The document provides an overview of process related aspects in offshore oil and gas. It begins with an introduction to offshore oil and gas field layout, including satellite platforms that separate bulk fluids and a central processing platform for finer separation. It then outlines the key process areas in more detail, including gas/liquid separation, water/condensate separation, chemical injection, compression, dehydration, export pipelines, and pigging. The purpose and basic design of equipment for each process area is described.
Piping Design Course is very Important today. Basically, Piping is the work of Providing and Maintaining the Water Supply, Replacing Pipes and Pipe Work. SEA has trained & certified more than 3000 Engineers & Individuals in last five ( 5 ) years in different engineering disciplines and various sectors which include Oil and Gas , Petrochemicals , Refineries , Power Plant , Aeronautics & Construction projects etc. SEA certification / qualification is accepted and recognized by major National & International companies in the world including India , Saudi Arabia , UAE , Kuwait , Qatar , Bahrain , Oman , Jordan , Iraq , Iran , Yemen , Nigeria , Sudan , Libya , Turkey ,Portugal, Cameroon, Congo & other countries. Our SEA certified Engineers are already working in the above said countries.
Piping Design Course is very Important today. Basically, Piping is the work of Providing and Maintaining the Water Supply, Replacing Pipes and Pipe Work. SEA has trained & certified more than 3000 Engineers & Individuals in last five ( 5 ) years in different engineering disciplines and various sectors which include Oil and Gas , Petrochemicals , Refineries , Power Plant , Aeronautics & Construction projects etc. SEA certification / qualification is accepted and recognized by major National & International companies in the world including India , Saudi Arabia , UAE , Kuwait , Qatar , Bahrain , Oman , Jordan , Iraq , Iran , Yemen , Nigeria , Sudan , Libya , Turkey ,Portugal, Cameroon, Congo & other countries. Our SEA certified Engineers are already working in the above said countries.
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Varun Patel
Course Description
Piping a must know skill to work in Oil & Gas and similar Process Industries.
Oil and Gas industry is become a very competitive in the current time. Getting right mentor and right exposer within industry is difficult. With limited training budget spent by company on employee training, it is difficult to acquire the knowledge to success.
Knowing cross-functional skill give you an edge over others in your career success.
This course design based on years of field experience to ensure student will comprehend technical details easily and enjoy overall journey.
Learn in detail every aspect of Pipe & Pipe Fittings used in process industry
•Different types of Pipe, Pipe fittings (Elbow, Tee, reducers, Caps etc.), Flanges, Gaskets, Branch Connection, Bolting materials
•Materials (Metal-Carbon Steel, Stainless Steel, Alloy Steel etc. Non-Metal- PVC/VCM, HDPE, GRE-GRP etc.)
•Manufacturing methods
•Heat treatment requirements
•Inspection and Testing requirements (Non Destructive Testing, Mechanical & Chemical testing)
•Dimensions & Markings requirements
•Code & Standard used in piping
Content and Overview
With 2 hours of content including 30 lectures & 8 Quizzes, this course cover every aspect of Pipe, Pipe fittings, flanges, gaskets, branch connections and bolting material used in Process Piping.
This Course is divided in three parts.
1st part of the course covers fundamental of process industries. In this Part, you will learn about fundamental process piping. You will also learn about Code, Standard & Specification used in process industries.
2nd part cover various types of material used in process industries. In this part, you will learn about Metallic and Non-Metallic material used to manufacture pipe and other piping components.
3rd parts covers in detail about pipe and piping components used in Process piping. In this part we will learn about Industry terminology of Piping components, types of industrial material grade used in manufacturing and entire manufacturing process of these components. You will learn about different manufacturing methods, Heat treatment requirements, Destructive and Non-destructive testing, Visual & Dimensional inspection and Product marking requirements.
Upon completion, you will be able to use this knowledge direct on your Job and you can easily answer any interview question on pipe & fittings.
This Presentation is about the basic fundamentals one needs to know to begin Piping Engineering. All the basic formulas and questions that are usually asked in interviews are answered in this presentation. Feel free to ask any doubts in the comments and iI may try my best to answer them for you.
