PPT ON PROGRAM
EVALUATION AND
REVIEW
TECHNIQUES
WHAT IS PERT?
PERT is program evaluation and review technique.
Program Evaluation Review Technique (PERT) is a project
management planning tool used to calculate the amount of time it
will take to realistically finish a project. PERT charts are used to plan
tasks within a project โ€” making it easier to schedule deliverables
and coordinate with team members.
PERT KEY TAKEAWAYS:-
โ€ข PERT charts were first created by the U.S. Navy's Special Projects Office in
1950s to guide the Polaris nuclear submarine project.1
โ€ข A PERT chart uses circles or rectangles called nodes to represent project
events or milestones. These nodes are linked by vectors, or lines, that
represent various tasks and their dependencies.1
โ€ข A PERT chart allows managers to evaluate the time and resources
necessary to manage a project.
HOW PERT CHART WORKS?
โ€ข The nodes on the PERT chart are linked by vectors or lines
that represent various tasks. Dependent tasks are items
that must be performed in a specific manner. For example,
if an arrow is drawn from Task No. 1 to Task No. 2 on a
PERT chart, Task No. 1 must be completed before work on
Task No. 2 begin.
โ€ข The nodes on the PERT chart are linked by vectors or lines that
represent various tasks. Dependent tasks are items that must be
performed in a specific manner. For example, if an arrow is drawn
from Task No. 1 to Task No. 2 on a PERT chart, Task No. 1 must be
completed before work on Task No. 2 begins.1
โ€ข Items at the same stage of production but on different task
lines within a project are referred to as parallel tasks. They're
independent of each other and occur at the same time.1
PROGRAM EVALUATION AND REVIEW TECHNIQUE
PERT PROCESS:
๏ƒ
PERT has a set series of steps in mapping out a complex project, which
include:List all the tasks and milestones (a.k.a. events) required for
completion of the project
๏ƒ
Determine the required sequence of tasks
๏ƒ
Design a chart to visually display all the steps
๏ƒ
Estimate the time required for each task
๏ƒ
Identify the critical path โ€“ the longest series of tasks in the project.
๏ƒ
Adjust the chart to reflect progress made once the project starts
๏ƒ
Reference: https://www.shopify.com/in/blog/what-is-program-evaluation-
review-technique.
THANK
YOU!
โ€ข Ppt made by ANUBHAV KATARIA
โ€ข Enrollment number- 01421301722
โ€ข CLASS- BBA
โ€ข SEMESTER- SIXTH
โ€ข DIVISION- A
โ€ข SHIFT โ€“ EVENING.

PROJECT MANAGEMENT PPT PARAG SIR (1).pdf

  • 1.
    PPT ON PROGRAM EVALUATIONAND REVIEW TECHNIQUES
  • 2.
    WHAT IS PERT? PERTis program evaluation and review technique. Program Evaluation Review Technique (PERT) is a project management planning tool used to calculate the amount of time it will take to realistically finish a project. PERT charts are used to plan tasks within a project โ€” making it easier to schedule deliverables and coordinate with team members.
  • 3.
    PERT KEY TAKEAWAYS:- โ€ขPERT charts were first created by the U.S. Navy's Special Projects Office in 1950s to guide the Polaris nuclear submarine project.1 โ€ข A PERT chart uses circles or rectangles called nodes to represent project events or milestones. These nodes are linked by vectors, or lines, that represent various tasks and their dependencies.1 โ€ข A PERT chart allows managers to evaluate the time and resources necessary to manage a project.
  • 4.
    HOW PERT CHARTWORKS? โ€ข The nodes on the PERT chart are linked by vectors or lines that represent various tasks. Dependent tasks are items that must be performed in a specific manner. For example, if an arrow is drawn from Task No. 1 to Task No. 2 on a PERT chart, Task No. 1 must be completed before work on Task No. 2 begin.
  • 5.
    โ€ข The nodeson the PERT chart are linked by vectors or lines that represent various tasks. Dependent tasks are items that must be performed in a specific manner. For example, if an arrow is drawn from Task No. 1 to Task No. 2 on a PERT chart, Task No. 1 must be completed before work on Task No. 2 begins.1 โ€ข Items at the same stage of production but on different task lines within a project are referred to as parallel tasks. They're independent of each other and occur at the same time.1
  • 6.
    PROGRAM EVALUATION ANDREVIEW TECHNIQUE
  • 7.
    PERT PROCESS: ๏ƒ PERT hasa set series of steps in mapping out a complex project, which include:List all the tasks and milestones (a.k.a. events) required for completion of the project ๏ƒ Determine the required sequence of tasks ๏ƒ Design a chart to visually display all the steps ๏ƒ Estimate the time required for each task ๏ƒ Identify the critical path โ€“ the longest series of tasks in the project. ๏ƒ Adjust the chart to reflect progress made once the project starts ๏ƒ Reference: https://www.shopify.com/in/blog/what-is-program-evaluation- review-technique.
  • 8.