Big Data Supply Chains

  Go Big or Go Home!
Big Data will be the NEW
Foundation of the Future
     Supply Chain
BRICKS                               Book
                                  Publishes




 Matter
                                  in August
                                     2012



 The Role of Supply Chains
      in Building Market-Driven
         Differentiation




     LORA M. CECERE
           CHARLES W. CHASE JR.
Agenda


         Current State
What is a Big Data Supply Chain?
 How will Applications Change?
           Wrap-up




                                                           p. 4
                             Supply Chain Insights, LLC © 2012
Supply Chain Tipping Points

1987 1988     1989     1990      1991   1992   1993    1994    1995    1996    1997     1998    1999


             JIT              Supply Chain                    Internet/Email
                                                                                            RFID
                              Organization
   Evolution of                                                       eProcurement
     the PC

                                                  Re-Engineering the                  Total Quality
 S&OP                                                Organization                     Management
                    Theory of
                   Constraints                    (Michael Hammer)


Supply Chain Excellence =                             Supply Chain Excellence =
        Islands of   Manufacturing                        Vertical Silo   Efficient Order to
                   +                                                    +
        Excellence   Excellence                           Excellence      Cash Processes


         Inside-Out                                           Inside-Out


                                                                                                              p. 5
                                                                                Supply Chain Insights, LLC © 2012
Supply Chain Tipping Points

 2000   2001   2002   2003   2004   2005   2006    2007    2008    2009   2010     2011      2012


               .com                                  Social
                                                  Responsibility
 Y2K
                        Demand Driven
                          Concepts                                 CSCO
   Lean Six Sigma
                                                                           Market-Driven
                                                                          Value Networks


Supply Chain Excellence =                     Supply Chain Excellence =
        Vertical Silo Outsourcing                      Value-Based Outcomes
                     +
        Excellence     Effectiveness                   Delivered by Horizontal Processes


         Inside-Out                                    Outside-In


                                                                                                        p. 6
                                                                          Supply Chain Insights, LLC © 2012
7
  What is a Market-driven Value Network?



 An adaptive network focused on a value-
based outcome that senses and translates
market changes (buy and sell-side markets)
  bi-directionally with near-real time data
  latency to align sell, deliver, make and
            sourcing operations.


                                                               p. 7
                                 Supply Chain Insights, LLC © 2012
Evolution of Supply Chain Process
                     Excellence
Align:                                   Continuous
                Building Horizontal        Testing            Orchestrate
Market          Process Connectors        Learning
                                         Improving         Demand and Supply
Driven                                    In Market

 Adapt:
 Demand-              Resilient
 Driven                                 Reliable
                                          Right Product   Efficient
     Sense                 Demand
    Demand                 Volatility
   and Supply                              Right Place            Cost


     Shape                                 Right Time
                                                               Procure to
  Demand and                Supply                            pay/order to
  Supply based             Volatility                            cash
   on Market                               Right Cost




                                                                                           p. 8
                                                             Supply Chain Insights, LLC © 2012
What is Supply Chain Excellence?

                          How Define Supply Chain “Excellence”
  Right product, right place, right time at the
                   right cost.                                                                     70%


A responsive supply chain that can adapt as
             markets change.                                                                  57% Most Mature


 A resilient supply chain that can withstand
the shocks of demand and supply volatility.                                                  52%


The Efficient Supply Chain. Lowest cost per
                    unit.                                                             38%


           Right product, right place, right time.                         20%


Base: Total Sample (61)
Q14. How does your company define supply chain “excellence?” Please select all that apply.                                   p. 9
                                                                                               Supply Chain Insights, LLC © 2012
The Effective Frontier


                             Profitable Growth

                   Revenue                    Cost of Goods

                              Working Capital

                   Corporate Social Responsibility

R&D Strategy and Investment                Asset Strategy and Investment

Forecast Accuracy           Customer Service                 Inventory

Channel Strategy              Product and               Supplier Strategy
                             Service Portfolio
 Sales      Distribution   Manufacturing         Logistics      Procurement
Policies     Policies        Policies            Policies         Policies