Here's a presentation on piping engineering in PDF format, now available for all. This presentation covers the basics points of piping for our EPC industry. This presentation covers various aspects of piping engineering
FUNCTION OF PIPING ENGINEERING
• PIPING ENGINEERING TEAM
• PLANT LAYOUT
• LAYOUT
• PIPE FITTINGS CLASSIFICATION
• VALVE CLASSIFICATION BASED ON FUNCTION
• PIPE ROUTING
• STRESS ANALYSIS
• OBJECTIVE
• REQUIREMENTS OF SUPPORTS IN PIPING SYSTEM
• TYPE OF SUPPORTS
• FAMILIARIZATION WITH STRESS SYMBOLS
• MATERIAL ENGINEERING
• BASIS FOR MATERIALS SELECTION
• MATERIAL SELECTION DIAGRAM
• MATERIAL SELECTION AS A FUNCTION OF TEMPERATURE
Epc project interdepency and Work Flow- promoignitetribes
Engineering, Procurement and Construction are highly correlated and set precedence against each other. They are very interdependent and these dependencies become increasingly critical as the phases are overlapped. In this module we share the interdependence of Engineering - Procurement and the influence in Construction. Here we touch a bit on work front monitoring and work face planning.
Webinar: How to manage technical risk in CO2 capture technology developmentGlobal CCS Institute
Scaling up, integrating and optimising CO2 capture plants can be associated with high risks and costs. Currently, there is a lack of standard codes and procedures to be used, making the development of CCS projects challenging. In this webinar, DNV GL presented the recommended qualification procedure for scaling-up CO2 capture technologies, from the lab to commercial scale.
The technical risks associated with new CO2 capture technologies can be managed through a systematic qualification process. This process focuses on the identification of the risks and indicates how they can be evaluated and reduced with adequate qualification methods, such as analyses and testing. Aker Solutions illustrated how this procedure has been applied for scaling up their proprietary CO2 capture technology.
This webinar was presented by Anastasia Isaenko, Consultant, Carbon Capture and Storage from DNV GL and Oscar Graff, Chief Technology Officer, Department of Clean Carbon from Aker Solutions.
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Varun Patel
Course Description
Piping a must know skill to work in Oil & Gas and similar Process Industries.
Oil and Gas industry is become a very competitive in the current time. Getting right mentor and right exposer within industry is difficult. With limited training budget spent by company on employee training, it is difficult to acquire the knowledge to success.
Knowing cross-functional skill give you an edge over others in your career success.
This course design based on years of field experience to ensure student will comprehend technical details easily and enjoy overall journey.
Learn in detail every aspect of Pipe & Pipe Fittings used in process industry
•Different types of Pipe, Pipe fittings (Elbow, Tee, reducers, Caps etc.), Flanges, Gaskets, Branch Connection, Bolting materials
•Materials (Metal-Carbon Steel, Stainless Steel, Alloy Steel etc. Non-Metal- PVC/VCM, HDPE, GRE-GRP etc.)
•Manufacturing methods
•Heat treatment requirements
•Inspection and Testing requirements (Non Destructive Testing, Mechanical & Chemical testing)
•Dimensions & Markings requirements
•Code & Standard used in piping
Content and Overview
With 2 hours of content including 30 lectures & 8 Quizzes, this course cover every aspect of Pipe, Pipe fittings, flanges, gaskets, branch connections and bolting material used in Process Piping.
This Course is divided in three parts.
1st part of the course covers fundamental of process industries. In this Part, you will learn about fundamental process piping. You will also learn about Code, Standard & Specification used in process industries.
2nd part cover various types of material used in process industries. In this part, you will learn about Metallic and Non-Metallic material used to manufacture pipe and other piping components.
3rd parts covers in detail about pipe and piping components used in Process piping. In this part we will learn about Industry terminology of Piping components, types of industrial material grade used in manufacturing and entire manufacturing process of these components. You will learn about different manufacturing methods, Heat treatment requirements, Destructive and Non-destructive testing, Visual & Dimensional inspection and Product marking requirements.
Upon completion, you will be able to use this knowledge direct on your Job and you can easily answer any interview question on pipe & fittings.
This Presentation is about the basic fundamentals one needs to know to begin Piping Engineering. All the basic formulas and questions that are usually asked in interviews are answered in this presentation. Feel free to ask any doubts in the comments and iI may try my best to answer them for you.
