Project Planning, Analysis and Control with Lego invites participants to take an active role in project planning and control through hands-on modeling with Lego bricks. The course treats everyone as equals and encourages 100% collaboration. Participants simulate construction project management by building Lego models within time and budget constraints while assuming roles like project manager. The goal is to strategize around constraints and gain an understanding of project planning tools and methodologies.
** PMP® Training: https://www.edureka.co/pmp **
This Edureka PPT on PMP® Exam Questions and Answers will discuss the top 50 questions which can be asked in your PMP Certification Exam 2019 along with the proper explanation. After going through this PPT, you will have a better insight of which type of questions you must focus on and how to filter out the correct option from the lot.
** PMP® Training: https://www.edureka.co/pmp **
This Edureka PPT on PMP® Exam Questions and Answers will discuss the top 50 questions which can be asked in your PMP Certification Exam 2019 along with the proper explanation. After going through this PPT, you will have a better insight of which type of questions you must focus on and how to filter out the correct option from the lot.
Front End Engineering Design (FEED) Project Control TrainingDEVELOP
DEVELOP Training Center (TM) conducts Front End Engineering Design (FEED) Project Control Training, which is very useful to gain skills on how to plan & control projects, as well as navigate and optimize the Project execution.
This training will be useful to gain skills on how to plan & control projects, as well as navigate and optimize the FEED Project execution, such as : FEED Work Order-Scope,FEED Stakeholder identification,FEED Project Deliverables,FEED Multidiscipline Man-hour Calculation-productivity,Engineering-Procurement-Construction Project Contract technical issues-investment Cost Estimation ,FEED Review Cycle,EPC Long lead items,FEED Close out Report-Lessons Learnt
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...Gaurav Verma
These slides present a case study of Delay Analysis in Construction of "AL KUT OLYMPIC STADIUM". After going through these slides you will gotta know the following things:
1. What are construction delays?
2. Types of Construction Delays.
3. Effects of Construction Delays.
4. Location of "Al Kut Olympic Stadium".
5. Scope of study.
6. Objectives of study.
7. Research Methodology.
8. Result Analysis.
Recently, Construction IQ conducted an online survey on construction project risk management. Some valuable statistics emerged from the results. Have a look at what your colleagues and peers in the industry had to say…
PMP Exam Flashcards common definitions 7th edition original v2.0Vinod Kumar, PMP®
The Project Management Professional (PMP) exam is quite hard. The exam consists of 200 multiple-choice questions in a period of only four hours. The questions are written for a high difficulty level and are designed to test your understanding of the subjects and the ability to problem solve in real life.
Flashcards are small note cards used for testing and improving memory through practiced information retrieval.
Hence, I have captured 342 of the most important common definitions around Project Management in the Microsoft PowerPoint Presentation format aligned with the NEW 2021 PMP Exam and the PMBOK Guide, it will be very useful while you are preparing for your PMP exam to understand the concepts and no need to memorize anymore, also you can quickly review during your free time.
At doubt you can easily do a quick search for the required Common Definition.
All the very best for your PMP Examination!
This project charter guide covers everything you need to know about the project charter. It is based on the free template you can download here: http://project-charter-template.casual.pm/
Training Slides of Extension of Time (EOT) & Related Costs in Construction, in fullfillment of Delay Claim Expert.
Some Key-Points:
- Contentious Issues in Delay Analysis
- The SLC Protocol
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Stakeholder management In Construction IndustryGirish Singh
Stakeholder Management is a theory by which we can ensure the success of the project by avoiding may type of disputes & problem during the project life cycle
Excited to share my presentation on Lesson 03 - "Doing the Work" for PMI Authorized PMP Exam Preparation! 📊🌐
In this session, I'll delve into the core aspects of effective project management, aligning your skills with PMI's renowned PMP certification. We'll explore the art of translating theory into practical action, delivering tangible results in complex projects. Join me in unraveling the secrets to success in the PMP exam journey! 💡🚀
#PMPExam #ProjectManagement #PMP #PMI #Certification #ProfessionalGrowth
Product Management 101: Techniques for SuccessMatterport
This is a snapshot from a living document. To see the current document, please go to https://goo.gl/yFFrml.