Returns     Backorders     First Pass Yield    Empty Miles      Material Yield




                                                                                                      p. 10
                                                                         Supply Chain Insights, LLC © 2012
A Supply Chain
   is a Complex System
 with Complex Processes
with Increasing Complexity



                                                    p. 11
                       Supply Chain Insights, LLC © 2012
IT Systems:
                                                                                Quantity

                                                                      Operational IT Systems
                                                                                                                                                                      Any
                                                                                     1 System                         2 Systems                         3+ Systems Systems
                                     Order Management                                                 61%                                   15%           23%         98%

      ERP (Enterprise Resource Planning)                                                               64%                                  8%          25%         97%

                                        Demand Planning                                    39%                                31%                    23%          93%

                                   Production Planning                                  33%                         25%                        33%              90%

                           Tactical Supply Planning                                       36%                       18%                     26%          80%

                           Warehouse Management                                        30%                   16%                     33%                79%

         Manufacturing Execution Systems                                                 34%                   10%               28%              72%

                            Transportation Planning                                        38%                         20%             13%        70%

                                      Price Management                                   34%                    13%         11%        59%

                Product Lifecycle Management                                         26%               8% 10% 44%




Base: Total Sample (61)
Q15. For each of the following IT systems, please indicate how many you currently have operational – 0 systems, 1 system, 2 systems or 3+                                 p. 12
systems.                                                                                                                                     Supply Chain Insights, LLC © 2012
IT Systems:
                                             Importance & Satisfaction

                                                          IT Importance vs. Satisfaction
                                       Importance (6-7)             Satisfaction (6-7)               Gap (Sat - Impt)
                                                                                                                                                     120%

                                                                                                                                                     100%
             86%        83%           80%          76%          75%          73%                                                                     80%
                                                                                            65%             63%            59%          58%
                                                                                                                                                     60%
                                                                                                42%                                         38%
                30%                       35%                                                                                                        40%
                            24%                                     28%                                                        25%
                                                       20%
                                                                                 15%                           11%                                   20%

                                                                                                                                                     0%

                                                                                                                                          -21%       -20%
                                                                                             -23%
                                                                                                                             -34%                    -40%
                                       -45%                      -47%
              -56%                                  -55%                                                     -52%
                         -59%                                                  -58%                                                                  -60%

                                                                                                                                                     -80%
             Demand     Enterprise     Order    Tactical Supply    Price     Production   Transportation     Product  Manufacturing Warehouse
             Planning   Resource     Management    Planning     Management    Planning       Planning       Lifecycle  Execution    Management
                        Planning                                                                           Management   Systems
Base: Have
               57         59            60           49            36            55             43              27*             44            48
   System




                                                                                                                                                   p. 13
                                                                                                                      Supply Chain Insights, LLC © 2012
Agenda


         Current State
What is a Big Data Supply Chain?
  How will Applications Change?
            Wrap-up




                                                           p. 14
                              Supply Chain Insights, LLC © 2012
IT Trends Excited About (Top 3)

                                                                                                                                     Other IT Trends
                          Top 3 IT Trends Excited About                                                                              Excited About
                                                                                                                                         (open-ended)
                               Demand sensing                                                        69%                CLOUD SOLUTIONS
                                                                                                                        • Cloud based solutions that can link value chain
      Sales and operations planning                                                            57%                        partners with different ERP systems.
                                                                                                                        • Cloud computing (not just storage)
                              Data visualization                                     36%
                                                                                                                        ANALYTICS
                    Big data supply chains                                        31%                                   • Predictive analytics
                                                                                                                        • Predictive Analytics to address growing volatility
                                                                                                                        • Business Intelligence - integrating massive
           eCommerce/social & mobile…                                         23%                                         amounts of data into an actionable visual
                                                                                                                        • Linear Program Models driving optimized plans
                                               Mobility                      21%
                                                                                                                        PROCESSES
                                  Supply sensing                          15%                                           • It's not about systems. It's about basic
                                                                                                                          processes. Relying on systems to be the "solve"
                        Social supply chains                          7%                                                  is wrong. I'm being forced to choose an IT
                                                                                                                          trend--I'd like to choose "none." Otherwise, it's
                                                                                                                          always about the shiny new toy
      Corporate social responsibility                                5%
                                                                                                                        OTHER
                               Machine learning                     2%                                                  • Network optimization - maybe you would list in
                                                                                                                          supply sensing, not sure.



