(4 REQ'D)
d
(3 REQ'D)
40°
TYP.
LD01
2
31/8"45/8"1'-91/2"
1' - 1 3/4" 1' - 1 3/4"
r2
c
b
1'-11/2"
1/2" 1' - 6" 1/2"
40°
TYP.
7"7"91/8"
d
(4 REQ'D)
LD01
1
f2
f1
f3
f2
f1 r1
1' - 1 3/4" 1' - 1 3/4"
31/8"45/8"1'-1"1'-13/4"
b
1'-11/2"
"B""A"
3' - 6 3/8"10 1/8" 29 SPA'S @ 11 7/8 = 28' - 8 3/8"
TYP.
11 7/8"
29' - 7 5/16" 3" 3' - 2 9/16"
3"1'-7"3"
3" 3' - 2 9/16"
1'-6"
1"
k
k
3/4"11/4"
1" 3"
2"
(6 REQ'D)
(3 REQ'D)
EL. 4 1/2"
EL. 30' - 0"
BPL1
BPL1
BPL1
BPL1f2
f1
f3
f1
f2
aR
aL
b
(30 REQ'D)
r1 r2
c
45°
45°
33' - 0 7/8"
3' - 8 7/8"22' - 1"7' - 3"
20' - 1 1/2"1' - 11 1/2"
1"
EL. 4 1/2" EL. 33' - 6 3/8"
2'-51/4"
2'-101/2"
11/2"11/2"
ONE - LADDER - L01
d
d
BPL1 BPL1
g
h
?
k
1"1"
4' - 0 5/16"10' - 0"19' - 0 9/16"
3"
33/4"
3"
3' - 6 3/8"1" 1" 1"1"
1/4"
TYP.
aR
"Ø HLS
1/2"
3"3' - 9"3"3' - 9"3"3' - 9"3"3' - 9"3"3' - 9"1 1/2"
r2 r2 r2 r2 r2
r1
95/8"
3 1/2"
60°
1/4" 1/4" 1/4" 1/4"
1' - 6 1/2"
11/2"11/2"
ON
13/16"Ø
TYP.
ARCH ENG
DESCRIPTION
PROJECT
CONTRACTOR
JOB NO.
CHK BY
DRAN BY
DATE
SHEET NO.
REVISIONS
1616 PRECISION PARK LANE SUITE C
SAN DIEGO, CA 92173
LIC #975206
PHONE: (619) 662-1031 FAX: (858) 662-1132
BOOTH AND SUAREZ
WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:39PM
LD01
Cage Ladder
STADIUM PARK 2/3/2017
WM
SC
9449 FRIARS ROAD
SAN DIEGO, CA 92108
NO. Revision Date DESCRIPTION
1 2/12/17 FOR FABRICATION
SECTION "B"SECTION "A"
BILL OF MATERIALS - L01
SHIP
MARK
DETAIL
MARK QTY DESCRIPTION LENGTH REMARKS
L01 1 LADDER
f3 1 PL 1/4 x 2 2'-5"
f2 2 PL 1/4 x 2 2'-1 3/4"
f1 2 PL 1/4 x 2 2'-4 1/4"
k 2 L4 x 2 x 1/2 0'-2"
2 3/8"Ø HILTI KB-TZ 0'-3 1/4"
aL 1 PL 1/2 x 3 33'-4 3/4"
aR 1 PL 1/2 x 3 33'-4 3/4"
b 30 3/4" Ø RB 1'-6 1/2"
BPL1 4 BT PL3/8 x 2 1'-0 3/4"
c 3 PL 1/4 x 2 20'-1 1/2"
d 4 PL 1/4 x 2 22'-1"
g 2 PL 1/2 x 3 0'-3 3/4"
h 2 PL 1/2 x 3 3'-6 3/8"
r1 1 RING PL 1/4 x 2 7'-4 3/8" LOWER BAND
r2 6 RING PL 1/4 x 2 6'-9 3/8" TOP BAND
PLATE DETETAIL - BPL1
LADDER DETAIL #1

More Related Content

What's hot

CONCRETE Design mix
CONCRETE Design mixCONCRETE Design mix
CONCRETE Design mix
MD AMANULLAH
 
Analysis of portal frame by direct stiffness method
Analysis of  portal frame by direct stiffness methodAnalysis of  portal frame by direct stiffness method
Analysis of portal frame by direct stiffness method
kasirekha
 
Buku beton
Buku betonBuku beton
Buku beton
Fadly Parenrengi
 
Presentasi Instrumentasi Geoteknik 1C.pptx
Presentasi Instrumentasi Geoteknik 1C.pptxPresentasi Instrumentasi Geoteknik 1C.pptx
Presentasi Instrumentasi Geoteknik 1C.pptx
CandykaRidhoHerdana
 
Sample calculation for design mix of concrete
Sample calculation for design mix of concreteSample calculation for design mix of concrete
Sample calculation for design mix of concrete
Sagar Vekariya
 
FIBER REINFORCED POLYMER CONCRETE
FIBER REINFORCED POLYMER CONCRETEFIBER REINFORCED POLYMER CONCRETE
FIBER REINFORCED POLYMER CONCRETE
ARCHITECTURE SCHOOL
 
Ce 382 l5 truss structures
Ce 382 l5   truss structuresCe 382 l5   truss structures
Ce 382 l5 truss structureshlksd
 
Repair and strengthening of reinforced concrete beam column joints
Repair and strengthening of reinforced concrete beam column jointsRepair and strengthening of reinforced concrete beam column joints
Repair and strengthening of reinforced concrete beam column joints
Pavan Kumar N
 
Water Supply - Design Approach And Methodologies
Water  Supply - Design Approach And MethodologiesWater  Supply - Design Approach And Methodologies
Water Supply - Design Approach And MethodologiesIr. Abdul Aziz Abas
 
Basic Civil Engineering MCQ
Basic Civil Engineering MCQBasic Civil Engineering MCQ
Basic Civil Engineering MCQ
Pralhad Kore
 
Final detailingpp
Final detailingppFinal detailingpp
Final detailingpp
naveen kumar
 
Masonry Code Of Practice Amp
Masonry Code Of Practice   AmpMasonry Code Of Practice   Amp
Masonry Code Of Practice AmpTeja Ande
 
STRENGTHENING OF RC BEAMS USING FRP SHEET
STRENGTHENING OF RC BEAMS USING FRP SHEETSTRENGTHENING OF RC BEAMS USING FRP SHEET
STRENGTHENING OF RC BEAMS USING FRP SHEET
Ijripublishers Ijri
 
Foundation investigation
Foundation investigationFoundation investigation
Foundation investigationanbinhbk
 
Direct integration method
Direct integration methodDirect integration method
Direct integration method
Mahdi Damghani
 
Concrete
ConcreteConcrete
Concrete
civilforall
 
analysis of simple portal frame with sway
analysis of simple portal frame with swayanalysis of simple portal frame with sway
analysis of simple portal frame with sway
ShahIshani1996
 
IRJET- Construction of E3 Shelter by Civil Waste Material: A Review
IRJET-  	  Construction of E3 Shelter by Civil Waste Material: A ReviewIRJET-  	  Construction of E3 Shelter by Civil Waste Material: A Review
IRJET- Construction of E3 Shelter by Civil Waste Material: A Review
IRJET Journal
 
Bolted connections
Bolted connectionsBolted connections
Bolted connections
Siddiqui Anwar
 
Deflection & cracking of RC structure(limit state method)
Deflection & cracking of RC structure(limit state method)Deflection & cracking of RC structure(limit state method)
Deflection & cracking of RC structure(limit state method)
gudtik
 

What's hot (20)

CONCRETE Design mix
CONCRETE Design mixCONCRETE Design mix
CONCRETE Design mix
 
Analysis of portal frame by direct stiffness method
Analysis of  portal frame by direct stiffness methodAnalysis of  portal frame by direct stiffness method
Analysis of portal frame by direct stiffness method
 
Buku beton
Buku betonBuku beton
Buku beton
 
Presentasi Instrumentasi Geoteknik 1C.pptx
Presentasi Instrumentasi Geoteknik 1C.pptxPresentasi Instrumentasi Geoteknik 1C.pptx
Presentasi Instrumentasi Geoteknik 1C.pptx
 