Here's a presentation on piping engineering in PDF format, now available for all. This presentation covers the basics points of piping for our EPC industry. This presentation covers various aspects of piping engineering
FUNCTION OF PIPING ENGINEERING
• PIPING ENGINEERING TEAM
• PLANT LAYOUT
• LAYOUT
• PIPE FITTINGS CLASSIFICATION
• VALVE CLASSIFICATION BASED ON FUNCTION
• PIPE ROUTING
• STRESS ANALYSIS
• OBJECTIVE
• REQUIREMENTS OF SUPPORTS IN PIPING SYSTEM
• TYPE OF SUPPORTS
• FAMILIARIZATION WITH STRESS SYMBOLS
• MATERIAL ENGINEERING
• BASIS FOR MATERIALS SELECTION
• MATERIAL SELECTION DIAGRAM
• MATERIAL SELECTION AS A FUNCTION OF TEMPERATURE
Epc project interdepency and Work Flow- promoignitetribes
Engineering, Procurement and Construction are highly correlated and set precedence against each other. They are very interdependent and these dependencies become increasingly critical as the phases are overlapped. In this module we share the interdependence of Engineering - Procurement and the influence in Construction. Here we touch a bit on work front monitoring and work face planning.
Webinar: How to manage technical risk in CO2 capture technology developmentGlobal CCS Institute
Scaling up, integrating and optimising CO2 capture plants can be associated with high risks and costs. Currently, there is a lack of standard codes and procedures to be used, making the development of CCS projects challenging. In this webinar, DNV GL presented the recommended qualification procedure for scaling-up CO2 capture technologies, from the lab to commercial scale.
The technical risks associated with new CO2 capture technologies can be managed through a systematic qualification process. This process focuses on the identification of the risks and indicates how they can be evaluated and reduced with adequate qualification methods, such as analyses and testing. Aker Solutions illustrated how this procedure has been applied for scaling up their proprietary CO2 capture technology.
This webinar was presented by Anastasia Isaenko, Consultant, Carbon Capture and Storage from DNV GL and Oscar Graff, Chief Technology Officer, Department of Clean Carbon from Aker Solutions.
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Global CCS Institute
The Rotterdam Capture and Storage Demonstration Project (ROAD) has completed a report for the Global CCS Institute to investigate issues surrounding CCS operation under different operating conditions, including start-up, shutdown and emergencies. Various strategies have been developed to provide robust, safe, and efficient operating solutions at different focal points along the CO2 chain, including the compression unit, the transport, and the injection platform.
At this webinar, Jan Uilenreef, Project Manager Transport & Storage, ROAD | Maasvlakte CCS Project C.V., presetned the findings about the CCS CO2 chain operation based on the practice of ROAD, as well as some recommendations for future CCS projects operation.
Second edition epc project rule of credit and progress measurement promoignitetribes
This is the second edition for project rule of credit and progress measurement which covers for Upstream,Downstream, General Construction, Skid fabrication and many more.
Most employees are usually under stress for a period of time before becoming burnt out. While stress and burnout are connected, they aren’t exactly the same thing. Stress is often short-term while burnout takes place over an extended period of time. This means that too much workplace stress can lead to burnout.
Elon Musk is a South Africa-born inventor and investor. He is the CEO and CTO of SpaceX, CEO of Tesla Motors, and Chairman of SolarCity. He is an early investor in SpaceX, PayPal, Inc, Tesla Motors and Zip2.
The measured mile/baseline method has been widely accepted to quantify labor
productivity loss, but it has not been successfully used in engineering productivity because of the
challenges in engineering productivity measurement and the determination of productivity
benchmark. This paper presents a series of procedures based on the measured mile/baseline
method to quantify engineering productivity loss from a project specific perspective. A case study
on the piping discipline in a large scale process plant project is used to illustrate the calculation.
The paper also includes a proposed approach, the two mile method, to quantify engineering
productivity loss using data for similar work, but different complexity.
Promo_Epc project rule of credit and progress measurement ignitetribes
Project progress monitoring and control is one of the most important tasks of construction project management. Many times planner or project manager not able.The hardest part of project controls is accurate performance measurement of work accomplished.
Taking time out to establish repeatable rules of credit can literally remove 75% of the performance measurement "guessing game" out of the equation.
In this book we don't just explain on what is rule of credit but we also provide tonnes of examples on how to establish the weighted milestone. It's a ready to be plug and plan in your project control measurement.
