Typical Network Issues
Sample Network
Master
2 7 9 23 34 51 71
RR
R
R R
R
5V
Note: The termination resistors are integrated in the connectors of station 2
and 71; the 5V supply for the termination is provided by the respective
device.
5V
The following network issues were
recorded on this sample network.
2
Typical Network Issues
Case 1: Reversal of results from both ends of the system
 Case 1:
 Step 1:
 Connect and test from left end side (Master 2)
 Step 2:
 Connect and test from right end side (Slave 71)
 Result:
 Test results from the left end:
 - Good quality values for stations 2 - 34
 - Bad quality values for stations 51 – 71
 Test results from the right side:
 - Bad quality values for stations 2 – 34
 - Good quality values for stations 51 – 71
  Reversal of Q-Levels !
measurement from right side
(Slave 71)
measurement from left side
(Master 2)
3
2 7 9 23 34 51 71
RR
R
R R
R
5V 5V
Master
R
Reason: High Line Resistance between two Stations
(#34 and #51)
Interpretation:
The test result from the right side is the reversal (!) of the test results from the left side and
vice versa.
This kind of reversal is a clear indication for an high resistance in the network.
In this case the problem is caused somewhere between slave 34 and slave 51
e.g. corrosion, sharply bent cable, etc.
Typical Network Issues
Case 1: Reversal of results from both ends of the system
4
Typical Network Issues
Case 2: Q-level becomes worse from one measuring point to other
Case 2:
- Step 1: perform test at left end (Master 2)
- Step 2: perform test at right end (Slave 71)
- Step 3: perform tests at random stations located in the middle of the network
Result:
- No reversion of Q-level between left and right side
- Instead, the Q-level for all stations generally declines from one station to the other.
Master 2 Slave 7 Slave 23 Slave 71
5
Interpretation:
- The problem is not caused by resistance problems (corrosion, cable too long, etc…
- The problem is caused by signal reflections in the network,
in this case by a missing termination resistance at Slave 71.
Typically, the problem is located at the test point that shows most stations with a bad Q-
level.
2 7 9 23 34 51 71
RR
R
R R
R
5V 5V
Master
You can see the reflections in the oscilloscope
display of master 2 while connected
at test point Slave 71.
Typical Network Issues
Case 2: Q-level becomes worse from one measuring point to other
6
Typical Network Issues
Case 3: Some stations are “missing”
Case 3:
- Step 1: perform test at left side (Master 2)
- Step 2: perform test at right side (Slave 71)
(Note: make sure that Timeout is not caused by the
time-out setting in PB-T4: => Tools / settings)
Result:
- Test at left end: Slave 53 and 71 are missing
- Test at right end: all stations are missing
7
 Interpretation:
 The fact that some devices can be seen from one end but not from the other
indicates that the problem is not be caused by the devices themselves.
 The test result at the left end shows that the Q-levels are good until slave 34.
After slave 34 the Q-levels are not testable. This indicates that the problem
must be in the line between slave 34 and 51.
 Conclusion:
 The problem is caused by a break of one or both signal lines.
Master
2 7 9 23 34 51 71
RR
R
R R
R
5V 5V
?
Typical Network Issues
Case 3: Some stations are “missing”
8
Typical Network Issues
Case 4: Quality Level of one device is bad
 Step 1: perform test at left side (Master 2)
 Step 2: perform test at right side (Slave 123)
 Step 3: perform test at Slave 23
 Result:
 The Q-level of slave 23 is bad. All others are good. The result of all three measurements is basically
identical.
 Interpretation:
 The voltage level of RS485 driver of station 23 (and only station 23) is too low.
measurement from left side (master 2)
measurement directly from slave 23
measurement from right side (slave 123)
9
Typical Network Issues
Case 5: Bus-termination is not powered correctly
 An idle voltage of approx. 0,6 Volts indicates that only one bus-termination is powered correctly
 communication may work, sporadic failures likely
 An idle voltage close to 0 Volts (both terminations not correctly powered or one termination missing/one
not correctly powered  PROFIBUS will not start
Indication of idle voltage:
The correct idle voltage is supposed to be
between 0.8 and 1.4 V.
An idle voltage lower than that indicates that one
or both bus-terminations are not powered
correctly.
In addtion, you can detect a low
idle-voltage in the oscilloscope
(in this case approx. 0.5 V)
1V
10
Typical Network Issues
Case 6: Too many bus-terminations or electrical resistance
R
R
R
2 7 9 23 34 51 71
RR
R
R R
R
5V 5V
Master
11
Typical Failure Cases
Case 6: Too many bus-terminations or electrical resistance
Note: The test results get worse the closer the PBT-4 is connected to the location of
the problem (Master #2).
However, the signal quality level of the problematic station (Master #2) might be one
of the best.
Unfortunately, the test results do not change as strikingly when dealing with tool
many bus-terminations as they do with missing bus-terminations. Additional
resistance usually affects all stations.
signal blurred
only some drops in signal due to reflections
bad signal flanks
12
Typical Network Issues
Case 7: Cable too long for selected baud rate
Note:
Here the built-in Master functionality of the PB-
T4 comes in very handy.
Without changing the PLC-program, the
network can be tested at different baud rates
(e.g. 1.5Mbaud).As shown above, running the
same network at a baud rate of 1,5 Mbaud is
perfectly acceptable.
Note 1:
A cable length of 144m is too long for 12 Mbaud
(100m permissible).
Therefore, the quality levels / signal level of the
stations measured at the master drop with the
distance to the referring slave.
Note 2:
A test performed at the opposite end of the
network (station #17) will show a “mirrored
image”. In contrast to high line resistance the
signal quality degrades gradually.
12 Mbaud, 144m 1.5 Mbaud, 144m
13
Best-Practice for PROFIBUS
Cable type, number of stations, cable length
 PROFIBUS RS-485
 Layout: terminated line, branch (or stub) lines < 0.3 m (1 foot) !!
 Cable type: shielded twisted pair cable acc. to PROFIBUS specification
 Number of stations: max. 32 w/o repeater, 127 using repeaters
 Max. cable length (applies to cable type A only):
Baud Rate Max. Cable Length
9.6, 19.2, 31.25, and 45.45Kbit/s 1200 m (3940 ft)
93.75 and 187.5 Kbit/s 1000 m (3280 ft)
500 Kbit/s 400 m (1310 ft)
1500 Kbit/s 200 m (656 ft)
3000, 6000, and 12000 Kbit/s 100 m (328 ft)
14
Best-Practice for PROFIBUS
Correct line topology, setting of bus termination
Rt Rt
S S SS
M
S No ! Avoid branch lines !
termination„on“
termination„on“
termination„off“
termination„off“
termination„off“
termination„off“
termination„off“
Copper cable 0.22 mm2, twisted pair, shielded, AWG 24*
Max. 32 stations (Masters and Slaves) in one segment without repeater
15
Best-Practice for PROFIBUS
Correct line topology with repeaters
Rt Rt
S SS
Rt Rt
S SS
M
31 Stations
+1 Rep
30 Stations
+2 Rep
30 Stations
+2 Rep
Rt Rt
S SS
Rt Rt
S SS
31 Stations
+ 1 Rep
Rep
Rep
Rep
…
…
…
…
16
Best-Practice for PROFIBUS
Grounding and mounting of PROFIBUS RS-485
PROFIBUS
GND Cable to balance the Potentials, approx. 16 mm2,
Best: Same Routing as PROFIBUS Cable (parallel)
Slave Slave
Master
Equipotential Rail
PROFIBUS
Planar Connection of the PROFIBUS Cable Shielding to the Ground
Potential, e.g. through special Clamps
Equipotential Rail Equipotential Rail
17
www.BlueBoxComm.com
Thank You 
BlueBox Communication
443, Nana Peth, Kirad Villa,
Shop No. 5B, Pune- 411002,
Maharashtra, India.
+91 7875218696
+91 7875440101
sales@BlueBoxComm.com
18

