This document summarizes a developmental irrigation project in Andhra Pradesh, India. The project aims to provide irrigation and drinking water to East and West Godavari districts and Vishakhapatnam through canals. It also plans to generate hydroelectric power. The project carries risks like natural calamities, financial issues, technical problems, and quality issues that require monitoring and mitigation. It has been ongoing since 2004 with a budget of ₹65 million and goals of completing construction by 2019 and supplying water to additional regions.
4. This project is developmental project. Which
was started in the state of Andhra Pradesh.
Through this project East and West Godavari
district and Vishakhapatnam can get the
benefits of irrigation and drinking water. That’s
why this project is developmental project. Hydro
power generation will also possible in this
project. That district can be develop by water. It
is national river linking project.
9. • The project manager has to monitor
the risk which has been raised in the
project and also has to control the
risk.
10. 1
• Identify and understand the risk
2
• Make the list of risks
3
• Make matrix of the risks
4
• Identify the trigger in the project
5
• Collect the solution from managers
6
• Plan the risk management process
14. • Construction was started in 2004
• All canals finished by 2017
• It will complete by 2019
• After completion it will spread in
CHHATTISGADH and ODISHA
15. • To prepare 40 megawatt hydro
electronic plan
• The budget of project will be ₹65
million
17. • Indian ministry of water resource and Irrigation
minister of Andhra Pradesh both are working
for this project
• Chief minister of Andhra Pradesh is supporting
to this project
18. • To provide water in three district which are near
by this project.
• Also start the hydro power station.
• Water will be provided through the canal.
19. • Project started in year 2004
• Continuously observed by the chief minister
• Budget allocated for project is ₹65 million