2
Why Study Operating Systems?
Because OS hacking will make you a better
programmer and a better thinker.
 The OS is really large (Windows Vista is 50 million lines+).
 The OS manages concurrency.
 Concurrency leads to interesting programming challenges.
 (Interesting programming challenges can lead to wisdom.)
 OS code manages raw hardware.
 Programming raw hardware is challenging: timing dependent
behavior, undocumented behavior, HW bugs.
 OS code must be efficient, low CPU, memory, disk use.
 OS fails  machine fails. OS must fail less than user
programs.
 OS provides services that enable application programs
 … knowledge of OS will make you a better computer user
 OS basis of system security.
3
Why Won’t Operating Systems Go Away?
Hardware needs an OS to be useful.
 Multiplex resources for efficiency and security.
OS is cornerstone of what makes computing fun.
The design of an MP3 player involves many OS
issues:
 Its OS implements a file system which is specially
designed to store music files.
 The OS manages communication with your PC.
 The OS reads music from the disc and buffers it in
memory.
 The OS controls the volume of the output device.
 The OS controls the display.
 The OS controls wireless network access.
Cell phone, mp3 player, DVD player, PDA, iPhone,
peer-to-peer file sharing
Systems/Theory/Artificial intelligence
4
Operating Systems:
Basic Concepts and History
5
Introduction to Operating Systems
An operating system is the interface between the user and
the architecture.
OS as juggler: providing the illusion of a dedicated machine
with infinite memory and CPU.
OS as government: protecting users from each other,
allocating resources efficiently and fairly, and providing
secure and safe communication
OS as complex system: keeping OS design and
implementation as simple as possible is the key to getting the
OS to work
User Applications
Operating System
Hardware
Virtual Machine Interface
Physical Machine Interface
6
What is an Operating System?
Any code that runs with the hardware kernel bit set
 An abstract virtual machine
 A set of abstractions that simplify application design
 Files instead of “bytes on a disk”
Core OS services, written by “pros”
 Processes, process scheduling
 Address spaces
 Device control
 ~30% of Linux source code. Basis of stability and security
Device drivers written by “whoever”
 Software run in kernel to manages a particular vendor’s
hardware
E.g. Homer Simpson doll with USB
 ~70% of Linux source code
 OS is extensible
 Drivers are the biggest source of OS instability
7
What is an Operating System?
For any OS area (CPU scheduling, file systems, memory
management), begin by asking two questions
 What’s the hardware interface? (The Physical Reality)
 What is the application interface? (The Nicer Interface for
programmer producivity)
Key questions:
 Why is the application interface defined the way it is?
 Should we push more functionality into applications, the OS, or
the hardware?
 What are the tradeoffs between programmability, complexity,
and flexibility?
8
Operating System Functions
Service provider
 Provide standard facilities
 File system
 Standard libraries
 Window system
 …
Coordinator: three aspects
 Protection: prevent jobs from interfering with each other
 Communication: enable jobs to interact with each other
 Resource management: facilitate sharing of resources across
jobs.
Operating systems are everywhere
 Single-function devices (embedded controllers, Nintendo, …)
 OS provides a collection of standard services
 Sometimes OS/middleware distinction is blurry
 Multi-function/application devices (workstations and servers)
 OS manages application interactions
9
Why do we need operating systems?
Convenience
 Provide a high-level abstraction of physical resources.
 Make hardware usable by getting rid of warts & specifics.
 Enable the construction of more complex software systems
 Enable portable code.
 MS-DOS version 1 boots on the latest 3+ GHz Pentium.
 Would games that ran on MS-DOSv1 work well today?
Efficiency
 Share limited or expensive physical resources.
 Provide protection.
10
Computer Architecture & Processes
CPU - the processor that performs the actual computation
I/O devices - terminal, disks, video board, printer, etc.
Memory - RAM containing data and programs used by the CPU
System bus - the communication medium between the CPU,
memory, and peripherals
11
Evolution of Operating Systems
Why do operating systems change?
 Key functions: hardware abstraction and coordination
 Principle: Design tradeoffs change as technology changes.
Comparing computing systems from 1981 and 2007
1981 2007 Factor
MIPS 1 57,000 57,000
$/SPECInt $100K $2 50,000
DRAM size 128KB 2GB 16,000
Disk size 10MB 1TB 100,000
Net BW 9600 bps 100 Mb/s 10,000
Address bits 16 64 4
Users/machine 100 <1 100
Energy efficiency and parallelism loom on the horizon.
Data centers projected to consume 3% of US energy by next year
No more single-core CPUs
12
From Architecture to OS to Application, and Back
Hardware Example OS Services User Abstraction
Processor Process management,
Scheduling, Traps,
Protections, Billing,
Synchronization
Process
Memory Management, Protection,
Virtual memory
Address space
I/O devices Concurrency with CPU,
Interrupt handling
Terminal, Mouse,
Printer, (System
Calls)
File system Management, Persistence Files
Distributed
systems
Network security,
Distributed file system
RPC system calls,
Transparent file
sharing
13
From Architectural to OS to Application, and Back
OS Service Hardware Support
Protection Kernel / User mode
Protected Instructions
Base and Limit Registers
Interrupts Interrupt Vectors
System calls Trap instructions and trap vectors
I/O Interrupts or Memory-Mapping
Scheduling, error
recovery, billing
Timer
Synchronization Atomic instructions
Virtual Memory Translation look-aside buffers
Register pointing to base of page table
14
Interrupts - Moving from Kernel to User Mode
User processes may not:
address I/O directly
use instructions that
manipulate OS memory
(e.g., page tables)
set the mode bits that
determine user or kernel
mode
disable and enable
interrupts
halt the machine
but in kernel mode, the OS does all these things
a status bit in a protected processor register indicates the
mode
Protected instructions can only be executed in kernel mode.
On interrupts (e.g., time slice) or system calls
15
History of Operating Systems: Phases
Phase 1: Hardware is expensive, humans are cheap
 User at console: single-user systems
 Batching systems
 Multi-programming systems
Phase 2: Hardware is cheap, humans are expensive
 Time sharing: Users use cheap terminals and share servers
Phase 3: Hardware is very cheap, humans are very expensive
 Personal computing: One system per user
 Distributed computing: lots of systems per user
Phase 4: Ubiquitous computing
 Computers will be sewn into our clothes, but I hope not
implanted in our skin
 Cell phone, mp3 player, DVD player, TIVO, PDA, iPhone
16
History of Operating Systems: Phases
Phase 1: Hardware is expensive, humans are cheap
 User at console: single-user systems
 Batching systems
 Multi-programming systems
Phase 2: Hardware is cheap, humans are expensive
 Time sharing: Users use cheap terminals and share servers
Phase 3: Hardware is very cheap, humans are very expensive
 Personal computing: One system per user
 Distributed computing: lots of systems per user
Phase 4: Ubiquitous computing
17
A Brief History of Operating Systems
Hand programmed machines (‘45-‘55)
Single user systems
OS = loader + libraries of common subroutines
Problem: low utilization of expensive components
= % utilization
Execution time
Execution time +
Card reader time
18
Batch/Off-line processing (‘55-‘65)
Batching v. sequential execution of jobs
Card Reader:
CPU:
Printer:
Read Batch 1
Execute Batch 1 Batch 2 Batch 3
Batch 2 Batch 3
Print Batch 1 Batch 2 Batch 3
Card Reader:
CPU:
Printer:
Read Job 1
Execute Job 1 Job 2 Job 3
Job 2 Job 3
Print Job 1 Job 2 Job 3
19
TapeTape
Batch processing (‘55-‘65)
Operating system = loader + sequencer + output processor
Input
Compute
Output
Card
Reader
Printer
Tape Tape
Operating System
“System Software”
User Program
User Data
20
Multiprogramming (‘65-‘80)
Keep several jobs in memory and multiplex CPU
between jobs
Operating System
“System Software”
User Program 1
User Program 2User Program 2
User Program n
...
program P
begin
:
Read(var)
:
end P
system call Read()
begin
StartIO(input device)
WaitIO(interrupt)
EndIO(input device)
:
end Read
Simple, “synchronous” input:
What to do while we wait
for the I/O device?