Topics covered include:
- Resources
- General Overview
- The Role of Product Management
- Characteristics of Great Project and Product Managers
- Problem Space and Solution Space
- Customer Personas
- User Stories
- Product Documentation
- Agile Product Development
- Succeeding with Agile from The Lean Playbook
- Analytics, Customer Engagement, & Monetization
- Pricing Strategies
- Overall Leadership and Organizational Development
- Final Guidelines and Recommendations
Epc project interdepency and Work Flow- promoignitetribes
Engineering, Procurement and Construction are highly correlated and set precedence against each other. They are very interdependent and these dependencies become increasingly critical as the phases are overlapped. In this module we share the interdependence of Engineering - Procurement and the influence in Construction. Here we touch a bit on work front monitoring and work face planning.
Front End Engineering Design (FEED) Project Control TrainingDEVELOP
DEVELOP Training Center (TM) conducts Front End Engineering Design (FEED) Project Control Training, which is very useful to gain skills on how to plan & control projects, as well as navigate and optimize the Project execution.
This training will be useful to gain skills on how to plan & control projects, as well as navigate and optimize the FEED Project execution, such as : FEED Work Order-Scope,FEED Stakeholder identification,FEED Project Deliverables,FEED Multidiscipline Man-hour Calculation-productivity,Engineering-Procurement-Construction Project Contract technical issues-investment Cost Estimation ,FEED Review Cycle,EPC Long lead items,FEED Close out Report-Lessons Learnt
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...Gaurav Verma
These slides present a case study of Delay Analysis in Construction of "AL KUT OLYMPIC STADIUM". After going through these slides you will gotta know the following things:
1. What are construction delays?
2. Types of Construction Delays.
3. Effects of Construction Delays.
4. Location of "Al Kut Olympic Stadium".
5. Scope of study.
6. Objectives of study.
7. Research Methodology.
8. Result Analysis.
Recently, Construction IQ conducted an online survey on construction project risk management. Some valuable statistics emerged from the results. Have a look at what your colleagues and peers in the industry had to say…
PMP Exam Flashcards common definitions 7th edition original v2.0Vinod Kumar, PMP®
The Project Management Professional (PMP) exam is quite hard. The exam consists of 200 multiple-choice questions in a period of only four hours. The questions are written for a high difficulty level and are designed to test your understanding of the subjects and the ability to problem solve in real life.
Flashcards are small note cards used for testing and improving memory through practiced information retrieval.
Hence, I have captured 342 of the most important common definitions around Project Management in the Microsoft PowerPoint Presentation format aligned with the NEW 2021 PMP Exam and the PMBOK Guide, it will be very useful while you are preparing for your PMP exam to understand the concepts and no need to memorize anymore, also you can quickly review during your free time.
At doubt you can easily do a quick search for the required Common Definition.
All the very best for your PMP Examination!
This project charter guide covers everything you need to know about the project charter. It is based on the free template you can download here: http://project-charter-template.casual.pm/
Training Slides of Extension of Time (EOT) & Related Costs in Construction, in fullfillment of Delay Claim Expert.
Some Key-Points:
- Contentious Issues in Delay Analysis
- The SLC Protocol
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Stakeholder management In Construction IndustryGirish Singh
Stakeholder Management is a theory by which we can ensure the success of the project by avoiding may type of disputes & problem during the project life cycle
Excited to share my presentation on Lesson 03 - "Doing the Work" for PMI Authorized PMP Exam Preparation! 📊🌐
In this session, I'll delve into the core aspects of effective project management, aligning your skills with PMI's renowned PMP certification. We'll explore the art of translating theory into practical action, delivering tangible results in complex projects. Join me in unraveling the secrets to success in the PMP exam journey! 💡🚀
#PMPExam #ProjectManagement #PMP #PMI #Certification #ProfessionalGrowth
Product Management 101: Techniques for SuccessMatterport
This is a snapshot from a living document. To see the current document, please go to https://goo.gl/yFFrml.
