Project Planning, Analysis and Control
with Lego
1
2
Give Your Brain a Hand
3
“The human mind is designed to work in three dimensions. When our hands are used, we engage an increased
portion of our minds. For the scientific community, this is a well-established fact – yet we tend to predominately use
two dimensional mediums like paper and visual presentations in business.”
Our course “ Project Planning, Analysis and Control with Lego” invites all participants to take an active role in the
process. The common language – the bricks – treats everyone as equals and allows all opinions and aspects to be
heard. Project planning and control is everyone’s responsibility and it takes the whole team to synergize in order to
meet each milestones on-time.
The entire strategy is dependent on Engineering and Procurement providing
their deliverables to meet Path of Construction.
And in this lesson we are showing you on the strategy, process and tools
needed to achieve the above goal.
4
If someone asks you a question …
… and you answer verbally, you activate your short & long term memory
(= +- 15% of your brain)
… and you start building with your hands,
80% of your brain is activated.
Darwin proved that.
Why Teaching Project with Lego
5
Traditional Training Planning with Lego
20% participation 100% participation
We breakaway from the traditional training.
It’s all about 100% collaboration.
Bricks in Project Planning Training
6
Lego in Project Planning is a technique where we use LEGO
bricks to follow through a series of structured exercises
during which we simulate a typical construction activities
and manage the activities with project management best
practise method.
Why using Lego ?
It helps you generate alternate solutions:
Design Thinking is about identifying and working within
given set of constraints to arrive at new and better
solutions. We will present a problem, Lego Project Planning
is a great way to generate new ideas, imagine alternate
solutions and implementation.
Bricks in Project Planning Training
7
Why using Lego ?
You construct, deconstruct and reconstruct:
Creative thinking requires the ability to break the existing
pattern to discover another.. Deconstructing helps to break
our preconception so we can see the same thing
from a whole new perspective or have the freedom to
change things by examining all parts, keeping some and
adding new ingredients.
Creativity involves breaking out of established
patterns in order to look at things in a different
way….. Edward De bono
Bricks in Project Planning Training
8
Why ?
It creates commitment and alignment :
Each models planned and built based on the understanding
from all participants in the group. That achieves a
commitment, as the conclusions are discussed, agreed and
understood by all. Everyone is having a say to contribute
and to take the next steps going forward. It also creates
alignments and strategic clarity.
If it’s not then the team will fall back and the scores speak
by itself.
“ If innovation is part of your strategic landscape then this course is for you.
Many business recognise that innovation is a critical element in competitive
strategy but they have no idea on where to start. ”
Why Lego in Project
9
Why ?
No bullet points and backs to the wall – brick by brick
LEGO Project Planning models are three dimensional and
better to understand than for instance a presentation.
Project Planning with Lego
10
Warm-up Construct Constraint
management Reflection
We begin with project planning,
analysis and control training.
•Emphasizethe importanceof initiating
project with structured approach
•Systematicallyidentifythe work required
to achieve project goals
•Defineand develop the foundation of
project plan including,the project
requirementsdocuments, WBS,
schedule and cost management.
•Describeproject risk identification,risk
assessment and risk mitigation strategies
•Control project by managing against the
baseline
Time to build and let’s have fun
•Construct Lego model based on a typical
EPC project management approach.
•Requiredto complete buildingwithin a
given budget (cost), risk and time.
•Participantswill assume the roles of a
typicalEPC project, including trade of
planner, foreman, project manager or
even risk manager.
Time to strategize.
•Team’s challenge. Constraint: an item or
requirementthat will prevent an activity
from starting, advancing or completing
as planned.
•Team will be required to analyze the
constraint together with associated risk
and take necessary approach for
mitigation.
•Emphasizethe importanceof pull
planningmethodology and tools.