Sample calculation for design mix of concrete
Sample calculation for design mix of concreteSample calculation for design mix of concrete
Sample calculation for design mix of concrete
 
FIBER REINFORCED POLYMER CONCRETE
FIBER REINFORCED POLYMER CONCRETEFIBER REINFORCED POLYMER CONCRETE
FIBER REINFORCED POLYMER CONCRETE
 
Ce 382 l5 truss structures
Ce 382 l5   truss structuresCe 382 l5   truss structures
Ce 382 l5 truss structures
 
Repair and strengthening of reinforced concrete beam column joints
Repair and strengthening of reinforced concrete beam column jointsRepair and strengthening of reinforced concrete beam column joints
Repair and strengthening of reinforced concrete beam column joints
 
Water Supply - Design Approach And Methodologies
Water  Supply - Design Approach And MethodologiesWater  Supply - Design Approach And Methodologies
Water Supply - Design Approach And Methodologies
 
Basic Civil Engineering MCQ
Basic Civil Engineering MCQBasic Civil Engineering MCQ
Basic Civil Engineering MCQ
 
Final detailingpp
Final detailingppFinal detailingpp
Final detailingpp
 
Masonry Code Of Practice Amp
Masonry Code Of Practice   AmpMasonry Code Of Practice   Amp
Masonry Code Of Practice Amp
 
STRENGTHENING OF RC BEAMS USING FRP SHEET
STRENGTHENING OF RC BEAMS USING FRP SHEETSTRENGTHENING OF RC BEAMS USING FRP SHEET
STRENGTHENING OF RC BEAMS USING FRP SHEET
 
Foundation investigation
Foundation investigationFoundation investigation
Foundation investigation
 
Direct integration method
Direct integration methodDirect integration method
Direct integration method
 
Concrete
ConcreteConcrete
Concrete
 
analysis of simple portal frame with sway
analysis of simple portal frame with swayanalysis of simple portal frame with sway
analysis of simple portal frame with sway
 
IRJET- Construction of E3 Shelter by Civil Waste Material: A Review
IRJET-  	  Construction of E3 Shelter by Civil Waste Material: A ReviewIRJET-  	  Construction of E3 Shelter by Civil Waste Material: A Review
IRJET- Construction of E3 Shelter by Civil Waste Material: A Review
 
Bolted connections
Bolted connectionsBolted connections
Bolted connections
 
Deflection & cracking of RC structure(limit state method)
Deflection & cracking of RC structure(limit state method)Deflection & cracking of RC structure(limit state method)
Deflection & cracking of RC structure(limit state method)
 

Viewers also liked

Fire Protection Sample
Fire Protection SampleFire Protection Sample
Fire Protection Sample
Wuillian Medrano
 
24hrs fitness escondido for fabrication
24hrs fitness escondido  for fabrication24hrs fitness escondido  for fabrication
24hrs fitness escondido for fabrication
Wuillian Medrano
 
Sprinkler at roof3
Sprinkler at roof3Sprinkler at roof3
Sprinkler at roof3
Wuillian Medrano
 
Cad samples
Cad samplesCad samples
Cad samples
Wuillian Medrano
 
Tekla samples
Tekla samplesTekla samples
Tekla samples
Wuillian Medrano
 

Viewers also liked (6)

Fire Protection Sample
Fire Protection SampleFire Protection Sample
Fire Protection Sample
 
24hrs fitness escondido for fabrication
24hrs fitness escondido  for fabrication24hrs fitness escondido  for fabrication
24hrs fitness escondido for fabrication
 
Sprinkler at roof3
Sprinkler at roof3Sprinkler at roof3
Sprinkler at roof3
 
Cad samples
Cad samplesCad samples
Cad samples
 
Tekla samples
Tekla samplesTekla samples
Tekla samples
 
Damen Business Card
Damen Business CardDamen Business Card
Damen Business Card
 

Similar to Revit Steel Shop Drawings - Tower

Building Information Modeling - Residential Fall 2014
Building Information Modeling -  Residential Fall 2014Building Information Modeling -  Residential Fall 2014
Building Information Modeling - Residential Fall 2014Martin Pauly
 
71 westbourne full set
71 westbourne full set71 westbourne full set
71 westbourne full set
Trivek Architects
 
COURTYARD-STAIR
COURTYARD-STAIRCOURTYARD-STAIR
COURTYARD-STAIR
Eric Tongson
 
Fabrication drawings
Fabrication drawingsFabrication drawings
Fabrication drawingsDongze Di
 
M.BERG- ARCH201-CD-SET
M.BERG- ARCH201-CD-SETM.BERG- ARCH201-CD-SET
M.BERG- ARCH201-CD-SETMarcia Berg
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examplesLoren Davis
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014Martin Pauly
 
Cnc projeto completo (só montar)
Cnc projeto completo (só montar)Cnc projeto completo (só montar)
Cnc projeto completo (só montar)
epahk
 
Chicago Med Portfolio
Chicago Med PortfolioChicago Med Portfolio
Chicago Med PortfolioJuan Bautista
 
BIM Metal Floor Joists Drawing
BIM Metal Floor Joists DrawingBIM Metal Floor Joists Drawing
BIM Metal Floor Joists Drawing
Geoffrey Jennings
 
COSTELLO_ANNAPOLIS SINGLE FAMILY
COSTELLO_ANNAPOLIS SINGLE FAMILYCOSTELLO_ANNAPOLIS SINGLE FAMILY
COSTELLO_ANNAPOLIS SINGLE FAMILYSara Costello
 
BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1Rochelle Abrie
 
Fdfg2 u (asdfgmbly) (1)
Fdfg2 u (asdfgmbly) (1)Fdfg2 u (asdfgmbly) (1)
Fdfg2 u (asdfgmbly) (1)
Pedro Flores
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawingsbibimisael
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setar
shacjhow
 

Similar to Revit Steel Shop Drawings - Tower (20)

3D Drawing Samples
3D Drawing Samples3D Drawing Samples
3D Drawing Samples
 
Building Information Modeling - Residential Fall 2014
Building Information Modeling -  Residential Fall 2014Building Information Modeling -  Residential Fall 2014
Building Information Modeling - Residential Fall 2014
 
IC3D example dwgs
IC3D example dwgsIC3D example dwgs
IC3D example dwgs
 
71 westbourne full set
71 westbourne full set71 westbourne full set
71 westbourne full set
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
 
COURTYARD-STAIR
COURTYARD-STAIRCOURTYARD-STAIR
COURTYARD-STAIR
 
Fabrication drawings
Fabrication drawingsFabrication drawings
Fabrication drawings
 
5104800
51048005104800
5104800
 
M.BERG- ARCH201-CD-SET
M.BERG- ARCH201-CD-SETM.BERG- ARCH201-CD-SET
M.BERG- ARCH201-CD-SET
 
TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
 
Cnc projeto completo (só montar)
Cnc projeto completo (só montar)Cnc projeto completo (só montar)
Cnc projeto completo (só montar)
 
Chicago Med Portfolio
Chicago Med PortfolioChicago Med Portfolio
Chicago Med Portfolio
 
BIM Metal Floor Joists Drawing
BIM Metal Floor Joists DrawingBIM Metal Floor Joists Drawing
BIM Metal Floor Joists Drawing
 
COSTELLO_ANNAPOLIS SINGLE FAMILY
COSTELLO_ANNAPOLIS SINGLE FAMILYCOSTELLO_ANNAPOLIS SINGLE FAMILY
COSTELLO_ANNAPOLIS SINGLE FAMILY
 
BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1BUSTUBE JIG DESIGN SHEET 1
BUSTUBE JIG DESIGN SHEET 1
 
Fdfg2 u (asdfgmbly) (1)
Fdfg2 u (asdfgmbly) (1)Fdfg2 u (asdfgmbly) (1)
Fdfg2 u (asdfgmbly) (1)
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setar
 