More Related Content

What's hot

Power system slide notes
Power system slide notesPower system slide notes
Power system slide notes
michaeljmack
 
Underground cables
Underground cablesUnderground cables
Underground cables
Poonam Sarawgi
 
Sag in overhead transmission line, sag calculation &amp; string chart
Sag in overhead transmission line, sag   calculation &amp; string chartSag in overhead transmission line, sag   calculation &amp; string chart
Sag in overhead transmission line, sag calculation &amp; string chart
vishalgohel12195
 
Equipments of power transmission
Equipments of power transmissionEquipments of power transmission
Equipments of power transmission
Rasika Ghongade
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
Thorne & Derrick International
 
Bundle conductors in transmission line
Bundle conductors in transmission line Bundle conductors in transmission line
Bundle conductors in transmission line
chandan kumar
 
Underground cables
Underground cablesUnderground cables
Underground cables
Anu71
 
Busbar Configuarations
Busbar ConfiguarationsBusbar Configuarations
Busbar Configuarations
Power System Operation
 
Sag and tension
Sag and tensionSag and tension
Sag and tension
rajendrachoudhary123
 
Busbar configuarations
Busbar configuarationsBusbar configuarations
Busbar configuarations
Boopathi Thambusamy
 
Sag calculation
Sag calculationSag calculation
Sag calculation
Darshil Shah
 
Electrical Design of Overhead Lines.ppt
Electrical Design of Overhead Lines.pptElectrical Design of Overhead Lines.ppt
Electrical Design of Overhead Lines.ppt
AkdDeshmukh
 