(constructionsequence, look-ahead
schedule, constraint analysis, work
package breakdown, readiness (make-
ready)assessmentetc.
Takeaway
•Sharing and discuss with what
and how we can do better.
•How we have done against the
budget and time.
•The underlying values of the fun
includethe belief in the potential
of people, and also the belief that
everyone within an organization
can contribute to the discussion,
solutions, and outcomes.
From Bricks to Complex EPC Project
11
Example of Project WBSs
GeographicalWBS – Site 1 – Area 1 – Sub-Area 3
GeographicalWBS – Site 1 – Area 1 – Sub-Area3 -
Workfront Package1
WBS 1 : Flooring
WBS 2 : house level 1: structure, beam etc
WBS 3 : House level 2 window, door etc
WBS 4 : Roofing,
From bricks
Complex EPC WBS example
Project Planning with Lego
12
Project planning ,
monitoring and control
strategy
Construction
Delivery
Baseline
Project planning ,
monitoring and control
strategy
Construction
Delivery
30 minutes
3 hours
Milestone
30 minutes
4 hours
Delay = 1 hour
Milestone
Actual
Participantwill learn :
1.Liquidateddamage calculation
2.Impactdue to stop-workorder
3.Quantifydisruption and delay
4.Methodto manage period of inefficiency
5.Lossof productivity calculation
1. Risk not identified and not mitigated (ex. missing detail in
risk register)
2. Resources not planned and managed properly (ex. bricks
quantity less than planned)
3.Missingitems in purchase order (ex. missing bricks)
4.Conflictin the team (ex. RACI matrix is missing from project
charter)
5.Overlookon long lead (LLI) items. (ex. LLI bricks does not
managed)
Delay quantification
Risk Management with Lego Bricks
13
Participant start to construct
based on a typical EPC
project flow
Project planning ,
monitoring and control
strategy
Project lesson learnt
1 Participantsare introduced to Project planning, analysis and control concepts
2 Tools : based on PMI best practice
3 Riskidentificationand mitigation plan will be emphasized at this stage
1 Riskare introduced randomly while each participantsconstruct.
2 Participantswill have the “feel” of cause and impact on their
constructionbased on early stage risk management practice
1 Reflectionon the lesson learnt
Why Ignite
14
Why Ignite
15
Free online portal access
Free access to e- library
Free notes download
Free e-book download
Free newspaper article download
Free membership
Free case study download
When Fun Meets Protocols
16
• Fun and playful
• Hands-on and vibrant
• Collaboration and team work
• Innovative process design
• Imagination
• Project management methodology
and tools
• Project planning and control
methodology and tools
• Best practices
• EPC project management know how
• Procedures and worksheets
Project planning Project planning as a system
Plus
The result : Meet us in our training ;)
Topics
17
Getting started : Introductionto Project Management
• Definitionof a Project
• Definitionof Project Management
• Definitionof project planning, monitoringand control
• The Project Constraints
• Organizational Structures and Their Influence on Projects
• Project Manager Roles and Responsibilities
• Planningand Risk manager Roles and Responsibilities
• Project Life Cycle Key Documentation
• What is an EPC project
Project Planning
• Scope of work and Requirements
• Work Breakdown Structure
• Resource Planningand Tools
• Schedule Planning Tools
• Network Diagramming
• Critical Path vs Critical Activities
• Float determination
• Lag and Lead
• Gantt Charts
• Expeditingmethod
• Cost Management
• Baseline Costs Plus Reserve
• Resource management and Tools
• CommunicationPlanningand other Essential Planning
Processes
• Elementsof a Project Management Plan
Project Implementation
• Project Control Considerations
• Tools and Techniques for Project Control
• Project Monitoring Processes
• Project progress calculation
• Earned Value Management (EVM)
• Schedule and Cost Variance
• InterpretingEVM Calculations
Risk Management
• Risk Management: Elements and Characteristics
• Risk Management—AFull Project Life-Cycle Responsibility
• Risk Management Planning
• IdentifyRisks
• Analyze Risks
• Qualitative and Quantitative risk analysis
• Prioritize Risks
• Risk PrioritizationTools and Techniques
• Risk Response Planning
• Response Strategies for Threats and Opportunities
• Risk Monitoring and Control
• Execute Risk Strategy
• EvaluateResults
• Risk Documentation
Project Closing
• Typical Closeout Steps
• Final Project Evaluation
• Final Contract Obligations
• AdministrativeCloseout
• Assess Lessons Learned
• As built schedule
Plus
Project planning simulation
with Lego bricks
18
The End
19

