ROADMAP FOR GROWTH




Number of Green Projects        30        48%
Number of Yellow Projects       4         6%
Number of Red Projects          6         10%
Number of Black Projects        22        35%
                                62       100%


 83% complete or on track….up from 75%
ROADMAP FOR GROWTH




• Roadmap Completion planned for 2014
• Meeting with Council is planned to reprioritize
  our Roadmap and ensure we are aligned
• 4 initiatives considered yellow(behind) in the
  roadmap
• 6 initiatives considered red(delayed) in the
  roadmap
BUDGET UPDATE
2013 BUDGET - UPDATES

• Financial Statements update
       2010 is complete and with the Province
       2011,2012 will be completed in 2013
       We will be back on track going forward
• 2013 Budget Review Process:
       April Month End – Due May 7th
       June Month End – Due July 8th
       August Month End – Due Sept. 9th
       September Month End – Due Oct. 7th
       October Month End – Due Nov. 7th
• June start planning for 2014 budget
2013 BUDGET- $600,000 CHALLENGE


• We were challenged with finding an additional
$600,000 from the budget, specifically in labour
with a focus on Protective Services
• We have successfully met Council’s request and the
mix of the reductions are as follows:
  Departments                   Percentage
  Total Protective Services       58.98%
  Total Other Departments         41.02%
  *mix of $600,000 cost savings
2013-2014 BUDGET TARGETS

Budget Efficiencies and Revenue
• 2013 Continuous Improvement Project
• As we have done now for 2 years, every
department is tasked to find sustainable efficiencies
and / or revenue where possible
• Departments are aligned to “find a better way”
and constantly be looking for efficiencies and
improvements across the organization
PEOPLE
PEOPLE - SAFETY

Mission Zero Program

• Safety continues to be the #1 agenda item at all
Department Head meetings
• Safety awareness and visibility across the
organization has significantly increased over the last
few years
• Safety results to date are headed in the right
direction
• Our 2013 goal for LTIFR (Lost Time Injury Frequency
Rate) is 3.6
PEOPLE - SAFETY

Safety Focus – Mission Zero Program
PEOPLE - SAFETY
PEOPLE - PERFORMANCE

2013 Scorecard

• We will be launching a City of Brandon
scorecard in Spring of 2013
• You can’t manage what you can’t measure
• Key metrics by department
• Corporate metrics such as safety, OT and sick
time
• Road Map for Growth progress
• Monitored and reviewed monthly and shared
PEOPLE
PEOPLE – SICK TIME / OVERTIME
PEOPLE – SICK TIME / OVERTIME


• Sick time continues to be a priority for the Department
Head group and me
• We have been focused on the departments with the
largest opportunities for improvement
• I am happy to report that we are seeing significant
improvements in our sick time versus last year, specifically
in Fire, E911, Fleet and Treasury*
• These metrics will continue to be monitored through
our scorecard and any issues will be investigated and
dealt with appropriately
• Overtime year to date has been well controlled across
the organization and currently favourable to budget
PEOPLE – SICK TIME / OVERTIME
PEOPLE - UNION UPDATES


• Transit - Just completed an arbitration hearing
  regarding guaranteed hours for temp
  operators (There are several other outstanding grievances that
   we are working through)
• Fire - Interest arbitration pending
• E911 - Interest arbitration pending

• Police - No outstanding issues
• CUPE - No outstanding issues. Negotiations begin
  at the end of 2013
GROWTH
GROWTH – HOTEL TAX


•   Implemented by the City of Brandon in July, 2012
•   Q3 2012 - $214,770
•   Q4 2012 - $173,670
•   First event funding application was approved by Council
    on November 19th in the amount of $25,000
•   % of collections issued as event funding – 6.5%
•   Given that it’s a new process, everything went very
    smoothly in 2012
•   We continue to adjust the process to make things better
•   Work continues on developing the Capital Funding
    Matrix in 2013 and getting the word out to event
    organizers
GROWTH – AFFORDABLE HOUSING
          STRATEGY