Analysis of unsymmetrical faults using bus impedence matrix
Analysis of unsymmetrical faults using bus impedence matrixAnalysis of unsymmetrical faults using bus impedence matrix
Analysis of unsymmetrical faults using bus impedence matrix
Trupesh Rupareliya
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
guestecdd58
 
To control one lamp with one switch.
To control one lamp with one switch.To control one lamp with one switch.
To control one lamp with one switch.
Salman Jailani
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
Shrikant Bhansali
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
Dhananjay Jha
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
SURESH GOPAL
 
Ee423 fault analysis_notes
Ee423  fault analysis_notesEe423  fault analysis_notes
Ee423 fault analysis_notes
Acot Benard
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
Md. Atiqur Rahman
 

What's hot (20)

Power system slide notes
Power system slide notesPower system slide notes
Power system slide notes
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Sag in overhead transmission line, sag calculation &amp; string chart
Sag in overhead transmission line, sag   calculation &amp; string chartSag in overhead transmission line, sag   calculation &amp; string chart
Sag in overhead transmission line, sag calculation &amp; string chart
 
Equipments of power transmission
Equipments of power transmissionEquipments of power transmission
Equipments of power transmission
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
Bundle conductors in transmission line
Bundle conductors in transmission line Bundle conductors in transmission line
Bundle conductors in transmission line
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Busbar Configuarations
Busbar ConfiguarationsBusbar Configuarations
Busbar Configuarations
 
Sag and tension
Sag and tensionSag and tension
Sag and tension
 
Busbar configuarations
Busbar configuarationsBusbar configuarations
Busbar configuarations
 
Sag calculation
Sag calculationSag calculation
Sag calculation
 
Electrical Design of Overhead Lines.ppt
Electrical Design of Overhead Lines.pptElectrical Design of Overhead Lines.ppt
Electrical Design of Overhead Lines.ppt
 
Analysis of unsymmetrical faults using bus impedence matrix
Analysis of unsymmetrical faults using bus impedence matrixAnalysis of unsymmetrical faults using bus impedence matrix
Analysis of unsymmetrical faults using bus impedence matrix
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
To control one lamp with one switch.
To control one lamp with one switch.To control one lamp with one switch.
To control one lamp with one switch.
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
Ee423 fault analysis_notes
Ee423  fault analysis_notesEe423  fault analysis_notes
Ee423 fault analysis_notes
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 

Similar to Profibus Network Issues

Electrical testing
Electrical testingElectrical testing
Electrical testing
Aarjun Singh Panesar
 
Manuale 3 lw8108en
Manuale 3 lw8108enManuale 3 lw8108en
Manuale 3 lw8108en
Alex Ross
 
Detection of fault location in underground cable using arduino
Detection of fault location in underground cable using arduinoDetection of fault location in underground cable using arduino
Detection of fault location in underground cable using arduino
Chirag Lakhani
 
UNDERGROUND CABLE FAULT DISTANCE LOCATOR
UNDERGROUND CABLE FAULT DISTANCE LOCATORUNDERGROUND CABLE FAULT DISTANCE LOCATOR
UNDERGROUND CABLE FAULT DISTANCE LOCATOR
ijiert bestjournal
 
IRJET- Underground Cable Fault Distance Locator
IRJET- Underground Cable Fault Distance LocatorIRJET- Underground Cable Fault Distance Locator
IRJET- Underground Cable Fault Distance Locator
IRJET Journal
 
B1102030610
B1102030610B1102030610
B1102030610
IOSR Journals
 
Electronics i ii razavi
Electronics i ii razaviElectronics i ii razavi
Electronics i ii razavi
Hoopeer Hoopeer
 
Development of underground line fault detector
Development of underground line fault detectorDevelopment of underground line fault detector
Development of underground line fault detector
DODDI NAGASAI
 
Insulation testing of power cable
Insulation testing of power cableInsulation testing of power cable
Insulation testing of power cable
Syed Atif Naseem
 
The iot academy_embeddedsystems_training_circuitdesignpart3
The iot academy_embeddedsystems_training_circuitdesignpart3The iot academy_embeddedsystems_training_circuitdesignpart3
The iot academy_embeddedsystems_training_circuitdesignpart3
The IOT Academy
 
Ece 523 project – fully differential two stage telescopic op amp
Ece 523 project – fully differential two stage telescopic op ampEce 523 project – fully differential two stage telescopic op amp
Ece 523 project – fully differential two stage telescopic op amp
Karthik Rathinavel
 
Webinar Slides: Probing in Power Electronics - What to use and why
Webinar Slides:  Probing in Power Electronics - What to use and whyWebinar Slides:  Probing in Power Electronics - What to use and why
Webinar Slides: Probing in Power Electronics - What to use and why
teledynelecroy
 