More Related Content

What's hot

Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingFront End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control Training
DEVELOP
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
Anand Bobade
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
NAVNEET KUMAR JHA
 
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
Gaurav Verma
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk management
IQPC
 
Project scope and requirements management
Project scope and requirements managementProject scope and requirements management
Project scope and requirements management
tictactoe123
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draft
ignitetribes
 
PMP Exam Flashcards common definitions 7th edition original v2.0
PMP Exam Flashcards common definitions 7th edition original v2.0PMP Exam Flashcards common definitions 7th edition original v2.0
PMP Exam Flashcards common definitions 7th edition original v2.0
Vinod Kumar, PMP®
 
08-Project-Control-ppt.ppt
08-Project-Control-ppt.ppt08-Project-Control-ppt.ppt
08-Project-Control-ppt.ppt
TecnicoItca
 
Project Charter Guide
Project Charter GuideProject Charter Guide
Project Charter Guide
Casual Project Management
 
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation SlidesExtension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
Asia Master Training آسيا ماسترز للتدريب والتطوير
 
Stakeholder management In Construction Industry
Stakeholder management In  Construction IndustryStakeholder management In  Construction Industry
Stakeholder management In Construction Industry
Girish Singh
 
Presentation on Project Risk Management
Presentation on Project Risk ManagementPresentation on Project Risk Management
Presentation on Project Risk Management
Md. Masudur Rahman, PMP
 
Project Management - Basic Concepts
Project Management - Basic ConceptsProject Management - Basic Concepts
Project Management - Basic Concepts
Imran Jamil
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
asim78
 
Product Management 101: Techniques for Success
Product Management 101:  Techniques for SuccessProduct Management 101:  Techniques for Success
Product Management 101: Techniques for Success
Matterport
 

What's hot (20)

Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingFront End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control Training
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk management
 
Project scope and requirements management
Project scope and requirements managementProject scope and requirements management
Project scope and requirements management
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draft
 
PMP Exam Flashcards common definitions 7th edition original v2.0
PMP Exam Flashcards common definitions 7th edition original v2.0PMP Exam Flashcards common definitions 7th edition original v2.0
PMP Exam Flashcards common definitions 7th edition original v2.0
 
Claims
ClaimsClaims
Claims
 
08-Project-Control-ppt.ppt
08-Project-Control-ppt.ppt08-Project-Control-ppt.ppt
08-Project-Control-ppt.ppt
 
Project Charter Guide
Project Charter GuideProject Charter Guide
Project Charter Guide
 
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation SlidesExtension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
 
Stakeholder management In Construction Industry
Stakeholder management In  Construction IndustryStakeholder management In  Construction Industry
Stakeholder management In Construction Industry
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
Presentation on Project Risk Management
Presentation on Project Risk ManagementPresentation on Project Risk Management
Presentation on Project Risk Management
 
Project Management Report
Project Management ReportProject Management Report
Project Management Report
 
Project Management - Basic Concepts
Project Management - Basic ConceptsProject Management - Basic Concepts
Project Management - Basic Concepts
 
International project management
International project managementInternational project management
International project management
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
Product Management 101: Techniques for Success
Product Management 101:  Techniques for SuccessProduct Management 101:  Techniques for Success
Product Management 101: Techniques for Success
 

Viewers also liked

Lego: Strategy Analysis & Business Model
Lego: Strategy Analysis & Business ModelLego: Strategy Analysis & Business Model
Lego: Strategy Analysis & Business ModelEvgenii Gvozdev
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
ignitetribes
 
The Lego case study, the great turnaround 2003 - 2013
The Lego case study, the great turnaround 2003 - 2013The Lego case study, the great turnaround 2003 - 2013
The Lego case study, the great turnaround 2003 - 2013
John Ashcroft
 
Everything I Need To Know About IA/UX I Learned Playing LEGO
Everything I Need To Know About IA/UX I Learned Playing LEGOEverything I Need To Know About IA/UX I Learned Playing LEGO
Everything I Need To Know About IA/UX I Learned Playing LEGO
Jeffrey Ryan Pass
 
C:\Shared\Rapid Results\Training Programmes\Lego Serious Play\15 Top Tips Lsp
C:\Shared\Rapid Results\Training Programmes\Lego Serious Play\15 Top Tips LspC:\Shared\Rapid Results\Training Programmes\Lego Serious Play\15 Top Tips Lsp
C:\Shared\Rapid Results\Training Programmes\Lego Serious Play\15 Top Tips Lsp
LearningPlanet
 
