BUSINESS PROFILE
BUILDCOM SDN BHD
s i n c e 1 9 9 6
To be THE BEST in what we do.
PROCESS OF PRESENTATION TENDER
We aim to lead the region in innovative breakthrough solutions for large scale public
infrastructure and property development.
We reliably deliver innovative world-class infrastructure and premier lifestyle properties for
our customers through our core business in infrastructure development and construction,
operation of infrastructure facilities and property development.
Take Personal Ownership - A-card holders must take charge and deliver
Walk The Talk - Show the right values and be a role model
Adopt Open, Honest Communication - Discuss, resolve & move on
Demonstrate Real Teamwork - break silos, work together across divisions
Develop Our People - Be Passion for developing people
B U I L D C O M
Originally associated with latest construction technology.
CURRENT
DEVELOPTMENT
PROCESS OF PRESENTATION TENDER
B U I L D C O M
B U I L D C O M
Managing Director
Lai Hui Ying (Vlyn) Eric Wee hiong Kiet
Executive Director
Wong Sher Sheng
Independent Director
Roxane Preti
Information Director
Wong Tian Yi
General Manager
Teo Chiang Loong
Alternate Director
Andy Chin
Chief Information Director
Deong Khai Keat
Legal Secretarial
Ong Chia Hong
Head of Marketing
Kennedy Ho
General Manager
Sim Si Kai
Alternate Director
OUR TEAM
LONG BRANCH @ KOTA KEMUNING SRI DAMAI @ BUKIT RIMBAUKOTA KEMUNING HILLS
B U I L D C O M
PAST PROJECT
THE DRAWING THE RESULT
B U I L D C O M
PROCESS OF PRESENTATION TENDER
WORK PROGRAMME
B U I L D C O M
RM0
RM20,000
RM40,000
RM60,000
RM80,000
RM100,000
RM120,000
RM140,000
Preliminaries & General Conditions RM12,000
Prime Cost & Provisional Sum RM52,952
Main Building Works RM124,652.50
RM12,000
RM52,952
RM124,652.50
Preliminaries & General Conditions Prime Cost & Provisional Sum Main Building Works
COST ANALYSIS
B U I L D C O M
RM18,889.44
RM7,358.05
RM52,364.97
RM3,603.44 RM4,048.55
RM11,577.94
RM10,161.27
RM7,415.08 RM7,300
RM1,570.13
RM0.00
RM10,000.00
RM20,000.00
RM30,000.00
RM40,000.00
RM50,000.00
RM60,000.00
1
W.B.L.F.L FRAME ROOF CONSTRUCTION & FINISHES EXTERNAL WALL
INTERNAL WALL DOOR & IRONMONGERIES INTERNAL WALL FINISHES INTERNAL FLOOR FINISHES
INTERNAL CEILING FINISHES EXTERNAL FINISHES
PRICE IN MAIN BUILDING WORKS
B U I L D C O M
COST ANALYSIS
PAINTING - TOTAL PRICE DEDUCTION = RM 1196.17
Element TYPE ELEMENT & PRODUCT NAME NO. OF
COAT (s)
I. Internal Wall
Finishes - B4 (7) / 1
/D
II. Internal Ceiling
Finishes Finishes -
B4 (9) / 1 /8
III. External Finishes -
B4 (10) / 1 /D & B4
(10) / 1 /E
IV. Door&Ironmongeries
- B4 (6) / 2 / B
Sealer / Primer Dulux Interior Basecoast Sealer
→ Nippon Vinilex Wall Sealer
1 coat
Topcoat Dulux ICI Maxilite Trade Emulsion Paint
→ Nippon Super Matex Emulsion
2 coats
Undercoat Dulux Maxilite Pluss
→ Nippon Paint Interior Q-Glo
1 coat
Topcoat Dulux Gloss Finish
→ Nippon Paint High Gloss Finish
2 coats
B U I L D C O M
Preliminaries PRELIMINARIES
B U I L D C O M
Labour Justification
Skilled workers used for important tasks ( e.g painting, plastering, tiling )
Cost cutting by using unskilled workers for normal task ( e.g cement and sand mixture )
LABOUR JUSTIFICATION
B U I L D C O M
PROCESS OF PRESENTATION TENDER
B U I L D C O M
