Reproductive & Child Health
         Program


State Institute of Health & Family Welfare,
                   Jaipur
What is RCH….?
• Reproductive & Child Health program is a model
  developed through experiments in paradigm shifts,
          Clinic approach
          Extension & Education
          “Cafeteria”/ “Targets”
          “Comprehensive” service delivery approach
          Primary health care (1983)
          Targeted interventions-Target couples & EC
          TFA (1996)
          Quality services & Policy reforms
          CNAA(1997-98)
          Capacity enhancement,                    2
              SIHFW: an ISO 9001: 2008 certified Institution
Chronological Events
•   NFPP-1951
•   NFWP-1977
•   Alma Ata-1978
•   EPI-1978
•   NHP-1983
•   UIP-1985 (unified approach and micro
    planning)
•   CSSM-1992 (the 1st program officially
    launched by President of India)
•   ICPD-1994
•   RCH-I (1997, October)
•   RCH-II (2005-06 -2009-10)                           3
       SIHFW: an ISO 9001: 2008 certified Institution
Why RCH………?
• Unified approach
• Convergence for integration
• Performance in relation to Goals &
  Timeframe
• Shuffling priorities-Paradigm shift
• Fertility regulation & Replacement goals
• High Unmet needs
• High Morbidity/Mortality in women &
  children

       SIHFW: an ISO 9001: 2008 certified Institution   4
Objectives of RCH
• Reduction in Birth Rate & Empowering
  women

• Integration of related programs for
  meaningful

• Meeting unmet needs through institutional
  strengthening & Quality of Care routed by-
      • Choice of methods
      • Information provided to clients
          SIHFW: an ISO 9001: 2008 certified Institution   5
• Technical competence of providers
• Interpersonal relationship between Clients
  & service providers
• Mechanism to ensure continuity of Care
• Constellation of services appropriate to
  need of users



          SIHFW: an ISO 9001: 2008 certified Institution   6
Components of RCH 1
• Family Planning
• Child Survival & Safe Motherhood
• Client approach to health care
• Prevention/Management of RTI/STD/AIDS
• Adolescent Reproductive Health
• Modified Management Information Sub-
  System
• IEC & Counseling
• Community Needs Assessment Approach
  (CNAA)
      SIHFW: an ISO 9001: 2008 certified Institution   7
• High Quality training at all levels
• District sub projects under Local
  Capacity Enhancement
• Enhanced community participation
  through Panchayats, Women groups &
  NGOs
• Implementation of Target free approach
• Referral System



      SIHFW: an ISO 9001: 2008 certified Institution   8
Activities
Universal interventions without any
  differentiation
• CS & SM interventions
• Operationalization of CNAA
• Institutional development
• Modified Management Information sub-
  system
• IEC & Counseling
• Urban & Tribal area RCH package
• District sub-projects for capacity
  enhancement 2008 certified Institution
         SIHFW: an ISO 9001:               9
Differential Strategy based on

 Crude Birth Rate & Female Literacy Rate
      • Category-A (Low CBR, High
        Literacy) (58)
      • Category-B (Moderate CBR,
        Moderate literacy) (184)
      • Category-C (High CBR, Low literacy)
        (265)



        SIHFW: an ISO 9001: 2008 certified Institution   10
Additional Activities in selected
            districts
     • Screening & Treatment of RTI/STI in-
       • 3 FRUs - “A” Category (FRU=First
         Referral Unit)
       • 2 FRUs - “B”
       • 1 FRU of “C”
     • Emergency Obstetric Care –
       • 2 FRUs of “B” Category
       • 3 FRUs of “C”

         SIHFW: an ISO 9001: 2008 certified Institution   11
• Essential Obstetric. Care-
      • Drugs & PHCs in “B” & “C” category
      • Contractual PHN/Staff nurse in “C”
        category
• Additional HWF in – 30% S/C of “C” of 8
  States
• Contractual PHNs/Staff Nurse
• Referral Transport facility- 25%S/C of “C”
  Districts of all States


        SIHFW: an ISO 9001: 2008 certified Institution   12
• Service strengthening-inputs for-
      • Mobility,
      • Supervision,
      • Micro-planning (50 Districts in 8
        States)
• Dai training-142 Districts with < 30% safe
  delivery
• RCH Camps in remote/under-utilized PHCs
• Border Cluster project-46 Districts in 16
  States to have addl. Inputs