Log in to ignitetribes.com to purchase the book.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Cosmetic shop management system project report.pdf
Process Related, Mechanical and Piping Workshop by Technip
1. PROGRAM OF THE DAY:
1) Introduction of TECHNIP (and myself)
2) Process related aspects in offshore
oil and gas
3) Specific lay-out aspects of offshore
platforms (piping / mechanical)
Lecture for Avans 2015, Baijan Savalan – Process technologist
2. Herman Hamhuis
8 jaar werkzaam in Engineering
Ervaring in Olie/Gas, Petrochemie, en Chemie
Werkzaam bij TECHNIP-EPG
Huidige functie: Lead process engineer (hiervoor Tebodin, Zeton)
Bijzonderheden: Ook werkzaam geweest als project engineer en site
engineer
4. Technip Today
With engineering, technologies and project management, on land and at sea, we safely and
successfully deliver the best solutions for our clients in the energy business
Worldwide presence with 36,500 people in 48 countries
Industrial assets on all continents, a fleet of 34 vessels (of which 5 under construction)
2013 revenue: €9 billion (€15 billion backlog)
Energy is at the core of Technip
Technip Presentation4
5. Technip Presentation5
Engineering and fabrication of fixed
platforms for shallow waters (TPG
500, Unideck®)
Engineering and fabrication of
floating platforms for deep waters
(Spar, semi-submersible
platforms, FPSO)
Leadership in floatover technology
Floating Liquefied Natural Gas
(FLNG)
Construction yard
Design, manufacture and supply of
deepwater flexible and rigid
pipelines, umbilicals and riser
systems
Subsea construction, pipeline
installation services and Heavy Lift
Six state-of-the-art flexible pipe and /
or umbilical manufacturing plants
Five spoolbases for reeled pipeline
assembly as well as four logistic
bases
A constantly evolving fleet
strategically deployed in the world's
major offshore markets
Three Business Segments, One Technip
Gas treatment and liquefaction
(LNG), Gas-to-Liquids (GTL)
Oil refining (refining, hydrogen and
sulphur units)
Onshore pipelines
Petrochemicals (ethylene,
aromatics, olefins, polymers,
fertilizers)
Process technologies (proprietary or
through alliances)
Biofuel and renewable energies
(including offshore wind)
Non-oil activities (principally in life
sciences, metals & mining,
construction)
Subsea Offshore Onshore
The best solutions across the value chain
7. Technip Presentation7
Subsea:
Worldwide Leading Integrated Player
Products
Flexible pipe
(in house manufacturing)
Umbilicals
(in-house manufacturing)
Rigid pipelines
Services
Inspection,
repair & maintenance
Flexible/rigid pipelaying
(Reel, S-Lay & J-Lay)
Heavy Lift Operations
Deep water installation
& construction
Vertical integration
In-house technologies
Worldwide leadership
First class assets
Architecture
8. Technip Slide Library8
Offshore:
Expertise in High Added-value Technology
WindFPSO/FLNGSparSemi-submersibleUnideck®TPG 500 TLP
Innovative capabilities
Heavy lift capabilities
Proprietary platform design
Proven track record in engineering & construction
9. Technip Presentation9
Technip Onshore Segment
Refining & heavy oil
Clean fuels
Grassroots
Heavy oil upgraders
Hydrogen
Gas Processing
Gas treatment
GTL
LNG
Petrochemicals
Ethylene
Polyolefins
Aromatics
Fertilizers
Project management consultancy
Strong process engineering capabilities
Process technologies (Hydrogen, Ethylene, Refining, Petrochemical & GTL)
Solid reputation with NOCs & IOCs
Others
Mining and metals
Infrastructures
Buildings
Life sciences,…
10. Technip Presentation10
Floating LNG Solutions
A unique combination of technologies and know-how
from our 3 business segments
Cryogenic pipe-in-pipe
Processing systemCryogenic flexible pipe FPSOSubsea services
& product provider
17. Technip Presentation17
Engineering Services
Studies and Consultancy
Engineering
Basic Engineering
Detail Engineering
Scope definition and (cost) estimating
Procurement
Purchasing
Inspection
Expediting
Construction
Construction management
18. Technip Presentation18
Engineering Services
Engineering Procurement Construction (EPC)
Revamp and Grass Root
100 – 100.000 hours
Contracts
Lump Sum Turnkey
Reimbursable
Incentive
High Value Technip centers
19. Technip Presentation19
Process + HSE
Process Study
Flow Assurance
Process Flow Diagrams PFD’s
Piping Instrumentation Diagrams P&ID’s
Equipment-specification
Hazard & Operability studies (HAZOP)
Validation processes
20. Technip Presentation20
Electrical & Instrumentation
High, mid and low voltage
ATEX 95/137
DCS/PLC-configuration
Instrumentation
Fieldbus; Foundation Fieldbus, Profibus
Load-flow and motorstart calculations
Short-circuit calculations
NEN 3140-Inspection
NEN 1010-Inspection
SIL - Classification
21. Technip Presentation21
Mechanical / piping
3D-Design, new installation and modifications
Plot study
Pipe stress calculations
Pipe specification-calculations
Pressure vessel calculations
PED-classification
22. Technip Presentation2222
G17d-AP
Technip-EPG
Segment : Oil & Gas Offshore
Client : GDF Suez E&P Nederland B.V.