Looking @ MBTI through the Leadership lens
Looking @ MBTI through the Leadership lensLooking @ MBTI through the Leadership lens
Looking @ MBTI through the Leadership lens
Julia Atkinson
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
Godfrey James
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
ignitetribes
 
Fm industrial data summary 2012
Fm industrial data summary 2012Fm industrial data summary 2012
Fm industrial data summary 2012filtermag
 
Les metamorphose1
Les metamorphose1Les metamorphose1
Les metamorphose1PINAKI ROY
 
Two to four wheeler transformable bike
Two to four wheeler transformable bikeTwo to four wheeler transformable bike
Two to four wheeler transformable bikeDanial Sohail
 
Blood Pressure - The risk factors
Blood Pressure - The risk factorsBlood Pressure - The risk factors
Blood Pressure - The risk factors
PINAKI ROY
 
Sae paper 881825
Sae paper 881825Sae paper 881825
Sae paper 881825filtermag
 
boiler
boilerboiler
boiler
Waqas Ahmed
 
Little book of leadership ppt
Little book of leadership pptLittle book of leadership ppt
Little book of leadership pptPINAKI ROY
 
BP risk factors
BP risk factorsBP risk factors
BP risk factors
PINAKI ROY
 
Why you should quit smoking
Why you should quit smokingWhy you should quit smoking
Why you should quit smokingDanial Sohail
 
Practicing oil analysis it's all about size
Practicing oil analysis   it's all about sizePracticing oil analysis   it's all about size
Practicing oil analysis it's all about sizefiltermag
 

Viewers also liked (19)

Lego: Strategy Analysis & Business Model
Lego: Strategy Analysis & Business ModelLego: Strategy Analysis & Business Model
Lego: Strategy Analysis & Business Model
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
 
The Lego case study, the great turnaround 2003 - 2013
The Lego case study, the great turnaround 2003 - 2013The Lego case study, the great turnaround 2003 - 2013
The Lego case study, the great turnaround 2003 - 2013
 
Everything I Need To Know About IA/UX I Learned Playing LEGO
Everything I Need To Know About IA/UX I Learned Playing LEGOEverything I Need To Know About IA/UX I Learned Playing LEGO
Everything I Need To Know About IA/UX I Learned Playing LEGO
 
C:\Shared\Rapid Results\Training Programmes\Lego Serious Play\15 Top Tips Lsp
C:\Shared\Rapid Results\Training Programmes\Lego Serious Play\15 Top Tips LspC:\Shared\Rapid Results\Training Programmes\Lego Serious Play\15 Top Tips Lsp
C:\Shared\Rapid Results\Training Programmes\Lego Serious Play\15 Top Tips Lsp
 
Design at Lego
Design at LegoDesign at Lego
Design at Lego
 
Looking @ MBTI through the Leadership lens
Looking @ MBTI through the Leadership lensLooking @ MBTI through the Leadership lens
Looking @ MBTI through the Leadership lens
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
Fm industrial data summary 2012
Fm industrial data summary 2012Fm industrial data summary 2012
Fm industrial data summary 2012
 
Les metamorphose1
Les metamorphose1Les metamorphose1
Les metamorphose1
 
Two to four wheeler transformable bike
Two to four wheeler transformable bikeTwo to four wheeler transformable bike
Two to four wheeler transformable bike
 
Blood Pressure - The risk factors
Blood Pressure - The risk factorsBlood Pressure - The risk factors
Blood Pressure - The risk factors
 
Sae paper 881825
Sae paper 881825Sae paper 881825
Sae paper 881825
 
boiler
boilerboiler
boiler
 
Little book of leadership ppt
Little book of leadership pptLittle book of leadership ppt
Little book of leadership ppt
 
BP risk factors
BP risk factorsBP risk factors
BP risk factors
 
Why you should quit smoking
Why you should quit smokingWhy you should quit smoking
Why you should quit smoking
 
Practicing oil analysis it's all about size
Practicing oil analysis   it's all about sizePracticing oil analysis   it's all about size
Practicing oil analysis it's all about size
 

Similar to Project planning and control training with lego

Demo project planning and control training with lego
Demo project planning and control training with legoDemo project planning and control training with lego
Demo project planning and control training with lego
Cameron
 