            SIHFW: an ISO 9001: 2008 certified Institution   13
Child Survival Activities
• Care of New borne                     • Diarrhea-ORT & ARI
   • Eye, Cord, Bath &                     • Standard case
     Feed                                    definition &
   • Special care &                          management
     Referral conditions                • Support Activities-
• Immunization                             • Cold chain
• Vitamin-A (9 dose                        • Supplies
  prophylaxis)                             • Surveillance


             SIHFW: an ISO 9001: 2008 certified Institution   14
Safe Motherhood Interventions
    • Essential Obstetric care-
       • Early registration of pregnancy (12-
         16 weeks)
       • ANC (3 visits)
       • TT (2 or Booster)
       • IFA (100 Tab.)
       • Delivery by Trained/Skilled Birth
         attendants observing 5Cs
       • Referral for emergencies-conditions,
         time-frame & place
             SIHFW: an ISO 9001: 2008 certified Institution   15
• PNC (3 visits)
   • Spacing 3 yrs
   • STI/RTI Management
   • Adolescent Reproductive health-
   • Counseling/IEC based on Life
     cycle approach
• Emergency Obstetric care
• Strengthening Referrals
• Training of TBA/SBA

     SIHFW: an ISO 9001: 2008 certified Institution
                                                      16
CNAA
The Committee on Population in National
Development Council (NDC) in 1993
Recommended-
• Decentralized area specific planning
  based on Local Needs
• Creation of a District level Data base on:
       Quality,
       Coverage,
• Impact indicators; for monitoring &
  Evaluation.
    SIHFW: an ISO 9001: 2008 certified Institution   17
Purpose & Key Issues of CNAA
   Purpose                                     Key issues
• Setting Priorities                   • Micro-planning
• Identify Target and                  • Community
  High Risk groups                       involvement
• Estimation of Service                • Client’s perspective
  needs and matching                   • Quality of Care
  it with Resources
• Develop a realistic
  action Plan

             SIHFW: an ISO 9001: 2008 certified Institution   18
Process of CNAA

Focus on Participatory Planning based
  on:
• Felt Needs
• Actual workload assessment
• Assess Capacity of Providers
• Involve people for better Utilization
• “Speak” to People, “Get through”
  Records and “Take up” surveys


     SIHFW: an ISO 9001: 2008 certified Institution   19
• Develop teams involving local people
• Organize meetings for decision on service
  delivery
• Evaluate need for each Health & Family
  Welfare service-Share it with people
• Develop an Action Plan
   • Sub-Center Action plan
   • PHC Action plan
   • CHC Action plan
   • District Action plan: Consolidation
   • State Action plan: Compilation
         SIHFW: an ISO 9001: 2008 certified Institution   20
Initiatives after National Population
             Policy 2000
        •   RCH Camps
        •   RCH Out Reach Schemes
        •   Home based Neonatal Care
        •   Border District Cluster Strategy
        •   Hepatitis B Vaccination Project
        •   Training of Dais
        •   Empowered Action Group
        •   District Surveys

              SIHFW: an ISO 9001: 2008 certified Institution   21
Lessons from RCH-I
• “One size fits all” approach does not work
• State/District level requirements not
  accounted
• Adequate program mgt. skills missing
• Planning, monitoring, budgeting and resource
  allocation did not match program objectives
• Frequent turnover
• Result/outcome orientation missing
• Human Resource planning neglected
• Financial/accounting/disbursement and
  utilization bottlenecks certified Institution
              SIHFW: an ISO 9001: 2008          22
•   Generic BCC
•   Focused and thematic approach missing
•   Low utilization of public health facilities
•   Complaints against insensitive providers
•   Hidden cost incurred by users
•   Limited choices for clients
•   No convergence between related sectors
•   Fragmented approach
•   Duplication
•   Loss of opportunities to achieve
    effectiveness
          SIHFW: an ISO 9001: 2008 certified Institution   23
RCH Phase II

  Major Focus on……

• Reducing Maternal & Child Mortality
  and Morbidity

• Emphasis on Rural Health Care




   SIHFW: an ISO 9001: 2008 certified Institution   24
Key Issues

• Flexibility: States’ needs and capacities
• Strengthening management capacity
• Integrated Behavior Change
  Communication (BCC) strategies
• Improved client responsiveness to
  public health facilities
• Convergence with other critical sectors