21
Multiprogramming (‘65-‘80)
Keep several jobs in memory and multiplex CPU
between jobs
Operating System
“System Software”
User Program 1
User Program 2User Program 2
User Program n
...
Program 1
I/O
Device
k: read()
k+1:
endio()
interrupt
main{
}
}
OS
read{
startIO()
waitIO()
22
Multiprogramming (‘65-‘80)
Keep several jobs in memory and multiplex CPU
between jobs
Operating System
“System Software”
User Program 1
User Program 2User Program 2
User Program n
...
Program 1 Program 2OS
I/O
Device
k: read()
startIO()
interrupt
main{
read{
endio{
}
schedule()
main{
k+1:
}
}
schedule()
23
History of Operating Systems: Phases
Phase 1: Hardware is expensive, humans are cheap
 User at console: single-user systems
 Batching systems
 Multi-programming systems
Phase 2: Hardware is cheap, humans are expensive
 Time sharing: Users use cheap terminals and share servers
Phase 3: Hardware is very cheap, humans are very expensive
 Personal computing: One system per user
 Distributed computing: lots of systems per user
Phase 4: Ubiquitous computing
24
Timesharing (‘70- )
A timer interrupt is used to multiplex CPU among
jobs
Operating System
“System Software”
User Program 1
User Program 2User Program 2
User Program n
...
Program 1 Program 2OS
k+1:
schedule{
timer
interrupt
schedule{
timer
interrupt
k:
main{
}
main{
}
timer
interrupt
schedule{
25
History of Operating Systems: Phases
Phase 1: Hardware is expensive, humans are cheap
 User at console: single-user systems
 Batching systems
 Multi-programming systems
Phase 2: Hardware is cheap, humans are expensive
 Time sharing: Users use cheap terminals and share servers
Phase 3: Hardware is very cheap, humans are very expensive
 Personal computing: One system per user
 Distributed computing: lots of systems per user
Phase 4: Ubiquitous computing
26
Operating Systems for PCs
Personal computing systems
 Single user
 Utilization is no longer a concern
 Emphasis is on user interface and API
 Many services & features not present
Evolution
 Initially: OS as a simple service provider
(simple libraries)
 Now: Multi-application systems with
support for coordination and
communication
 Growing security issues (e.g., online
commerce, medical records)
27
Distributed Operating Systems
Typically support distributed services
 Sharing of data and coordination across multiple systems
Possibly employ multiple processors
 Loosely coupled v. tightly coupled systems
High availability & reliability requirements
 Amazon, CNN
OS
process
management
User
Program
CPU
LAN/WAN
OS
process management
memory management
User
Program
CPU
OS
file system
name services
mail services
CPU
Network
28
History of Operating Systems: Phases
Phase 1: Hardware is expensive, humans are cheap
 User at console: single-user systems
 Batching systems
 Multi-programming systems
Phase 2: Hardware is cheap, humans are expensive
 Time sharing: Users use cheap terminals and share servers
Phase 3: Hardware is very cheap, humans are very expensive
 Personal computing: One system per user
 Distributed computing: lots of systems per user
Phase 4: Connecting people and their machines
 Intellectual property issues
 Information organization
29
Course Overview
OS Structure, Processes and Process Management
CPU scheduling
Threads and concurrent programming
 Thread coordination, mutual exclusion, monitors
 Deadlocks
Virtual memory & Memory management
Disks & file systems
 Distributed file systems
Security
30
What is an Operating System?
A program that acts as an intermediary between a
user of a computer and the computer hardware.
Operating system goals:
Execute user programs
Make the computer system convenient to use.
Use the computer hardware in an efficient manner.
31
Computer System Structure
Computer system can be divided into four components
 Hardware – provides basic computing resources
 CPU, memory, I/O devices
 Operating system
 Controls and coordinates use of hardware among
various applications and users
 Application programs – define the ways in which the
system resources are used to solve the computing
problems of the users
 Word processors, compilers, web browsers,
database systems, video games
 Users
 People, machines, other computers
32
Four Components of a Computer System
33
Operating System Definition
OS is a resource allocator
 Manages all resources
 Decides between conflicting requests for efficient and fair
resource use
OS is a control program
 Controls execution of programs to prevent errors and
improper use of the computer
34
Operating System Structure
Multiprogramming needed for efficiency
 Single user cannot keep CPU and I/O devices busy at all times
 Multiprogramming organizes jobs (code and data) so CPU always has
one to execute
 A subset of total jobs in system is kept in memory
 One job selected and run via job scheduling
 When it has to wait (for I/O for example), OS switches to another
job
Timesharing (multitasking) is logical extension in which CPU switches
jobs so frequently that users can interact with each job while it is
running, creating interactive computing
 Response time should be < 1 second
 Each user has at least one program executing in memory process
 If several jobs ready to run at the same time  CPU scheduling
 If processes don’t fit in memory, swapping moves them in and out to
run
 Virtual memory allows execution of processes not completely in
memory
35
Memory Layout for Multiprogrammed System
36
Operating-System Operations
Interrupt driven by hardware
Software error or request creates exception or trap
 Division by zero, request for operating system service
Other process problems include infinite loop, processes modifying
each other or the operating system
Dual-mode operation allows OS to protect itself and other system
components
 User mode and kernel mode
 Mode bit provided by hardware
 Provides ability to distinguish when system is running user
code or kernel code
 Some instructions designated as privileged, only executable
in kernel mode
 System call changes mode to kernel, return from call resets
it to user
37
Chapter 3: Processes
Process Concept
Process Scheduling
Operations on Processes
Cooperating Processes
Interprocess Communication
Communication in Client-Server Systems
38
Process Concept
An operating system executes a variety of
programs:
 Batch system – jobs
 Time-shared systems – user programs or tasks
Textbook uses the terms job and process
almost interchangeably
Process – a program in execution; process
execution must progress in sequential
fashion
A process includes:
 program counter
 stack
 data section
39
Process in Memory
40
Process State
As a process executes, it changes state
new: The process is being created
running: Instructions are being executed
waiting: The process is waiting for some
event to occur
ready: The process is waiting to be
assigned to a processor
terminated: The process has finished
execution
41
Diagram of Process State
42
Process Control Block (PCB)
Information associated with each process
Process state
Program counter
CPU registers
CPU scheduling information
Memory-management information
Accounting information
I/O status information
43
Process Control Block (PCB)
44
CPU Switch From Process to Process
45
Process Scheduling Queues
Job queue – set of all processes in the
system
Ready queue – set of all processes residing
in main memory, ready and waiting to
execute
Device queues – set of processes waiting
for an I/O device
Processes migrate among the various
queues
46
Process Scheduling Queues
Job queue – set of all processes in the
system
Ready queue – set of all processes residing
in main memory, ready and waiting to
execute
Device queues – set of processes waiting
for an I/O device
Processes migrate among the various
queues
47
Ready Queue And Various I/O Device Queues
48
Representation of Process Scheduling
49
Schedulers
Long-term scheduler (or job scheduler)
– selects which processes should be
brought into the ready queue
Short-term scheduler (or CPU
scheduler) – selects which process should
be executed next and allocates CPU
50
Addition of Medium Term Scheduling
51
Schedulers (Cont.)