Project : G17d-AP Compression
Scope : Integration of the Low Low
compression facilities
Platform & Compressor modifications
Hang-of module 10 x 7 x12,5 mtr
Lifting weight 200 ton.
Disciplines :
Project management, Process, Piping and
Structural, Instrumentation and Electrical
Execution: 2011 - present Technip is qualified to perform the works
with the highest HSSE standards
23. Technip Presentation23 Technip Presentation23
K2b-A
Technip-EPG
Segment : Offshore
Client : Gaz de France
Project : K2bA Compression
Detail engineering for compressor unit, to be
installed on existing platform
Disciplines
Project management
Piping
Pipestress
Structural
Execution: 2007-2008, 9.000 hrs
Vibration study & analysis
and coördination with TNO
were subject to this project
24. Technip Presentation2424
K5-A /K4-Z
Technip-EPG
Segment : Oil & Gas Offshore
Client : Total E&P Nederland
Project : K4-Z / Topside modifications K5-A
Scope : Engineering & Procurement
New equipment/facilities to be installed
Water Treatment unit, Oil Absorption filters, Methanol and
KHI/CI Injection skids, Separator modifications, E&I room,
HPU, Fire walls.
ESD valves, Choke valve and Electrical Heater are
installed in a new Hang off Module.
Additional Weight
Steel 50 Ton, Equipment 50 Ton (dry weight)
Piping and supports 25 Ton (dry weight)
Disciplines
Project management, HSE, Process, Mechanical, Piping &
Pipe Stress, Structural, Electrical & Instrumentation,
Procurement, Expediting and QA/QC.
Execution: 2011/2012, 20.000 hrs
25. Technip Presentation2525
K4-BE
Technip-EPG
Segment : Oil & Gas Offshore
Client : Total E&P Nederland
Project : K4-BE
Scope : Engineering & procurement services
New equipment to be installed
Skimmer tank (3 phase separation)
Disciplines
Project management, Process, Piping, Mechanical,
Structural, Instrumentation, Electrical,
Procurement services (Expediting QA/QC)
Execution: 2011, 2000 hrs
26. Technip Presentation26
Our knowledge and experience contribute
to the success of our clients
Why Technip is an excellent choice
Broad experience in the industry
Flexible set-up of project team
State-of-the-Art tools
Located close to the client, therefore able to
immediately respond to requests
Committed to a code of business ethics
Full access to resources and technologies
of TECHNIP GROUP, ranking top 5 major
players in engineering and construction
services worldwide
28. Technip EPG28
Table of contents
1. General
2. Process Flow Diagram (In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
29. Technip EPG29
Table of contents
1. General
2. Process Flow Diagram(In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
36. Well fluid gathering manifold
Bulk water separation
Chemical injection
Pig launcher
...
1. General
Satellite Platform
37. 1. General
Satellite Platform
Bulk Separation
Pumping/Metering
Sea Water
Produced Water
Diesel Power Gen
Gas Metering
Wellheads
Overboard
Crude Export
Gas Export
Crane
Diesel
Chemical Injection
Flare/Vent
Closed, Haz Drains
Pig Launcher
38. Gathering manifold of all the
connected satellites
Fine tuned water separation
Dehydration
Compresssion
Chemical injection
Pig launcher / Receiever
...
