PROJECT MANAGEMENT TRAINING SERIES
Front End Engineering Design (FEED) Project Control
Training
FEED (Front End Engineering Design) is a basic engineering
study after Conceptual Design or Feasibility Study.
At this stage, prior to commencement of an E.P.C
(Engineering, Procurement and Construction) Project
Contract, specific studies are conducted to find out the
technical issues and the estimated investment cost roughly.
The product of this activity is called "FEED Package" that contains dozens of documents to
file and will be the basis of the EPC contract deals.
DEVELOP Training Center (TM) conducts Front End Engineering Design (FEED) Project Control
Training, which is very useful to gain skills on how to plan & control projects, as well as navigate and
optimize the Project execution.
Our Project Management Course Material has been developed with the help of construction industry
professionals in the field. Schedule data and techniques utilized in this class are based upon real projects
and real industry method of operation.
Therefore, you will get knowledge sharing directly from practitioners with years of experience who will
share essential skills of Project Planning & Controlling such as :
 the characteristics of the Front End Engineering Design/FEED
 the strategy in the preparation of the FEED project proposal.
 the issues that exist in the project FEED
 the scope of project management responsibilities FEED
 
 
 the techniques cost estimation and schedule for Phase EPC and many other essential skills for
Project Management Planning & Controlling
DEVELOP implements Front End Engineering Design (FEED) Project Control Training with quality
learning stages as below :
Sesi 1-2 FEED Initiation, Planning&Execution
 FEED Initiation
o Client Work Order, Client Scope of work, FEED Stakeholder identification, etc.
 FEED Planning
 FEED Proposal Preparation
o FEED Deliverables identification for
Process/Piping/Mechanical/Instrumentation/Electrical/Civil & Project Support,
Man-hour estimation for each discipline, FEED Budget, etc.
 FEED Execution
o MDR development for
Process/Piping/Mechanical/Instrumentation/Electrical/Civil & Project Support,
FEED Project Measurement, And FEED Project change order, FEED Review
Cycles, etc.
 
 
Sesi 3-4 FEED Monitoring&Control, Cost Estimation Output Project Final Close Out
 FEED Monitoring & Controlling
o FEED Progress & Cost control, FEED productivity, FEED project update, ect.
 Cost Estimation and Schedule’s important element for EPC
 FEED Close Out
o FEED Lessons Learnt, FEED Close out Report and FEED Deliverables
packaging.
Our Front End Engineering Design (FEED) Project Control Training Course Material has been developed
with the help of construction industry professionals in the field. Schedule data and techniques utilized in
this class are based upon real projects and real industry method of operation. Therefore, you will get
knowledge sharing directly from practitioners with years of experience.
Contact us NOW at :
DEVELOP Oil and Gas Training Center
Jl.Danau Poso no 151, Jakarta Pusat,INDONESIA
Phone : 021 4050 6000 Direct 0852 1068 5004 Fax : 021 573 6891
Email : info@oilgascourse.com Website : www.oilgascourse.com

Front End Engineering Design (FEED) Project Control Training

  • 1.
        PROJECT MANAGEMENT TRAININGSERIES Front End Engineering Design (FEED) Project Control Training FEED (Front End Engineering Design) is a basic engineering study after Conceptual Design or Feasibility Study. At this stage, prior to commencement of an E.P.C (Engineering, Procurement and Construction) Project Contract, specific studies are conducted to find out the technical issues and the estimated investment cost roughly. The product of this activity is called "FEED Package" that contains dozens of documents to file and will be the basis of the EPC contract deals. DEVELOP Training Center (TM) conducts Front End Engineering Design (FEED) Project Control Training, which is very useful to gain skills on how to plan & control projects, as well as navigate and optimize the Project execution. Our Project Management Course Material has been developed with the help of construction industry professionals in the field. Schedule data and techniques utilized in this class are based upon real projects and real industry method of operation. Therefore, you will get knowledge sharing directly from practitioners with years of experience who will share essential skills of Project Planning & Controlling such as :  the characteristics of the Front End Engineering Design/FEED  the strategy in the preparation of the FEED project proposal.  the issues that exist in the project FEED  the scope of project management responsibilities FEED
  • 2.
         the techniquescost estimation and schedule for Phase EPC and many other essential skills for Project Management Planning & Controlling DEVELOP implements Front End Engineering Design (FEED) Project Control Training with quality learning stages as below : Sesi 1-2 FEED Initiation, Planning&Execution  FEED Initiation o Client Work Order, Client Scope of work, FEED Stakeholder identification, etc.  FEED Planning  FEED Proposal Preparation o FEED Deliverables identification for Process/Piping/Mechanical/Instrumentation/Electrical/Civil & Project Support, Man-hour estimation for each discipline, FEED Budget, etc.  FEED Execution o MDR development for Process/Piping/Mechanical/Instrumentation/Electrical/Civil & Project Support, FEED Project Measurement, And FEED Project change order, FEED Review Cycles, etc.
  • 3.
        Sesi 3-4 FEEDMonitoring&Control, Cost Estimation Output Project Final Close Out  FEED Monitoring & Controlling o FEED Progress & Cost control, FEED productivity, FEED project update, ect.  Cost Estimation and Schedule’s important element for EPC  FEED Close Out o FEED Lessons Learnt, FEED Close out Report and FEED Deliverables packaging. Our Front End Engineering Design (FEED) Project Control Training Course Material has been developed with the help of construction industry professionals in the field. Schedule data and techniques utilized in this class are based upon real projects and real industry method of operation. Therefore, you will get knowledge sharing directly from practitioners with years of experience. Contact us NOW at : DEVELOP Oil and Gas Training Center Jl.Danau Poso no 151, Jakarta Pusat,INDONESIA Phone : 021 4050 6000 Direct 0852 1068 5004 Fax : 021 573 6891 Email : info@oilgascourse.com Website : www.oilgascourse.com