Short-term scheduler is invoked very frequently
(milliseconds)  (must be fast)
Long-term scheduler is invoked very infrequently
(seconds, minutes)  (may be slow)
The long-term scheduler controls the degree of
multiprogramming
Processes can be described as either:
 I/O-bound process – spends more time doing I/O than
computations, many short CPU bursts
 CPU-bound process – spends more time doing
computations; few very long CPU bursts
52
Context Switch
When CPU switches to another process, the
system must save the state of the old process
and load the saved state for the new process
Context-switch time is overhead; the system
does no useful work while switching
Time dependent on hardware support
53
Process Creation
Parent process create children processes, which,
in turn create other processes, forming a tree of
processes
Resource sharing
 Parent and children share all resources
 Children share subset of parent’s resources
 Parent and child share no resources
Execution
 Parent and children execute concurrently
 Parent waits until children terminate
54
Process Creation (Cont.)
Address space
 Child duplicate of parent
 Child has a program loaded into it
UNIX examples
 fork system call creates new process
 exec system call used after a fork to replace the
process’ memory space with a new program
55
Process Creation
56
C Program Forking Separate Process
int main()
{
pid_t pid;
/* fork another process */
pid = fork();
if (pid < 0) { /* error occurred */
fprintf(stderr, "Fork Failed");
exit(-1);
}
else if (pid == 0) { /* child process */
execlp("/bin/ls", "ls", NULL);
}
else { /* parent process */
/* parent will wait for the child to complete */
wait (NULL);
printf ("Child Complete");
exit(0);
}
}
57
A tree of processes on a typical Solaris
58
Process Termination
Process executes last statement and asks the
operating system to delete it (exit)
 Output data from child to parent (via wait)
 Process’ resources are deallocated by operating system
Parent may terminate execution of children
processes (abort)
 Child has exceeded allocated resources
 Task assigned to child is no longer required
 If parent is exiting
Some operating system do not allow child to
continue if its parent terminates
 All children terminated - cascading termination
59
Cooperating Processes
Independent process cannot affect or be
affected by the execution of another process
Cooperating process can affect or be affected by
the execution of another process
Advantages of process cooperation
 Information sharing
 Computation speed-up
 Modularity
 Convenience
60
Producer-Consumer Problem
Paradigm for cooperating processes,
producer process produces information
that is consumed by a consumer process
 unbounded-buffer places no practical limit on
the size of the buffer
 bounded-buffer assumes that there is a fixed
buffer size
61
Bounded-Buffer – Shared-Memory Solution
Shared data
#define BUFFER_SIZE 10
typedef struct {
. . .
} item;
item buffer[BUFFER_SIZE];
int in = 0;
int out = 0;
Solution is correct, but can only use
BUFFER_SIZE-1 elements
62
Bounded-Buffer – Insert() Method
while (true) {
/* Produce an item */
while (((in = (in + 1) % BUFFER SIZE count) == out)
; /* do nothing -- no free buffers */
buffer[in] = item;
in = (in + 1) % BUFFER SIZE;
}
63
Bounded Buffer – Remove() Method
while (true) {
while (in == out)
; // do nothing -- nothing to
consume
// remove an item from the buffer
item = buffer[out];
out = (out + 1) % BUFFER SIZE;
return item;
}
64
Interprocess Communication (IPC)
Mechanism for processes to communicate and to
synchronize their actions
Message system – processes communicate with
each other without resorting to shared variables
IPC facility provides two operations:
 send(message) – message size fixed or variable
 receive(message)
If P and Q wish to communicate, they need to:
 establish a communication link between them
 exchange messages via send/receive
Implementation of communication link
 physical (e.g., shared memory, hardware bus)
 logical (e.g., logical properties)
65
Implementation Questions
How are links established?
Can a link be associated with more than two
processes?
How many links can there be between every pair of
communicating processes?
What is the capacity of a link?
Is the size of a message that the link can
accommodate fixed or variable?
Is a link unidirectional or bi-directional?
66
Communications Models
67
Indirect Communication
Messages are directed and received from
mailboxes (also referred to as ports)
 Each mailbox has a unique id
 Processes can communicate only if they share a
mailbox
Properties of communication link
 Link established only if processes share a common
mailbox
 A link may be associated with many processes
 Each pair of processes may share several
communication links
 Link may be unidirectional or bi-directional
68
Indirect Communication
Operations
 create a new mailbox
 send and receive messages through mailbox
 destroy a mailbox
Primitives are defined as:
send(A, message) – send a message to
mailbox A
receive(A, message) – receive a message
from mailbox A
69
Indirect Communication
Mailbox sharing
 P1, P2, and P3 share mailbox A
 P1, sends; P2 and P3 receive
 Who gets the message?
Solutions
 Allow a link to be associated with at most two processes
 Allow only one process at a time to execute a receive
operation
 Allow the system to select arbitrarily the receiver.
Sender is notified who the receiver was.