Webinar Slides: Probing in Power Electronics - What to use and why
Webinar Slides:  Probing in Power Electronics - What to use and whyWebinar Slides:  Probing in Power Electronics - What to use and why
Webinar Slides: Probing in Power Electronics - What to use and why
Hilary Lustig
 
8-15
8-158-15
8-15
ramya c b
 
Signal Integrity Testing With a Vector Network Analyzer
Signal Integrity Testing With a Vector Network AnalyzerSignal Integrity Testing With a Vector Network Analyzer
Signal Integrity Testing With a Vector Network Analyzer
Rohde & Schwarz North America
 
Grid synchronisation
Grid synchronisationGrid synchronisation
Grid synchronisation
manogna gwen
 
Exp no 1 edited Analog electronics
Exp no 1 edited Analog electronicsExp no 1 edited Analog electronics
Exp no 1 edited Analog electronics
Omkar Rane
 
IRJET- Arduino based Single Phase Fault Detection System using IoT
IRJET- Arduino based Single Phase Fault Detection System using IoTIRJET- Arduino based Single Phase Fault Detection System using IoT
IRJET- Arduino based Single Phase Fault Detection System using IoT
IRJET Journal
 
Design Con VNA
Design Con VNADesign Con VNA
Design Con VNA
Neil Jarvis
 
Fault level calculations
Fault level calculationsFault level calculations
Fault level calculations
Shyamkant Vasekar
 

Similar to Profibus Network Issues (20)

Electrical testing
Electrical testingElectrical testing
Electrical testing
 
Manuale 3 lw8108en
Manuale 3 lw8108enManuale 3 lw8108en
Manuale 3 lw8108en
 
Detection of fault location in underground cable using arduino
Detection of fault location in underground cable using arduinoDetection of fault location in underground cable using arduino
Detection of fault location in underground cable using arduino
 
UNDERGROUND CABLE FAULT DISTANCE LOCATOR
UNDERGROUND CABLE FAULT DISTANCE LOCATORUNDERGROUND CABLE FAULT DISTANCE LOCATOR
UNDERGROUND CABLE FAULT DISTANCE LOCATOR
 
IRJET- Underground Cable Fault Distance Locator
IRJET- Underground Cable Fault Distance LocatorIRJET- Underground Cable Fault Distance Locator
IRJET- Underground Cable Fault Distance Locator
 
B1102030610
B1102030610B1102030610
B1102030610
 
Electronics i ii razavi
Electronics i ii razaviElectronics i ii razavi
Electronics i ii razavi
 
Development of underground line fault detector
Development of underground line fault detectorDevelopment of underground line fault detector
Development of underground line fault detector
 
Insulation testing of power cable
Insulation testing of power cableInsulation testing of power cable
Insulation testing of power cable
 
The iot academy_embeddedsystems_training_circuitdesignpart3
The iot academy_embeddedsystems_training_circuitdesignpart3The iot academy_embeddedsystems_training_circuitdesignpart3
The iot academy_embeddedsystems_training_circuitdesignpart3
 
Ece 523 project – fully differential two stage telescopic op amp
Ece 523 project – fully differential two stage telescopic op ampEce 523 project – fully differential two stage telescopic op amp
Ece 523 project – fully differential two stage telescopic op amp
 
Webinar Slides: Probing in Power Electronics - What to use and why
Webinar Slides:  Probing in Power Electronics - What to use and whyWebinar Slides:  Probing in Power Electronics - What to use and why
Webinar Slides: Probing in Power Electronics - What to use and why
 
Webinar Slides: Probing in Power Electronics - What to use and why
Webinar Slides:  Probing in Power Electronics - What to use and whyWebinar Slides:  Probing in Power Electronics - What to use and why
Webinar Slides: Probing in Power Electronics - What to use and why
 
8-15
8-158-15
8-15
 
Signal Integrity Testing With a Vector Network Analyzer
Signal Integrity Testing With a Vector Network AnalyzerSignal Integrity Testing With a Vector Network Analyzer
Signal Integrity Testing With a Vector Network Analyzer
 
Grid synchronisation
Grid synchronisationGrid synchronisation
Grid synchronisation
 
Exp no 1 edited Analog electronics
Exp no 1 edited Analog electronicsExp no 1 edited Analog electronics
Exp no 1 edited Analog electronics
 
IRJET- Arduino based Single Phase Fault Detection System using IoT
IRJET- Arduino based Single Phase Fault Detection System using IoTIRJET- Arduino based Single Phase Fault Detection System using IoT
IRJET- Arduino based Single Phase Fault Detection System using IoT
 
Design Con VNA
Design Con VNADesign Con VNA
Design Con VNA
 
Fault level calculations
Fault level calculationsFault level calculations
Fault level calculations
 

More from BluBoxx Communication Pvt. ltd

WGS-803 Industrial Wall-mount Switch
WGS-803 Industrial Wall-mount Switch WGS-803 Industrial Wall-mount Switch
WGS-803 Industrial Wall-mount Switch
BluBoxx Communication Pvt. ltd
 