1. General
Central Processing Platform
39. 1. General
Central Processing Platform
Instrument Air
Bulk Separation
Pumping/MeteringFinal Separation
Flash Gas
Compression
Export Compression
Cooling Medium Sea Water
Water Injection
Produced Water
Fire Water
DCS
Gas Turbine Power Gen
Fuel Gas
Gas Metering
Satellites
Dehydration
Overboard
Crude Export
Gas Export
AccommodationDiesel
Chemical Injection
Flare/Vent Non-Haz Drains
Closed, Haz Drains
Potable Water
Pig Launcher / Receiver
Wellheads
40. Technip EPG40
Table of contents
1. General
2. Process Flow Diagram(In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
41. MeOH or
MEG Injection
Gas/Liq
Separator
Wat / Cond.
Separator
2. Process Flow Diagram
Satellite Platform
Degassing
Drum
Gas + Cond. To
Central Processing
Platform
Water Overboard
MEG-CI Injection
Skimmer
42. Gas/Liq
LP
Separator
2. Process Flow Diagram
Central Processing Platform
Degassing
Drum
Water Overboard
HP LP
KO
Drum
Gas/Liq
HP
Separator
Metering
Export Gas
To Pipeline
DEG
Skimmer
Degassing
Drum
Cond. Storage
drum
43. Technip EPG43
Table of contents
1. General
2. Process Flow Diagram(In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
48. Technip EPG48
Table of contents
1. General
2. Process Flow Diagram(In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
49. Technip EPG49
Separate water from condensate
Separate remaining condensate from water to make the water
ready for overboard conditions
Purpose
4. Water /Condensate Separation
50. MeOH or
MEG Injection
Gas/Liq
Separator
Wat / Cond.
Separator
4. Water /Condensate Separation
Degassing
Drum
Gas + Cond. To
Central Processing
Platform
Water Overboard
MEG-CI Injection
Skimmer
52. MeOH or
MEG Injection
Gas/Liq
Separator
Wat / Cond.
Separator
4. Water/Condensate Separation
Degassing
Drum
Gas + Cond. To
Central Processing
Platform
Water Overboard
MEG-CI Injection
Skimmer
54. Technip EPG54
Table of contents
1. General
2. Process Flow Diagram(In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
55. Technip EPG55
Prevent piping and pipeline from rupture
Prevent hydrate/wax formation and blocking of piping / pipeline
Purpose
5. Chemical Injection
56. 56 Technip EPG
Hydrate (Ice that burns)
Crystalline compounds of water and light hydrocarbon molecules
Ice-like solid crystals
Cages of water molecules surrounding hydrocarbon molecules
Can form in gas, gas-condensate and black oil systems
Forms at temperatures higher than 32ºF (up to 80°F) at high pressure
Transient operations are very susceptible to hydrate blockages
Blockages can occur very rapidly
5. Chemical Injection
Hydrate Inhibitor (MeoH / MEG)
57. 57 Technip EPG
5. Chemical Injection
Corrosion Inhibitor (CI)
Pipeline corrosion can be inhibited
by several means.
Choice of corrosion-resistant
metals, alloys
Injection of corrosion inhibitors
Cathodic protection
External and/or internal
protective coatings
59. Technip EPG59
Prevention of killing the well in order to explore the “latest” gas
Purpose
5. Chemical Injection
Foam injection
60. Technip EPG60
Table of contents
1. General
2. Process Flow Diagram(In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
61. Technip EPG61
Boost the gas to the conditions (higher pressure) of delivery
for export gas
6. Compression
Purpose
67. Technip EPG67
Table of contents
1. General
2. Process Flow Diagram(In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
68. Technip EPG68
Dry gas to avoid gas hydrate formation as well as to reduce
corrosion
Meet delivery specifications (dew point e.g -8°C @ 72 barg)
7. Dehydration
Purpose
73. Technip EPG73
Table of contents
1. General
2. Process Flow Diagram(In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
76. Technip EPG76
Table of contents
1. General
2. Process Flow Diagram(In satellite and central processing platforms)
3. Gas / Liquid separation
4. Water / Condensate Separation
5. Chemical Injection
6. Compression
7. Dehydration
8. Export Pipeline
9. Pigging
77. Technip EPG77
Check wall thickness and find damaged sections of lines
(intelligent pigging / imposed by SODM)
Remove debris such as dirt and wax from lines
Provide a known volume for calibrating flow meters
Coat inner pipe walls with inhibitors
Remove condensed hydrocarbon liquids and water in two phase
pipelines
9. Pigging
Purpose
81. De bovenbouw ”TOPSIDE”
De configuratie wordt bepaald door:
Samenstelling van het gas.