Revit Steel Shop Drawings - Tower

  • 1. 1 A D 31 E1 2 B C 4'-01/2"8'-1"4'-01/2" 16'-2" 2' - 0" 7' - 0" 7' - 0" 2' - 0" 8' - 4" 9' - 0" 18' - 0" 6' - 1" 10' - 1" 14' - 0" 60° W12X30 TMP1 (6 REQ'D)TYP. 4 1/2" TYP. 4 1/2" TYP. 73/4" TYP. 73/4" 1"81/2"10" 2'-0"2'-0" TOP OF TMPL EL. -2' - 7 7/8" 1 E2 1 A D 32 B C 5' - 1" 3' - 10" 5' - 1" 4'-31/2"7'-7"4'-31/2" W12X14W12X14 W12X14 W12X14W12X14 W12X14 W12X14 W12X14 W12X14 W12X14 W12X14W12X14 W12X14 W12X14 14' - 0" 7' - 0" 7' - 0" 3' - 6" 3' - 6" 3' - 6" 3' - 6" EL 20' - 0" T.O.S TYP. B8 B7 B12 B13 B10 B9 B1 B4 B3B2 B5B6 16'-2" 8'-1" 3" 3" C4 C6 C1 C2 C5 C3 W12X30 W12X30 W12X30 W12X30 W12X30 W12X30 2 E2 KEEP 3' - 6" E1 2 E1 3 B11 4 E3 B24 BR1 HSS4X4X3/8 HSS4X4X3/8 BR2 BR2 HSS4X4X3/8 HSS4X4X3/8 BR1BR2 HSS4X4X3/8 BR1 HSS4X4X3/8 1 E2 1 A D 32 B C 2' - 3" 2' - 10" 3' - 10" 2' - 10" 2' - 3" 7' - 0" 7' - 0" 2' - 3" 9' - 6" 2' - 3" 3'-91/2"3'-91/2" 3"7'-7"3" 14' - 0" 16'-2" 4'-01/2"8'-1"4'-01/2" W12X14W12X14W12X14 W12X14 W12X14 W12X14 W12X14 W12X14 W12X14W12X14 W12X14 W12X14 W12X14 W12X14 W12X14 W12X14 W12X14 W12X14 W12X14 W12X14 W12X14 2 E2 B16 B23 B23B23 B23B23 B17 B25 B24 B26 B13 B12 B27 B28 B19B18 B15 B14 EL 30' - 0" T.O.S TYP. W12X30 W12X30 W12X30 W12X30 W12X30 W12X30 HSS4X4X3/8 HSS4X4X3/8 HSS4X4X3/8 HSS4X4X3/8 C7C8 C8 C7 4 E1 SIM B20 B21 B22 B23 L01 1 E2 1 A D 32 B C W12X14 W12X14 W12X14B31 W12X14W12X14 B30 B29 4' - 9" 4' - 9" 9' - 6" 3"7'-7"3" HSS4X4X3/8 HSS4X4X3/8 HSS4X4X3/8 HSS4X4X3/8 C8 C8 B32 W12X14 C7 C7 SLOPING SLOPING EL 39' - 6" T.O.S EL. 41' - 10 1/2" T.O.S SEE E3 FOR BT PLA LAYOUT 3" / 12" Grade Level 0" Level A 4 1/2" 2'-9"1'-3" 1'-0"4'-0" W12X30 PL 1/2 x 12 x 1' - 6 1/2"LG W/ 4- 5/8"Ø ANCH BOLTS x 1'-0 LG 1" GROUT FOOTING PER PLAN STEAM WALL 1"1'-61/2" 1 1/2" 9" 1 1/2" 1' - 0" PL 1/2 x 12 x 1' - 6 1/2"LG W/ 4- 5/8"Ø ANCH BOLTS x 1'-0 LG 5" 11/2"1'-31/2"11/2" 1" 11" 81/2"10" W12X14 W12X30 3" 30° 120° PL 3/8 x 3 1/2 x 0' - 9"LG W/ (3 )3/4"Ø T.C.B A325 W12X14 W12X14 W12X14 W12X14 W12X14 PL 3/8 x 3 1/2 x 0' - 9"LG W/ (3) 3/4"Ø T.C.B. A325 W12X30 10" 4" 3" 2 1/4" PL 3/4 x 4 x 0' - 10"LG W/ (4) 1/2"Ø T.C.B A325W12X14 W12X14 W12X14 11/2" FIELD CUT GRATING AROUND HSS 21/4" W12X14 W12X14 HSS4X4X3/8 PL 3/4 x 4 x 0' - 10"LG W/ (4) 1/2"Ø T.C.B A325 PL3/8 x 3 1/2 x 0' - 11 3/8"LG W/ (4) 3/4"Ø T.C.B A325 2 1/4 x 3/16 Grating x 6' - 0"LG ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:27PM E1 ANTENNA TOWER FRAMING PLANS STADIUM PARK 2/3/2017 WM SC 9449 FRIARS ROAD SAN DIEGO, CA 92108 ANCHOR BOLT SETTING PLAN LEVEL B FRAMING PLAN LEVEL C FRAMING PLAN LEVEL E FRAMING PLAN 1 TYPICAL BASE PLATE DETAIL 2 TYPICAL BEAM CONNECTION AT COLUMN 3 COLUMN FLANGE PERPENDICULAR TO BEAM CONNECTION 4 ROOF COLUMN CONNECTION AT ANTENNA LEVEL NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 2. LEVEL B 20' - 0" BC LEVEL C 30' - 0" HSS4X4X3/8 E2 3 W12X30 W12X30 8' - 1" E2 4 HSS4X4X3/8 HSS4X4X3/8 Grade Level 0" 1 3 LEVEL B 20' - 0" 14' - 0" 2 LEVEL C 30' - 0" LEVEL D 37' - 0" LEVEL E 44' - 0" Level A 4 1/2" 20'-0"10'-0"7'-0"7'-0" 1'-0" 2'-9" 4'-0"44'-0" 9'-6" 4' - 9"4' - 9" 11'-101/2" 1'-0" 7' - 0"7' - 0" HSS4X4X3/8 HSS4X4X3/8 W12X30 HSS4X4X3/8 HSS4X4X3/8 W12X30 W12X30 W12X14 W12X14 1' - 0" 3" C8 C7 BR2 BR1 W12X14 E2 6 HSS4X4X3/8 PL 3/8 x 10 x 1' - 1 1/16"LG PL 3/8 x 3 1/2 x 0' - 9"LG W/ (3) 3/4"Ø T.C.B A325 3/4"Ø T.C.B x 0' - 5 1/4"LG W12x30 COL. WEB CL BM PL 3/8 x 3 1/2 x 0' - 9"LG 2 1/4 x 3/16 Grating x 6' - 0"LG 1 1/2" 5 1/2" 1/2" 3/16" 5 TYP. PL 3/8 x 3 1/2 x 0' - 9"LG W/ (3) 3/4"Ø T.C.B A325 HSS4X4X3/8 3/4"Ø T.C.B x 0' - 5 1/4"LG PL 3/8 x 10 x 1' - 1 1/16"LG PL 3/8 x 3 1/2 x 0' - 9"LG W/ (3 )3/4"Ø T.C.B A325 W12X14 5 1/2" 1 1/2" W12x30 1/2" 3/16' 5 TYP. PL3/8 x 3 1/2 x 0' - 11 3/8"LG W/ (3) 3/4"Ø T.C.B. A325 PL 3/8 x 2 x 0' - 11 3/8"LG HSS4X4X3/8 1/4" TYP. W12X14 ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:35PM E2 TOWER SECTION AND BRACE DETAILS STADIUM PARK 2/3/2017 WM SC 9449 FRIARS ROAD SAN DIEGO, CA 92108 2 SECTION AT HSS BRACE 1 Working View 3 BRACE CONNECTION AT ANTENNA LEVEL 4 BRACE CONNECTION AT LEVEL B TOWER ISO NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION 6 HSS COLUMN TO BEAM CONNECTION
  • 3. 4 E3 7"MIN. 3' - 6" 4'-11/2" L01 LADDER W/ 1/2x 3 STRINGGER 4' - 0" 3'-21/4" GR1 1/4" TYP. Grade Level 0" A LEVEL B 20' - 0" B LEVEL C 30' - 0" Level A 4 1/2" E3 3 22'-1"7'-4" 3'-63/8" 9 3/4" L01 LADDER W/ 1/2x 3 STRINGGER CAGE W/ PL1/4 x 2 VERTICAL BANDS E/ PL 1/4x 3 HORZ BANDS E3 2 3'-81/4" 3'-6" HSS1.5X.120 4'-0" 1" L4 x 2 x 1/2 x 0' - 2"LG W/ (1)3/8"Ø HILTI KB-TZ 4" LADDER W/ 1/2x 3 STRINGGER 2" BT PL3/8 x 2 x 1' - 0 3/4"LG EACH SIDE OF LADDER 9 5/8" 31/2" BT PL3/8 x 2 x 1' - 0 3/4"LG EACH SIDE OF LADDER 1/4" TYP. W12X14 3'-81/4" 3'-6"21/4" 6"6"6"6"6"6" 41/2" 2 1/4" BAR GRATING HSS1.5X.120 4' - 0" 1/4" TYP. 1 E2 1 A D 32 B C 2'-0" 13° 18' - 0" TYP. BPL2 (28 REQ'D) SLOPPING E3 6 10" 2"6"2" 1' - 0" BT. PL 1/4 x 10 x 1'-1 3/4 STAINLESS STEEL 6" 4" 1/2"Ø FIBER GLASS BOLT (BY OTHERS) 6 x 6 x 1/4 FIBER GLASS TUBE (BY OTHERS) 1' - 0" LOUVERS (BY OTHERS) BT. PL 1/4 x 10 x 1'-1 3/4 STAINLESS STEEL ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:38PM E3 LADDER AND RAIL DETAILS STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION 1 LADDER PLAN VIEW 4 LADDER SECTION 3 LADDER ANCHOR 2 LADDER BRACKET 5 TYPICAL PIPE GUARDRAILS LEVEL E SS BT PLATE LAYOUT 6 STAINLESS STEEL BT PLATE AT ROOF