XST-705A Copper to 10GBASE-X SFP+ Smart Media Converter
XST-705A Copper to 10GBASE-X SFP+ Smart Media ConverterXST-705A Copper to 10GBASE-X SFP+ Smart Media Converter
XST-705A Copper to 10GBASE-X SFP+ Smart Media Converter
BluBoxx Communication Pvt. ltd
 
POE-E304 PoE++ to 4-Port 802.3af/at Gigabit PoE Extender
POE-E304  PoE++ to 4-Port 802.3af/at Gigabit PoE ExtenderPOE-E304  PoE++ to 4-Port 802.3af/at Gigabit PoE Extender
POE-E304 PoE++ to 4-Port 802.3af/at Gigabit PoE Extender
BluBoxx Communication Pvt. ltd
 
WGS-5225-8UP2SV Industrial PoE Wall-mount Managed Switch with LCD Touch Screen
WGS-5225-8UP2SV Industrial PoE Wall-mount Managed Switch with LCD Touch ScreenWGS-5225-8UP2SV Industrial PoE Wall-mount Managed Switch with LCD Touch Screen
WGS-5225-8UP2SV Industrial PoE Wall-mount Managed Switch with LCD Touch Screen
BluBoxx Communication Pvt. ltd
 
IGS-6325-24P4S Industrial Managed Ethernet Switch
IGS-6325-24P4S Industrial  Managed Ethernet Switch IGS-6325-24P4S Industrial  Managed Ethernet Switch
IGS-6325-24P4S Industrial Managed Ethernet Switch
BluBoxx Communication Pvt. ltd
 
IGS-6325-20S4C4X Industrial Managed Ethernet Switch
IGS-6325-20S4C4X Industrial Managed Ethernet SwitchIGS-6325-20S4C4X Industrial Managed Ethernet Switch
IGS-6325-20S4C4X Industrial Managed Ethernet Switch
BluBoxx Communication Pvt. ltd
 
IGS-6325-8UP2S Industrial Managed Ethernet Switch
IGS-6325-8UP2S Industrial  Managed Ethernet SwitchIGS-6325-8UP2S Industrial  Managed Ethernet Switch
IGS-6325-8UP2S Industrial Managed Ethernet Switch
BluBoxx Communication Pvt. ltd
 
LCG-300 Industrial LoRaWAN Gateway
LCG-300 Industrial LoRaWAN GatewayLCG-300 Industrial LoRaWAN Gateway
LCG-300 Industrial LoRaWAN Gateway
BluBoxx Communication Pvt. ltd
 
IGS-6325-24P4X Industrial Managed Ethernet Switch
IGS-6325-24P4X Industrial Managed Ethernet Switch IGS-6325-24P4X Industrial Managed Ethernet Switch
IGS-6325-24P4X Industrial Managed Ethernet Switch
BluBoxx Communication Pvt. ltd
 
MC-1610MR 16-Slot Managed Media Converter Chassis with Redundant Power Supply...
MC-1610MR 16-Slot Managed Media Converter Chassis with Redundant Power Supply...MC-1610MR 16-Slot Managed Media Converter Chassis with Redundant Power Supply...
MC-1610MR 16-Slot Managed Media Converter Chassis with Redundant Power Supply...
BluBoxx Communication Pvt. ltd
 
IGS-5227-6T Industrial Managed Ethernet Switch
IGS-5227-6T Industrial  Managed Ethernet SwitchIGS-5227-6T Industrial  Managed Ethernet Switch
IGS-5227-6T Industrial Managed Ethernet Switch
BluBoxx Communication Pvt. ltd
 
GSW-2824P Combo Ethernet Switch
GSW-2824P Combo Ethernet SwitchGSW-2824P Combo Ethernet Switch
GSW-2824P Combo Ethernet Switch
BluBoxx Communication Pvt. ltd
 
VC-231GF Converter
VC-231GF ConverterVC-231GF Converter
VC-231GF Converter
BluBoxx Communication Pvt. ltd
 
IGS-1600T Gigabit Ethernet Switch
IGS-1600T Gigabit Ethernet Switch IGS-1600T Gigabit Ethernet Switch
IGS-1600T Gigabit Ethernet Switch
BluBoxx Communication Pvt. ltd
 
IGS-10020MT Industrial Managed Gigabit Switch
IGS-10020MT Industrial Managed Gigabit SwitchIGS-10020MT Industrial Managed Gigabit Switch
IGS-10020MT Industrial Managed Gigabit Switch
BluBoxx Communication Pvt. ltd
 
IGS-1600T Gigabit Ethernet Switch
IGS-1600T Gigabit Ethernet SwitchIGS-1600T Gigabit Ethernet Switch
IGS-1600T Gigabit Ethernet Switch
BluBoxx Communication Pvt. ltd
 