70
Synchronization
Message passing may be either blocking or non-
blocking
Blocking is considered synchronous
 Blocking send has the sender block until the message is
received
 Blocking receive has the receiver block until a message is
available
Non-blocking is considered asynchronous
 Non-blocking send has the sender send the message and
continue
 Non-blocking receive has the receiver receive a valid
message or null
71
Synchronization
Message passing may be either blocking or non-
blocking
Blocking is considered synchronous
 Blocking send has the sender block until the message is
received
 Blocking receive has the receiver block until a message
is available
Non-blocking is considered asynchronous
 Non-blocking send has the sender send the message and
continue
 Non-blocking receive has the receiver receive a valid
message or null
72
Synchronization
Message passing may be either blocking or non-
blocking
Blocking is considered synchronous
 Blocking send has the sender block until the message is
received
 Blocking receive has the receiver block until a message
is available
Non-blocking is considered asynchronous
 Non-blocking send has the sender send the message and
continue
 Non-blocking receive has the receiver receive a valid
message or null
73
Buffering
Queue of messages attached to the link;
implemented in one of three ways
1. Zero capacity – 0 messages
Sender must wait for receiver (rendezvous)
2. Bounded capacity – finite length of n messages
Sender must wait if link full
3. Unbounded capacity – infinite length
Sender never waits
74
Chapter 5: CPU Scheduling
75
Chapter 5: CPU Scheduling
Basic Concepts
Scheduling Criteria
Scheduling Algorithms
Multiple-Processor Scheduling
Real-Time Scheduling
Algorithm Evaluation
76
Basic Concepts
Maximum CPU utilization obtained with
multiprogramming
CPU–I/O Burst Cycle – Process execution
consists of a cycle of CPU execution and I/O
wait
CPU burst distribution
77
Alternating Sequence of CPU And I/O Bursts
78
Histogram of CPU-burst Times
79
CPU Scheduler
Selects from among the processes in memory that
are ready to execute, and allocates the CPU to one
of them
CPU scheduling decisions may take place when a
process:
1. Switches from running to waiting state
2. Switches from running to ready state
3. Switches from waiting to ready
4. Terminates
Scheduling under 1 and 4 is nonpreemptive
All other scheduling is preemptive
80
Dispatcher
Dispatcher module gives control of the CPU to
the process selected by the short-term
scheduler; this involves:
 switching context
 switching to user mode
 jumping to the proper location in the user program to
restart that program
Dispatch latency – time it takes for the
dispatcher to stop one process and start
another running
81
Scheduling Criteria
CPU utilization – keep the CPU as busy as
possible
Throughput – # of processes that
complete their execution per time unit
Turnaround time – amount of time to
execute a particular process
Waiting time – amount of time a process
has been waiting in the ready queue
Response time – amount of time it takes
from when a request was submitted until
the first response is produced, not output
(for time-sharing environment)
82
Optimization Criteria
Max CPU utilization
Max throughput
Min turnaround time
Min waiting time
Min response time
83
First-Come, First-Served (FCFS) Scheduling
Process Burst Time
P1 24
P2 3
P3 3
Suppose that the processes arrive in the order: P1 , P2
, P3
The Gantt Chart for the schedule is:
Waiting time for P1 = 0; P2 = 24; P3 = 27
Average waiting time: (0 + 24 + 27)/3 = 17
P1 P2 P3
24 27 300
84
FCFS Scheduling (Cont.)
Suppose that the processes arrive in the order
P2 , P3 , P1
The Gantt chart for the schedule is:
Waiting time for P1 = 6; P2 = 0; P3 = 3
Average waiting time: (6 + 0 + 3)/3 = 3
Much better than previous case
Convoy effect short process behind long process
P1P3P2
63 300
85
Shortest-Job-First (SJR) Scheduling
Associate with each process the length of its next
CPU burst. Use these lengths to schedule the
process with the shortest time
Two schemes:
 nonpreemptive – once CPU given to the process it cannot
be preempted until completes its CPU burst
 preemptive – if a new process arrives with CPU burst
length less than remaining time of current executing
process, preempt. This scheme is know as the
Shortest-Remaining-Time-First (SRTF)
SJF is optimal – gives minimum average waiting
time for a given set of processes
86
Process Arrival Time Burst Time Remaining time
P1 0.0 7 7
P2 2.0 4 5
P3 4.0 1
P4 5.0 4
SJF (non-preemptive)
Average waiting time = (0 + 6 + 3 + 7)/4 = 4
Example of Non-Preemptive SJF
P1 P3 P2
73 160
P4
8 12
87
Example of Preemptive SJF
Process Arrival Time Burst Time
P1 0.0 7
P2 2.0 4
P3 4.0 1
P4 5.0 4
SJF (preemptive)
Average waiting time = (9 + 1 + 0 +2)/4 = 3
P1 P3P2
42 110
P4
5 7
P2 P1
16
88
Determining Length of Next CPU Burst
Can only estimate the length
Can be done by using the length of previous CPU
bursts, using exponential averaging
:Define4.
10,3.
burstCPUnexttheforvaluepredicted2.
burstCPUoflenghtactual1.
1





n
th
n nt
  .11 nnn t  
89
Examples of Exponential Averaging
 =0
 n+1 = n
 Recent history does not count
 =1
 n+1 =  tn
 Only the actual last CPU burst counts
If we expand the formula, we get:
n+1 =  tn+(1 - ) tn -1 + …
+(1 -  )j  tn -j + …
+(1 -  )n +1 0
Since both  and (1 - ) are less than or equal to 1,
each successive term has less weight than its
predecessor
  .11 nnn t  
90
Priority Scheduling
A priority number (integer) is associated with each
process
The CPU is allocated to the process with the highest
priority (smallest integer  highest priority)
 Preemptive
 nonpreemptive
SJF is a priority scheduling where priority is the
predicted next CPU burst time
Problem  Starvation – low priority processes may
never execute
Solution  Aging – as time progresses increase the
priority of the process
91
Round Robin (RR)
Each process gets a small unit of CPU time (time
quantum), usually 10-100 milliseconds. After this
time has elapsed, the process is preempted and
added to the end of the ready queue.
If there are n processes in the ready queue and the
time quantum is q, then each process gets 1/n of the
CPU time in chunks of at most q time units at once.
No process waits more than (n-1)q time units.
Performance
 q large  FIFO
 q small  q must be large with respect to context switch,
otherwise overhead is too high
92
Example of RR with Time Quantum = 20
Process Burst Time
P1 53
P2 17
P3 68
P4 24
The Gantt chart is:
Typically, higher average turnaround than SJF, but
better response
P1 P2 P3 P4 P1 P3 P4 P1 P3 P3
0 20 37 57 77 97 117 121 134 154 162
93
Time Quantum and Context Switch Time
94
Multilevel Queue
Ready queue is partitioned into separate queues:
foreground (interactive)
background (batch)
Each queue has its own scheduling algorithm
 foreground – RR
 background – FCFS
Scheduling must be done between the queues
 Fixed priority scheduling; (i.e., serve all from foreground
then from background). Possibility of starvation.
 Time slice – each queue gets a certain amount of CPU time
which it can schedule amongst its processes; i.e., 80% to
foreground in RR
 20% to background in FCFS
95
Multilevel Queue Scheduling
96
Multilevel Feedback Queue
A process can move between the various
queues; aging can be implemented this way
Multilevel-feedback-queue scheduler defined
by the following parameters:
 number of queues
 scheduling algorithms for each queue
 method used to determine when to upgrade a process
 method used to determine when to demote a process
 method used to determine which queue a process will
enter when that process needs service
97
Example of Multilevel Feedback Queue
Three queues:
 Q0 – RR with time quantum 8 milliseconds
 Q1 – RR time quantum 16 milliseconds
 Q2 – FCFS
Scheduling
 A new job enters queue Q0 which is served FCFS. When
it gains CPU, job receives 8 milliseconds. If it does not
finish in 8 milliseconds, job is moved to queue Q1.
 At Q1 job is again served FCFS and receives 16 additional
milliseconds. If it still does not complete, it is
preempted and moved to queue Q2.
98
Multilevel Feedback Queues
99
Multiple-Processor Scheduling
CPU scheduling more complex when
multiple CPUs are available
Homogeneous processors within a
multiprocessor
Load sharing
Asymmetric multiprocessing – only one
processor accesses the system data
structures, alleviating the need for data
sharing
100
Algorithm Evaluation
Deterministic modeling – takes a
particular predetermined workload and
defines the performance of each
algorithm for that workload
Queueing models
Implementation

Principles of operating system

  • 1.