  • 4. 10"2" 1'-0" ab1 (4 REQ'D) 5/8"Ø STD. HOOK x 1' - 0"LG 6 - TEMPLATE - TMP1 11/2"1'-31/2"11/2" 1 1/2" 9" 1 1/2" 1'-61/2" 1' - 0" "Ø HLS 11/16" "Ø HLS 11/16" DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:53PM TMP1 TEMPLATE STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 11/16'Ø BILL OF MATERIALS - TMP1 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS ab1 24 5/8"Ø STD. HOOK 1'-0" TMP1 6 TEMPLATE 12 GA x 12 1'-6 1/2" NO. DATE DESCRIPTION
  • 5. "B" "A" 6" 6" 32'-71/2"1/2" 11/2" 3" 22'-71/2"10'-0" 22'-41/2"32'-41/2" 11/2" 3" W12X30 EL -2' - 8" 0" 20' - 0" 30' - 0" CP1 (FS) CP3 (NS) CP3 ONE - COLUMN - C1 (FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 3" 11/2" 1015/16" 11/2"22'-41/2"31'-59/16" 32'-41/2" 3" 11/2" (FS) CP3 (FS) CP3"B" SIM "B" SIM "A""A" "B" "A""A""A" 715/16"3" 11/2"11/2" 3" 3" 10"8 1/2" 11/2" 3" 3" 11/2" 11/2" 22'-41/2"32'-41/2" 22'-41/2"31'-59/16"32'-41/2" CP3 (BS) CP3 (BS) CP3 (BS) CP3 CP3 CP1 MK; EXTERIOR 5/8" 5/8" 30° 5/8" 30° CP3 CP3 CP3 30° 1/4" TYP. 1/4" TYP. 11/2"1'-31/2"11/2" 1 1/2"9"1 1/2" 1'-61/2" 1' - 0" CP1 W12X30 81/2"10" 6"6" "Ø HLS 15/16" "Ø HLS 15/16" 1/4" TYP. 11/2"3"3"11/2" 1 1/2"2" 3 1/2" 9" CP3 "Ø HLS 13/16" ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:47PM C1 COLUMN STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 BILL OF MATERIALS - C1 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS C1 1 W12X30 32'-7 1/2" CP1 1 PL 1/2 x 12 1'-6 1/2" CP3 8 PL 3/8 x 3 1/2 0'-9" SECTION "B" SECTION "A" PLATE DETAIL - CP3 GALVANIZED NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION TYPICAL HL 13/16"Ø
  • 6. 10"8 1/2" CP1 3" 11/2" 11"11/2" 3" 11/2" CP3 (BS) CP3 (BS) CP3 (BS) CP3 CP3 22'-41/2"23'-31/2"32'-41/2" MK; EXTERIOR 3" 1/2"32'-71/2" 3" 11/2" 11/2" 11/2" 11/2" W12X30 22'-41/2"23'-31/2"32'-41/2" (NS) CP3 (FS) CP3(FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (NS) CP3 -2' - 8" 0" 20' - 0" 91/2"3" 30' - 0" CP1 6"6" ONE - COLUMN - C2 SIM "A" "B" "B" "B" "B" 11/2"1'-31/2"11/2" 1 1/2"9"1 1/2" 1'-61/2" 1' - 0" CP1 W12X30 81/2"10" 6"6" "Ø HLS 15/16" "Ø HLS 15/16" 1/4" TYP. 11/2"3"3"11/2" 1 1/2"2" 3 1/2" 9" CP3 "Ø HLS 13/16" 5/8" 5/8" 5/8" 30° 30° 30° CP3CP3 CP3 1/4" TYP. 1/4" TYP. ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:51PM C2 COLUMN STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 BILL OF MATERIALS - C2 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS C2 1 W12X30 32'-7 1/2" CP1 1 PL 1/2 x 12 1'-6 1/2" CP3 8 PL 3/8 x 3 1/2 0'-9" SECTION "A" PLATE- DETAIL - CP3 GALVANIZED SECTION "B" NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION TYPICAL HL 13/16"Ø
  • 7. 32'-71/2"1/2" 6"6" (BS) CP1 W12X30 11"11/2" 3" (NS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (NS) CP3 3" 3" 11/2" 11/2" 22'-41/2"23'-31/2"32'-41/2" -2' - 8" 20' - 0" 30' - 0" ONE - COLUMN - C3 "A" "B" "B" SIM "B" 3" 11/2" 3" 11/2" 11"11/2" 22'-41/2"32'-41/2" CP3 (BS) CP3 (BS) CP3 CP3 (BS) CP3 CP1 8 1/2" 10" 11/2"1'-31/2"11/2" 1 1/2"9"1 1/2" 1'-61/2" 1' - 0" CP1 W12X30 81/2"10" 6"6" "Ø HLS 15/16" "Ø HLS 15/16" 1/4" TYP. 5/8" 5/8" 30° 5/8" 30° CP3 CP3 CP3 30° 1/4" TYP. 1/4" TYP. 11/2"3"3"11/2" 1 1/2"2" 3 1/2" 9" CP3 "Ø HLS 13/16" ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:55PM C3 COLUMN STADIUM PARK 2/3/2017 WM SC 9449 FRIARS ROAD SAN DIEGO, CA 92108 BILL OF MATERIALS - C3 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS C3 1 W12X30 32'-7 1/2" CP1 1 PL 1/2 x 12 1'-6 1/2" CP3 8 PL 3/8 x 3 1/2 0'-9" MK; EXTERIOR SECTION "A" SECTION "B" PLATE- DETAIL - CP3 GALVANIZED NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION TYPICAL HL 13/16"Ø
  • 8. 6" 6" 11/2" 3"1015/16"3" 11/2" 1/2"32'-71/2" CP1 (NS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (NS) CP3 (FS) CP3 22'-41/2"31'-59/16"32'-41/2" W12X30 -2' - 8" 20' - 0" 30' - 0" 2' - 0" ONE - COLUMN - C4 "A" "B" "B" "B" SIM 11/2" (FS) CP3 3" 11/2" 3" 11/2" (BS) CP3 (BS) CP3 (BS) CP3 CP3 CP3 CP1 8 1/2" 10" MK: EXTERIOR 11/2"1'-31/2"11/2" 1 1/2"9"1 1/2" 1'-61/2" 1' - 0" CP1 W12X30 81/2"10" 6"6" "Ø HLS 15/16" "Ø HLS 15/16" 1/4" TYP. 5/8" 5/8" 5/8" 30° 30° 30° CP3CP3 CP3 1/4" TYP. 1/4" TYP. 11/2"3"3"11/2" 1 1/2"2" 3 1/2" 9" CP3 "Ø HLS 13/16" ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:59PM C4 COLUMN STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 BILL OF MATERIALS - C4 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS C4 1 W12X30 32'-7 1/2" CP1 1 PL 1/2 x 12 1'-6 1/2" CP3 8 PL 3/8 x 3 1/2 0'-9" SECTION "A" SECTION "B"@ C4 PLATE- DETAIL - CP3 GALVANIZED NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION TYPICAL HL 13/16"Ø
