Basic Quality Induction
for construction projects
www.QualityInConstruction.com
What are the main requirements for
our Project? (specs, design
drawings, regulations, other
documents)
www.QualityInConstruction.com
How do we make sure we comply
with the requirements?
www.QualityInConstruction.com
How can we actually find the
drawings, Method Statements and
Specs in our project ?
(basics of document control)
www.QualityInConstruction.com
What’s an ITP and why we need to
follow it?
What are the Hold, Witness or
Review Points on the ITPs?
www.QualityInConstruction.com
What happens when things go
wrong or not as required (not as per
drawings, specs, Method Statements
or else) ?
www.QualityInConstruction.com
What’s an NCR and how we can
actually report it…?
www.QualityInConstruction.com
Why we need to record the NCRs
and how can we make sure that they
won’t happen again ?
www.QualityInConstruction.com

Quality induction

  • 1.
    Basic Quality Induction forconstruction projects www.QualityInConstruction.com
  • 2.
    What are themain requirements for our Project? (specs, design drawings, regulations, other documents) www.QualityInConstruction.com
  • 3.
    How do wemake sure we comply with the requirements? www.QualityInConstruction.com
  • 4.
    How can weactually find the drawings, Method Statements and Specs in our project ? (basics of document control) www.QualityInConstruction.com
  • 5.
    What’s an ITPand why we need to follow it? What are the Hold, Witness or Review Points on the ITPs? www.QualityInConstruction.com
  • 6.
    What happens whenthings go wrong or not as required (not as per drawings, specs, Method Statements or else) ? www.QualityInConstruction.com
  • 7.
    What’s an NCRand how we can actually report it…? www.QualityInConstruction.com
  • 8.
    Why we needto record the NCRs and how can we make sure that they won’t happen again ? www.QualityInConstruction.com