Base: Total Sample (61)
Q20. Please select up to three IT trends below that you are most excited about.                                                                                      p. 15
Q21. Please list any other IT trends that you are excited about, if any, in addition to the ones mentioned above. OPEN-ENDED            Supply Chain Insights, LLC © 2012
Big Data Plans & Expectations

                                                             Current Initiative to Evaluate Big Data




                                                                                                          Yes
                                                                            Not sure                      28%
                                                                             29%




                                                                                                    No
                                                                                                   43%




Base: Preliminary Total Sample (21)
Q7 - Does your company currently have an initiative in place to evaluate the opportunity with Big Data?                                      p. 16
Q6a - How soon do you expect to have a database that equals a Petabyte?                                         Supply Chain Insights, LLC © 2012
Definition
Structured     • Transactional
                                                    Challenges:
   Data        • Time phased data



               • Social                              Volume
Unstructured   • Channel
   Data        • Customer Service
               • Warranty


               • Temperature                     Velocity
  Sensor       • RFID
   Data        • QR codes
               • GPS

                                                    Variability
    New        • Mapping and GPS
               • Video
   Data        • Voice
   Types       • Digital Images



                                                        17                               p. 17
                                                            Supply Chain Insights, LLC © 2012
Big Data: What is it all About?

 Downstream Data       EDI         Sentiment           Text
Cold Chain         Call
                                    Analysis           Analytics
                   Center Logs
eCommerce Social                 What-if Models Hadoop
                                       Learning Systems
 Geolocation                           Data Visualization
Ratings &
Reviews
            RFID     Facebook    Scorecards Rules-Based
         Photographs                 Map Reduce Ontology
  Video
        T-Log Data Twitter
                                  R         Forecasting
Weblogs Warranty Returns          Digital Path To Constraint-
        Information
Sensors Mobile Applications       Purchase based Planning
                                      Data Mining
                                                                           p. 18
                                              Supply Chain Insights, LLC © 2012
Hallmark
Connecting the Extended Supply Chain



Transactional         Transactional          Transactional
Applications          Applications           Applications




  Trading Partner 1     Trading Partner 2        Trading Partner 3




                                            20                            p. 20
                                             Supply Chain Insights, LLC © 2012
Connecting the Extended Supply Chain

 Collaborative           Collaborative                Collaborative
     Layer                   Layer                        Layer
 Transactional           Transactional                Transactional
 Applications            Applications                 Applications

Enterprise Data         Enterprise Data              Enterprise Data
 Warehouse               Warehouse                    Warehouse
   Trading Partner 1       Trading Partner 2            Trading Partner 3


Key:
        Demand Signal
                         Predictive Analytics
        Repository
        Supply Signal    Transactional Adapters
        Repository       and Intelligent Rule Sets




                                                                                   p. 21
                                                      Supply Chain Insights, LLC © 2012
Supply Chain 2020 Tipping Points

   2013    2014     2015   2016      2017   2018   2019   2020   2021      2022     2023     2024      2025


                  Orchestration                       Internet of Things
 Talent
Shortage                            Big Data                                    Learning
                                  Supply Chains                               Supply Chains
      Compliance on
      Safe & Secure
                                                                                  Digital Manufacturing



                                       Supply Chain Excellence =

                                        Value-Based Outcomes
                                        Delivered by Value Networks

                                            Outside-In


                                                                                                                 p. 22
                                                                                    Supply Chain Insights, LLC © 2012
Agenda


         Current State
What is a Big Data Supply Chain?
         Case Studies
            Wrap-up




                                                         p. 23
                            Supply Chain Insights, LLC © 2012
Fresh Express Defined a NEW Market