6455922 project-management-teacher-notes
6455922 project-management-teacher-notes6455922 project-management-teacher-notes
6455922 project-management-teacher-notesBhanu Singh
 
Industrial.projects.Student.Level
Industrial.projects.Student.LevelIndustrial.projects.Student.Level
Industrial.projects.Student.Level
Dino Almirall
 
Session 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdfSession 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdf
NyakanaJoseph1
 
Software Project Management(Unit-1). ppt
Software Project Management(Unit-1). pptSoftware Project Management(Unit-1). ppt
Software Project Management(Unit-1). ppt
ghatak2042
 
Pile Chapter 5 Design Process Ym
Pile Chapter 5   Design Process   YmPile Chapter 5   Design Process   Ym
Pile Chapter 5 Design Process YmGalala University
 
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Andrew Schwartz
 
lecture 8 (1).ppt
lecture 8 (1).pptlecture 8 (1).ppt
lecture 8 (1).ppt
MonikaSharma151258
 
Chapter5 project-management
Chapter5 project-managementChapter5 project-management
Chapter5 project-managementVin Voro
 
Drs 255 project management skills
Drs 255 project management skillsDrs 255 project management skills
Drs 255 project management skillspaulyeboah
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
SAMPREET3
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao
mao-osman73
 
Project management
Project managementProject management
Project managementErin Mucci
 
Project management part 1
Project management part 1Project management part 1
Project management part 1
hkbhadraa
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.ppt
FaisalRafique27
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.ppt
sheelaa10
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.ppt
Raja Manyam
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.ppt
DarioVivancoHuaytara
 

Similar to Project planning and control training with lego (20)

Demo project planning and control training with lego
Demo project planning and control training with legoDemo project planning and control training with lego
Demo project planning and control training with lego
 
6455922 project-management-teacher-notes
6455922 project-management-teacher-notes6455922 project-management-teacher-notes
6455922 project-management-teacher-notes
 
Industrial.projects.Student.Level
Industrial.projects.Student.LevelIndustrial.projects.Student.Level
Industrial.projects.Student.Level
 
Session 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdfSession 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdf
 
Software Project Management(Unit-1). ppt
Software Project Management(Unit-1). pptSoftware Project Management(Unit-1). ppt
Software Project Management(Unit-1). ppt
 
Pile Chapter 5 Design Process Ym
Pile Chapter 5   Design Process   YmPile Chapter 5   Design Process   Ym
Pile Chapter 5 Design Process Ym
 
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
 
pmppgoav14.ppt
pmppgoav14.pptpmppgoav14.ppt
pmppgoav14.ppt
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
lecture 8 (1).ppt
lecture 8 (1).pptlecture 8 (1).ppt
lecture 8 (1).ppt
 
Chapter5 project-management
Chapter5 project-managementChapter5 project-management
Chapter5 project-management
 
Drs 255 project management skills
Drs 255 project management skillsDrs 255 project management skills
Drs 255 project management skills
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao
 
Project management
Project managementProject management
Project management
 
Project management part 1
Project management part 1Project management part 1
Project management part 1
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.ppt
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.ppt
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.ppt
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.ppt
 

More from ignitetribes

Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Coding
ignitetribes
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_project
ignitetribes
 
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoSecond edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promo
ignitetribes
 
Headed Towards Burnout
Headed Towards BurnoutHeaded Towards Burnout
Headed Towards Burnout
ignitetribes
 
The Leadership Qualities of Elon Musk
The Leadership Qualities of Elon MuskThe Leadership Qualities of Elon Musk
The Leadership Qualities of Elon Musk
ignitetribes
 
Improving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganImproving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dungan
ignitetribes
 
101 toughest interviews_questions
101 toughest interviews_questions101 toughest interviews_questions
101 toughest interviews_questions
ignitetribes
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
ignitetribes
 
Technip case study
Technip case studyTechnip case study
Technip case study
ignitetribes
 

More from ignitetribes (9)

Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Coding
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_project
 
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoSecond edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promo
 
Headed Towards Burnout
Headed Towards BurnoutHeaded Towards Burnout
Headed Towards Burnout
 
The Leadership Qualities of Elon Musk
The Leadership Qualities of Elon MuskThe Leadership Qualities of Elon Musk
The Leadership Qualities of Elon Musk
 