• The demographic / housing data has been
  updated
• Input has been sought from not for profit
  organizations involved in affordable housing
• Input has been sought from the for profit
  development community
• Recommendations are being formulated
• We will have the strategy before Council in June
  2013
GROWTH – ECONOMIC DEVELOPMENT
           STRATEGY

• An advisory group comprised of local business
  people has been assembled to guide the updating
  of the Economic Development strategic plan
• Initial areas of strategic focus have been identified
• Background research has been completed
• Best practices for engaging the business community
  in the development of the strategy have been
  researched
• This will be a key initiative in the upcoming months
  and will see a focused effort devoted to completing
  the strategy, targeting a Sept 2013 completion date
INFRASTRUCTURE
INFRASTRUCTURE – CITY PROJECT
         PLANNING

Initial Brainstorming
• Airport upgrades
• Bridges – 18th Street and 8th Street
• North Hill water and sewer lines
• Future development opportunities North and South
• Indoor recreation complex
• Water plant
• Roads
• Water and sewer
• Overland flooding
• Other ideas
INFRASTRUCTURE – SNOW CLEARING


• It has been a long tough winter both on our streets and
  sidewalks as well as our budget
• We may have to use our snow clearing reserve in the
  Fall if necessary
• The two recent heavy snowfalls and our quick response
  was costly
• Public Works will be evaluating how responses for large
  snow storms are conducted in the future utilizing
  private contractors
     SNOW REMOVAL & SANDING 2013 BUDGET
 Account          Actuals       Budget
                   $ 811,474.81 $ 903,086.00
INFRASTRUCTURE – WASTE WATER
      TREATMENT PLANT

• All seven contracts have been awarded and are
underway
• An eighth contract will be issued to wrap up the
project in the near future
• It is estimated that 85%+ of the construction has
been completed
• The completion date continues to be on target for
September 2013
• Currently, the upgrade is approximately $2M under
budget without any considerations for allowances
INFRASTRUCTURE – PLANNING


Brandon & Area Planning District Growth Strategy

• Community Workshop held on January 29th, 2013
• Background report completed
• In process of completing land analysis within Brandon
  Fringe Area
• Land analysis will lead to three growth scenarios for
  Steering & Technical Committee discussion
• Anticipated project completion for approval by
  Sept/Oct 2013
INFRASTRUCTURE – PLANNING


North Brandon Gateway Secondary Plan

• Community Workshop held on January 24th, 2013
• Option Plans Completed
• Residential Landowner meeting held on March 27th, 2013
• In process of refining preferred option plan and density
  calculations
• Final open house anticipated to be completed in August
• Anticipated project completion for approval by Sept/Oct
  2013
INFRASTRUCTURE – PLANNING


Southwest Brandon Secondary Plan

• Initial landowners meeting completed on March 14,
  2013
• In process of completing background report and
  infrastructure analysis
• Initial community workshop anticipated for mid-June
• Anticipated project completion for approval by
  Sept/Oct 2013
INFRASTRUCTURE – PLANNING

Planning Department Public Outreach in 2013

•   North Gateway Secondary Plan Community Workshop: January
    24th, 6-8pm at Discovery Centre
•   Growth Strategy Community Workshop: January 29th, 6-9pm at
    Park Community Centre
•   Public Outreach Policy Open House: February 20th, 5-7pm at City
    Hall
•   Southwest Brandon Secondary Plan Landowners Meeting: March
    14th, 5-6pm at Planning Office
•   Urban Design & Landscape Standards Community Workshop:
    March 21st, 6-8pm at Discovery Centre
•   (Upcoming) - Secondary Suites/Boarding House Open House:
    April 25th, 6-8pm at Discovery Centre
INFRASTRUCTURE - SANITATION