                                                          YR 1 = $119.5
                                                          (launch FEB/20/1995 QUAD)
                                                          (launch FEB/20/1995 QUAD)

                                                          Latest YR09 = $1,201
                                                          (52 Wks MAY/17/2009 FDMX
                                                          (52 Wks MAY/17/2009 FDMX



                                                     CONVENIENCE,
                                                     Ease of Serving

                                            New Unique Formula
                                            New Technology
                                            Distinctive Innovation
                                            Superior Process
                                            More Ingredients



                                                             Dole Fresh
   “Experience Freshness ”                                  Follower



FRESH EXPRESS ’ priority benefit focus was about the convenience of
serving all that you had previously cut and chopped.
                                                                                  9
Opportunity
    •    1/3 of shipped produce wasted: $34B in annual global waste from
         perishable foods

    •    50% is due to temperature variations from the farm to retail shelf

    •    Reducing temperature related shrink by half is approx. $9B opportunity.


                                     Strawberries

                                              1%                      Increase in
                                              reduction in            profit of
                                              Shrink                  $1,173,555

                                                                      Increase in
                                              6% reduction
                                                                      profit of
SHM PowerPoint Template Guidelines            in Shrink                 03.15.10
                                                                      $7,378,830
Unit BuildingTemperatures MatterFirst
                    Level Export Pallets – Group by
                          In or Shelf Life?


                                                        11+
                                            14+                                15+                15+
         15+              15+
                                                                         12+
  12+                                                          15+             15+         <10

                                                                         <10                      15+
         15+              14+               15+
                                                        12+                                10+
                                                                               5+
Having different remaining shelf life mixed on pallets, causes problems later. Sending short shelf life
                                                             15+                               15+
berries on longer delivery cycles turns Good Berries into BAD Berries for the retailer and others.
More yellow & red pallets in Philadelphia & Southern California ~ More shrink at the retailer ~
Lower customer satisfaction
If we can group berries by shelf life, we avoid problems on multiple pallets – and send pallets to the
right destination…
                                                                                                 <10
                                                                                         10+
                                                                                                        12+
        15+              15+               14+                15+              15+               <10
                                                                                          11+

                                                                                                        12+
                                                                                                 12+
                                                                                          13+
“Where’s My Bud” Viral Campaign
          Campaign
         Objectives:
  Reduce Out of Stocks
  at targeted retailers by
                       5%
       Increase Shopper
  satisfaction and brand
                   loyalty       Validation:
                                 Identify a key leader or
                                 market that wants to pilot.
                                 50/50 shared risk in effort
                                 and resources to pursue.
                                 Keep costs to a minimum for
                                 pilot, under $75K
              Concept:
 Execute a viral campaign
     focused on leveraging
 shoppers to identify out of
      stocks and potentially
 pricing compliance issues
Leverage a combination of
consumer, internet, and in-
store technical capabilities

                                                                  p. 27
                                     Supply Chain Insights, LLC © 2012
Retailer Experience



   New text message to
   612-961-7802:

   A customer at Denny
   and Doug’s Liquor
   Emporium has just
   snapped a tag. You’re
   out of stock on Bud
   Light.

   Please contact your
   wholesaler.




                                                        p. 28
                           Supply Chain Insights, LLC © 2012
Here are some locations near you where you can
find Bud Light. Be sure to use this promotion code
to get your discount:
ABBL12456




                                                                                  p. 29
                                                     Supply Chain Insights, LLC © 2012
More than Just “Like”




                                                     p. 30
                        Supply Chain Insights, LLC © 2012
Dell
Dell’s Key Social Media Milestones
Redefine Customer Service?