  • 9. 8 1/2" 10" 3" 11/2" 1015/16" 11/2" 3" 11/2"22'-41/2"31'-59/16" 32'-41/2" (BS) CP3 (BS) CP3 (BS) CP3 6" 6" 1/2"32'-71/2" 3"1015/16" 11/2"11/2"22'-41/2"31'-59/16"32'-41/2" W12X30 11/2" 3" -2' - 8" 20' - 0" 30' - 0" ONE - COLUMN - C5 CP1 (FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 "B" "B" "B" 11/2"1'-31/2"11/2" 1 1/2"9"1 1/2" 1'-61/2" 1' - 0" CP1 W12X30 81/2"10" 6"6" "Ø HLS 15/16" "Ø HLS 15/16" 1/4" TYP. 5/8" 5/8" 61/8" 61/8" 30° 30° CP3CP3 1/4" TYP. 11/2"3"3"11/2" 1 1/2"2" 3 1/2" 9" CP3 "Ø HLS 13/16" ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:03PM C5 COLUMN STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 BILL OF MATERIALS - C5 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS C5 1 W12X30 32'-7 1/2" CP1 1 PL 1/2 x 12 1'-6 1/2" CP3 6 PL 3/8 x 3 1/2 0'-9" SECTION "A" SECTION "B" PLATE- DETAIL - CP3 GALVANIZED NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION TYPICAL HL 13/16"Ø
  • 10. 10"8 1/2" CP1 22'-41/2"23'-31/2"32'-41/2" 3" 11/2" CP3 (BS) CP3 1 1/2" 2" 11"11/2" 11/2" 1 1/2" 2" CP3 (BS) CP3 (BS) CP3 32'-71/2"1/2" 3" 11/2" 11/2"11" 11/2" 3" -2' - 8" 20' - 0" 30' - 0" W12X30 22'-41/2"23'-31/2"32'-41/2" ONE - COLUMN - C6 6"6" (FS) CP3 CP1 (FS) CP3 (NS) CP3 (FS) CP3 (FS) CP3 (FS) CP3 (NS) CP3 (FS) CP3 "B" "C" "B" 11/2"1'-31/2"11/2" 1 1/2"9"1 1/2" 1'-61/2" 1' - 0" CP1 W12X30 81/2"10" 6"6" "Ø HLS 15/16" "Ø HLS 15/16" 1/4" TYP. 5/8" 5/8" 1/8" 61/8" 61/8" CP3 CP3 CP3 2"11/2" 30° 30° 1/4" TYP. 1/4" TYP. 5/8" 5/8" 61/8" 61/8" CP3 CP3 30° 30° 1/4" TYP. 11/2"3"3"11/2" 1 1/2"2" 3 1/2" 9" CP3 "Ø HLS 13/16" ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:07PM C6 COLUMN STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 BILL OF MATERIALS - C6 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS C6 1 W12X30 32'-7 1/2" CP1 1 PL 1/2 x 12 1'-6 1/2" CP3 8 PL 3/8 x 3 1/2 0'-9" SECTION "A" SECTION "B" SECTION "C" PLATE- DETAIL - CP3 NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION GALVANIZEDTYPICAL HL 13/16"Ø
  • 11. "A" 5"5" 10'-97/8"3/4" HSS4X4X3/8 2 - COLUMN - C7 CP2 2" 2" CP2 MARK NORTH; N 0' 1 1/2" 7" 1 1/2" 10" 7/8"21/4"7/8" 4" 3/16 TYP. TYP. CP2 2" 2" CP2 MARK NORTH; N 0' 8'-53/8"3/4" 5"5" HSS4X4X3/8 CP2 "A" 2 - COLUMN - C8 ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:12PM C7&C8 COLUMN STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 NO. Revision Date DESCRIPTION BILL OF MATERIALS - C7 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS C7 2 HSS4X4X3/8 10'-9 7/8" CP2 2 PL 3/4 x 4 0'-10" SECTION "A" GALVANIZEDTYPICAL HL 9/16"Ø BILL OF MATERIALS - C8 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS C8 2 HSS4X4X3/8 8'-5 3/8" CP2 2 PL 3/4 x 4 0'-10"
  • 12. 2 5/16" 2 5/16" 7/8" 1' - 1 1/16" 60° 60° Gp1 2"2" 3/16" 3/16" TYP. 8' - 1 13/16" 3"3"3"2"3"3"2" 10 3/16" 2 7/8" 71/4"23/4" 9 3/16" 3 7/8" 1' - 1 1/16" 10" Gp1 613/16"33/16" 2 13/16" 2 13/16"7' - 10 15/16" 3"3"3" ONE - BEAM - B1 W12X14 1 11/16" 1 11/16" 7/8" (AS SHOWN ) ONE - BEAM - B4 (OPP HAND) 1 15/16" 11 1/16" DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:23PM B1 & B4 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B1 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B1 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" BILL OF MATERIALS - B4 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B4 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" (OPP HAND) (AS SHOWN) NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 13. 2 5/16" 2 1/4" 60° 60° 60° 3' - 10 5/8"5/8"3' - 10" P2 4' - 0 1/4" 2"2" Gp1 1' - 1 1/16" 7/8" (FS) P2 1/4" 3 SIDES 3/16" 3/16" TYP. 8' - 1 13/16" 2 13/16" 2 13/16" 1 5/8"1 11/16" 3"3"3" 2"3"3"2" 1 15/16" 10" 33/16"613/16" 3 7/8" 9 3/16" 2 7/8" 10 3/16" 23/4"71/4" Gp1 1' - 1 1/16" ONE - BEAM - B2 W12X14 (NS) P2 3"3"3" 7' - 2 11/16" 2" 1 1/2" 3 1/2" 3"3"3"25/8" 23/4" 1 5/8" 5/8" 113/8" (FS) P2 DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:26PM B2 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B2 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B2 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P2 1 PL 3/8 x 3 1/2 0'-11 3/8" PLATE DETAIL - P2 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 14. 2 1/4" 2 5/16" 60° 60° 3' - 11 1/4" 3' - 10" 4' - 1 1/2" 60° P2 Gp1 2"2" 1' - 1 1/16"7/8" 3/16" 3/16" TYP. 1/4" 3 SIDES 3"3"3" 2"3"3"2" 10"3"3"3" 1 15/16" 9 3/16" 3 7/8" 10 3/16" 2 7/8" 10" 71/4"23/4" 613/16"33/16" Gp1 8' - 1 3/4" 2 13/16" 1 11/16" 2 13/16" 1 11/16" (NS) P2 ONE - BEAM - B3 W12X14 11 1/16" 7' - 10 15/16" 2" 1 1/2" 3 1/2" 3"3"3"25/8" 23/4" 1 5/8" 5/8" 113/8" (FS) P2 T&B DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:30PM B3 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B3 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B3 1 W12X14 8'-1 3/4" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P2 1 PL 3/8 x 3 1/2 0'-11 3/8" PLATE DETAIL - P2 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 15. 2 1/4" 2' - 1 5/16" 5' - 7 15/16" 2 5/16" 5/8" 60° P2 2' - 3 9/16" 1' - 1 1/16" 7/8" Gp1 60° 60° 3/16" 3/16" TYP. 1/4" 3 SIDES 2"3"3"2"3"3"3" 33/16" 613/16" 23/4"71/4" 101/4" 2 7/8" 10 3/16" 1 15/16" 9 3/16"3 7/8" 3"3"3" (FS) P2 8' - 1 13/16" 2 13/16" 2" 2 13/16" 1 11/16" 2' - 3 9/16" 7' - 10 15/16" Gp1 W12X14 ONE - BEAM - B5 7' - 2 11/16" 2" 1 1/2" 3 1/2" 3"3"3"25/8" 23/4" 1 5/8" 5/8" 113/8" (FS) P2 DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:32PM B5 & B6 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B5 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B5 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P2 1 PL 3/8 x 3 1/2 0'-11 3/8" ONE - BEAM - B6 (AS SHOWN) (OPP HAND) BILL OF MATERIALS - B6 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B6 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P2 1 PL 3/8 x 3 1/2 0'-11 3/8" (OPP HAND) (AS SHOWN) PLATE DETAIL - P2 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 16. 