• Launch of our new Organic Curbside Collection Service
will be April 30th (Date may change depending on weather)
• As of today we have a total 1167 participants
• We have received 5 trailer loads of new containers
• Staff will be assembling containers in the coming weeks
• Distribution of containers to residents will occur in the
    near future
• Public information and signup opportunities are being
    held
          *April 16 City Hall foyer 7pm to 8pm
          *April 21st Earth day, at City Hall at noon
INFRASTRUCTURE – BRANDON INN

• Demo permit has been issued for Real Estate Board
  building (funded by Renaissance Brandon) and should
  receive the Brandon Inn demo permit today
• Equipment arriving at site over next few days
• Safety fencing is being erected, fencing will close
  public sidewalk on 9th Street from south end of
  property (at Princess Ave) to barber shop entrance
  and west lane way will also be closed, public sidewalk
  along Princess Ave will remain open
• Barbershop will remain open with the exception of a
  few days for safety concerns
• Arrangements have been made for garbage
  collections in back lane between 9thand 10th Street
QUESTIONS?
APPENDIX
INFRASTRUCTURE – SPRING FLOOD


 Based on the Province’s Spring Flood Outlook issued on
  April 10th, Brandon can continue to anticipate river levels
  similar to 2009
 As such, the City of Brandon continues to prepare for an
  unfavourable level of 1,174.2 feet above sea level
  measured at 1st Street.
 In comparison, the City of Brandon’s flood of record in 2011
  peaked at 1,182.89 feet above sea level measured at 1st
  Street.
 It is important to remember that we have seen levels in
  the neighbourhood of 1,174 feet on the river 5 times since
  1995.
INFRASTRUCTURE – SPRING FLOOD


 The City anticipates seeing water in recreation areas along
  the Assiniboine River and may have to close storm sewer
  outflows and locate pumps to manage melt and rain water
 We have 10,000 sandbags filled and in stock ready to go if
  required
 The Province of Manitoba has indicated that the
  Shellmouth Reservoir is at historically low levels
 The Province remains committed to the installation of a
  single row of super sandbags and aqua dam protection on
  1st Street and 18th Street if needed

More Related Content

Similar to Quarterly Council Update - April 15, 2013

Quarterly Council Update - January 17, 2013
Quarterly Council Update - January 17, 2013Quarterly Council Update - January 17, 2013
Quarterly Council Update - January 17, 2013City Brandon
 
Council Update January 2014
Council Update January 2014Council Update January 2014
Council Update January 2014City Brandon
 
Budget 102 powerpoint: A Guide to San Diego's Capital Improvement Program
Budget 102 powerpoint: A Guide to San Diego's Capital Improvement ProgramBudget 102 powerpoint: A Guide to San Diego's Capital Improvement Program
Budget 102 powerpoint: A Guide to San Diego's Capital Improvement ProgramCenter On Policy Initiatives
 
Watkins Elementary School Community Meeting (December 9, 2014)
Watkins Elementary School Community Meeting (December 9, 2014)Watkins Elementary School Community Meeting (December 9, 2014)
Watkins Elementary School Community Meeting (December 9, 2014)DC Department of General Services
 
Sumter County FL Strategic Plan
Sumter County FL Strategic PlanSumter County FL Strategic Plan
Sumter County FL Strategic PlanTracy Quintana
 
Monthly review december strategic projects
Monthly review december   strategic projectsMonthly review december   strategic projects
Monthly review december strategic projects647435
 
Town hall slideshow 110514
Town hall slideshow 110514Town hall slideshow 110514
Town hall slideshow 110514CityofMilan
 
Community Meeting – Construction Update Presentation November 12, 2015
Community Meeting – Construction Update Presentation November 12, 2015Community Meeting – Construction Update Presentation November 12, 2015
Community Meeting – Construction Update Presentation November 12, 2015DerekC1990
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOCity of College Station
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptxPawanNegi35
 
Keep on planning presentation final
Keep on planning presentation finalKeep on planning presentation final
Keep on planning presentation finalPAS_Team
 
Uganda budgettransparency tomhart_en
Uganda budgettransparency tomhart_enUganda budgettransparency tomhart_en
Uganda budgettransparency tomhart_enicgfmconference
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Crosstown TO
 