Improving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganImproving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dungan
 
101 toughest interviews_questions
101 toughest interviews_questions101 toughest interviews_questions
101 toughest interviews_questions
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
 
Technip case study
Technip case studyTechnip case study
Technip case study
 

Recently uploaded

Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
Wasim Ak
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
chanes7
 
Advantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO PerspectiveAdvantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO Perspective
Krisztián Száraz
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 

Recently uploaded (20)

Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
 
Advantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO PerspectiveAdvantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO Perspective
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 

Project planning and control training with lego

  • 1. Project Planning, Analysis and Control with Lego 1
  • 2. 2
  • 3. Give Your Brain a Hand 3 “The human mind is designed to work in three dimensions. When our hands are used, we engage an increased portion of our minds. For the scientific community, this is a well-established fact – yet we tend to predominately use two dimensional mediums like paper and visual presentations in business.” Our course “ Project Planning, Analysis and Control with Lego” invites all participants to take an active role in the process. The common language – the bricks – treats everyone as equals and allows all opinions and aspects to be heard. Project planning and control is everyone’s responsibility and it takes the whole team to synergize in order to meet each milestones on-time. The entire strategy is dependent on Engineering and Procurement providing their deliverables to meet Path of Construction. And in this lesson we are showing you on the strategy, process and tools needed to achieve the above goal.
  • 4. 4 If someone asks you a question … … and you answer verbally, you activate your short & long term memory (= +- 15% of your brain) … and you start building with your hands, 80% of your brain is activated. Darwin proved that.
  • 5. Why Teaching Project with Lego 5 Traditional Training Planning with Lego 20% participation 100% participation We breakaway from the traditional training. It’s all about 100% collaboration.
  • 6. Bricks in Project Planning Training 6 Lego in Project Planning is a technique where we use LEGO bricks to follow through a series of structured exercises during which we simulate a typical construction activities and manage the activities with project management best practise method. Why using Lego ? It helps you generate alternate solutions: Design Thinking is about identifying and working within given set of constraints to arrive at new and better solutions. We will present a problem, Lego Project Planning is a great way to generate new ideas, imagine alternate solutions and implementation.
  • 7. Bricks in Project Planning Training 7 Why using Lego ? You construct, deconstruct and reconstruct: Creative thinking requires the ability to break the existing pattern to discover another.. Deconstructing helps to break our preconception so we can see the same thing from a whole new perspective or have the freedom to change things by examining all parts, keeping some and adding new ingredients. Creativity involves breaking out of established patterns in order to look at things in a different way….. Edward De bono
  • 8. Bricks in Project Planning Training 8 Why ? It creates commitment and alignment : Each models planned and built based on the understanding from all participants in the group. That achieves a commitment, as the conclusions are discussed, agreed and understood by all. Everyone is having a say to contribute and to take the next steps going forward. It also creates alignments and strategic clarity. If it’s not then the team will fall back and the scores speak by itself. “ If innovation is part of your strategic landscape then this course is for you. Many business recognise that innovation is a critical element in competitive strategy but they have no idea on where to start. ”
  • 9. Why Lego in Project 9 Why ? No bullet points and backs to the wall – brick by brick LEGO Project Planning models are three dimensional and better to understand than for instance a presentation.