STRENGTH
B U I L D C O M
FINANCIALLY STRONG
MACHINERY AND PLANTS
PROCUREMENT METHOD
WORK PROGRESS UPDATE
TEAM WORK
LABOURER
WIDE RANGE OF NETWORK OF SUPPLIERS
1) Element No.1 - Work Below Lowest Floor Level
• Lean Concrete and Hardcore - B4 (1) / 1 / D
Unit : M2 → M3
• Reinforced concrete bed spread- M2 → M3
• BRC A8 for 175mm thick bed spread → BRC A6
2) Calculation ERROR
Performance Bond RM7000 → add to the preliminary amount
B U I L D C O M
ERROR IN BILL OF QUANTITIES & CALCULATION
PROCESS OF PRESENTATION TENDER
B U I L D C O M
Tender deposit is not stated in letter of invitation
ERROR IN CLIENT'S TENDER DOCUMENT
B U I L D C O M
CORRECTION : APPENDIX ''E'' → APPENDIX ''D''
ERROR IN CLIENT'S TENDER DOCUMENT
B U I L D C O M
PROCESS OF PRESENTATION TENDER
B U I L D C O M
WHY
US
B U I L D C O M
Performance Tracking
B U I L D C O M
Changes
(Design & Material)
B U I L D C O M
B U I L D C O M
CONTACT
US
BUILDCOM SDN BHD
No. 8, Jalan PJU 1
Bandar Damansara Perdana
47820 Petaling Jaya
Selangor Darul Ehsan
Malaysia
Tel: +603 7491 1234
Email: contactus@buildcom.my
BUILDCOM SDN BHD
@buildcom.sdn.bhd
@buildcom.sdn.bhd
BUILDCOM SDN BHD
No. 8, Jalan PJU 1
Bandar Damansara Perdana
47820 Petaling Jaya
Selangor Darul Ehsan
Malaysia
Tel: +603 7491 1234
Email: contactus@buildcom.my

Est 22222

  • 1.
    BUSINESS PROFILE BUILDCOM SDNBHD s i n c e 1 9 9 6 To be THE BEST in what we do.
  • 2.
  • 3.
    We aim tolead the region in innovative breakthrough solutions for large scale public infrastructure and property development. We reliably deliver innovative world-class infrastructure and premier lifestyle properties for our customers through our core business in infrastructure development and construction, operation of infrastructure facilities and property development. Take Personal Ownership - A-card holders must take charge and deliver Walk The Talk - Show the right values and be a role model Adopt Open, Honest Communication - Discuss, resolve & move on Demonstrate Real Teamwork - break silos, work together across divisions Develop Our People - Be Passion for developing people B U I L D C O M
  • 4.
    Originally associated withlatest construction technology. CURRENT DEVELOPTMENT
  • 5.
    PROCESS OF PRESENTATIONTENDER B U I L D C O M
  • 6.
    B U IL D C O M Managing Director Lai Hui Ying (Vlyn) Eric Wee hiong Kiet Executive Director Wong Sher Sheng Independent Director Roxane Preti Information Director Wong Tian Yi General Manager Teo Chiang Loong Alternate Director Andy Chin Chief Information Director Deong Khai Keat Legal Secretarial Ong Chia Hong Head of Marketing Kennedy Ho General Manager Sim Si Kai Alternate Director OUR TEAM
  • 7.
    LONG BRANCH @KOTA KEMUNING SRI DAMAI @ BUKIT RIMBAUKOTA KEMUNING HILLS B U I L D C O M PAST PROJECT
  • 8.
    THE DRAWING THERESULT B U I L D C O M
  • 9.
  • 10.
    WORK PROGRAMME B UI L D C O M
  • 11.
    RM0 RM20,000 RM40,000 RM60,000 RM80,000 RM100,000 RM120,000 RM140,000 Preliminaries & GeneralConditions RM12,000 Prime Cost & Provisional Sum RM52,952 Main Building Works RM124,652.50 RM12,000 RM52,952 RM124,652.50 Preliminaries & General Conditions Prime Cost & Provisional Sum Main Building Works COST ANALYSIS B U I L D C O M
  • 12.