2 5/16" 2 5/16"4' - 5 5/16" 1' - 11 15/16" 1' - 10 5/8" 4' - 5 11/16" 4' - 7 9/16" 6' - 7 1/2" 8' - 6 1/8" P1P1 P1 60° 60° 2 5/8" 4' - 7 9/16" 6' - 7 7/16" 8' - 6 1/8" 12' - 11 7/16" 2 5/8" 1 1/2" 1 1/2" 13' - 2 1/8" (NS) P1 (FS) P1 (NS) P1 3"3"3" 3"3"3" "B" "A" ONE - BEAM - B7 W12X14 "B" 1 1/2" 2" 23/4" 3"3"3"211/16" 117/16" 3 1/2" 5/8" 1 5/8" P1 1/4" TYP. T&B 3 1/2" 2" 1 1/2" 23/4" 25/8"3"3"3" 117/16" P1 1/4" 3 SIDES 2 5/16" 2' - 10 5/16" 3' - 6 9/16" 3' - 6" 2' - 10 11/16" 2 5/16" 6' - 7 1/8" 6' - 6 15/16" P1 P1 P1P1 60° 60°13' - 2 1/8" (BS) P1 (FS) P1 (FS) P1 W12X14 ONE - BEAM - B8 3' - 0 9/16" 6' - 7 1/8" 10' - 1 3/16" 12' - 11 7/16" 2 5/8" 1 1/2" 2 5/8" 1 1/2" 3"3"3" 3"3"3" "C" "A" "A" 2" 1 1/2" 3 1/2" 3"3"3" 117/16" 1 5/8" 5/8" 23/4" P1 P1 1/4" 3 SIDES T&B ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:30PM B7 & B8 BEAM STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 BILL OF MATERIALS - B7 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B7 1 W12X14 13'-2 1/8" 6 3/4"Ø T.C.B 0'-1 1/2" A325 P1 3 PL3/8 x 3 1/2 0'-11 3/8" SECTION "A" SECTION "B" SECTION "C" BILL OF MATERIALS - B8 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B8 1 W12X14 13'-2 1/8" 6 3/4"Ø T.C.B 0'-1 1/2" A325 P1 4 PL3/8 x 3 1/2 0'-11 3/8" GALVANIZEDTYPICAL HL 13/16"Ø NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 17. 1 1/16"1' - 11 1/16"1 7/8" 2 5/16" 2' - 2" 60° 2' - 2" 1 3/4" 3"3"3" 3"3"3" 1 7/8" 3/4" 1 7/8" 1 1/2" W12X14 ONE - BEAM - B9 T&B DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:34PM B9 & B10 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 13/16Ø BILL OF MATERIALS - B9 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B9 1 W12X14 2'-2" 6 3/4"Ø T.C.B 0'-1 1/2" A325 ONE - BEAM - B10 (AS SHOWN) (OPP HAND) (OPP HAND) (AS SHOWN) BILL OF MATERIALS - B10 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B10 1 W12X14 2'-2" 6 3/4"Ø T.C.B 0'-1 1/2" A325 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 18. 3"3"3" 3"3"3" W12X14 ONE - BEAM - B11 7' - 5 3/4" 1 7/8" 3/4" 1 1/2"1 1/2" 7' - 4 1/4" T&B 1 7/8" 3/4" T&B DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:36PM B11 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B11 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B11 1 W12X14 7'-5 3/4" 6 3/4"Ø T.C.B 0'-1 1/2" A325 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 19. 1 1/16" 2 5/16" 60° 1 1/2" 3' - 1" 1 3/4" 3"3"3" 1 7/8" 3/4" 3"3"3" W12X14 T&B 2 - BEAM - B12 (AS SHOWN ) 2 - BEAM - B13 (OPP HAND) DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:37PM B12&B13 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16"Ø BILL OF MATERIALS - B12 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B12 2 W12X14 3'-1" 12 3/4"Ø T.C.B 0'-1 1/2" A325 (OPP HAND) (AS SHOWN) BILL OF MATERIALS - B13 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B13 2 W12X14 3'-1" 12 3/4"Ø T.C.B 0'-1 1/2" A325 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 20. 2 5/16" 2' - 1 5/16" 3' - 3 1/4" 2' - 4 11/16" 2 5/16" 60° 60° P2 P2 2' - 3 5/8" 5' - 6 7/8" 60° 60° (FS) Gp1 2"2" 15/16" 3/16" 3/16" TYP. 1/4" 3 SIDES 8' - 1 13/16" 3"3"3" 2"3"3"2" 15/16" 1' - 1 1/16" 1 15/16" 2 7/8" 23/4" 10" 613/16"33/16" 9 3/16" 3 7/8" 2 13/16" Gp1 W12X14 ONE - BEAM - B14 (FS) P2 (FS) P2 3"3"3" 1 11/16" 2 7/8" (AS SHOWN ) ONE - BEAM - B15 (OPP HAND) 11 1/8" 7' - 11" 2" 1 1/2" 3 1/2" 3"3"3"25/8" 23/4" 1 5/8" 5/8" 113/8" (FS) P2 DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:38PM B14&B15 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16"Ø BILL OF MATERIALS - B14 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B14 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P2 2 PL 3/8 x 3 1/2 0'-11 3/8" PLATE DETAIL - P2 (OPP HAND) (AS SHOWN) BILL OF MATERIALS - B15 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B15 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P2 2 PL 3/8 x 3 1/2 0'-11 3/8" NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 21. 1 1/2"2" 3"3"3"25/8" 5/8" 1 5/8" T & B 117/16" 23/4" P1 1/4" 3 SIDES 3 1/2" 2 5/16" 3' - 10 11/16" 3' - 10 1/2" 2 5/16" 60° 60° P1 3/16" 3/16" TYP. (FS) Gp1 "A" 1 15/16" 3 7/8" 9 3/16" 7/8" 3"3"3" 21/4"3"3" 71/16"33/16" 10" 23/4" 2 13/16" 3"3"3" 2 13/16" 8' - 1 13/16" 4' - 1" P1 W12X14 ONE - BEAM - B16 Gp1 2 7/8" 7' - 10 15/16" 7' - 2 11/16" (AS SHOWN ) ONE - BEAM - B17 (OPP HAND) DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:39PM B16&B17 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16"Ø BILL OF MATERIALS - B16 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B16 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P1 1 PL3/8 x 3 1/2 0'-11 3/8" SECTION "A" BILL OF MATERIALS - B17 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B17 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P1 1 PL3/8 x 3 1/2 0'-11 3/8" (OPP HAND) (AS SHOWN) NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 22. 