    1 Principles of OperatingSystems Text Book: Operating System Concepts - Avi Silberschatz, Peter BaerGalvin and Greg Gagne Anilsatyadas Dharmapuri Department of Computer Sciences Pondicherry University anilsatyadas@gmail.com
  • 2.
    2 Why Study OperatingSystems? Because OS hacking will make you a better programmer and a better thinker.  The OS is really large (Windows Vista is 50 million lines+).  The OS manages concurrency.  Concurrency leads to interesting programming challenges.  (Interesting programming challenges can lead to wisdom.)  OS code manages raw hardware.  Programming raw hardware is challenging: timing dependent behavior, undocumented behavior, HW bugs.  OS code must be efficient, low CPU, memory, disk use.  OS fails  machine fails. OS must fail less than user programs.  OS provides services that enable application programs  … knowledge of OS will make you a better computer user  OS basis of system security.
  • 3.
    3 Why Won’t OperatingSystems Go Away? Hardware needs an OS to be useful.  Multiplex resources for efficiency and security. OS is cornerstone of what makes computing fun. The design of an MP3 player involves many OS issues:  Its OS implements a file system which is specially designed to store music files.  The OS manages communication with your PC.  The OS reads music from the disc and buffers it in memory.  The OS controls the volume of the output device.  The OS controls the display.  The OS controls wireless network access. Cell phone, mp3 player, DVD player, PDA, iPhone, peer-to-peer file sharing Systems/Theory/Artificial intelligence
  • 4.
  • 5.
    5 Introduction to OperatingSystems An operating system is the interface between the user and the architecture. OS as juggler: providing the illusion of a dedicated machine with infinite memory and CPU. OS as government: protecting users from each other, allocating resources efficiently and fairly, and providing secure and safe communication OS as complex system: keeping OS design and implementation as simple as possible is the key to getting the OS to work User Applications Operating System Hardware Virtual Machine Interface Physical Machine Interface
  • 6.
    6 What is anOperating System? Any code that runs with the hardware kernel bit set  An abstract virtual machine  A set of abstractions that simplify application design  Files instead of “bytes on a disk” Core OS services, written by “pros”  Processes, process scheduling  Address spaces  Device control  ~30% of Linux source code. Basis of stability and security Device drivers written by “whoever”  Software run in kernel to manages a particular vendor’s hardware E.g. Homer Simpson doll with USB  ~70% of Linux source code  OS is extensible  Drivers are the biggest source of OS instability
  • 7.
    7 What is anOperating System? For any OS area (CPU scheduling, file systems, memory management), begin by asking two questions  What’s the hardware interface? (The Physical Reality)  What is the application interface? (The Nicer Interface for programmer producivity) Key questions:  Why is the application interface defined the way it is?  Should we push more functionality into applications, the OS, or the hardware?  What are the tradeoffs between programmability, complexity, and flexibility?
  • 8.
    8 Operating System Functions Serviceprovider  Provide standard facilities  File system  Standard libraries  Window system  … Coordinator: three aspects  Protection: prevent jobs from interfering with each other  Communication: enable jobs to interact with each other  Resource management: facilitate sharing of resources across jobs. Operating systems are everywhere  Single-function devices (embedded controllers, Nintendo, …)  OS provides a collection of standard services  Sometimes OS/middleware distinction is blurry  Multi-function/application devices (workstations and servers)  OS manages application interactions
  • 9.
    9 Why do weneed operating systems? Convenience  Provide a high-level abstraction of physical resources.  Make hardware usable by getting rid of warts & specifics.  Enable the construction of more complex software systems  Enable portable code.  MS-DOS version 1 boots on the latest 3+ GHz Pentium.  Would games that ran on MS-DOSv1 work well today? Efficiency  Share limited or expensive physical resources.  Provide protection.
  • 10.
    10 Computer Architecture &Processes CPU - the processor that performs the actual computation I/O devices - terminal, disks, video board, printer, etc. Memory - RAM containing data and programs used by the CPU System bus - the communication medium between the CPU, memory, and peripherals
  • 11.
    11 Evolution of OperatingSystems Why do operating systems change?  Key functions: hardware abstraction and coordination  Principle: Design tradeoffs change as technology changes. Comparing computing systems from 1981 and 2007 1981 2007 Factor MIPS 1 57,000 57,000 $/SPECInt $100K $2 50,000 DRAM size 128KB 2GB 16,000 Disk size 10MB 1TB 100,000 Net BW 9600 bps 100 Mb/s 10,000 Address bits 16 64 4 Users/machine 100 <1 100 Energy efficiency and parallelism loom on the horizon. Data centers projected to consume 3% of US energy by next year No more single-core CPUs
  • 12.
    12 From Architecture toOS to Application, and Back Hardware Example OS Services User Abstraction Processor Process management, Scheduling, Traps, Protections, Billing, Synchronization Process Memory Management, Protection, Virtual memory Address space I/O devices Concurrency with CPU, Interrupt handling Terminal, Mouse, Printer, (System Calls) File system Management, Persistence Files Distributed systems Network security, Distributed file system RPC system calls, Transparent file sharing
  • 13.
    13 From Architectural toOS to Application, and Back OS Service Hardware Support Protection Kernel / User mode Protected Instructions Base and Limit Registers Interrupts Interrupt Vectors System calls Trap instructions and trap vectors I/O Interrupts or Memory-Mapping Scheduling, error recovery, billing Timer Synchronization Atomic instructions Virtual Memory Translation look-aside buffers Register pointing to base of page table
  • 14.
    14 Interrupts - Movingfrom Kernel to User Mode User processes may not: address I/O directly use instructions that manipulate OS memory (e.g., page tables) set the mode bits that determine user or kernel mode disable and enable interrupts halt the machine but in kernel mode, the OS does all these things a status bit in a protected processor register indicates the mode Protected instructions can only be executed in kernel mode. On interrupts (e.g., time slice) or system calls
  • 15.
    15 History of OperatingSystems: Phases Phase 1: Hardware is expensive, humans are cheap  User at console: single-user systems  Batching systems  Multi-programming systems Phase 2: Hardware is cheap, humans are expensive  Time sharing: Users use cheap terminals and share servers Phase 3: Hardware is very cheap, humans are very expensive  Personal computing: One system per user  Distributed computing: lots of systems per user Phase 4: Ubiquitous computing  Computers will be sewn into our clothes, but I hope not implanted in our skin  Cell phone, mp3 player, DVD player, TIVO, PDA, iPhone
  • 16.
    16 History of OperatingSystems: Phases Phase 1: Hardware is expensive, humans are cheap  User at console: single-user systems  Batching systems  Multi-programming systems Phase 2: Hardware is cheap, humans are expensive  Time sharing: Users use cheap terminals and share servers Phase 3: Hardware is very cheap, humans are very expensive  Personal computing: One system per user  Distributed computing: lots of systems per user Phase 4: Ubiquitous computing
  • 17.
