The project is an integrated component where it involves structural theory, force calculation and basic structural
proposal. This project is designed to allow the demonstration of knowledge and understanding of building structure.
Objectives of Project
The objectives of this project are as follows:
 To introduce the basic process of building structures design process to the students.
 To enable the students to have a holistic experience including Concept and Structure Layout Design,
Building Structure Engineering Considerations, Structure Members Sizing and Calculations, Final Report
and Presentation.
Learning Outcomes
 Produce a complete documentation on structural system of a case study
 Explore and understand the concept of structural analysis
 Identification of structural components
 Recognize, Execute and implement basic procedures of building structure design
 Produce a structural proposal
2
Tasks - Methodology
Working in a group of max 6 members, each group is to design a single storey bungalow which consists of the
following component. You are free to choose any layout from APPENDIX A. The roof of the bungalow must be FLAT
ROOF.
1. 1 master bedroom with attached bathroom
2. 2 guests rooms
3. 2 bathrooms
4. Kitchen
5. Living area
6. Dining area
7. 1 store room
Next, each group is required to design the structural frame of the building and perform structural analysis on all the
component of the buildings. Every member in the group should get involved in structural analysis.
Suggested Timeline
Week 7
Assignment Briefing +
Grouping +
Start Bungalow Design
Please check your group member names here!
Week 8
Finalise Bungalow Design +
Start Structural Framing of Bungalow
(after week 8, no further comment on Design)
Week 9 Finalise Structural Frame (after week 9, no further comment on structural frame)
Week 10 Beam Design
Week 11 Column Design
Week 12 Final Discussion/Consultation
Week 13 Submission
3
Submission Requirement
An A4 Report which consist of the following,
- Cover page - Name and student ID of all group members
- Brief description of the bungalow
o Location, usage, and etc
- All relevant floor plans, i.e. ground floor and roof plan
- Design brief which summarize the materials used, weight of the material and live load assumed
o Assume the size of all beams to be 150mmx300mm and all slab thickness to be 150mm.
- All structural plans, which inclusive of
o Foundation plan, structural ground floor plan and structural roof plan.
o Structural plans are plan which only shows structural component of a building, typically consists of
beams, columns, and slab.
- Beam analysis report which consists of: (a separator to separate analysis done by different student)
o Load distribution plans for beam design
**indicate live load assumed for each room on floor plans
**live load for roof is taken as 0.5kN/m2
o Load Diagram
o Bending moment diagram
o Shear force diagrams
- Column analysis report which consists of: (a separator to separate analysis done by different student)
o Load distribution plans for column design
o Estimation of column load
o Suggested column size
Assessment Criteria
The assessment for this assignment will be based on:
- Understanding and concept of structural system and load distribution path
- Application of knowledge, concept and skill
o Ability to analyse structural members
Marking Criteria
Marking critera shall be as follow :
1. Understanding of load distribution path
2. Understanding of structural analysis which inclusive the following :
a. Ability to Identify and quantify loads acting on beams and columns
b. Understanding of structural analysis
4
Prepared by:
…………………………….
(Ann See Peng)
Module Coordinator
Office No.: 0356295250
Office Location: Academic Suite C9
Date:
1
APPENDIX A
** All units in m
** Not to scale
14.0

More Related Content

Similar to Structure project brief march 2018 (updated)

Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016
Arvindhan Balasingam
 
Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016
Chow Hong Da
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
Anthony Chew
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
JoyeeLee0131
 
Building Construction Project 1 Brief
Building Construction Project 1 BriefBuilding Construction Project 1 Brief
Building Construction Project 1 Brief
JoyeeLee0131
 
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTIONSEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
Darshiini Vig
 
Onkar Interntship PPT.pptx
Onkar Interntship PPT.pptxOnkar Interntship PPT.pptx
Onkar Interntship PPT.pptx
shaik saifulla
 
sandy batch.pptx
sandy batch.pptxsandy batch.pptx
sandy batch.pptx
RajeshKumar25548
 
bstructureproject2-150706142716-lva1-app6892.pdf
bstructureproject2-150706142716-lva1-app6892.pdfbstructureproject2-150706142716-lva1-app6892.pdf
bstructureproject2-150706142716-lva1-app6892.pdfJ.j. Hayashi
 