32   p.                                                      p. 32
                                Supply Chain Insights, LLC © 2012
Social Coupons for Social Communities




                                                        p. 33
                                                      33
                           Supply Chain Insights, LLC © 2012
                                   p.
Newell Rubbermaid




       #Future15SB @bwdumars

                                                      p. 34
                         Supply Chain Insights, LLC © 2012
Newell Rubbermaid




       #Future15SB @bwdumars

                                                      p. 35
                         Supply Chain Insights, LLC © 2012
Best Buy
How Best Buy created a social strategy




                                                          p. 36
                             Supply Chain Insights, LLC © 2012
37




                             p. 37
Supply Chain Insights, LLC © 2012
Summary


• Today’s supply chains respond. They don’t
  sense. To be able to sense, the supply
  chain needs to be redefined by new data
  forms and applications.
• The pace of the next decade will be quicker.
  It will be outside-in and it will make many of
  today’s applications obsolete.
• Go Big DATA or GO HOME!


                                                                   p. 38
                                      Supply Chain Insights, LLC © 2012
Big Data will be the NEW
Foundation of the Future
     Supply Chain


                                               p. 39
                  Supply Chain Insights, LLC © 2012
Who is Lora?

• Founder of Supply Chain Insights
• Partner at Altimeter Group (leader in open
  research)
• 7 years of Management Experience leading
  Analyst Teams at Gartner and AMR Research
• 8 years Experience in Marketing and Selling
  Supply Chain Software at Descartes Systems
  Group and Manugistics (now JDA)
• 15 Years Leading teams in Manufacturing and
  Distribution operations for Clorox, Kraft/General
  Foods, Nestle/Dreyers Grand Ice Cream and
  Procter & Gamble.

                                                                p. 40
                                   Supply Chain Insights, LLC © 2012
Where do you find Lora?

 Contact Information: loracecere@gmail.com
 Blog: www.supplychainshaman.com
 (3500 pageviews/month)
 Twitter: lcecere 2900 followers. Rated as the
 top rated supply chain social network user.
 Linkedin: linkedin.com/pub/lora-
 cecere/0/196/573 (2300 in the network)