SGS-5240-48T4X Stackable Managed Switch
SGS-5240-48T4X Stackable Managed SwitchSGS-5240-48T4X Stackable Managed Switch
SGS-5240-48T4X Stackable Managed Switch
BluBoxx Communication Pvt. ltd
 
IMG-2102T Industrial Modbus Gateway
IMG-2102T  Industrial Modbus Gateway IMG-2102T  Industrial Modbus Gateway
IMG-2102T Industrial Modbus Gateway
BluBoxx Communication Pvt. ltd
 
SGS-5240-20S4C4XR Stackable Managed Switch
SGS-5240-20S4C4XR Stackable Managed Switch SGS-5240-20S4C4XR Stackable Managed Switch
SGS-5240-20S4C4XR Stackable Managed Switch
BluBoxx Communication Pvt. ltd
 
ICS-2100T Industrial 1-Port RS232/RS422/RS485 Serial Device Server
ICS-2100T Industrial 1-Port RS232/RS422/RS485 Serial Device ServerICS-2100T Industrial 1-Port RS232/RS422/RS485 Serial Device Server
ICS-2100T Industrial 1-Port RS232/RS422/RS485 Serial Device Server
BluBoxx Communication Pvt. ltd
 

More from BluBoxx Communication Pvt. ltd (20)

WGS-803 Industrial Wall-mount Switch
WGS-803 Industrial Wall-mount Switch WGS-803 Industrial Wall-mount Switch
WGS-803 Industrial Wall-mount Switch
 
XST-705A Copper to 10GBASE-X SFP+ Smart Media Converter
XST-705A Copper to 10GBASE-X SFP+ Smart Media ConverterXST-705A Copper to 10GBASE-X SFP+ Smart Media Converter
XST-705A Copper to 10GBASE-X SFP+ Smart Media Converter
 
POE-E304 PoE++ to 4-Port 802.3af/at Gigabit PoE Extender
POE-E304  PoE++ to 4-Port 802.3af/at Gigabit PoE ExtenderPOE-E304  PoE++ to 4-Port 802.3af/at Gigabit PoE Extender
POE-E304 PoE++ to 4-Port 802.3af/at Gigabit PoE Extender
 
WGS-5225-8UP2SV Industrial PoE Wall-mount Managed Switch with LCD Touch Screen
WGS-5225-8UP2SV Industrial PoE Wall-mount Managed Switch with LCD Touch ScreenWGS-5225-8UP2SV Industrial PoE Wall-mount Managed Switch with LCD Touch Screen
WGS-5225-8UP2SV Industrial PoE Wall-mount Managed Switch with LCD Touch Screen
 
IGS-6325-24P4S Industrial Managed Ethernet Switch
IGS-6325-24P4S Industrial  Managed Ethernet Switch IGS-6325-24P4S Industrial  Managed Ethernet Switch
IGS-6325-24P4S Industrial Managed Ethernet Switch
 
IGS-6325-20S4C4X Industrial Managed Ethernet Switch
IGS-6325-20S4C4X Industrial Managed Ethernet SwitchIGS-6325-20S4C4X Industrial Managed Ethernet Switch
IGS-6325-20S4C4X Industrial Managed Ethernet Switch
 
IGS-6325-8UP2S Industrial Managed Ethernet Switch
IGS-6325-8UP2S Industrial  Managed Ethernet SwitchIGS-6325-8UP2S Industrial  Managed Ethernet Switch
IGS-6325-8UP2S Industrial Managed Ethernet Switch
 
LCG-300 Industrial LoRaWAN Gateway
LCG-300 Industrial LoRaWAN GatewayLCG-300 Industrial LoRaWAN Gateway
LCG-300 Industrial LoRaWAN Gateway
 
IGS-6325-24P4X Industrial Managed Ethernet Switch
IGS-6325-24P4X Industrial Managed Ethernet Switch IGS-6325-24P4X Industrial Managed Ethernet Switch
IGS-6325-24P4X Industrial Managed Ethernet Switch
 
MC-1610MR 16-Slot Managed Media Converter Chassis with Redundant Power Supply...
MC-1610MR 16-Slot Managed Media Converter Chassis with Redundant Power Supply...MC-1610MR 16-Slot Managed Media Converter Chassis with Redundant Power Supply...
MC-1610MR 16-Slot Managed Media Converter Chassis with Redundant Power Supply...
 