    17 A Brief Historyof Operating Systems Hand programmed machines (‘45-‘55) Single user systems OS = loader + libraries of common subroutines Problem: low utilization of expensive components = % utilization Execution time Execution time + Card reader time
  • 18.
    18 Batch/Off-line processing (‘55-‘65) Batchingv. sequential execution of jobs Card Reader: CPU: Printer: Read Batch 1 Execute Batch 1 Batch 2 Batch 3 Batch 2 Batch 3 Print Batch 1 Batch 2 Batch 3 Card Reader: CPU: Printer: Read Job 1 Execute Job 1 Job 2 Job 3 Job 2 Job 3 Print Job 1 Job 2 Job 3
  • 19.
    19 TapeTape Batch processing (‘55-‘65) Operatingsystem = loader + sequencer + output processor Input Compute Output Card Reader Printer Tape Tape Operating System “System Software” User Program User Data
  • 20.
    20 Multiprogramming (‘65-‘80) Keep severaljobs in memory and multiplex CPU between jobs Operating System “System Software” User Program 1 User Program 2User Program 2 User Program n ... program P begin : Read(var) : end P system call Read() begin StartIO(input device) WaitIO(interrupt) EndIO(input device) : end Read Simple, “synchronous” input: What to do while we wait for the I/O device?
  • 21.
    21 Multiprogramming (‘65-‘80) Keep severaljobs in memory and multiplex CPU between jobs Operating System “System Software” User Program 1 User Program 2User Program 2 User Program n ... Program 1 I/O Device k: read() k+1: endio() interrupt main{ } } OS read{ startIO() waitIO()
  • 22.
    22 Multiprogramming (‘65-‘80) Keep severaljobs in memory and multiplex CPU between jobs Operating System “System Software” User Program 1 User Program 2User Program 2 User Program n ... Program 1 Program 2OS I/O Device k: read() startIO() interrupt main{ read{ endio{ } schedule() main{ k+1: } } schedule()
  • 23.
    23 History of OperatingSystems: Phases Phase 1: Hardware is expensive, humans are cheap  User at console: single-user systems  Batching systems  Multi-programming systems Phase 2: Hardware is cheap, humans are expensive  Time sharing: Users use cheap terminals and share servers Phase 3: Hardware is very cheap, humans are very expensive  Personal computing: One system per user  Distributed computing: lots of systems per user Phase 4: Ubiquitous computing
  • 24.
    24 Timesharing (‘70- ) Atimer interrupt is used to multiplex CPU among jobs Operating System “System Software” User Program 1 User Program 2User Program 2 User Program n ... Program 1 Program 2OS k+1: schedule{ timer interrupt schedule{ timer interrupt k: main{ } main{ } timer interrupt schedule{
  • 25.
    25 History of OperatingSystems: Phases Phase 1: Hardware is expensive, humans are cheap  User at console: single-user systems  Batching systems  Multi-programming systems Phase 2: Hardware is cheap, humans are expensive  Time sharing: Users use cheap terminals and share servers Phase 3: Hardware is very cheap, humans are very expensive  Personal computing: One system per user  Distributed computing: lots of systems per user Phase 4: Ubiquitous computing
  • 26.
    26 Operating Systems forPCs Personal computing systems  Single user  Utilization is no longer a concern  Emphasis is on user interface and API  Many services & features not present Evolution  Initially: OS as a simple service provider (simple libraries)  Now: Multi-application systems with support for coordination and communication  Growing security issues (e.g., online commerce, medical records)
  • 27.
    27 Distributed Operating Systems Typicallysupport distributed services  Sharing of data and coordination across multiple systems Possibly employ multiple processors  Loosely coupled v. tightly coupled systems High availability & reliability requirements  Amazon, CNN OS process management User Program CPU LAN/WAN OS process management memory management User Program CPU OS file system name services mail services CPU Network
  • 28.
    28 History of OperatingSystems: Phases Phase 1: Hardware is expensive, humans are cheap  User at console: single-user systems  Batching systems  Multi-programming systems Phase 2: Hardware is cheap, humans are expensive  Time sharing: Users use cheap terminals and share servers Phase 3: Hardware is very cheap, humans are very expensive  Personal computing: One system per user  Distributed computing: lots of systems per user Phase 4: Connecting people and their machines  Intellectual property issues  Information organization
  • 29.
    29 Course Overview OS Structure,Processes and Process Management CPU scheduling Threads and concurrent programming  Thread coordination, mutual exclusion, monitors  Deadlocks Virtual memory & Memory management Disks & file systems  Distributed file systems Security
  • 30.
    30 What is anOperating System? A program that acts as an intermediary between a user of a computer and the computer hardware. Operating system goals: Execute user programs Make the computer system convenient to use. Use the computer hardware in an efficient manner.
  • 31.
    31 Computer System Structure Computersystem can be divided into four components  Hardware – provides basic computing resources  CPU, memory, I/O devices  Operating system  Controls and coordinates use of hardware among various applications and users  Application programs – define the ways in which the system resources are used to solve the computing problems of the users  Word processors, compilers, web browsers, database systems, video games  Users  People, machines, other computers
  • 32.
    32 Four Components ofa Computer System
  • 33.
    33 Operating System Definition OSis a resource allocator  Manages all resources  Decides between conflicting requests for efficient and fair resource use OS is a control program  Controls execution of programs to prevent errors and improper use of the computer
  • 34.
    34 Operating System Structure Multiprogrammingneeded for efficiency  Single user cannot keep CPU and I/O devices busy at all times  Multiprogramming organizes jobs (code and data) so CPU always has one to execute  A subset of total jobs in system is kept in memory  One job selected and run via job scheduling  When it has to wait (for I/O for example), OS switches to another job Timesharing (multitasking) is logical extension in which CPU switches jobs so frequently that users can interact with each job while it is running, creating interactive computing  Response time should be < 1 second  Each user has at least one program executing in memory process  If several jobs ready to run at the same time  CPU scheduling  If processes don’t fit in memory, swapping moves them in and out to run  Virtual memory allows execution of processes not completely in memory
  • 35.
    35 Memory Layout forMultiprogrammed System
  • 36.
    36 Operating-System Operations Interrupt drivenby hardware Software error or request creates exception or trap  Division by zero, request for operating system service Other process problems include infinite loop, processes modifying each other or the operating system Dual-mode operation allows OS to protect itself and other system components  User mode and kernel mode  Mode bit provided by hardware  Provides ability to distinguish when system is running user code or kernel code  Some instructions designated as privileged, only executable in kernel mode  System call changes mode to kernel, return from call resets it to user
  • 37.
    37 Chapter 3: Processes ProcessConcept Process Scheduling Operations on Processes Cooperating Processes Interprocess Communication Communication in Client-Server Systems
  • 38.
    38 Process Concept An operatingsystem executes a variety of programs:  Batch system – jobs  Time-shared systems – user programs or tasks Textbook uses the terms job and process almost interchangeably Process – a program in execution; process execution must progress in sequential fashion A process includes:  program counter  stack  data section
  • 39.
  • 40.
    40 Process State As aprocess executes, it changes state new: The process is being created running: Instructions are being executed waiting: The process is waiting for some event to occur ready: The process is waiting to be assigned to a processor terminated: The process has finished execution
  • 41.
  • 42.