2 5/16" 2' - 4 11/16" 5' - 4 9/16" 2 5/16" 60° 60° 2' - 6 15/16" 60° 1/4" 3 SIDES (FS) Gp1 3/16" 3/16" 3 SIDES 7/8" 8' - 1 13/16" 11 1/16" 7' - 10 15/16" 2 7/8" 2 13/16" 1 15/16" 2 7/8" 9 3/16" 3 7/8" 23/4" 10" 33/16"613/16" 3"3"3"2"3"3"2" 3"3"3" (NS) P2 Gp1 W12X14 ONE - BEAM - B18 (AS SHOWN ) (OPP HAND) ONE - BEAM - B19 2" 1 1/2" 3 1/2" 3"3"3"25/8" 23/4" 1 5/8" 5/8" 113/8" (FS) P2 DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:40PM B18&B19 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B18 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B18 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P2 1 PL 3/8 x 3 1/2 0'-11 3/8" (OPP HAND) (AS SHOWN) BILL OF MATERIALS - B19 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B19 1 W12X14 8'-1 13/16" 9 3/4"Ø T.C.B 0'-1 1/2" A325 Gp1 1 PL 3/8 x 10 1'-1 1/16" P2 1 PL 3/8 x 3 1/2 0'-11 3/8" PLATE DETAIL - P2 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 23. 2 5/16" 1' - 7 7/8" 4' - 9" 4' - 9" 1' - 7 11/16" 2 5/16" 1' - 10 1/8" 4' - 9" 4' - 9" 1' - 9 15/16" P1 P1 P1 P1 P1 P1 60° 60° 21/4" 11/8"11/8" 7" 1' - 6 9/16" 21/4" "Ø HLS 9/16" "Ø HLS 9/16" "Ø HLS 9/16" "Ø HLS 9/16" 3"3"3" 3"3"3" 1' - 10 1/8" 4' - 9" 4' - 9" 1' - 9 15/16" 2 5/8" 2 5/8" 1' - 10 1/8" 6' - 7 1/8" 11' - 4 1/8" 12' - 11 7/16" 13' - 2 1/8" (BS) P1 (BS) P1 (BS) P1 ONE - BEAM - B20 W12X14 TYP. "C" 1' - 6 9/16" 7" 11' - 0 9/16" 11' - 7 9/16" 7" 3"3"3" 2 5/8" 1' - 9 15/16"2' - 10"1' - 11"1' - 11 9/16"2' - 9 7/16"1' - 10 1/8" 2 5/8"1' - 10 1/8" 4' - 7 9/16" 6' - 7 1/8" 8' - 6 1/8" 11' - 4 1/8" 12' - 11 7/16" 3"3"3" 13' - 2 1/8" ONE - BEAM - B21 W12X14 (BS) P1 (NS) P1 (FS) P1 (NS) P1 (BS) P1 "C" TYP. "B" TYP. "A" TYP. 1' - 6 9/16" 7" 11' - 0 9/16" 11' - 7 9/16" 7" 2 5/16" 1' - 7 7/8" 2' - 9 7/16" 3' - 10 9/16" 2' - 10" 1' - 7 11/16" 2 5/16" 1' - 10 1/8" 4' - 7 9/16" 6' - 7 1/8" 8' - 6 1/8" 11' - 4 1/8" P1 P1 P1 P1 P1 P1 P1 60° 60° 11/8"11/8" 21/4" "Ø HLS 9/16" "Ø HLS 9/16" "Ø HLS 9/16" 7" 21/4" "Ø HLS 9/16" "Ø HLS 9/16""Ø HLS 9/16" 1 1/2" 2" 23/4" 3"3"3"211/16" 117/16" 3 1/2" 11/16" 1 5/8" P1 1/4" 3 SIDES 3 1/2" 2" 1 1/2" 23/4" 25/8"3"3"3" 117/16" P1 1/4" 3 SIDES 2" 1 1/2" 3 1/2" 3"3"3" 117/16" 1 5/8" 5/8"5/8" 1 5/8" 23/4" P1 P1 1/4" 3 SIDES ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:42:54PM B20&B21 BEAM STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 BILL OF MATERIALS - B20 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B20 1 W12X14 13'-2 1/8" 8 1/2"Ø T.C.B 0'-2 1/4" A325 6 3/4"Ø T.C.B 0'-1 1/2" A325 P1 6 PL3/8 x 3 1/2 0'-11 3/8" SECTION "A" SECTION "B" SECTION "C" GALVANIZEDTYPICAL HL 13/16"Ø NO. Revision Date DESCRIPTION BILL OF MATERIALS - B21 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B21 1 W12X14 13'-2 1/8" 8 1/2"Ø T.C.B 0'-2 1/4" A325 6 3/4"Ø T.C.B 0'-1 1/2" A325 P1 7 PL3/8 x 3 1/2 0'-11 3/8"
  • 24. 2' - 2 1/2" 6' - 11 1/2" 11' - 8 1/2" 2' - 2 1/2" 4' - 9" 4' - 9" 2' - 2 5/16" P1 P1 P1 P1 P1P1 13' - 10 13/16" 1 1/2" 3/4" 1 7/8" 3"3"3" (BS) P1 (BS) P1 (BS) P1 3"3"3" 3/4" 1 7/8" T&B T&B ONE - BEAM - B22 W12X14 "A" TYP. 1 1/2"13' - 9 5/16" 2" 1 1/2" 3 1/2" 3"3"3" 117/16" 1 5/8" 5/8"5/8" 1 5/8" 23/4" P1 P1 1/4" 3 SIDES DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:40PM B22 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16"Ø BILL OF MATERIALS - B22 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B22 1 W12X14 13'-10 13/16" 6 3/4"Ø T.C.B 0'-1 1/2" A325 P1 6 PL3/8 x 3 1/2 0'-11 3/8" SECTION "A" NO. DATE DESCRIPTION
  • 25. 1 1/2"1 1/2" 3' - 8 5/16" 3"3"3" 3"3"3" W12X14 6 - BEAM - B23 3' - 6 13/16" 1 7/8" 3/4" 1 7/8" 3/4" T&B T&B DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:42PM B23 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B23 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B23 6 W12X14 3'-8 5/16" 36 3/4"Ø T.C.B 0'-1 1/2" A325 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 26. 3' - 8 1/4" 1 1/2" 3' - 6 3/4" 1 1/2" 3"3"3" 3"3"3" 1 7/8" 3/4" T&B W12X14 2 - BEAM - B24 DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:44PM B24 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B24 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B24 2 W12X14 3'-8 1/4" 12 3/4"Ø T.C.B 0'-1 1/2" A325 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION
  • 27. 1 7/8" 1' - 0 1/8" 2 5/16" 1 1/16" 60° 1' - 5 3/8" 1 3/4"1 1/2" 3/4" 1 7/8" 3"3"3" 3"3"3" ONE - BEAM - B25 W12X14 (AS SHOWN ) ONE - BEAM - B26 (OPP HAND) 1' - 3 5/8" DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:46PM B25&B26 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B25 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B25 1 W12X14 1'-5 3/8" 6 3/4"Ø T.C.B 0'-1 1/2" A325 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION BILL OF MATERIALS - B26 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B26 1 W12X14 1'-5 3/8" 6 3/4"Ø T.C.B 0'-1 1/2" A325 (OPP HAND) (AS SHOWN)