IGS-5227-6T Industrial Managed Ethernet Switch
IGS-5227-6T Industrial  Managed Ethernet SwitchIGS-5227-6T Industrial  Managed Ethernet Switch
IGS-5227-6T Industrial Managed Ethernet Switch
 
GSW-2824P Combo Ethernet Switch
GSW-2824P Combo Ethernet SwitchGSW-2824P Combo Ethernet Switch
GSW-2824P Combo Ethernet Switch
 
VC-231GF Converter
VC-231GF ConverterVC-231GF Converter
VC-231GF Converter
 
IGS-1600T Gigabit Ethernet Switch
IGS-1600T Gigabit Ethernet Switch IGS-1600T Gigabit Ethernet Switch
IGS-1600T Gigabit Ethernet Switch
 
IGS-10020MT Industrial Managed Gigabit Switch
IGS-10020MT Industrial Managed Gigabit SwitchIGS-10020MT Industrial Managed Gigabit Switch
IGS-10020MT Industrial Managed Gigabit Switch
 
IGS-1600T Gigabit Ethernet Switch
IGS-1600T Gigabit Ethernet SwitchIGS-1600T Gigabit Ethernet Switch
IGS-1600T Gigabit Ethernet Switch
 
SGS-5240-48T4X Stackable Managed Switch
SGS-5240-48T4X Stackable Managed SwitchSGS-5240-48T4X Stackable Managed Switch
SGS-5240-48T4X Stackable Managed Switch
 
IMG-2102T Industrial Modbus Gateway
IMG-2102T  Industrial Modbus Gateway IMG-2102T  Industrial Modbus Gateway
IMG-2102T Industrial Modbus Gateway
 
SGS-5240-20S4C4XR Stackable Managed Switch
SGS-5240-20S4C4XR Stackable Managed Switch SGS-5240-20S4C4XR Stackable Managed Switch
SGS-5240-20S4C4XR Stackable Managed Switch
 
ICS-2100T Industrial 1-Port RS232/RS422/RS485 Serial Device Server
ICS-2100T Industrial 1-Port RS232/RS422/RS485 Serial Device ServerICS-2100T Industrial 1-Port RS232/RS422/RS485 Serial Device Server
ICS-2100T Industrial 1-Port RS232/RS422/RS485 Serial Device Server
 

Recently uploaded

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 

Recently uploaded (20)