     SIHFW: an ISO 9001: 2008 certified Institution   25
Activities under RCH-II
    1. Strengthening Project Management
                      Structure
•   Re-organizing of Medical Directorate.
•   Renovation of Medical Directorate and
    NRHM/RCH-II cell.
•   Setting up, of the PMU at state & district
    levels.
•   Induction of newly appointed professionals
•   Support for communication, equipments and
    mobility to DPMUs.
           SIHFW: an ISO 9001: 2008 certified Institution   26
2. Strengthening Infrastructure
•   Upgrading of PHCs as BEmOcs.
•   Provision of blood storage at 26 identified
    CEmOcs
•   Support for equipment and labor tables at
    25% PHCs.(10000.00 Rs. Per Institution)
•   Support for minor repair and renovation of
    public facilities at 50% PHCs. (25000.00 Rs.
    Per Institution)
•   Facility survey of all PHC and CHCs.

           SIHFW: an ISO 9001: 2008 certified Institution   27
3. HRD and capacity building
•   Development of annual training calendar.
•   Strengthening of ANMTCs.
•   Support medical colleges for Anesthesia
    trainings.
•   Library at SIHFW & Medical Directorate.
•   Orientation of AYUSH Doctors on National
    Programs.


         SIHFW: an ISO 9001: 2008 certified Institution   28
4. Improving quality of care and
           Strengthening Referral System
•   Study on referral system by RHSDP
•   7 days Mobility support to PHC MOs
•   Installation of new telephone connection at
    all PHC/CHCs.
•   Work shops for developing standards and
    protocols for quality of care.


              SIHFW: an ISO 9001: 2008 certified Institution   29
5. Strengthening and improvement of
        logistics and supply systems
• Feasibility study to setting up of the drugs
  and logistics warehousing
• Support for the repair of workshop for cold
  chain equipment
• Support for hiring 12 new refrigerators




      SIHFW: an ISO 9001: 2008 certified Institution   30
6. Strengthening HMIS, M&E
• Support for CNAA format, ECS has been
  provided from state level.
• Integration of RCH-II/NRHM reporting
  format in existing HMIS software.
• Baseline and concurrent evaluation.




     SIHFW: an ISO 9001: 2008 certified Institution   31
7. BCC for increasing demand for RCH and
             contraceptive services
• Intensive IEC for RCH-II and NRHM
  interventions.
• Provision for hiring of IEC van in all
  districts.
• Implementation of Integrated Media Plan.
• IEC for “Panchamrit program” done by
  printing of booklet, Banners, cards.


      SIHFW: an ISO 9001: 2008 certified Institution   32
8. Specific Interventions

    Maternal Health
•   RCH camps target
•   Dai training target
•   Night delivery facility at all PHCs and CHCs.
•   Hiring of contractual staff (PHN & LT)
•   Provision of 1321 additional ANMS at 10
    desert and tribal districts.
•   STD/RTI drugs for PHCs
•   Janani Suraksha Yojna

          SIHFW: an ISO 9001: 2008 certified Institution   33
Child Health                           Family Planning
• IMNCI launched in 9                  • Improving quality of fix
  districts.                             camps.
• Mal nutrition corner at              • Compensation scheme
  all 237 blocks.                        for sterilization.
• Purchase of ORS                      • Blood donation camps.
  packets.                             • NSV mega camps
                                       • AFHS Training



                SIHFW: an ISO 9001: 2008 certified Institution   34
9. Strengthening Networking and
         Partnership with the civil society
•   Collaboration with IMA & FOGSI
•   Accreditation of Private nursing home for
    JSY.
•   MNGO scheme in all districts.
•   Annual consultation with stakeholders on
    NRHM.
•   Social marketing of contraceptives and other
    health services.
         SIHFW: an ISO 9001: 2008 certified Institution   35
10. Innovative schemes and pilot
                      projects
•   Pilot Project on Population stabilization
    initiated at Jhalawar & Tonk.
•   PARINCHE project for five districts.
•   Help line at medical directorate for
    improving communication
•   Campaign on Age at Marriage.
•   Medical Mobile unit for all districts.
•   VCTC at 16 CHCs.
        SIHFW: an ISO 9001: 2008 certified Institution   36
11. Improving and strengthening RCH
         Services in Tribal population

• Six districts, namely, Baran, Banswara,
  Chittorgarh Dungarpur, Sirohi and Udaipur

• Process for developing PIP for six urban
  districts is under process.