                                                             p. 41
                                Supply Chain Insights, LLC © 2012

Presentation on Big Data

  • 1.
    Big Data SupplyChains Go Big or Go Home!
  • 2.
    Big Data willbe the NEW Foundation of the Future Supply Chain
  • 3.
    BRICKS Book Publishes Matter in August 2012 The Role of Supply Chains in Building Market-Driven Differentiation LORA M. CECERE CHARLES W. CHASE JR.
  • 4.
    Agenda Current State What is a Big Data Supply Chain? How will Applications Change? Wrap-up p. 4 Supply Chain Insights, LLC © 2012
  • 5.
    Supply Chain TippingPoints 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 JIT Supply Chain Internet/Email RFID Organization Evolution of eProcurement the PC Re-Engineering the Total Quality S&OP Organization Management Theory of Constraints (Michael Hammer) Supply Chain Excellence = Supply Chain Excellence = Islands of Manufacturing Vertical Silo Efficient Order to + + Excellence Excellence Excellence Cash Processes Inside-Out Inside-Out p. 5 Supply Chain Insights, LLC © 2012
  • 6.
    Supply Chain TippingPoints 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 .com Social Responsibility Y2K Demand Driven Concepts CSCO Lean Six Sigma Market-Driven Value Networks Supply Chain Excellence = Supply Chain Excellence = Vertical Silo Outsourcing Value-Based Outcomes + Excellence Effectiveness Delivered by Horizontal Processes Inside-Out Outside-In p. 6 Supply Chain Insights, LLC © 2012
  • 7.
    7 Whatis a Market-driven Value Network? An adaptive network focused on a value- based outcome that senses and translates market changes (buy and sell-side markets) bi-directionally with near-real time data latency to align sell, deliver, make and sourcing operations. p. 7 Supply Chain Insights, LLC © 2012
  • 8.
    Evolution of SupplyChain Process Excellence Align: Continuous Building Horizontal Testing Orchestrate Market Process Connectors Learning Improving Demand and Supply Driven In Market Adapt: Demand- Resilient Driven Reliable Right Product Efficient Sense Demand Demand Volatility and Supply Right Place Cost Shape Right Time Procure to Demand and Supply pay/order to Supply based Volatility cash on Market Right Cost p. 8 Supply Chain Insights, LLC © 2012
  • 9.
    What is SupplyChain Excellence? How Define Supply Chain “Excellence” Right product, right place, right time at the right cost. 70% A responsive supply chain that can adapt as markets change. 57% Most Mature A resilient supply chain that can withstand the shocks of demand and supply volatility. 52% The Efficient Supply Chain. Lowest cost per unit. 38% Right product, right place, right time. 20% Base: Total Sample (61) Q14. How does your company define supply chain “excellence?” Please select all that apply. p. 9 Supply Chain Insights, LLC © 2012
  • 10.
    The Effective Frontier Profitable Growth Revenue Cost of Goods Working Capital Corporate Social Responsibility R&D Strategy and Investment Asset Strategy and Investment Forecast Accuracy Customer Service Inventory Channel Strategy Product and Supplier Strategy Service Portfolio Sales Distribution Manufacturing Logistics Procurement Policies Policies Policies Policies Policies Returns Backorders First Pass Yield Empty Miles Material Yield p. 10 Supply Chain Insights, LLC © 2012
  • 11.
    A Supply Chain is a Complex System with Complex Processes with Increasing Complexity p. 11 Supply Chain Insights, LLC © 2012
  • 12.
    IT Systems: Quantity Operational IT Systems Any 1 System 2 Systems 3+ Systems Systems Order Management 61% 15% 23% 98% ERP (Enterprise Resource Planning) 64% 8% 25% 97% Demand Planning 39% 31% 23% 93% Production Planning 33% 25% 33% 90% Tactical Supply Planning 36% 18% 26% 80% Warehouse Management 30% 16% 33% 79% Manufacturing Execution Systems 34% 10% 28% 72% Transportation Planning 38% 20% 13% 70% Price Management 34% 13% 11% 59% Product Lifecycle Management 26% 8% 10% 44% Base: Total Sample (61) Q15. For each of the following IT systems, please indicate how many you currently have operational – 0 systems, 1 system, 2 systems or 3+ p. 12 systems. Supply Chain Insights, LLC © 2012
  • 13.
    IT Systems: Importance & Satisfaction IT Importance vs. Satisfaction Importance (6-7) Satisfaction (6-7) Gap (Sat - Impt) 120% 100% 86% 83% 80% 76% 75% 73% 80% 65% 63% 59% 58% 60% 42% 38% 30% 35% 40% 24% 28% 25% 20% 15% 11% 20% 0% -21% -20% -23% -34% -40% -45% -47% -56% -55% -52% -59% -58% -60% -80% Demand Enterprise Order Tactical Supply Price Production Transportation Product Manufacturing Warehouse Planning Resource Management Planning Management Planning Planning Lifecycle Execution Management Planning Management Systems Base: Have 57 59 60 49 36 55 43 27* 44 48 System p. 13 Supply Chain Insights, LLC © 2012