Bstructure project2
Bstructure project2 Bstructure project2
Bstructure project2
J.j. Hayashi
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures ReportJoanne Yunn Tze
 
bstrut report
bstrut reportbstrut report
bstrut report
Gary Yeow
 
STRUCTURAL ENGINEERING
STRUCTURAL ENGINEERINGSTRUCTURAL ENGINEERING
STRUCTURAL ENGINEERING
Nicole Valerio
 
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
Darshiini Vig
 
Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1
Chow Hong Da
 
Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)
Arvindhan Balasingam
 
SCHOOL_BUILDING[1] BATCH-2.pptx
SCHOOL_BUILDING[1] BATCH-2.pptxSCHOOL_BUILDING[1] BATCH-2.pptx
SCHOOL_BUILDING[1] BATCH-2.pptx
NikhilMoviechanger
 

Similar to Structure project brief march 2018 (updated) (20)

Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016
 
Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
 
Project 1 brief
Project 1 briefProject 1 brief
Project 1 brief
 
Building Construction Project 1 Brief
Building Construction Project 1 BriefBuilding Construction Project 1 Brief
Building Construction Project 1 Brief
 
Bcon 2 proj 1
Bcon 2 proj 1Bcon 2 proj 1
Bcon 2 proj 1
 
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTIONSEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
 
Onkar Interntship PPT.pptx
Onkar Interntship PPT.pptxOnkar Interntship PPT.pptx
Onkar Interntship PPT.pptx
 
sandy batch.pptx
sandy batch.pptxsandy batch.pptx
sandy batch.pptx
 
bstructureproject2-150706142716-lva1-app6892.pdf
bstructureproject2-150706142716-lva1-app6892.pdfbstructureproject2-150706142716-lva1-app6892.pdf
bstructureproject2-150706142716-lva1-app6892.pdf
 
Bstructure project2
Bstructure project2 Bstructure project2
Bstructure project2
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
 
bstrut report
bstrut reportbstrut report
bstrut report
 
STRUCTURAL ENGINEERING
STRUCTURAL ENGINEERINGSTRUCTURAL ENGINEERING
STRUCTURAL ENGINEERING
 
report2
report2report2
report2
 
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
 
Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1
 
Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)
 
SCHOOL_BUILDING[1] BATCH-2.pptx
SCHOOL_BUILDING[1] BATCH-2.pptxSCHOOL_BUILDING[1] BATCH-2.pptx
SCHOOL_BUILDING[1] BATCH-2.pptx
 

More from w ss

Est 22222
Est 22222Est 22222
Est 22222
w ss
 
Course outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qsCourse outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qs
w ss
 
Pp presentation 1
Pp presentation 1Pp presentation 1
Pp presentation 1
w ss
 
Assignment brief qsb2134 tender
Assignment brief qsb2134 tenderAssignment brief qsb2134 tender
Assignment brief qsb2134 tender
w ss
 
Evaluation brief qsb2134 tender
Evaluation brief qsb2134 tenderEvaluation brief qsb2134 tender
Evaluation brief qsb2134 tender
w ss
 
Management science
Management scienceManagement science
Management science
w ss
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
w ss
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
w ss
 
Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017
w ss
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
w ss
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
w ss
 
Final presentation
Final presentationFinal presentation
Final presentation
w ss
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
w ss
 
Building services assignment
Building services assignmentBuilding services assignment
Building services assignment
w ss
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
w ss
 
M2 project assignment mar 2017
M2 project assignment mar 2017M2 project assignment mar 2017
M2 project assignment mar 2017
w ss
 
Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017
w ss
 
Assignment 2 bld60204 sketching
Assignment 2 bld60204 sketchingAssignment 2 bld60204 sketching
Assignment 2 bld60204 sketching
w ss
 
Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)
w ss
 
Flooring presentation(t 4 b)
Flooring presentation(t 4 b)Flooring presentation(t 4 b)
Flooring presentation(t 4 b)
w ss
 

More from w ss (20)

Est 22222
Est 22222Est 22222
Est 22222
 
Course outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qsCourse outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qs
 
Pp presentation 1
Pp presentation 1Pp presentation 1
Pp presentation 1
 
Assignment brief qsb2134 tender
Assignment brief qsb2134 tenderAssignment brief qsb2134 tender
Assignment brief qsb2134 tender
 