         SIHFW: an ISO 9001: 2008 certified Institution   37
12. Establishing and strengthening RCH
           services in Urban Area

• Urban slum population in Jaipur, Jodhpur,
  Kota, Bikaner, Pali, Udaipur, Ganganagar,
  Hanumangarh, Bhilwara and Tonk

• PIP for 8 urban slums is under process.


           SIHFW: an ISO 9001: 2008 certified Institution   38
Goals of RCH II
Indicator   X Plan Goals           RCH –II               NPP 2000           MDG
             (2002-07)         Goals(2005-                (By 2010)
                                       10)

  IMR           <45                    <30                    <30             -
                                                                         Reduce by 2/3
U-5 MR           -                       -                         -   from 1990 levels

                                                                       Reduce by ¾ by
 MMR            200                   <100                   <100          2015


  TFR           2.3                    2.1                     2.1            -


                                                                                    39
                  SIHFW: an ISO 9001: 2008 certified Institution
Goals for Rajasthan

          Outcomes                              Goal of Rajasthan up to 2011-12


  Infant Mortality Rate (IMR)                                      32


Maternal Mortality Ratio (MMR)                                     148


   Total Fertility Rate (TFR)                                      2.1


   Crude Birth Rate (CBR)                                          21


  Crude Death Rate (CDR)                                           7


                  SIHFW: an ISO 9001: 2008 certified Institution              40
Performance Indicators for RCH
         [Ante Natal]
• Number of Ante Natal cases registration
• Number of Pregnant women who
      • Had 3 ANCs
      • Had 2 doses of TT
• Were Under prophylaxis & treatment of anemia
• Number of high risk pregnant referred
• Number of deliveries by trained & Untrained
  birth attendants
• Number of cases with complications referred to
  PHC/FRU                                     41
           SIHFW: an ISO 9001: 2008 certified Institution
Performance Indicators
    (Post natal & New born)

• Number of New born with Birth weight
  recorded
• Number of woman given 3 post natal check
  ups
• Number of Fully Immunized children
• Number of Adverse reactions reported after
  Immunization
• Number of cases motivated & followed up for
  contraception
                                                           42
          SIHFW: an ISO 9001: 2008 certified Institution
Institutional Deliveries
                      (Source: DLHS 2 &3)

                       Institutional Delivery%

50                          45.5
45                                                                    47
40                                              40.9
35          30.3
 30
 25
 20
 15
  10
   5
   0

       2002-04[Raj]
                      2007-08[Raj]
                                         2002-04[Ind]
                                                                 2007-08[Ind]

                SIHFW: an ISO 9001: 2008 certified Institution                  43
Ante natal cases Registration
                                   (Source :DLHS 2 & 3)

             80                                                               73.6
                                                                                            75.3
             70           67.3

             60
                                                    56.6
             50
Axis Title




             40
             30
             20
             10
             0
                   2002-04[Raj]         2007-08[Raj]               2002-04[Ind]      2007-08[Ind]

                                                                                                    44
                                 SIHFW: an ISO 9001: 2008 certified Institution
Number of Pregnant in relation to
ANC                (Source: DLHS 2 & 3)

90

80                                                   80.2
                                                                             73.5
70
                                                                                     Status of 3 or
60          61.4        55
                                                                            51       more ANCs %
                             53.5                   50.4
50
                                                                             46.8    At least 1 TT
                                                                                     Vaccination
40
            28.8
30                                                                                   Mothers who
                             28.2
                                                                                     consumed
20                                                   20.5                            100 IFA
                                                                                     tablets
10
            7.4
0
     2002-04[Raj]   2007-08[Raj]           2002-04[Ind]               2007-08[Ind]

                     SIHFW: an ISO 9001: 2008 certified Institution                             45
Status of Full Immunization of children aged 12-23 months


  2007-08[Ind]
                                                                                54.1


   2002-04[Ind]
                                                                       45.9


   2007-08[Raj]
                                                                         48.8


   2002-04[Raj]                             23.9


                  0
                       10
                                   20
                                                30
                                                             40
                                                                        50
                                                                                  60

(Source: DLHS 2 & 3)
                                                                                       46
                      SIHFW: an ISO 9001: 2008 certified Institution
Status of Recording of Birth Weight
                                                         (Source :NFHS 3)
               New Born whose birth weight was recorded