Topics covered include:
- Resources
- General Overview
- The Role of Product Management
- Characteristics of Great Project and Product Managers
- Problem Space and Solution Space
- Customer Personas
- User Stories
- Product Documentation
- Agile Product Development
- Succeeding with Agile from The Lean Playbook
- Analytics, Customer Engagement, & Monetization
- Pricing Strategies
- Overall Leadership and Organizational Development
- Final Guidelines and Recommendations
Epc project interdepency and Work Flow- promoignitetribes
Engineering, Procurement and Construction are highly correlated and set precedence against each other. They are very interdependent and these dependencies become increasingly critical as the phases are overlapped. In this module we share the interdependence of Engineering - Procurement and the influence in Construction. Here we touch a bit on work front monitoring and work face planning.
The Lego case study, the great turnaround 2003 - 2013John Ashcroft
In presenting his report to management in June 2003, Jørgen Vig Knudstorp, then head of strategic development had pulled no punches, “We are on a burning platform, losing money with negative cash flow and a real risk of debt default which could lead to a break up of the company. In 2013, LEGO reported profits of $1.5 bn on sales of $4.5 bn. Quite a turnaround! Here's how.
Everything I Need To Know About IA/UX I Learned Playing LEGOJeffrey Ryan Pass
OK, not everything, but an amazing foundation…
LEGO®: children’s toy, grown up’s toy, global brand, lucrative industry, and theme park half-an-hour north of this conference. But LEGO® is also an educator and trainer’s tool, as well as a medium for personal expression and interactive learning.
This presentation explores how LEGO® building bricks can be used to understand and even teach the fundamentals of information architecture (IA) and to improve the user experience (UX) lifecycle.
Looking @ MBTI through the Leadership lensJulia Atkinson
Building on MBTI basics, find out what different leadership types there might be in your team. Learn about different leader types' strengths and pitfalls. Use the Keirsey lens to derive synergies from your leadership team.
Promo_Epc project rule of credit and progress measurement ignitetribes
Project progress monitoring and control is one of the most important tasks of construction project management. Many times planner or project manager not able.The hardest part of project controls is accurate performance measurement of work accomplished.
Taking time out to establish repeatable rules of credit can literally remove 75% of the performance measurement "guessing game" out of the equation.
In this book we don't just explain on what is rule of credit but we also provide tonnes of examples on how to establish the weighted milestone. It's a ready to be plug and plan in your project control measurement.
Log in to ignitetribes.com to purchase the book.
Management : is the process of using organizational resources to achieve organizational goals through Planning, Organizing, Controlling and leading.
It is thus, a set of activities directed at an organization’s resources with the aim of achieving organizational goals in an efficient and effective manner.
Second edition epc project rule of credit and progress measurement promoignitetribes
This is the second edition for project rule of credit and progress measurement which covers for Upstream,Downstream, General Construction, Skid fabrication and many more.
Most employees are usually under stress for a period of time before becoming burnt out. While stress and burnout are connected, they aren’t exactly the same thing. Stress is often short-term while burnout takes place over an extended period of time. This means that too much workplace stress can lead to burnout.
Elon Musk is a South Africa-born inventor and investor. He is the CEO and CTO of SpaceX, CEO of Tesla Motors, and Chairman of SolarCity. He is an early investor in SpaceX, PayPal, Inc, Tesla Motors and Zip2.
The measured mile/baseline method has been widely accepted to quantify labor
productivity loss, but it has not been successfully used in engineering productivity because of the
challenges in engineering productivity measurement and the determination of productivity
benchmark. This paper presents a series of procedures based on the measured mile/baseline
method to quantify engineering productivity loss from a project specific perspective. A case study
on the piping discipline in a large scale process plant project is used to illustrate the calculation.
The paper also includes a proposed approach, the two mile method, to quantify engineering
productivity loss using data for similar work, but different complexity.
Embracing GenAI - A Strategic ImperativePeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Introduction to AI for Nonprofits with Tapp NetworkTechSoup
Dive into the world of AI! Experts Jon Hill and Tareq Monaur will guide you through AI's role in enhancing nonprofit websites and basic marketing strategies, making it easy to understand and apply.