    RM18,889.44 RM7,358.05 RM52,364.97 RM3,603.44 RM4,048.55 RM11,577.94 RM10,161.27 RM7,415.08 RM7,300 RM1,570.13 RM0.00 RM10,000.00 RM20,000.00 RM30,000.00 RM40,000.00 RM50,000.00 RM60,000.00 1 W.B.L.F.LFRAME ROOF CONSTRUCTION & FINISHES EXTERNAL WALL INTERNAL WALL DOOR & IRONMONGERIES INTERNAL WALL FINISHES INTERNAL FLOOR FINISHES INTERNAL CEILING FINISHES EXTERNAL FINISHES PRICE IN MAIN BUILDING WORKS B U I L D C O M
  • 13.
    COST ANALYSIS PAINTING -TOTAL PRICE DEDUCTION = RM 1196.17 Element TYPE ELEMENT & PRODUCT NAME NO. OF COAT (s) I. Internal Wall Finishes - B4 (7) / 1 /D II. Internal Ceiling Finishes Finishes - B4 (9) / 1 /8 III. External Finishes - B4 (10) / 1 /D & B4 (10) / 1 /E IV. Door&Ironmongeries - B4 (6) / 2 / B Sealer / Primer Dulux Interior Basecoast Sealer → Nippon Vinilex Wall Sealer 1 coat Topcoat Dulux ICI Maxilite Trade Emulsion Paint → Nippon Super Matex Emulsion 2 coats Undercoat Dulux Maxilite Pluss → Nippon Paint Interior Q-Glo 1 coat Topcoat Dulux Gloss Finish → Nippon Paint High Gloss Finish 2 coats B U I L D C O M
  • 14.
  • 15.
    Labour Justification Skilled workersused for important tasks ( e.g painting, plastering, tiling ) Cost cutting by using unskilled workers for normal task ( e.g cement and sand mixture ) LABOUR JUSTIFICATION B U I L D C O M
  • 16.
    PROCESS OF PRESENTATIONTENDER B U I L D C O M
  • 17.
    STRENGTH B U IL D C O M FINANCIALLY STRONG MACHINERY AND PLANTS PROCUREMENT METHOD WORK PROGRESS UPDATE TEAM WORK LABOURER WIDE RANGE OF NETWORK OF SUPPLIERS
  • 18.
    1) Element No.1- Work Below Lowest Floor Level • Lean Concrete and Hardcore - B4 (1) / 1 / D Unit : M2 → M3 • Reinforced concrete bed spread- M2 → M3 • BRC A8 for 175mm thick bed spread → BRC A6 2) Calculation ERROR Performance Bond RM7000 → add to the preliminary amount B U I L D C O M ERROR IN BILL OF QUANTITIES & CALCULATION
  • 19.
    PROCESS OF PRESENTATIONTENDER B U I L D C O M
  • 20.
    Tender deposit isnot stated in letter of invitation ERROR IN CLIENT'S TENDER DOCUMENT B U I L D C O M
  • 21.
    CORRECTION : APPENDIX''E'' → APPENDIX ''D'' ERROR IN CLIENT'S TENDER DOCUMENT B U I L D C O M
  • 22.
    PROCESS OF PRESENTATIONTENDER B U I L D C O M
  • 23.
    WHY US B U IL D C O M
  • 24.
  • 25.
  • 26.
    B U IL D C O M
  • 27.
    CONTACT US BUILDCOM SDN BHD No.8, Jalan PJU 1 Bandar Damansara Perdana 47820 Petaling Jaya Selangor Darul Ehsan Malaysia Tel: +603 7491 1234 Email: contactus@buildcom.my BUILDCOM SDN BHD @buildcom.sdn.bhd @buildcom.sdn.bhd
  • 28.
    BUILDCOM SDN BHD No.8, Jalan PJU 1 Bandar Damansara Perdana 47820 Petaling Jaya Selangor Darul Ehsan Malaysia Tel: +603 7491 1234 Email: contactus@buildcom.my