 40
                                                                       34.1
 30                   20.9
  20

  10

      0

          NFHS 3 [2005-06] Raj

                                                        NFHS 3 [2005-06] Ind




                                                                               47
                      SIHFW: an ISO 9001: 2008 certified Institution
Status of 3 Post natal check ups
(Source DLHS 3)

        Mother who received postnatal care within 2 weeks of
                             delivery



   60                                                        50.8
   50              38.2
   40

   30

   20

   10

    0
             2007-08[Raj]                            2007-08[Ind]

                   SIHFW: an ISO 9001: 2008 certified Institution   48
Thank You

For more details log on to
www. sihfwrajasthan.com
             or
 contact : Director-SIHFW
            on

  sihfwraj@yahoo.co.in

RCH

  • 1.
    Reproductive & ChildHealth Program State Institute of Health & Family Welfare, Jaipur
  • 2.
    What is RCH….? •Reproductive & Child Health program is a model developed through experiments in paradigm shifts, Clinic approach Extension & Education “Cafeteria”/ “Targets” “Comprehensive” service delivery approach Primary health care (1983) Targeted interventions-Target couples & EC TFA (1996) Quality services & Policy reforms CNAA(1997-98) Capacity enhancement, 2 SIHFW: an ISO 9001: 2008 certified Institution
  • 3.
    Chronological Events • NFPP-1951 • NFWP-1977 • Alma Ata-1978 • EPI-1978 • NHP-1983 • UIP-1985 (unified approach and micro planning) • CSSM-1992 (the 1st program officially launched by President of India) • ICPD-1994 • RCH-I (1997, October) • RCH-II (2005-06 -2009-10) 3 SIHFW: an ISO 9001: 2008 certified Institution
  • 4.
    Why RCH………? • Unifiedapproach • Convergence for integration • Performance in relation to Goals & Timeframe • Shuffling priorities-Paradigm shift • Fertility regulation & Replacement goals • High Unmet needs • High Morbidity/Mortality in women & children SIHFW: an ISO 9001: 2008 certified Institution 4
  • 5.
    Objectives of RCH •Reduction in Birth Rate & Empowering women • Integration of related programs for meaningful • Meeting unmet needs through institutional strengthening & Quality of Care routed by- • Choice of methods • Information provided to clients SIHFW: an ISO 9001: 2008 certified Institution 5
  • 6.
    • Technical competenceof providers • Interpersonal relationship between Clients & service providers • Mechanism to ensure continuity of Care • Constellation of services appropriate to need of users SIHFW: an ISO 9001: 2008 certified Institution 6
  • 7.
    Components of RCH1 • Family Planning • Child Survival & Safe Motherhood • Client approach to health care • Prevention/Management of RTI/STD/AIDS • Adolescent Reproductive Health • Modified Management Information Sub- System • IEC & Counseling • Community Needs Assessment Approach (CNAA) SIHFW: an ISO 9001: 2008 certified Institution 7
  • 8.
    • High Qualitytraining at all levels • District sub projects under Local Capacity Enhancement • Enhanced community participation through Panchayats, Women groups & NGOs • Implementation of Target free approach • Referral System SIHFW: an ISO 9001: 2008 certified Institution 8
  • 9.
    Activities Universal interventions withoutany differentiation • CS & SM interventions • Operationalization of CNAA • Institutional development • Modified Management Information sub- system • IEC & Counseling • Urban & Tribal area RCH package • District sub-projects for capacity enhancement 2008 certified Institution SIHFW: an ISO 9001: 9
  • 10.
    Differential Strategy basedon Crude Birth Rate & Female Literacy Rate • Category-A (Low CBR, High Literacy) (58) • Category-B (Moderate CBR, Moderate literacy) (184) • Category-C (High CBR, Low literacy) (265) SIHFW: an ISO 9001: 2008 certified Institution 10
  • 11.