Downtown San Antonio Public Improvement District Update - July 2013
Downtown San Antonio Public Improvement District Update - July 2013Downtown San Antonio Public Improvement District Update - July 2013
Downtown San Antonio Public Improvement District Update - July 2013Becentro Bedowntown
 
Effective Project Management_handout
Effective Project Management_handoutEffective Project Management_handout
Effective Project Management_handoutRotary International
 

Similar to Quarterly Council Update - April 15, 2013 (20)

Quarterly Council Update - January 17, 2013
Quarterly Council Update - January 17, 2013Quarterly Council Update - January 17, 2013
Quarterly Council Update - January 17, 2013
 
Council Update January 2014
Council Update January 2014Council Update January 2014
Council Update January 2014
 
Budget 102 powerpoint: A Guide to San Diego's Capital Improvement Program
Budget 102 powerpoint: A Guide to San Diego's Capital Improvement ProgramBudget 102 powerpoint: A Guide to San Diego's Capital Improvement Program
Budget 102 powerpoint: A Guide to San Diego's Capital Improvement Program
 
Watkins Elementary School Community Meeting (December 9, 2014)
Watkins Elementary School Community Meeting (December 9, 2014)Watkins Elementary School Community Meeting (December 9, 2014)
Watkins Elementary School Community Meeting (December 9, 2014)
 
Sumter County FL Strategic Plan
Sumter County FL Strategic PlanSumter County FL Strategic Plan
Sumter County FL Strategic Plan
 
Monthly review december strategic projects
Monthly review december   strategic projectsMonthly review december   strategic projects
Monthly review december strategic projects
 
Town hall slideshow 110514
Town hall slideshow 110514Town hall slideshow 110514
Town hall slideshow 110514
 
Community Meeting – Construction Update Presentation November 12, 2015
Community Meeting – Construction Update Presentation November 12, 2015Community Meeting – Construction Update Presentation November 12, 2015
Community Meeting – Construction Update Presentation November 12, 2015
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDO
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptx
 
Garfield Heights Master Plan, Public Meeting #3
Garfield Heights Master Plan, Public Meeting #3Garfield Heights Master Plan, Public Meeting #3
Garfield Heights Master Plan, Public Meeting #3
 
Keep on planning presentation final
Keep on planning presentation finalKeep on planning presentation final
Keep on planning presentation final
 
Uganda budgettransparency tomhart_en
Uganda budgettransparency tomhart_enUganda budgettransparency tomhart_en
Uganda budgettransparency tomhart_en
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
Ephesus Church-Fordham Boulevard Small Area Planning
Ephesus Church-Fordham Boulevard Small Area PlanningEphesus Church-Fordham Boulevard Small Area Planning
Ephesus Church-Fordham Boulevard Small Area Planning
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017
 
Downtown San Antonio Public Improvement District Update - July 2013
Downtown San Antonio Public Improvement District Update - July 2013Downtown San Antonio Public Improvement District Update - July 2013
Downtown San Antonio Public Improvement District Update - July 2013
 
Roll Out of Back to Basics Programme - Western Cape
Roll Out of Back to Basics Programme - Western CapeRoll Out of Back to Basics Programme - Western Cape
Roll Out of Back to Basics Programme - Western Cape
 
Effective Project Management_handout
Effective Project Management_handoutEffective Project Management_handout
Effective Project Management_handout
 

More from City Brandon

8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015City Brandon
 
City of Brandon Community Infrastructure Update - August 2015
City of Brandon Community Infrastructure Update - August 2015City of Brandon Community Infrastructure Update - August 2015
City of Brandon Community Infrastructure Update - August 2015City Brandon
 
Brandon Signals Council Presentation
Brandon Signals Council PresentationBrandon Signals Council Presentation
Brandon Signals Council PresentationCity Brandon
 
Flood mitigation council presentation 2 july 2013
Flood mitigation council presentation 2 july 2013Flood mitigation council presentation 2 july 2013
Flood mitigation council presentation 2 july 2013City Brandon
 