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
Normal Labour/ Stages of Labour/ Mechanism of LabourWasim Ak
Normal labor is also termed spontaneous labor, defined as the natural physiological process through which the fetus, placenta, and membranes are expelled from the uterus through the birth canal at term (37 to 42 weeks
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
3. Give Your Brain a Hand
3
“The human mind is designed to work in three dimensions. When our hands are used, we engage an increased
portion of our minds. For the scientific community, this is a well-established fact – yet we tend to predominately use
two dimensional mediums like paper and visual presentations in business.”
Our course “ Project Planning, Analysis and Control with Lego” invites all participants to take an active role in the
process. The common language – the bricks – treats everyone as equals and allows all opinions and aspects to be
heard. Project planning and control is everyone’s responsibility and it takes the whole team to synergize in order to
meet each milestones on-time.
The entire strategy is dependent on Engineering and Procurement providing
their deliverables to meet Path of Construction.
And in this lesson we are showing you on the strategy, process and tools
needed to achieve the above goal.
4. 4
If someone asks you a question …
… and you answer verbally, you activate your short & long term memory
(= +- 15% of your brain)
… and you start building with your hands,
80% of your brain is activated.
Darwin proved that.
5. Why Teaching Project with Lego
5
Traditional Training Planning with Lego
20% participation 100% participation
We breakaway from the traditional training.
It’s all about 100% collaboration.
6. Bricks in Project Planning Training
6
Lego in Project Planning is a technique where we use LEGO
bricks to follow through a series of structured exercises
during which we simulate a typical construction activities
and manage the activities with project management best
practise method.
Why using Lego ?
It helps you generate alternate solutions:
Design Thinking is about identifying and working within
given set of constraints to arrive at new and better
solutions. We will present a problem, Lego Project Planning
is a great way to generate new ideas, imagine alternate
solutions and implementation.
7. Bricks in Project Planning Training
7
Why using Lego ?
You construct, deconstruct and reconstruct:
Creative thinking requires the ability to break the existing
pattern to discover another.. Deconstructing helps to break
our preconception so we can see the same thing
from a whole new perspective or have the freedom to
change things by examining all parts, keeping some and
adding new ingredients.
Creativity involves breaking out of established
patterns in order to look at things in a different
way….. Edward De bono
8. Bricks in Project Planning Training
8
Why ?
It creates commitment and alignment :
Each models planned and built based on the understanding
from all participants in the group. That achieves a
commitment, as the conclusions are discussed, agreed and
understood by all. Everyone is having a say to contribute
and to take the next steps going forward. It also creates
alignments and strategic clarity.
If it’s not then the team will fall back and the scores speak
by itself.
“ If innovation is part of your strategic landscape then this course is for you.
Many business recognise that innovation is a critical element in competitive
strategy but they have no idea on where to start. ”
9. Why Lego in Project
9
Why ?
No bullet points and backs to the wall – brick by brick
LEGO Project Planning models are three dimensional and
better to understand than for instance a presentation.
10. Project Planning with Lego
10
Warm-up Construct Constraint
management Reflection
We begin with project planning,
analysis and control training.
•Emphasizethe importanceof initiating
project with structured approach
•Systematicallyidentifythe work required
to achieve project goals
•Defineand develop the foundation of
project plan including,the project
requirementsdocuments, WBS,
schedule and cost management.
•Describeproject risk identification,risk
assessment and risk mitigation strategies
•Control project by managing against the
baseline
Time to build and let’s have fun
•Construct Lego model based on a typical
EPC project management approach.
•Requiredto complete buildingwithin a
given budget (cost), risk and time.
•Participantswill assume the roles of a
typicalEPC project, including trade of
planner, foreman, project manager or
even risk manager.
Time to strategize.
•Team’s challenge. Constraint: an item or
requirementthat will prevent an activity
from starting, advancing or completing
as planned.
•Team will be required to analyze the
constraint together with associated risk
and take necessary approach for
mitigation.
•Emphasizethe importanceof pull
planningmethodology and tools.
(constructionsequence, look-ahead
schedule, constraint analysis, work
package breakdown, readiness (make-
ready)assessmentetc.
Takeaway
•Sharing and discuss with what
and how we can do better.
•How we have done against the
budget and time.
•The underlying values of the fun
includethe belief in the potential
of people, and also the belief that
everyone within an organization
can contribute to the discussion,
solutions, and outcomes.