    Additional Activities inselected districts • Screening & Treatment of RTI/STI in- • 3 FRUs - “A” Category (FRU=First Referral Unit) • 2 FRUs - “B” • 1 FRU of “C” • Emergency Obstetric Care – • 2 FRUs of “B” Category • 3 FRUs of “C” SIHFW: an ISO 9001: 2008 certified Institution 11
  • 12.
    • Essential Obstetric.Care- • Drugs & PHCs in “B” & “C” category • Contractual PHN/Staff nurse in “C” category • Additional HWF in – 30% S/C of “C” of 8 States • Contractual PHNs/Staff Nurse • Referral Transport facility- 25%S/C of “C” Districts of all States SIHFW: an ISO 9001: 2008 certified Institution 12
  • 13.
    • Service strengthening-inputsfor- • Mobility, • Supervision, • Micro-planning (50 Districts in 8 States) • Dai training-142 Districts with < 30% safe delivery • RCH Camps in remote/under-utilized PHCs • Border Cluster project-46 Districts in 16 States to have addl. Inputs SIHFW: an ISO 9001: 2008 certified Institution 13
  • 14.
    Child Survival Activities •Care of New borne • Diarrhea-ORT & ARI • Eye, Cord, Bath & • Standard case Feed definition & • Special care & management Referral conditions • Support Activities- • Immunization • Cold chain • Vitamin-A (9 dose • Supplies prophylaxis) • Surveillance SIHFW: an ISO 9001: 2008 certified Institution 14
  • 15.
    Safe Motherhood Interventions • Essential Obstetric care- • Early registration of pregnancy (12- 16 weeks) • ANC (3 visits) • TT (2 or Booster) • IFA (100 Tab.) • Delivery by Trained/Skilled Birth attendants observing 5Cs • Referral for emergencies-conditions, time-frame & place SIHFW: an ISO 9001: 2008 certified Institution 15
  • 16.
    • PNC (3visits) • Spacing 3 yrs • STI/RTI Management • Adolescent Reproductive health- • Counseling/IEC based on Life cycle approach • Emergency Obstetric care • Strengthening Referrals • Training of TBA/SBA SIHFW: an ISO 9001: 2008 certified Institution 16
  • 17.
    CNAA The Committee onPopulation in National Development Council (NDC) in 1993 Recommended- • Decentralized area specific planning based on Local Needs • Creation of a District level Data base on: Quality, Coverage, • Impact indicators; for monitoring & Evaluation. SIHFW: an ISO 9001: 2008 certified Institution 17
  • 18.
    Purpose & KeyIssues of CNAA Purpose Key issues • Setting Priorities • Micro-planning • Identify Target and • Community High Risk groups involvement • Estimation of Service • Client’s perspective needs and matching • Quality of Care it with Resources • Develop a realistic action Plan SIHFW: an ISO 9001: 2008 certified Institution 18
  • 19.
    Process of CNAA Focuson Participatory Planning based on: • Felt Needs • Actual workload assessment • Assess Capacity of Providers • Involve people for better Utilization • “Speak” to People, “Get through” Records and “Take up” surveys SIHFW: an ISO 9001: 2008 certified Institution 19
  • 20.
    • Develop teamsinvolving local people • Organize meetings for decision on service delivery • Evaluate need for each Health & Family Welfare service-Share it with people • Develop an Action Plan • Sub-Center Action plan • PHC Action plan • CHC Action plan • District Action plan: Consolidation • State Action plan: Compilation SIHFW: an ISO 9001: 2008 certified Institution 20
  • 21.
    Initiatives after NationalPopulation Policy 2000 • RCH Camps • RCH Out Reach Schemes • Home based Neonatal Care • Border District Cluster Strategy • Hepatitis B Vaccination Project • Training of Dais • Empowered Action Group • District Surveys SIHFW: an ISO 9001: 2008 certified Institution 21
  • 22.
    Lessons from RCH-I •“One size fits all” approach does not work • State/District level requirements not accounted • Adequate program mgt. skills missing • Planning, monitoring, budgeting and resource allocation did not match program objectives • Frequent turnover • Result/outcome orientation missing • Human Resource planning neglected • Financial/accounting/disbursement and utilization bottlenecks certified Institution SIHFW: an ISO 9001: 2008 22
  • 23.