Brandon Food Charter Presentation
Brandon Food Charter PresentationBrandon Food Charter Presentation
Brandon Food Charter PresentationCity Brandon
 
2007 flood pictures council april 2 2013
2007 flood pictures   council april 2 20132007 flood pictures   council april 2 2013
2007 flood pictures council april 2 2013City Brandon
 
Budget public consultation presentation 20121212
Budget public consultation presentation 20121212Budget public consultation presentation 20121212
Budget public consultation presentation 20121212City Brandon
 
Budget public consultation presentation 20121212
Budget public consultation presentation 20121212Budget public consultation presentation 20121212
Budget public consultation presentation 20121212City Brandon
 
Preliminary Budget Highlights
Preliminary Budget HighlightsPreliminary Budget Highlights
Preliminary Budget HighlightsCity Brandon
 
Budget round table presentation - November 22, 2012
Budget round table presentation - November 22, 2012Budget round table presentation - November 22, 2012
Budget round table presentation - November 22, 2012City Brandon
 
2011 High Water Event Costs (update, 08.13.12)
2011 High Water Event Costs (update, 08.13.12)2011 High Water Event Costs (update, 08.13.12)
2011 High Water Event Costs (update, 08.13.12)City Brandon
 
Brandon Recreation Centre Property Public Open House #1
Brandon Recreation Centre Property Public Open House #1Brandon Recreation Centre Property Public Open House #1
Brandon Recreation Centre Property Public Open House #1City Brandon
 
2012 Financial Plan (Public Hearing - March 5, 2012)
2012 Financial Plan (Public Hearing - March 5, 2012)2012 Financial Plan (Public Hearing - March 5, 2012)
2012 Financial Plan (Public Hearing - March 5, 2012)City Brandon
 
2012 Proposed Budget - Public Forum
2012 Proposed Budget - Public Forum2012 Proposed Budget - Public Forum
2012 Proposed Budget - Public ForumCity Brandon
 
Proposed 2012 Budget - Salaries and Wages
Proposed 2012 Budget - Salaries and WagesProposed 2012 Budget - Salaries and Wages
Proposed 2012 Budget - Salaries and WagesCity Brandon
 
Salary Cost Comparative Data
Salary Cost Comparative DataSalary Cost Comparative Data
Salary Cost Comparative DataCity Brandon
 
Solid Waste Collection System - proposed changes (December 2011 council meeting)
Solid Waste Collection System - proposed changes (December 2011 council meeting)Solid Waste Collection System - proposed changes (December 2011 council meeting)
Solid Waste Collection System - proposed changes (December 2011 council meeting)City Brandon
 
2012 City of Brandon Budget Highlights
2012 City of Brandon Budget Highlights2012 City of Brandon Budget Highlights
2012 City of Brandon Budget HighlightsCity Brandon
 
2012 Public Budget Meeting
2012 Public Budget Meeting2012 Public Budget Meeting
2012 Public Budget MeetingCity Brandon
 

More from City Brandon (20)

8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015
 
City of Brandon Community Infrastructure Update - August 2015
City of Brandon Community Infrastructure Update - August 2015City of Brandon Community Infrastructure Update - August 2015
City of Brandon Community Infrastructure Update - August 2015
 
Brandon Signals Council Presentation
Brandon Signals Council PresentationBrandon Signals Council Presentation
Brandon Signals Council Presentation
 
Flood mitigation council presentation 2 july 2013
Flood mitigation council presentation 2 july 2013Flood mitigation council presentation 2 july 2013
Flood mitigation council presentation 2 july 2013
 
Brandon Food Charter Presentation
Brandon Food Charter PresentationBrandon Food Charter Presentation
Brandon Food Charter Presentation
 
2007 flood pictures council april 2 2013
2007 flood pictures   council april 2 20132007 flood pictures   council april 2 2013
2007 flood pictures council april 2 2013
 