11. From Bricks to Complex EPC Project
11
Example of Project WBSs
GeographicalWBS – Site 1 – Area 1 – Sub-Area 3
GeographicalWBS – Site 1 – Area 1 – Sub-Area3 -
Workfront Package1
WBS 1 : Flooring
WBS 2 : house level 1: structure, beam etc
WBS 3 : House level 2 window, door etc
WBS 4 : Roofing,
From bricks
Complex EPC WBS example
12. Project Planning with Lego
12
Project planning ,
monitoring and control
strategy
Construction
Delivery
Baseline
Project planning ,
monitoring and control
strategy
Construction
Delivery
30 minutes
3 hours
Milestone
30 minutes
4 hours
Delay = 1 hour
Milestone
Actual
Participantwill learn :
1.Liquidateddamage calculation
2.Impactdue to stop-workorder
3.Quantifydisruption and delay
4.Methodto manage period of inefficiency
5.Lossof productivity calculation
1. Risk not identified and not mitigated (ex. missing detail in
risk register)
2. Resources not planned and managed properly (ex. bricks
quantity less than planned)
3.Missingitems in purchase order (ex. missing bricks)
4.Conflictin the team (ex. RACI matrix is missing from project
charter)
5.Overlookon long lead (LLI) items. (ex. LLI bricks does not
managed)
Delay quantification
13. Risk Management with Lego Bricks
13
Participant start to construct
based on a typical EPC
project flow
Project planning ,
monitoring and control
strategy
Project lesson learnt
1 Participantsare introduced to Project planning, analysis and control concepts
2 Tools : based on PMI best practice
3 Riskidentificationand mitigation plan will be emphasized at this stage
1 Riskare introduced randomly while each participantsconstruct.
2 Participantswill have the “feel” of cause and impact on their
constructionbased on early stage risk management practice
1 Reflectionon the lesson learnt
15. Why Ignite
15
Free online portal access
Free access to e- library
Free notes download
Free e-book download
Free newspaper article download
Free membership
Free case study download
16. When Fun Meets Protocols
16
• Fun and playful
• Hands-on and vibrant
• Collaboration and team work
• Innovative process design
• Imagination
• Project management methodology
and tools
• Project planning and control
methodology and tools
• Best practices
• EPC project management know how
• Procedures and worksheets
Project planning Project planning as a system
Plus
The result : Meet us in our training ;)
17. Topics
17
Getting started : Introductionto Project Management
• Definitionof a Project
• Definitionof Project Management
• Definitionof project planning, monitoringand control
• The Project Constraints
• Organizational Structures and Their Influence on Projects
• Project Manager Roles and Responsibilities
• Planningand Risk manager Roles and Responsibilities
• Project Life Cycle Key Documentation
• What is an EPC project
Project Planning
• Scope of work and Requirements
• Work Breakdown Structure
• Resource Planningand Tools
• Schedule Planning Tools
• Network Diagramming
• Critical Path vs Critical Activities
• Float determination
• Lag and Lead
• Gantt Charts
• Expeditingmethod
• Cost Management
• Baseline Costs Plus Reserve
• Resource management and Tools
• CommunicationPlanningand other Essential Planning
Processes
• Elementsof a Project Management Plan
Project Implementation
• Project Control Considerations
• Tools and Techniques for Project Control
• Project Monitoring Processes
• Project progress calculation
• Earned Value Management (EVM)
• Schedule and Cost Variance
• InterpretingEVM Calculations
Risk Management
• Risk Management: Elements and Characteristics
• Risk Management—AFull Project Life-Cycle Responsibility
• Risk Management Planning
• IdentifyRisks
• Analyze Risks
• Qualitative and Quantitative risk analysis
• Prioritize Risks
• Risk PrioritizationTools and Techniques
• Risk Response Planning
• Response Strategies for Threats and Opportunities
• Risk Monitoring and Control
• Execute Risk Strategy
• EvaluateResults
• Risk Documentation
Project Closing
• Typical Closeout Steps
• Final Project Evaluation
• Final Contract Obligations
• AdministrativeCloseout
• Assess Lessons Learned
• As built schedule
Plus
Project planning simulation
with Lego bricks