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 

Profibus Network Issues

  • 1. Resolving Typical PROFIBUS Network issues using PROFIBUS Tester By BlueBox Communication 1 www.BlueBoxComm.com
  • 2. Typical Network Issues Sample Network Master 2 7 9 23 34 51 71 RR R R R R 5V Note: The termination resistors are integrated in the connectors of station 2 and 71; the 5V supply for the termination is provided by the respective device. 5V The following network issues were recorded on this sample network. 2
  • 3. Typical Network Issues Case 1: Reversal of results from both ends of the system  Case 1:  Step 1:  Connect and test from left end side (Master 2)  Step 2:  Connect and test from right end side (Slave 71)  Result:  Test results from the left end:  - Good quality values for stations 2 - 34  - Bad quality values for stations 51 – 71  Test results from the right side:  - Bad quality values for stations 2 – 34  - Good quality values for stations 51 – 71   Reversal of Q-Levels ! measurement from right side (Slave 71) measurement from left side (Master 2) 3
  • 4. 2 7 9 23 34 51 71 RR R R R R 5V 5V Master R Reason: High Line Resistance between two Stations (#34 and #51) Interpretation: The test result from the right side is the reversal (!) of the test results from the left side and vice versa. This kind of reversal is a clear indication for an high resistance in the network. In this case the problem is caused somewhere between slave 34 and slave 51 e.g. corrosion, sharply bent cable, etc. Typical Network Issues Case 1: Reversal of results from both ends of the system 4
  • 5. Typical Network Issues Case 2: Q-level becomes worse from one measuring point to other Case 2: - Step 1: perform test at left end (Master 2) - Step 2: perform test at right end (Slave 71) - Step 3: perform tests at random stations located in the middle of the network Result: - No reversion of Q-level between left and right side - Instead, the Q-level for all stations generally declines from one station to the other. Master 2 Slave 7 Slave 23 Slave 71 5
  • 6. Interpretation: - The problem is not caused by resistance problems (corrosion, cable too long, etc… - The problem is caused by signal reflections in the network, in this case by a missing termination resistance at Slave 71. Typically, the problem is located at the test point that shows most stations with a bad Q- level. 2 7 9 23 34 51 71 RR R R R R 5V 5V Master You can see the reflections in the oscilloscope display of master 2 while connected at test point Slave 71. Typical Network Issues Case 2: Q-level becomes worse from one measuring point to other 6
  • 7. Typical Network Issues Case 3: Some stations are “missing” Case 3: - Step 1: perform test at left side (Master 2) - Step 2: perform test at right side (Slave 71) (Note: make sure that Timeout is not caused by the time-out setting in PB-T4: => Tools / settings) Result: - Test at left end: Slave 53 and 71 are missing - Test at right end: all stations are missing 7
  • 8.  Interpretation:  The fact that some devices can be seen from one end but not from the other indicates that the problem is not be caused by the devices themselves.  The test result at the left end shows that the Q-levels are good until slave 34. After slave 34 the Q-levels are not testable. This indicates that the problem must be in the line between slave 34 and 51.  Conclusion:  The problem is caused by a break of one or both signal lines. Master 2 7 9 23 34 51 71 RR R R R R 5V 5V ? Typical Network Issues Case 3: Some stations are “missing” 8
  • 9. Typical Network Issues Case 4: Quality Level of one device is bad  Step 1: perform test at left side (Master 2)  Step 2: perform test at right side (Slave 123)  Step 3: perform test at Slave 23  Result:  The Q-level of slave 23 is bad. All others are good. The result of all three measurements is basically identical.  Interpretation:  The voltage level of RS485 driver of station 23 (and only station 23) is too low. measurement from left side (master 2) measurement directly from slave 23 measurement from right side (slave 123) 9
  • 10. Typical Network Issues Case 5: Bus-termination is not powered correctly  An idle voltage of approx. 0,6 Volts indicates that only one bus-termination is powered correctly  communication may work, sporadic failures likely  An idle voltage close to 0 Volts (both terminations not correctly powered or one termination missing/one not correctly powered  PROFIBUS will not start Indication of idle voltage: The correct idle voltage is supposed to be between 0.8 and 1.4 V. An idle voltage lower than that indicates that one or both bus-terminations are not powered correctly. In addtion, you can detect a low idle-voltage in the oscilloscope (in this case approx. 0.5 V) 1V 10
  • 11. Typical Network Issues Case 6: Too many bus-terminations or electrical resistance R R R 2 7 9 23 34 51 71 RR R R R R 5V 5V Master 11
  • 12. Typical Failure Cases Case 6: Too many bus-terminations or electrical resistance Note: The test results get worse the closer the PBT-4 is connected to the location of the problem (Master #2). However, the signal quality level of the problematic station (Master #2) might be one of the best. Unfortunately, the test results do not change as strikingly when dealing with tool many bus-terminations as they do with missing bus-terminations. Additional resistance usually affects all stations. signal blurred only some drops in signal due to reflections bad signal flanks 12
  • 13. Typical Network Issues Case 7: Cable too long for selected baud rate Note: Here the built-in Master functionality of the PB- T4 comes in very handy. Without changing the PLC-program, the network can be tested at different baud rates (e.g. 1.5Mbaud).As shown above, running the same network at a baud rate of 1,5 Mbaud is perfectly acceptable. Note 1: A cable length of 144m is too long for 12 Mbaud (100m permissible). Therefore, the quality levels / signal level of the stations measured at the master drop with the distance to the referring slave. Note 2: A test performed at the opposite end of the network (station #17) will show a “mirrored image”. In contrast to high line resistance the signal quality degrades gradually. 12 Mbaud, 144m 1.5 Mbaud, 144m 13
  • 14. Best-Practice for PROFIBUS Cable type, number of stations, cable length  PROFIBUS RS-485  Layout: terminated line, branch (or stub) lines < 0.3 m (1 foot) !!  Cable type: shielded twisted pair cable acc. to PROFIBUS specification  Number of stations: max. 32 w/o repeater, 127 using repeaters  Max. cable length (applies to cable type A only): Baud Rate Max. Cable Length 9.6, 19.2, 31.25, and 45.45Kbit/s 1200 m (3940 ft) 93.75 and 187.5 Kbit/s 1000 m (3280 ft) 500 Kbit/s 400 m (1310 ft) 1500 Kbit/s 200 m (656 ft) 3000, 6000, and 12000 Kbit/s 100 m (328 ft) 14
  • 15. Best-Practice for PROFIBUS Correct line topology, setting of bus termination Rt Rt S S SS M S No ! Avoid branch lines ! termination„on“ termination„on“ termination„off“ termination„off“ termination„off“ termination„off“ termination„off“ Copper cable 0.22 mm2, twisted pair, shielded, AWG 24* Max. 32 stations (Masters and Slaves) in one segment without repeater 15
  • 16. Best-Practice for PROFIBUS Correct line topology with repeaters Rt Rt S SS Rt Rt S SS M 31 Stations +1 Rep 30 Stations +2 Rep 30 Stations +2 Rep Rt Rt S SS Rt Rt S SS 31 Stations + 1 Rep Rep Rep Rep … … … … 16
  • 17. Best-Practice for PROFIBUS Grounding and mounting of PROFIBUS RS-485 PROFIBUS GND Cable to balance the Potentials, approx. 16 mm2, Best: Same Routing as PROFIBUS Cable (parallel) Slave Slave Master Equipotential Rail PROFIBUS Planar Connection of the PROFIBUS Cable Shielding to the Ground Potential, e.g. through special Clamps Equipotential Rail Equipotential Rail 17