Budget public consultation presentation 20121212
Budget public consultation presentation 20121212Budget public consultation presentation 20121212
Budget public consultation presentation 20121212
 
Budget public consultation presentation 20121212
Budget public consultation presentation 20121212Budget public consultation presentation 20121212
Budget public consultation presentation 20121212
 
Preliminary Budget Highlights
Preliminary Budget HighlightsPreliminary Budget Highlights
Preliminary Budget Highlights
 
Budget round table presentation - November 22, 2012
Budget round table presentation - November 22, 2012Budget round table presentation - November 22, 2012
Budget round table presentation - November 22, 2012
 
2011 High Water Event Costs (update, 08.13.12)
2011 High Water Event Costs (update, 08.13.12)2011 High Water Event Costs (update, 08.13.12)
2011 High Water Event Costs (update, 08.13.12)
 
Labour Strategy
Labour StrategyLabour Strategy
Labour Strategy
 
Brandon Recreation Centre Property Public Open House #1
Brandon Recreation Centre Property Public Open House #1Brandon Recreation Centre Property Public Open House #1
Brandon Recreation Centre Property Public Open House #1
 
2012 Financial Plan (Public Hearing - March 5, 2012)
2012 Financial Plan (Public Hearing - March 5, 2012)2012 Financial Plan (Public Hearing - March 5, 2012)
2012 Financial Plan (Public Hearing - March 5, 2012)
 
2012 Proposed Budget - Public Forum
2012 Proposed Budget - Public Forum2012 Proposed Budget - Public Forum
2012 Proposed Budget - Public Forum
 
Proposed 2012 Budget - Salaries and Wages
Proposed 2012 Budget - Salaries and WagesProposed 2012 Budget - Salaries and Wages
Proposed 2012 Budget - Salaries and Wages
 
Salary Cost Comparative Data
Salary Cost Comparative DataSalary Cost Comparative Data
Salary Cost Comparative Data
 
Solid Waste Collection System - proposed changes (December 2011 council meeting)
Solid Waste Collection System - proposed changes (December 2011 council meeting)Solid Waste Collection System - proposed changes (December 2011 council meeting)
Solid Waste Collection System - proposed changes (December 2011 council meeting)
 
2012 City of Brandon Budget Highlights
2012 City of Brandon Budget Highlights2012 City of Brandon Budget Highlights
2012 City of Brandon Budget Highlights
 
2012 Public Budget Meeting
2012 Public Budget Meeting2012 Public Budget Meeting
2012 Public Budget Meeting
 

Recently uploaded

Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 

Recently uploaded (20)

Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 

Quarterly Council Update - April 15, 2013

  • 2. Agenda  Roadmap for Growth  Budget  People  Growth  Infrastructure
  • 4. ROADMAP FOR GROWTH Number of Green Projects 30 48% Number of Yellow Projects 4 6% Number of Red Projects 6 10% Number of Black Projects 22 35% 62 100% 83% complete or on track….up from 75%
  • 5. ROADMAP FOR GROWTH • Roadmap Completion planned for 2014 • Meeting with Council is planned to reprioritize our Roadmap and ensure we are aligned • 4 initiatives considered yellow(behind) in the roadmap • 6 initiatives considered red(delayed) in the roadmap
  • 7. 2013 BUDGET - UPDATES • Financial Statements update  2010 is complete and with the Province  2011,2012 will be completed in 2013  We will be back on track going forward • 2013 Budget Review Process:  April Month End – Due May 7th  June Month End – Due July 8th  August Month End – Due Sept. 9th  September Month End – Due Oct. 7th  October Month End – Due Nov. 7th • June start planning for 2014 budget
  • 8. 2013 BUDGET- $600,000 CHALLENGE • We were challenged with finding an additional $600,000 from the budget, specifically in labour with a focus on Protective Services • We have successfully met Council’s request and the mix of the reductions are as follows: Departments Percentage Total Protective Services 58.98% Total Other Departments 41.02% *mix of $600,000 cost savings
  • 9. 2013-2014 BUDGET TARGETS Budget Efficiencies and Revenue • 2013 Continuous Improvement Project • As we have done now for 2 years, every department is tasked to find sustainable efficiencies and / or revenue where possible • Departments are aligned to “find a better way” and constantly be looking for efficiencies and improvements across the organization
  • 11. PEOPLE - SAFETY Mission Zero Program • Safety continues to be the #1 agenda item at all Department Head meetings • Safety awareness and visibility across the organization has significantly increased over the last few years • Safety results to date are headed in the right direction • Our 2013 goal for LTIFR (Lost Time Injury Frequency Rate) is 3.6
  • 12. PEOPLE - SAFETY Safety Focus – Mission Zero Program
  • 14. PEOPLE - PERFORMANCE 2013 Scorecard • We will be launching a City of Brandon scorecard in Spring of 2013 • You can’t manage what you can’t measure • Key metrics by department • Corporate metrics such as safety, OT and sick time • Road Map for Growth progress • Monitored and reviewed monthly and shared
  • 16. PEOPLE – SICK TIME / OVERTIME
  • 17. PEOPLE – SICK TIME / OVERTIME • Sick time continues to be a priority for the Department Head group and me • We have been focused on the departments with the largest opportunities for improvement • I am happy to report that we are seeing significant improvements in our sick time versus last year, specifically in Fire, E911, Fleet and Treasury* • These metrics will continue to be monitored through our scorecard and any issues will be investigated and dealt with appropriately • Overtime year to date has been well controlled across the organization and currently favourable to budget
  • 18. PEOPLE – SICK TIME / OVERTIME
  • 19. PEOPLE - UNION UPDATES • Transit - Just completed an arbitration hearing regarding guaranteed hours for temp operators (There are several other outstanding grievances that we are working through) • Fire - Interest arbitration pending • E911 - Interest arbitration pending • Police - No outstanding issues • CUPE - No outstanding issues. Negotiations begin at the end of 2013
  • 21. GROWTH – HOTEL TAX • Implemented by the City of Brandon in July, 2012 • Q3 2012 - $214,770 • Q4 2012 - $173,670 • First event funding application was approved by Council on November 19th in the amount of $25,000 • % of collections issued as event funding – 6.5% • Given that it’s a new process, everything went very smoothly in 2012 • We continue to adjust the process to make things better • Work continues on developing the Capital Funding Matrix in 2013 and getting the word out to event organizers
  • 22. GROWTH – AFFORDABLE HOUSING STRATEGY • The demographic / housing data has been updated • Input has been sought from not for profit organizations involved in affordable housing • Input has been sought from the for profit development community • Recommendations are being formulated • We will have the strategy before Council in June 2013
  • 23. GROWTH – ECONOMIC DEVELOPMENT STRATEGY • An advisory group comprised of local business people has been assembled to guide the updating of the Economic Development strategic plan • Initial areas of strategic focus have been identified • Background research has been completed • Best practices for engaging the business community in the development of the strategy have been researched • This will be a key initiative in the upcoming months and will see a focused effort devoted to completing the strategy, targeting a Sept 2013 completion date