    42 Process Control Block(PCB) Information associated with each process Process state Program counter CPU registers CPU scheduling information Memory-management information Accounting information I/O status information
  • 43.
  • 44.
    44 CPU Switch FromProcess to Process
  • 45.
    45 Process Scheduling Queues Jobqueue – set of all processes in the system Ready queue – set of all processes residing in main memory, ready and waiting to execute Device queues – set of processes waiting for an I/O device Processes migrate among the various queues
  • 46.
    46 Process Scheduling Queues Jobqueue – set of all processes in the system Ready queue – set of all processes residing in main memory, ready and waiting to execute Device queues – set of processes waiting for an I/O device Processes migrate among the various queues
  • 47.
    47 Ready Queue AndVarious I/O Device Queues
  • 48.
  • 49.
    49 Schedulers Long-term scheduler (orjob scheduler) – selects which processes should be brought into the ready queue Short-term scheduler (or CPU scheduler) – selects which process should be executed next and allocates CPU
  • 50.
    50 Addition of MediumTerm Scheduling
  • 51.
    51 Schedulers (Cont.) Short-term scheduleris invoked very frequently (milliseconds)  (must be fast) Long-term scheduler is invoked very infrequently (seconds, minutes)  (may be slow) The long-term scheduler controls the degree of multiprogramming Processes can be described as either:  I/O-bound process – spends more time doing I/O than computations, many short CPU bursts  CPU-bound process – spends more time doing computations; few very long CPU bursts
  • 52.
    52 Context Switch When CPUswitches to another process, the system must save the state of the old process and load the saved state for the new process Context-switch time is overhead; the system does no useful work while switching Time dependent on hardware support
  • 53.
    53 Process Creation Parent processcreate children processes, which, in turn create other processes, forming a tree of processes Resource sharing  Parent and children share all resources  Children share subset of parent’s resources  Parent and child share no resources Execution  Parent and children execute concurrently  Parent waits until children terminate
  • 54.
    54 Process Creation (Cont.) Addressspace  Child duplicate of parent  Child has a program loaded into it UNIX examples  fork system call creates new process  exec system call used after a fork to replace the process’ memory space with a new program
  • 55.
  • 56.
    56 C Program ForkingSeparate Process int main() { pid_t pid; /* fork another process */ pid = fork(); if (pid < 0) { /* error occurred */ fprintf(stderr, "Fork Failed"); exit(-1); } else if (pid == 0) { /* child process */ execlp("/bin/ls", "ls", NULL); } else { /* parent process */ /* parent will wait for the child to complete */ wait (NULL); printf ("Child Complete"); exit(0); } }
  • 57.
    57 A tree ofprocesses on a typical Solaris
  • 58.
    58 Process Termination Process executeslast statement and asks the operating system to delete it (exit)  Output data from child to parent (via wait)  Process’ resources are deallocated by operating system Parent may terminate execution of children processes (abort)  Child has exceeded allocated resources  Task assigned to child is no longer required  If parent is exiting Some operating system do not allow child to continue if its parent terminates  All children terminated - cascading termination
  • 59.
    59 Cooperating Processes Independent processcannot affect or be affected by the execution of another process Cooperating process can affect or be affected by the execution of another process Advantages of process cooperation  Information sharing  Computation speed-up  Modularity  Convenience
  • 60.
    60 Producer-Consumer Problem Paradigm forcooperating processes, producer process produces information that is consumed by a consumer process  unbounded-buffer places no practical limit on the size of the buffer  bounded-buffer assumes that there is a fixed buffer size
  • 61.
    61 Bounded-Buffer – Shared-MemorySolution Shared data #define BUFFER_SIZE 10 typedef struct { . . . } item; item buffer[BUFFER_SIZE]; int in = 0; int out = 0; Solution is correct, but can only use BUFFER_SIZE-1 elements
  • 62.
    62 Bounded-Buffer – Insert()Method while (true) { /* Produce an item */ while (((in = (in + 1) % BUFFER SIZE count) == out) ; /* do nothing -- no free buffers */ buffer[in] = item; in = (in + 1) % BUFFER SIZE; }
  • 63.
    63 Bounded Buffer –Remove() Method while (true) { while (in == out) ; // do nothing -- nothing to consume // remove an item from the buffer item = buffer[out]; out = (out + 1) % BUFFER SIZE; return item; }
  • 64.
    64 Interprocess Communication (IPC) Mechanismfor processes to communicate and to synchronize their actions Message system – processes communicate with each other without resorting to shared variables IPC facility provides two operations:  send(message) – message size fixed or variable  receive(message) If P and Q wish to communicate, they need to:  establish a communication link between them  exchange messages via send/receive Implementation of communication link  physical (e.g., shared memory, hardware bus)  logical (e.g., logical properties)
  • 65.
    65 Implementation Questions How arelinks established? Can a link be associated with more than two processes? How many links can there be between every pair of communicating processes? What is the capacity of a link? Is the size of a message that the link can accommodate fixed or variable? Is a link unidirectional or bi-directional?
  • 66.
  • 67.
    67 Indirect Communication Messages aredirected and received from mailboxes (also referred to as ports)  Each mailbox has a unique id  Processes can communicate only if they share a mailbox Properties of communication link  Link established only if processes share a common mailbox  A link may be associated with many processes  Each pair of processes may share several communication links  Link may be unidirectional or bi-directional
  • 68.
    68 Indirect Communication Operations  createa new mailbox  send and receive messages through mailbox  destroy a mailbox Primitives are defined as: send(A, message) – send a message to mailbox A receive(A, message) – receive a message from mailbox A
  • 69.
    69 Indirect Communication Mailbox sharing P1, P2, and P3 share mailbox A  P1, sends; P2 and P3 receive  Who gets the message? Solutions  Allow a link to be associated with at most two processes  Allow only one process at a time to execute a receive operation  Allow the system to select arbitrarily the receiver. Sender is notified who the receiver was.
  • 70.
    70 Synchronization Message passing maybe either blocking or non- blocking Blocking is considered synchronous  Blocking send has the sender block until the message is received  Blocking receive has the receiver block until a message is available Non-blocking is considered asynchronous  Non-blocking send has the sender send the message and continue  Non-blocking receive has the receiver receive a valid message or null
  • 71.
    71 Synchronization Message passing maybe either blocking or non- blocking Blocking is considered synchronous  Blocking send has the sender block until the message is received  Blocking receive has the receiver block until a message is available Non-blocking is considered asynchronous  Non-blocking send has the sender send the message and continue  Non-blocking receive has the receiver receive a valid message or null
  • 72.
    72 Synchronization Message passing maybe either blocking or non- blocking Blocking is considered synchronous  Blocking send has the sender block until the message is received  Blocking receive has the receiver block until a message is available Non-blocking is considered asynchronous  Non-blocking send has the sender send the message and continue  Non-blocking receive has the receiver receive a valid message or null
  • 73.
    73 Buffering Queue of messagesattached to the link; implemented in one of three ways 1. Zero capacity – 0 messages Sender must wait for receiver (rendezvous) 2. Bounded capacity – finite length of n messages Sender must wait if link full 3. Unbounded capacity – infinite length Sender never waits
  • 74.
  • 75.