    Generic BCC • Focused and thematic approach missing • Low utilization of public health facilities • Complaints against insensitive providers • Hidden cost incurred by users • Limited choices for clients • No convergence between related sectors • Fragmented approach • Duplication • Loss of opportunities to achieve effectiveness SIHFW: an ISO 9001: 2008 certified Institution 23
  • 24.
    RCH Phase II Major Focus on…… • Reducing Maternal & Child Mortality and Morbidity • Emphasis on Rural Health Care SIHFW: an ISO 9001: 2008 certified Institution 24
  • 25.
    Key Issues • Flexibility:States’ needs and capacities • Strengthening management capacity • Integrated Behavior Change Communication (BCC) strategies • Improved client responsiveness to public health facilities • Convergence with other critical sectors SIHFW: an ISO 9001: 2008 certified Institution 25
  • 26.
    Activities under RCH-II 1. Strengthening Project Management Structure • Re-organizing of Medical Directorate. • Renovation of Medical Directorate and NRHM/RCH-II cell. • Setting up, of the PMU at state & district levels. • Induction of newly appointed professionals • Support for communication, equipments and mobility to DPMUs. SIHFW: an ISO 9001: 2008 certified Institution 26
  • 27.
    2. Strengthening Infrastructure • Upgrading of PHCs as BEmOcs. • Provision of blood storage at 26 identified CEmOcs • Support for equipment and labor tables at 25% PHCs.(10000.00 Rs. Per Institution) • Support for minor repair and renovation of public facilities at 50% PHCs. (25000.00 Rs. Per Institution) • Facility survey of all PHC and CHCs. SIHFW: an ISO 9001: 2008 certified Institution 27
  • 28.
    3. HRD andcapacity building • Development of annual training calendar. • Strengthening of ANMTCs. • Support medical colleges for Anesthesia trainings. • Library at SIHFW & Medical Directorate. • Orientation of AYUSH Doctors on National Programs. SIHFW: an ISO 9001: 2008 certified Institution 28
  • 29.
    4. Improving qualityof care and Strengthening Referral System • Study on referral system by RHSDP • 7 days Mobility support to PHC MOs • Installation of new telephone connection at all PHC/CHCs. • Work shops for developing standards and protocols for quality of care. SIHFW: an ISO 9001: 2008 certified Institution 29
  • 30.
    5. Strengthening andimprovement of logistics and supply systems • Feasibility study to setting up of the drugs and logistics warehousing • Support for the repair of workshop for cold chain equipment • Support for hiring 12 new refrigerators SIHFW: an ISO 9001: 2008 certified Institution 30
  • 31.
    6. Strengthening HMIS,M&E • Support for CNAA format, ECS has been provided from state level. • Integration of RCH-II/NRHM reporting format in existing HMIS software. • Baseline and concurrent evaluation. SIHFW: an ISO 9001: 2008 certified Institution 31
  • 32.
    7. BCC forincreasing demand for RCH and contraceptive services • Intensive IEC for RCH-II and NRHM interventions. • Provision for hiring of IEC van in all districts. • Implementation of Integrated Media Plan. • IEC for “Panchamrit program” done by printing of booklet, Banners, cards. SIHFW: an ISO 9001: 2008 certified Institution 32
  • 33.
    8. Specific Interventions Maternal Health • RCH camps target • Dai training target • Night delivery facility at all PHCs and CHCs. • Hiring of contractual staff (PHN & LT) • Provision of 1321 additional ANMS at 10 desert and tribal districts. • STD/RTI drugs for PHCs • Janani Suraksha Yojna SIHFW: an ISO 9001: 2008 certified Institution 33
  • 34.
    Child Health Family Planning • IMNCI launched in 9 • Improving quality of fix districts. camps. • Mal nutrition corner at • Compensation scheme all 237 blocks. for sterilization. • Purchase of ORS • Blood donation camps. packets. • NSV mega camps • AFHS Training SIHFW: an ISO 9001: 2008 certified Institution 34
  • 35.
    9. Strengthening Networkingand Partnership with the civil society • Collaboration with IMA & FOGSI • Accreditation of Private nursing home for JSY. • MNGO scheme in all districts. • Annual consultation with stakeholders on NRHM. • Social marketing of contraceptives and other health services. SIHFW: an ISO 9001: 2008 certified Institution 35