  • 25. INFRASTRUCTURE – CITY PROJECT PLANNING Initial Brainstorming • Airport upgrades • Bridges – 18th Street and 8th Street • North Hill water and sewer lines • Future development opportunities North and South • Indoor recreation complex • Water plant • Roads • Water and sewer • Overland flooding • Other ideas
  • 26. INFRASTRUCTURE – SNOW CLEARING • It has been a long tough winter both on our streets and sidewalks as well as our budget • We may have to use our snow clearing reserve in the Fall if necessary • The two recent heavy snowfalls and our quick response was costly • Public Works will be evaluating how responses for large snow storms are conducted in the future utilizing private contractors SNOW REMOVAL & SANDING 2013 BUDGET Account Actuals Budget $ 811,474.81 $ 903,086.00
  • 27. INFRASTRUCTURE – WASTE WATER TREATMENT PLANT • All seven contracts have been awarded and are underway • An eighth contract will be issued to wrap up the project in the near future • It is estimated that 85%+ of the construction has been completed • The completion date continues to be on target for September 2013 • Currently, the upgrade is approximately $2M under budget without any considerations for allowances
  • 28. INFRASTRUCTURE – PLANNING Brandon & Area Planning District Growth Strategy • Community Workshop held on January 29th, 2013 • Background report completed • In process of completing land analysis within Brandon Fringe Area • Land analysis will lead to three growth scenarios for Steering & Technical Committee discussion • Anticipated project completion for approval by Sept/Oct 2013
  • 29. INFRASTRUCTURE – PLANNING North Brandon Gateway Secondary Plan • Community Workshop held on January 24th, 2013 • Option Plans Completed • Residential Landowner meeting held on March 27th, 2013 • In process of refining preferred option plan and density calculations • Final open house anticipated to be completed in August • Anticipated project completion for approval by Sept/Oct 2013
  • 30. INFRASTRUCTURE – PLANNING Southwest Brandon Secondary Plan • Initial landowners meeting completed on March 14, 2013 • In process of completing background report and infrastructure analysis • Initial community workshop anticipated for mid-June • Anticipated project completion for approval by Sept/Oct 2013
  • 31. INFRASTRUCTURE – PLANNING Planning Department Public Outreach in 2013 • North Gateway Secondary Plan Community Workshop: January 24th, 6-8pm at Discovery Centre • Growth Strategy Community Workshop: January 29th, 6-9pm at Park Community Centre • Public Outreach Policy Open House: February 20th, 5-7pm at City Hall • Southwest Brandon Secondary Plan Landowners Meeting: March 14th, 5-6pm at Planning Office • Urban Design & Landscape Standards Community Workshop: March 21st, 6-8pm at Discovery Centre • (Upcoming) - Secondary Suites/Boarding House Open House: April 25th, 6-8pm at Discovery Centre
  • 32. INFRASTRUCTURE - SANITATION • Launch of our new Organic Curbside Collection Service will be April 30th (Date may change depending on weather) • As of today we have a total 1167 participants • We have received 5 trailer loads of new containers • Staff will be assembling containers in the coming weeks • Distribution of containers to residents will occur in the near future • Public information and signup opportunities are being held *April 16 City Hall foyer 7pm to 8pm *April 21st Earth day, at City Hall at noon
  • 33. INFRASTRUCTURE – BRANDON INN • Demo permit has been issued for Real Estate Board building (funded by Renaissance Brandon) and should receive the Brandon Inn demo permit today • Equipment arriving at site over next few days • Safety fencing is being erected, fencing will close public sidewalk on 9th Street from south end of property (at Princess Ave) to barber shop entrance and west lane way will also be closed, public sidewalk along Princess Ave will remain open • Barbershop will remain open with the exception of a few days for safety concerns • Arrangements have been made for garbage collections in back lane between 9thand 10th Street
  • 36. INFRASTRUCTURE – SPRING FLOOD  Based on the Province’s Spring Flood Outlook issued on April 10th, Brandon can continue to anticipate river levels similar to 2009  As such, the City of Brandon continues to prepare for an unfavourable level of 1,174.2 feet above sea level measured at 1st Street.  In comparison, the City of Brandon’s flood of record in 2011 peaked at 1,182.89 feet above sea level measured at 1st Street.  It is important to remember that we have seen levels in the neighbourhood of 1,174 feet on the river 5 times since 1995.
  • 37. INFRASTRUCTURE – SPRING FLOOD  The City anticipates seeing water in recreation areas along the Assiniboine River and may have to close storm sewer outflows and locate pumps to manage melt and rain water  We have 10,000 sandbags filled and in stock ready to go if required  The Province of Manitoba has indicated that the Shellmouth Reservoir is at historically low levels  The Province remains committed to the installation of a single row of super sandbags and aqua dam protection on 1st Street and 18th Street if needed