Evaluation brief qsb2134 tender
Evaluation brief qsb2134 tenderEvaluation brief qsb2134 tender
Evaluation brief qsb2134 tender
 
Management science
Management scienceManagement science
Management science
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
 
Building services assignment
Building services assignmentBuilding services assignment
Building services assignment
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
 
M2 project assignment mar 2017
M2 project assignment mar 2017M2 project assignment mar 2017
M2 project assignment mar 2017
 
Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017
 
Assignment 2 bld60204 sketching
Assignment 2 bld60204 sketchingAssignment 2 bld60204 sketching
Assignment 2 bld60204 sketching
 
Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)
 
Flooring presentation(t 4 b)
Flooring presentation(t 4 b)Flooring presentation(t 4 b)
Flooring presentation(t 4 b)
 

Recently uploaded

Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 

Recently uploaded (20)

Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 

Structure project brief march 2018 (updated)

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) STRUCTURES (BLD61203) Prerequisite: None Final Assignment : Structural Analysis of a RC Bungalow Submission Date: Week 13 (19th Jun 2018, Tuesday) Introduction The project is an integrated component where it involves structural theory, force calculation and basic structural proposal. This project is designed to allow the demonstration of knowledge and understanding of building structure. Objectives of Project The objectives of this project are as follows:  To introduce the basic process of building structures design process to the students.  To enable the students to have a holistic experience including Concept and Structure Layout Design, Building Structure Engineering Considerations, Structure Members Sizing and Calculations, Final Report and Presentation. Learning Outcomes  Produce a complete documentation on structural system of a case study  Explore and understand the concept of structural analysis  Identification of structural components  Recognize, Execute and implement basic procedures of building structure design  Produce a structural proposal
  • 2. 2 Tasks - Methodology Working in a group of max 6 members, each group is to design a single storey bungalow which consists of the following component. You are free to choose any layout from APPENDIX A. The roof of the bungalow must be FLAT ROOF. 1. 1 master bedroom with attached bathroom 2. 2 guests rooms 3. 2 bathrooms 4. Kitchen 5. Living area 6. Dining area 7. 1 store room Next, each group is required to design the structural frame of the building and perform structural analysis on all the component of the buildings. Every member in the group should get involved in structural analysis. Suggested Timeline Week 7 Assignment Briefing + Grouping + Start Bungalow Design Please check your group member names here! Week 8 Finalise Bungalow Design + Start Structural Framing of Bungalow (after week 8, no further comment on Design) Week 9 Finalise Structural Frame (after week 9, no further comment on structural frame) Week 10 Beam Design Week 11 Column Design Week 12 Final Discussion/Consultation Week 13 Submission
  • 3. 3 Submission Requirement An A4 Report which consist of the following, - Cover page - Name and student ID of all group members - Brief description of the bungalow o Location, usage, and etc - All relevant floor plans, i.e. ground floor and roof plan - Design brief which summarize the materials used, weight of the material and live load assumed o Assume the size of all beams to be 150mmx300mm and all slab thickness to be 150mm. - All structural plans, which inclusive of o Foundation plan, structural ground floor plan and structural roof plan. o Structural plans are plan which only shows structural component of a building, typically consists of beams, columns, and slab. - Beam analysis report which consists of: (a separator to separate analysis done by different student) o Load distribution plans for beam design **indicate live load assumed for each room on floor plans **live load for roof is taken as 0.5kN/m2 o Load Diagram o Bending moment diagram o Shear force diagrams - Column analysis report which consists of: (a separator to separate analysis done by different student) o Load distribution plans for column design o Estimation of column load o Suggested column size Assessment Criteria The assessment for this assignment will be based on: - Understanding and concept of structural system and load distribution path - Application of knowledge, concept and skill o Ability to analyse structural members Marking Criteria Marking critera shall be as follow : 1. Understanding of load distribution path 2. Understanding of structural analysis which inclusive the following : a. Ability to Identify and quantify loads acting on beams and columns b. Understanding of structural analysis
  • 4. 4 Prepared by: ……………………………. (Ann See Peng) Module Coordinator Office No.: 0356295250 Office Location: Academic Suite C9 Date:
  • 5. 1 APPENDIX A ** All units in m ** Not to scale 14.0