  • 28. 1 1/16" 2 5/16" 1 1/16" 1' - 2 3/8" 60° 1 1/2"1 3/4" 3/4" 1 7/8" 3"3"3" 3"3"3" 1' - 5 3/8" ONE - BEAM - B27 W12X14 3/4" T&B (AS SHOWN ) ONE - BEAM - B28 (OPP HAND) 1' - 3 7/8" DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:47PM B27&B28 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø BILL OF MATERIALS - B27 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B27 1 W12X14 1'-5 3/8" 6 3/4"Ø T.C.B 0'-1 1/2" A325 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION BILL OF MATERIALS - B28 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B28 1 W12X14 1'-5 3/8" 6 3/4"Ø T.C.B 0'-1 1/2" A325 (OPP HAND) (AS SHOWN)
  • 29. 2 9/16"7' - 6 7/16"2" 7' - 8 7/16" P1 P1 P3 P3 7' - 8 7/16" 7' - 11" 2" 7' - 6 7/16" 2 9/16" (NS) P1 (NS) P1 ONE - BEAM - B29 W12X14 TYP. (FS) P3 (FS) P3 "A" 23/4" 3"3"3" 1 5/8" 5/8" 2" 1 1/2" 3 1/2" 2" 113/8" P1 ? 3/16" 3 SIDES 3/16" 3 SIDES T&B DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:49PM B29 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION BILL OF MATERIALS - B29 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B29 1 W12X14 7'-11" P1 2 PL3/8 x 3 1/2 0'-11 3/8" P3 2 PL 3/8 x 2 0'-11 3/8" SECTION "A"
  • 30. 7' - 11" ONE - BEAM - B30 W12X14 (FS) P1 (FS) P1 "A" (NS) P3 (NS) P3 TYP. 2 1/2"7' - 6 7/16"2 1/16" 7' - 8 1/2" P1P1 P3 P3 1 1/2" 2" 23/4" 3"3"3"211/16" 117/16" 3 1/2" 11/16" 1 5/8" P1 3/16" 3 SIDES T&B DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:51PM B30 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION SECTION "A" BILL OF MATERIALS - B30 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B30 1 W12X14 7'-11" P1 2 PL3/8 x 3 1/2 0'-11 3/8" P3 2 PL 3/8 x 2 0'-11 3/8"
  • 31. 3 3/4" 2 5/16" 17/16" 33/16"3"3" 3 1/2" 115/16" 115/16"3"3" 3/8"19/16" 3 3/4" 9' - 10 1/2" 9' - 4 13/16" 1 1/2 1 1/2 W12X14 ONE - BEAM - B31 3" / 12" 1' - 0" 3" 3 9/16" 9' - 1 15/16" 2 5/8" 2 3/8" 3 1/2" 9' - 0 3/4" 3 7/8" ONE - BEAM - B32 3/4" DESCRIPTION PROJECT CONTRACTOR CHK BYDRAWN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (619) 662-1132TYP. HOLE SIZEFINISH 1. ALL MATERIAL IS A36 U.N.O. 2. ALL HSS A500 GR "B" 3. ALL PIPE A53 4. ALL WF BEAMS A992 GR 50 5. GRIND ALL WELDS TO SMOOTH ELECTRODE E70XX SHOP NOTES JOB NUMBER WMCONSULTINGSERVICE|WWW.WMEDRANO.COM|760.429.8180 WM SC 2/22/20174:54:52PM B31&B32 BEAM STADIUM PARK 2/3/2017 9449 FRIARS ROAD SAN DIEGO, CA 92108 GALVANIZED 13/16Ø NO. DATE DESCRIPTION 1 2/12/17 FOR FABRICATION BILL OF MATERIALS - B31 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B31 1 W12X14 9'-10 1/2" 6 3/4"Ø T.C.B 0'-1 1/2" A325 BILL OF MATERIALS - B32 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS B32 1 W12X14 9'-10 1/2" 6 3/4"Ø T.C.B 0'-1 1/2" A325
  • 32. 13/4"1/2"13/4" 6" SLOT 13/4"1/2"13/4" 6" "A" 10'-8 5/16" 2" 2" 3 - BRACE - BR1 HSS4X4X3/8 4" 4" 2 9/16" 6' - 3 5/8" 2 1/2" 31/8"7'-95/8"31/8" 13/4"1/2"13/4" 6" 6" 13/4"1/2"13/4" SLOT SLOT "B" 10'-8 5/16" HSS4X4X3/8 3 - BRACE - BR2 4" 4" 2" 2" 2 1/2" 6' - 3 5/8" 2 1/2" 6' - 3 5/8" 31/8"7'-95/8"31/8" ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:03:41PM BR1&BR2 BEAM STADIUM PARK 2/3/2017 Author Checker 9449 FRIARS ROAD SAN DIEGO, CA 92108 BILL OF MATERIALS - BR1 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS BR1 3 HSS4X4X3/8 10'-8 5/16" BRACE 6 3/4"Ø T.C.B 0'-5 1/4" A325 SECTION "A" NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION BILL OF MATERIALS - BR2 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS BR2 3 HSS4X4X3/8 10'-8 5/16" BRACE 6 3/4"Ø T.C.B 0'-5 1/4" A325 SECTION "B" GALVANIZEDTYPICAL HL 13/16"Ø
  • 33. BPL1BPL1 1' - 6" 91/8"7" (4 REQ'D) d (3 REQ'D) 40° TYP. LD01 2 31/8"45/8"1'-91/2" 1' - 1 3/4" 1' - 1 3/4" r2 c b 1'-11/2" 1/2" 1' - 6" 1/2" 40° TYP. 7"7"91/8" d (4 REQ'D) LD01 1 f2 f1 f3 f2 f1 r1 1' - 1 3/4" 1' - 1 3/4" 31/8"45/8"1'-1"1'-13/4" b 1'-11/2" "B""A" 3' - 6 3/8"10 1/8" 29 SPA'S @ 11 7/8 = 28' - 8 3/8" TYP. 11 7/8" 29' - 7 5/16" 3" 3' - 2 9/16" 3"1'-7"3" 3" 3' - 2 9/16" 1'-6" 1" k k 3/4"11/4" 1" 3" 2" (6 REQ'D) (3 REQ'D) EL. 4 1/2" EL. 30' - 0" BPL1 BPL1 BPL1 BPL1f2 f1 f3 f1 f2 aR aL b (30 REQ'D) r1 r2 c 45° 45° 33' - 0 7/8" 3' - 8 7/8"22' - 1"7' - 3" 20' - 1 1/2"1' - 11 1/2" 1" EL. 4 1/2" EL. 33' - 6 3/8" 2'-51/4" 2'-101/2" 11/2"11/2" ONE - LADDER - L01 d d BPL1 BPL1 g h ? k 1"1" 4' - 0 5/16"10' - 0"19' - 0 9/16" 3" 33/4" 3" 3' - 6 3/8"1" 1" 1"1" 1/4" TYP. aR "Ø HLS 1/2" 3"3' - 9"3"3' - 9"3"3' - 9"3"3' - 9"3"3' - 9"1 1/2" r2 r2 r2 r2 r2 r1 95/8" 3 1/2" 60° 1/4" 1/4" 1/4" 1/4" 1' - 6 1/2" 11/2"11/2" ON 13/16"Ø TYP. ARCH ENG DESCRIPTION PROJECT CONTRACTOR JOB NO. CHK BY DRAN BY DATE SHEET NO. REVISIONS 1616 PRECISION PARK LANE SUITE C SAN DIEGO, CA 92173 LIC #975206 PHONE: (619) 662-1031 FAX: (858) 662-1132 BOOTH AND SUAREZ WMCONSULTINGSERVICE,LLC|WMEDRANO.COM|WUIL@WMEDRANO.COM2/22/20175:04:39PM LD01 Cage Ladder STADIUM PARK 2/3/2017 WM SC 9449 FRIARS ROAD SAN DIEGO, CA 92108 NO. Revision Date DESCRIPTION 1 2/12/17 FOR FABRICATION SECTION "B"SECTION "A" BILL OF MATERIALS - L01 SHIP MARK DETAIL MARK QTY DESCRIPTION LENGTH REMARKS L01 1 LADDER f3 1 PL 1/4 x 2 2'-5" f2 2 PL 1/4 x 2 2'-1 3/4" f1 2 PL 1/4 x 2 2'-4 1/4" k 2 L4 x 2 x 1/2 0'-2" 2 3/8"Ø HILTI KB-TZ 0'-3 1/4" aL 1 PL 1/2 x 3 33'-4 3/4" aR 1 PL 1/2 x 3 33'-4 3/4" b 30 3/4" Ø RB 1'-6 1/2" BPL1 4 BT PL3/8 x 2 1'-0 3/4" c 3 PL 1/4 x 2 20'-1 1/2" d 4 PL 1/4 x 2 22'-1" g 2 PL 1/2 x 3 0'-3 3/4" h 2 PL 1/2 x 3 3'-6 3/8" r1 1 RING PL 1/4 x 2 7'-4 3/8" LOWER BAND r2 6 RING PL 1/4 x 2 6'-9 3/8" TOP BAND PLATE DETETAIL - BPL1 LADDER DETAIL #1