    75 Chapter 5: CPUScheduling Basic Concepts Scheduling Criteria Scheduling Algorithms Multiple-Processor Scheduling Real-Time Scheduling Algorithm Evaluation
  • 76.
    76 Basic Concepts Maximum CPUutilization obtained with multiprogramming CPU–I/O Burst Cycle – Process execution consists of a cycle of CPU execution and I/O wait CPU burst distribution
  • 77.
    77 Alternating Sequence ofCPU And I/O Bursts
  • 78.
  • 79.
    79 CPU Scheduler Selects fromamong the processes in memory that are ready to execute, and allocates the CPU to one of them CPU scheduling decisions may take place when a process: 1. Switches from running to waiting state 2. Switches from running to ready state 3. Switches from waiting to ready 4. Terminates Scheduling under 1 and 4 is nonpreemptive All other scheduling is preemptive
  • 80.
    80 Dispatcher Dispatcher module givescontrol of the CPU to the process selected by the short-term scheduler; this involves:  switching context  switching to user mode  jumping to the proper location in the user program to restart that program Dispatch latency – time it takes for the dispatcher to stop one process and start another running
  • 81.
    81 Scheduling Criteria CPU utilization– keep the CPU as busy as possible Throughput – # of processes that complete their execution per time unit Turnaround time – amount of time to execute a particular process Waiting time – amount of time a process has been waiting in the ready queue Response time – amount of time it takes from when a request was submitted until the first response is produced, not output (for time-sharing environment)
  • 82.
    82 Optimization Criteria Max CPUutilization Max throughput Min turnaround time Min waiting time Min response time
  • 83.
    83 First-Come, First-Served (FCFS)Scheduling Process Burst Time P1 24 P2 3 P3 3 Suppose that the processes arrive in the order: P1 , P2 , P3 The Gantt Chart for the schedule is: Waiting time for P1 = 0; P2 = 24; P3 = 27 Average waiting time: (0 + 24 + 27)/3 = 17 P1 P2 P3 24 27 300
  • 84.
    84 FCFS Scheduling (Cont.) Supposethat the processes arrive in the order P2 , P3 , P1 The Gantt chart for the schedule is: Waiting time for P1 = 6; P2 = 0; P3 = 3 Average waiting time: (6 + 0 + 3)/3 = 3 Much better than previous case Convoy effect short process behind long process P1P3P2 63 300
  • 85.
    85 Shortest-Job-First (SJR) Scheduling Associatewith each process the length of its next CPU burst. Use these lengths to schedule the process with the shortest time Two schemes:  nonpreemptive – once CPU given to the process it cannot be preempted until completes its CPU burst  preemptive – if a new process arrives with CPU burst length less than remaining time of current executing process, preempt. This scheme is know as the Shortest-Remaining-Time-First (SRTF) SJF is optimal – gives minimum average waiting time for a given set of processes
  • 86.
    86 Process Arrival TimeBurst Time Remaining time P1 0.0 7 7 P2 2.0 4 5 P3 4.0 1 P4 5.0 4 SJF (non-preemptive) Average waiting time = (0 + 6 + 3 + 7)/4 = 4 Example of Non-Preemptive SJF P1 P3 P2 73 160 P4 8 12
  • 87.
    87 Example of PreemptiveSJF Process Arrival Time Burst Time P1 0.0 7 P2 2.0 4 P3 4.0 1 P4 5.0 4 SJF (preemptive) Average waiting time = (9 + 1 + 0 +2)/4 = 3 P1 P3P2 42 110 P4 5 7 P2 P1 16
  • 88.
    88 Determining Length ofNext CPU Burst Can only estimate the length Can be done by using the length of previous CPU bursts, using exponential averaging :Define4. 10,3. burstCPUnexttheforvaluepredicted2. burstCPUoflenghtactual1. 1      n th n nt   .11 nnn t  
  • 89.
    89 Examples of ExponentialAveraging  =0  n+1 = n  Recent history does not count  =1  n+1 =  tn  Only the actual last CPU burst counts If we expand the formula, we get: n+1 =  tn+(1 - ) tn -1 + … +(1 -  )j  tn -j + … +(1 -  )n +1 0 Since both  and (1 - ) are less than or equal to 1, each successive term has less weight than its predecessor   .11 nnn t  
  • 90.
    90 Priority Scheduling A prioritynumber (integer) is associated with each process The CPU is allocated to the process with the highest priority (smallest integer  highest priority)  Preemptive  nonpreemptive SJF is a priority scheduling where priority is the predicted next CPU burst time Problem  Starvation – low priority processes may never execute Solution  Aging – as time progresses increase the priority of the process
  • 91.
    91 Round Robin (RR) Eachprocess gets a small unit of CPU time (time quantum), usually 10-100 milliseconds. After this time has elapsed, the process is preempted and added to the end of the ready queue. If there are n processes in the ready queue and the time quantum is q, then each process gets 1/n of the CPU time in chunks of at most q time units at once. No process waits more than (n-1)q time units. Performance  q large  FIFO  q small  q must be large with respect to context switch, otherwise overhead is too high
  • 92.
    92 Example of RRwith Time Quantum = 20 Process Burst Time P1 53 P2 17 P3 68 P4 24 The Gantt chart is: Typically, higher average turnaround than SJF, but better response P1 P2 P3 P4 P1 P3 P4 P1 P3 P3 0 20 37 57 77 97 117 121 134 154 162
  • 93.
    93 Time Quantum andContext Switch Time
  • 94.
    94 Multilevel Queue Ready queueis partitioned into separate queues: foreground (interactive) background (batch) Each queue has its own scheduling algorithm  foreground – RR  background – FCFS Scheduling must be done between the queues  Fixed priority scheduling; (i.e., serve all from foreground then from background). Possibility of starvation.  Time slice – each queue gets a certain amount of CPU time which it can schedule amongst its processes; i.e., 80% to foreground in RR  20% to background in FCFS
  • 95.
  • 96.
    96 Multilevel Feedback Queue Aprocess can move between the various queues; aging can be implemented this way Multilevel-feedback-queue scheduler defined by the following parameters:  number of queues  scheduling algorithms for each queue  method used to determine when to upgrade a process  method used to determine when to demote a process  method used to determine which queue a process will enter when that process needs service
  • 97.
    97 Example of MultilevelFeedback Queue Three queues:  Q0 – RR with time quantum 8 milliseconds  Q1 – RR time quantum 16 milliseconds  Q2 – FCFS Scheduling  A new job enters queue Q0 which is served FCFS. When it gains CPU, job receives 8 milliseconds. If it does not finish in 8 milliseconds, job is moved to queue Q1.  At Q1 job is again served FCFS and receives 16 additional milliseconds. If it still does not complete, it is preempted and moved to queue Q2.
  • 98.
  • 99.
    99 Multiple-Processor Scheduling CPU schedulingmore complex when multiple CPUs are available Homogeneous processors within a multiprocessor Load sharing Asymmetric multiprocessing – only one processor accesses the system data structures, alleviating the need for data sharing
  • 100.
    100 Algorithm Evaluation Deterministic modeling– takes a particular predetermined workload and defines the performance of each algorithm for that workload Queueing models Implementation