  • 14.
    Agenda Current State What is a Big Data Supply Chain? How will Applications Change? Wrap-up p. 14 Supply Chain Insights, LLC © 2012
  • 15.
    IT Trends ExcitedAbout (Top 3) Other IT Trends Top 3 IT Trends Excited About Excited About (open-ended) Demand sensing 69% CLOUD SOLUTIONS • Cloud based solutions that can link value chain Sales and operations planning 57% partners with different ERP systems. • Cloud computing (not just storage) Data visualization 36% ANALYTICS Big data supply chains 31% • Predictive analytics • Predictive Analytics to address growing volatility • Business Intelligence - integrating massive eCommerce/social & mobile… 23% amounts of data into an actionable visual • Linear Program Models driving optimized plans Mobility 21% PROCESSES Supply sensing 15% • It's not about systems. It's about basic processes. Relying on systems to be the "solve" Social supply chains 7% is wrong. I'm being forced to choose an IT trend--I'd like to choose "none." Otherwise, it's always about the shiny new toy Corporate social responsibility 5% OTHER Machine learning 2% • Network optimization - maybe you would list in supply sensing, not sure. Base: Total Sample (61) Q20. Please select up to three IT trends below that you are most excited about. p. 15 Q21. Please list any other IT trends that you are excited about, if any, in addition to the ones mentioned above. OPEN-ENDED Supply Chain Insights, LLC © 2012
  • 16.
    Big Data Plans& Expectations Current Initiative to Evaluate Big Data Yes Not sure 28% 29% No 43% Base: Preliminary Total Sample (21) Q7 - Does your company currently have an initiative in place to evaluate the opportunity with Big Data? p. 16 Q6a - How soon do you expect to have a database that equals a Petabyte? Supply Chain Insights, LLC © 2012
  • 17.
    Definition Structured • Transactional Challenges: Data • Time phased data • Social Volume Unstructured • Channel Data • Customer Service • Warranty • Temperature Velocity Sensor • RFID Data • QR codes • GPS Variability New • Mapping and GPS • Video Data • Voice Types • Digital Images 17 p. 17 Supply Chain Insights, LLC © 2012
  • 18.
    Big Data: Whatis it all About? Downstream Data EDI Sentiment Text Cold Chain Call Analysis Analytics Center Logs eCommerce Social What-if Models Hadoop Learning Systems Geolocation Data Visualization Ratings & Reviews RFID Facebook Scorecards Rules-Based Photographs Map Reduce Ontology Video T-Log Data Twitter R Forecasting Weblogs Warranty Returns Digital Path To Constraint- Information Sensors Mobile Applications Purchase based Planning Data Mining p. 18 Supply Chain Insights, LLC © 2012
  • 19.
  • 20.
    Connecting the ExtendedSupply Chain Transactional Transactional Transactional Applications Applications Applications Trading Partner 1 Trading Partner 2 Trading Partner 3 20 p. 20 Supply Chain Insights, LLC © 2012
  • 21.
    Connecting the ExtendedSupply Chain Collaborative Collaborative Collaborative Layer Layer Layer Transactional Transactional Transactional Applications Applications Applications Enterprise Data Enterprise Data Enterprise Data Warehouse Warehouse Warehouse Trading Partner 1 Trading Partner 2 Trading Partner 3 Key: Demand Signal Predictive Analytics Repository Supply Signal Transactional Adapters Repository and Intelligent Rule Sets p. 21 Supply Chain Insights, LLC © 2012
  • 22.
    Supply Chain 2020Tipping Points 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Orchestration Internet of Things Talent Shortage Big Data Learning Supply Chains Supply Chains Compliance on Safe & Secure Digital Manufacturing Supply Chain Excellence = Value-Based Outcomes Delivered by Value Networks Outside-In p. 22 Supply Chain Insights, LLC © 2012
  • 23.
    Agenda Current State What is a Big Data Supply Chain? Case Studies Wrap-up p. 23 Supply Chain Insights, LLC © 2012
  • 24.
    Fresh Express Defineda NEW Market YR 1 = $119.5 (launch FEB/20/1995 QUAD) (launch FEB/20/1995 QUAD) Latest YR09 = $1,201 (52 Wks MAY/17/2009 FDMX (52 Wks MAY/17/2009 FDMX CONVENIENCE, Ease of Serving  New Unique Formula  New Technology  Distinctive Innovation  Superior Process  More Ingredients Dole Fresh “Experience Freshness ” Follower FRESH EXPRESS ’ priority benefit focus was about the convenience of serving all that you had previously cut and chopped. 9