• De productiecapaciteit
• Permanente of tijdelijke boortoren
• Accommodatiefaciliteit
• Helikopterdek
• Opslagcapaciteit
• Brugverbindingen met andere platforms
• Hijskraanfaciliteit
• Utiliteitsystemen
89. Installatie van een platform op de Noordzee
Het platform en de jacket worden met een kraanschip
naar de lokatie gebracht.
Platform
90. Installatie van een platform op de Noordzee
Jacket wordt vast geheid in de zee bodem.
JACKET
Heiblok
91. Installatie van een platform op de Noordzee
De topside wordt op het jacket geplaatst
Topside
JACKET
92. Installatie van een platform op de Noordzee
De topside wordt op het jacket geplaatst
JACKET
Topside
93. Installatie van een platform op de Noordzee
Het platform wordt door een transportleiding met het hoofdplatform verbonden.
Pijpenlegger
Aanvoer transportleiding
95. Installatie van een platform op de Noordzee
Bevoorrading pijpenlegger op zee
96. Installatie van een platform op de Noordzee
Lassen van de transportleiding op de pijpenlegger
97. Installatie van een platform op de Noordzee
Voorbereiding voor aansluiten transport leiding op hoofdeiland
98. Installatie van een platform op de Noordzee
Als laatste wordt de definitieve put geboord
99. De FPSO
Voor olie en gaswinning op grote diepte en kleine velden worden FPSO’s
toegepast.
FPSO is Floating Production Storage and Offloading vessel
Boven het scheepsdek worden alle productie faciliteiten voor de olie en gas
behandeling geplaatst.
De productie unit is modulair opgebouwd.
100. Equipment layout
Een offshore platform is uit de volgende dekken opgebouwd
helicopter deck (heli deck)
main deck (upper deck)
intermediate deck (mezzanine deck)
cellar deck
sub-cellar deck
102. Equipment layout
Helicopterdeck (heli deck)
Bevindt zich boven het living quarter.
Vrij van obstakels
Afmetingen worden bepaald door het type helicopter wat in het veld
gebruikt wordt.
113. Equipment layout
Sub-cellar deck
noodafsluiters (emergency shut down valves)
in de in en uitgaande export leidingen.
de pig launchers/ receivers.
de closed en open drain tanks inclusief pompen.
skimmer tank.
115. Platform oriëntatie
Bepaald door
Stromingsrichting van het zeewater
Meest voorkomende windrichting (prevailing wind)
Plaats van de risers die langs het jacket naar de zeebodem lopen
De plaats van de aanlanding (boat-landing) voor bevoorrading
117. Platform oriëntatie
Bepaald door
Toekomstige putboringen
De helicopter moet in alle windrichtingen kunnen landen en opstijgen.
Plaats van de fakkel en vent leidingen.
De hoogte van het sub-cellar deck wordt bepaald door de 100 jarige golf
plus de air gap van 1 meter.
118. Platform elevatie
Bepaald door
De hoogte van het sub-cellar deck wordt bepaald door de 100 jarige golf
plus de air gap van 1 meter.
120. Design criteria voor equipment location plan
Equipment op een logische plaats
Economische equipment opstelling
Veiligheidsvoorschriften raadplegen
Toegankelijkheid voor het plegen van onderhoud en bedienbaarheid
121. Design criteria voor equipment location plan
Voldoende onderlinge ruimte
Hazardous en non-hazardous.
Fire-wall (brandbescherming) of een blast-wall.
Vluchtwegen aangeven 1200 mm breed 2300mm hoog
Onderhoud en inspectie 800 mm breed
Lay-down area aangeven
122. Escape routes/fire-fighting layouts
Vluchtwegen naar de evacuatie plaatsen
Reddingsboten (escape capsules of free fall boats)
Locatie van brandblusmiddelen