  • 10. Project Planning with Lego 10 Warm-up Construct Constraint management Reflection We begin with project planning, analysis and control training. •Emphasizethe importanceof initiating project with structured approach •Systematicallyidentifythe work required to achieve project goals •Defineand develop the foundation of project plan including,the project requirementsdocuments, WBS, schedule and cost management. •Describeproject risk identification,risk assessment and risk mitigation strategies •Control project by managing against the baseline Time to build and let’s have fun •Construct Lego model based on a typical EPC project management approach. •Requiredto complete buildingwithin a given budget (cost), risk and time. •Participantswill assume the roles of a typicalEPC project, including trade of planner, foreman, project manager or even risk manager. Time to strategize. •Team’s challenge. Constraint: an item or requirementthat will prevent an activity from starting, advancing or completing as planned. •Team will be required to analyze the constraint together with associated risk and take necessary approach for mitigation. •Emphasizethe importanceof pull planningmethodology and tools. (constructionsequence, look-ahead schedule, constraint analysis, work package breakdown, readiness (make- ready)assessmentetc. Takeaway •Sharing and discuss with what and how we can do better. •How we have done against the budget and time. •The underlying values of the fun includethe belief in the potential of people, and also the belief that everyone within an organization can contribute to the discussion, solutions, and outcomes.
  • 11. From Bricks to Complex EPC Project 11 Example of Project WBSs GeographicalWBS – Site 1 – Area 1 – Sub-Area 3 GeographicalWBS – Site 1 – Area 1 – Sub-Area3 - Workfront Package1 WBS 1 : Flooring WBS 2 : house level 1: structure, beam etc WBS 3 : House level 2 window, door etc WBS 4 : Roofing, From bricks Complex EPC WBS example
  • 12. Project Planning with Lego 12 Project planning , monitoring and control strategy Construction Delivery Baseline Project planning , monitoring and control strategy Construction Delivery 30 minutes 3 hours Milestone 30 minutes 4 hours Delay = 1 hour Milestone Actual Participantwill learn : 1.Liquidateddamage calculation 2.Impactdue to stop-workorder 3.Quantifydisruption and delay 4.Methodto manage period of inefficiency 5.Lossof productivity calculation 1. Risk not identified and not mitigated (ex. missing detail in risk register) 2. Resources not planned and managed properly (ex. bricks quantity less than planned) 3.Missingitems in purchase order (ex. missing bricks) 4.Conflictin the team (ex. RACI matrix is missing from project charter) 5.Overlookon long lead (LLI) items. (ex. LLI bricks does not managed) Delay quantification
  • 13. Risk Management with Lego Bricks 13 Participant start to construct based on a typical EPC project flow Project planning , monitoring and control strategy Project lesson learnt 1 Participantsare introduced to Project planning, analysis and control concepts 2 Tools : based on PMI best practice 3 Riskidentificationand mitigation plan will be emphasized at this stage 1 Riskare introduced randomly while each participantsconstruct. 2 Participantswill have the “feel” of cause and impact on their constructionbased on early stage risk management practice 1 Reflectionon the lesson learnt
  • 15. Why Ignite 15 Free online portal access Free access to e- library Free notes download Free e-book download Free newspaper article download Free membership Free case study download
  • 16. When Fun Meets Protocols 16 • Fun and playful • Hands-on and vibrant • Collaboration and team work • Innovative process design • Imagination • Project management methodology and tools • Project planning and control methodology and tools • Best practices • EPC project management know how • Procedures and worksheets Project planning Project planning as a system Plus The result : Meet us in our training ;)
  • 17. Topics 17 Getting started : Introductionto Project Management • Definitionof a Project • Definitionof Project Management • Definitionof project planning, monitoringand control • The Project Constraints • Organizational Structures and Their Influence on Projects • Project Manager Roles and Responsibilities • Planningand Risk manager Roles and Responsibilities • Project Life Cycle Key Documentation • What is an EPC project Project Planning • Scope of work and Requirements • Work Breakdown Structure • Resource Planningand Tools • Schedule Planning Tools • Network Diagramming • Critical Path vs Critical Activities • Float determination • Lag and Lead • Gantt Charts • Expeditingmethod • Cost Management • Baseline Costs Plus Reserve • Resource management and Tools • CommunicationPlanningand other Essential Planning Processes • Elementsof a Project Management Plan Project Implementation • Project Control Considerations • Tools and Techniques for Project Control • Project Monitoring Processes • Project progress calculation • Earned Value Management (EVM) • Schedule and Cost Variance • InterpretingEVM Calculations Risk Management • Risk Management: Elements and Characteristics • Risk Management—AFull Project Life-Cycle Responsibility • Risk Management Planning • IdentifyRisks • Analyze Risks • Qualitative and Quantitative risk analysis • Prioritize Risks • Risk PrioritizationTools and Techniques • Risk Response Planning • Response Strategies for Threats and Opportunities • Risk Monitoring and Control • Execute Risk Strategy • EvaluateResults • Risk Documentation Project Closing • Typical Closeout Steps • Final Project Evaluation • Final Contract Obligations • AdministrativeCloseout • Assess Lessons Learned • As built schedule Plus Project planning simulation with Lego bricks
  • 18. 18