  • 25.
    Opportunity • 1/3 of shipped produce wasted: $34B in annual global waste from perishable foods • 50% is due to temperature variations from the farm to retail shelf • Reducing temperature related shrink by half is approx. $9B opportunity. Strawberries 1% Increase in reduction in profit of Shrink $1,173,555 Increase in 6% reduction profit of SHM PowerPoint Template Guidelines in Shrink 03.15.10 $7,378,830
  • 26.
    Unit BuildingTemperatures MatterFirst Level Export Pallets – Group by In or Shelf Life? 11+ 14+ 15+ 15+ 15+ 15+ 12+ 12+ 15+ 15+ <10 <10 15+ 15+ 14+ 15+ 12+ 10+ 5+ Having different remaining shelf life mixed on pallets, causes problems later. Sending short shelf life 15+ 15+ berries on longer delivery cycles turns Good Berries into BAD Berries for the retailer and others. More yellow & red pallets in Philadelphia & Southern California ~ More shrink at the retailer ~ Lower customer satisfaction If we can group berries by shelf life, we avoid problems on multiple pallets – and send pallets to the right destination… <10 10+ 12+ 15+ 15+ 14+ 15+ 15+ <10 11+ 12+ 12+ 13+
  • 27.
    “Where’s My Bud”Viral Campaign Campaign Objectives: Reduce Out of Stocks at targeted retailers by 5% Increase Shopper satisfaction and brand loyalty Validation: Identify a key leader or market that wants to pilot. 50/50 shared risk in effort and resources to pursue. Keep costs to a minimum for pilot, under $75K Concept: Execute a viral campaign focused on leveraging shoppers to identify out of stocks and potentially pricing compliance issues Leverage a combination of consumer, internet, and in- store technical capabilities p. 27 Supply Chain Insights, LLC © 2012
  • 28.
    Retailer Experience New text message to 612-961-7802: A customer at Denny and Doug’s Liquor Emporium has just snapped a tag. You’re out of stock on Bud Light. Please contact your wholesaler. p. 28 Supply Chain Insights, LLC © 2012
  • 29.
    Here are somelocations near you where you can find Bud Light. Be sure to use this promotion code to get your discount: ABBL12456 p. 29 Supply Chain Insights, LLC © 2012
  • 30.
    More than Just“Like” p. 30 Supply Chain Insights, LLC © 2012
  • 31.
    Dell Dell’s Key SocialMedia Milestones
  • 32.
    Redefine Customer Service? 32 p. p. 32 Supply Chain Insights, LLC © 2012
  • 33.
    Social Coupons forSocial Communities p. 33 33 Supply Chain Insights, LLC © 2012 p.
  • 34.
    Newell Rubbermaid #Future15SB @bwdumars p. 34 Supply Chain Insights, LLC © 2012
  • 35.
    Newell Rubbermaid #Future15SB @bwdumars p. 35 Supply Chain Insights, LLC © 2012
  • 36.
    Best Buy How BestBuy created a social strategy p. 36 Supply Chain Insights, LLC © 2012
  • 37.
    37 p. 37 Supply Chain Insights, LLC © 2012
  • 38.
    Summary • Today’s supplychains respond. They don’t sense. To be able to sense, the supply chain needs to be redefined by new data forms and applications. • The pace of the next decade will be quicker. It will be outside-in and it will make many of today’s applications obsolete. • Go Big DATA or GO HOME! p. 38 Supply Chain Insights, LLC © 2012
  • 39.
    Big Data willbe the NEW Foundation of the Future Supply Chain p. 39 Supply Chain Insights, LLC © 2012
  • 40.
    Who is Lora? •Founder of Supply Chain Insights • Partner at Altimeter Group (leader in open research) • 7 years of Management Experience leading Analyst Teams at Gartner and AMR Research • 8 years Experience in Marketing and Selling Supply Chain Software at Descartes Systems Group and Manugistics (now JDA) • 15 Years Leading teams in Manufacturing and Distribution operations for Clorox, Kraft/General Foods, Nestle/Dreyers Grand Ice Cream and Procter & Gamble. p. 40 Supply Chain Insights, LLC © 2012
  • 41.
    Where do youfind Lora? Contact Information: loracecere@gmail.com Blog: www.supplychainshaman.com (3500 pageviews/month) Twitter: lcecere 2900 followers. Rated as the top rated supply chain social network user. Linkedin: linkedin.com/pub/lora- cecere/0/196/573 (2300 in the network) p. 41 Supply Chain Insights, LLC © 2012

Editor's Notes

  • #25 The first case history is the 1995 launch of Fresh Express salad kits, clearly an innovation that changed our lives.
  • #37 - Having strategies, having a plan. align with a goal.  - more than social for the sake of social
  • #38 - Having strategies, having a plan. align with a goal.  - more than social for the sake of social