  • 36.
    10. Innovative schemesand pilot projects • Pilot Project on Population stabilization initiated at Jhalawar & Tonk. • PARINCHE project for five districts. • Help line at medical directorate for improving communication • Campaign on Age at Marriage. • Medical Mobile unit for all districts. • VCTC at 16 CHCs. SIHFW: an ISO 9001: 2008 certified Institution 36
  • 37.
    11. Improving andstrengthening RCH Services in Tribal population • Six districts, namely, Baran, Banswara, Chittorgarh Dungarpur, Sirohi and Udaipur • Process for developing PIP for six urban districts is under process. SIHFW: an ISO 9001: 2008 certified Institution 37
  • 38.
    12. Establishing andstrengthening RCH services in Urban Area • Urban slum population in Jaipur, Jodhpur, Kota, Bikaner, Pali, Udaipur, Ganganagar, Hanumangarh, Bhilwara and Tonk • PIP for 8 urban slums is under process. SIHFW: an ISO 9001: 2008 certified Institution 38
  • 39.
    Goals of RCHII Indicator X Plan Goals RCH –II NPP 2000 MDG (2002-07) Goals(2005- (By 2010) 10) IMR <45 <30 <30 - Reduce by 2/3 U-5 MR - - - from 1990 levels Reduce by ¾ by MMR 200 <100 <100 2015 TFR 2.3 2.1 2.1 - 39 SIHFW: an ISO 9001: 2008 certified Institution
  • 40.
    Goals for Rajasthan Outcomes Goal of Rajasthan up to 2011-12 Infant Mortality Rate (IMR) 32 Maternal Mortality Ratio (MMR) 148 Total Fertility Rate (TFR) 2.1 Crude Birth Rate (CBR) 21 Crude Death Rate (CDR) 7 SIHFW: an ISO 9001: 2008 certified Institution 40
  • 41.
    Performance Indicators forRCH [Ante Natal] • Number of Ante Natal cases registration • Number of Pregnant women who • Had 3 ANCs • Had 2 doses of TT • Were Under prophylaxis & treatment of anemia • Number of high risk pregnant referred • Number of deliveries by trained & Untrained birth attendants • Number of cases with complications referred to PHC/FRU 41 SIHFW: an ISO 9001: 2008 certified Institution
  • 42.
    Performance Indicators (Post natal & New born) • Number of New born with Birth weight recorded • Number of woman given 3 post natal check ups • Number of Fully Immunized children • Number of Adverse reactions reported after Immunization • Number of cases motivated & followed up for contraception 42 SIHFW: an ISO 9001: 2008 certified Institution
  • 43.
    Institutional Deliveries (Source: DLHS 2 &3) Institutional Delivery% 50 45.5 45 47 40 40.9 35 30.3 30 25 20 15 10 5 0 2002-04[Raj] 2007-08[Raj] 2002-04[Ind] 2007-08[Ind] SIHFW: an ISO 9001: 2008 certified Institution 43
  • 44.
    Ante natal casesRegistration (Source :DLHS 2 & 3) 80 73.6 75.3 70 67.3 60 56.6 50 Axis Title 40 30 20 10 0 2002-04[Raj] 2007-08[Raj] 2002-04[Ind] 2007-08[Ind] 44 SIHFW: an ISO 9001: 2008 certified Institution
  • 45.
    Number of Pregnantin relation to ANC (Source: DLHS 2 & 3) 90 80 80.2 73.5 70 Status of 3 or 60 61.4 55 51 more ANCs % 53.5 50.4 50 46.8 At least 1 TT Vaccination 40 28.8 30 Mothers who 28.2 consumed 20 20.5 100 IFA tablets 10 7.4 0 2002-04[Raj] 2007-08[Raj] 2002-04[Ind] 2007-08[Ind] SIHFW: an ISO 9001: 2008 certified Institution 45
  • 46.
    Status of FullImmunization of children aged 12-23 months 2007-08[Ind] 54.1 2002-04[Ind] 45.9 2007-08[Raj] 48.8 2002-04[Raj] 23.9 0 10 20 30 40 50 60 (Source: DLHS 2 & 3) 46 SIHFW: an ISO 9001: 2008 certified Institution
  • 47.
    Status of Recordingof Birth Weight (Source :NFHS 3) New Born whose birth weight was recorded 40 34.1 30 20.9 20 10 0 NFHS 3 [2005-06] Raj NFHS 3 [2005-06] Ind 47 SIHFW: an ISO 9001: 2008 certified Institution
  • 48.
    Status of 3Post natal check ups (Source DLHS 3) Mother who received postnatal care within 2 weeks of delivery 60 50.8 50 38.2 40 30 20 10 0 2007-08[Raj] 2007-08[Ind] SIHFW: an ISO 9001: 2008 certified Institution 48
  • 49.
    Thank You For moredetails log on to www. sihfwrajasthan.com or contact : Director-SIHFW on sihfwraj@yahoo.co.in