Topic of Lecture:
River Valley Development Project
&
Planning of Water Resource Development Projects
Prepared by:
Prof. Darshan J Mehta
Assistant Professor,
Civil Engineering Department,
Dr. S. & S. S. Ghandhy Government Engineering College, Surat 1
Subject: Water Resources Planning [3723303]
Dr. S & S. S. Ghandhy Government Engineering College,
Surat
9-Jul-20
Outline
• Multipurpose Projects
• Role of Multipurpose Projects
• Planning Of Multipurpose Projects
• Functional Requirements of Multipurpose Projects
• Merits & Demerits of Multipurpose Projects
• Estimation of Benefit Cost Ratio
• Case Study: Sardar Sarovar Dam
29-Jul-20
• Planning of Multi-purpose River Project represents the integrated
construction of two or more projects, each having a particular purpose or
function.
Multipurpose Projects
9-Jul-20 3
• Water is essential for sustenance of all forms of life on earth. It is not
evenly distributed all over the world and even its availability at the same
locations is not uniform over the year.
• The River valley projects which are constructed to meet several objectives
simultaneously or tackle various problems associated with river valleys in
an integrated manner.
• The basic motive behind the construction of multipurpose river valley
projects in India is to meet the critical requirements of irrigation for
agriculture, electricity for industries and flood control.
Introduction :
Multipurpose River Valley Projects
9-Jul-20 4
Role of Multipurpose River Valley Projects
• Reduce the threat of seasonal floods and bolster local economies.
• Aim to integrate agricultural development with the local economy through rapid
industrialization and growth.
• Irrigation for agriculture and electricity for industries
• Provide water for irrigation to towns, improve navigation, create habitats for fish
and wildlife and generate hydroelectric power for industrial purposes.
• The development of transportation facilities
• The creation of hydroelectric power.
• Economic self-sufficiency and improve the standard of living for citizens.
9-Jul-20 5
Planning of Multipurpose Projects
9-Jul-20 6
• Statement of Objectives
• Preparing Inventory of available resources
• Collection of Data
• Future Projection
• Project Formulation
• Project Evaluation
• Environmental Condition
Statement of Objectives
9-Jul-20 7
• Increased agricultural production
• Industrial development
• Improving the living standard of the people
• Social Stability
Preparing Inventory of available resources
9-Jul-20 8
• Water Resources
• Water Quality
• Land Resources
• Human Resources
• Means of Communications
• Financial Resources
Collection of Data
9-Jul-20 9
GENERAL DATA
• Physical Data
• Hydrological Data
• Geographical Data
• Cartographic Data
• Ecological Data
• Legal Data
• Demographic Data
• Economic Data
• Data on public opinion
• Data on existing data
Collection of Data
9-Jul-20 10
SPECIAL DATA
• Agricultural Data
• Water Supply Data
• Navigation Data
• Flood Control Data
• Hydropower Generation Data
• Pollution Control Data
• Fish and Wildlife Data
• Recreation and Tourism Data
Project for Future Planning
9-Jul-20 11
• Any project to be taken in hand should ne designed to serve not only or the present
need but also to serve for future needs for a period of at least 25 years.
• The historical and collected data (current) for project planning should be serve as a
base for future projection condition.
• All project must be plan to meet the future requirements.
Project Formulation
9-Jul-20 12
• After collection of basic data and evaluation future needs is completed actual
formulation of the project commence.
• This is a phase of planning where skill and imagination is required.
• Now, important step is compilation of a comprehensive list of alternatives. At the time
of compilation following steps are involved:
1) Define the boundary conditions
2) List all possible land use planning and their water requirements
3) List all possible projects
4) Prepare preliminary design and cost estimates for the projects
5) Estimates the benefits for all projects
6) Reject the projects which are no economical
7) Select 2/3rd combination which can give maximum return for detail study and
select final alternative
8) Prepare detailed report on final alternative which show costs, benefits, etc.
Project Evaluation
9-Jul-20 13
• The selection of most economical alternative from the various
alternatives known as Project Evaluation.
• For economic evaluation data on benefits and cost are collected.
• Economically Independent unit
• Physically Independent Unit
• A complete environmental impact assessment should be conducted before the
project is considered for clearance, and the results of the analysis should be
used to judge the viability and desirability of the project
• If the project is considered viable and desirable on social, economic,
environmental, and technical grounds, it is necessary to take preventive
measures related to the negative environmental impacts.
• This requires the formulation of precise and comprehensive work-plans, and
their implementation.
• At this stage it may even be necessary to redesign the project, if environmental,
social, or economic imperatives demand it.
Environmental Considerations :
9-Jul-20 14
Functional Requirement of Multi-Purpose
Projects
• Irrigation Facility
• Flood Control
• Generating Electricity
• Navigation
• Forests and Fisheries
• Drinking Water
• Development of Industry and Employment Generation
• Recreation
9-Jul-20 15
Demerits of Multi-Purpose Projects
• Exaggerated Benefits on Irrigation
• Higher Cost of Hydropower
• Least Flood Control Benefit
• Adverse Environmental Impact
9-Jul-20 16
Benefit Cost Ratio
• The benefit cost ratio is the ratio of annual benefits to the annual cost
• In India, the project is economical viable whose benefit cost ratio is greater
than unity.
• For Irrigation purpose this ratio is generally 1.5 and for flood control this ratio
is 1.10.
Annual Cost
• It is the summation of Annual Recovery cost and Recurring cost.
• Capital Cost – Expenditure done at the time of construction of a project.
• Recurring cost – Expenditure done on operation and maintenance of the project
during life span,
Estimation of Benefit Cost Ratio
9-Jul-20 17
Annual Benefits
• Benefits that are likely to be occur due to construction of project which should
fairly estimated.
• If there is an single purpose project it is easier to calculate those benefits for
multipurpose project.
• Damage data in India are generally collected from revenue department but it is
very difficult job to obtain such huge data.
Annual Cost
• It is the summation of Annual Recovery cost and Recurring cost.
• Capital Cost – Expenditure done at the time of construction of a project.
• Recurring cost – Expenditure done on operation and maintenance of the project
during life span,
Estimation of Benefit Cost Ratio
9-Jul-20 18
• Direct Cost
• Indirect Cost
Types of Cost
9-Jul-20 19
Types of Benefits
• Direct Benefits
• Indirect Benefits
• Tangible Benefits
• Intangible Benefits
India's One of the Most Productive
Multipurpose Projects
Sardar Sarovar Dam
9-Jul-20 20
• One of the most controversial and protested government schemes .
• Approved by “Narmada Water Disputes Tribunal” in 1978 which included 30
large dams, 135 medium dams, and 3,000 small dams.
• Initially, started at small level but later in 1985 the World Bank agreed to
finance.
• Estimated that project will irrigate more than 18,000 km2, most of it in drought
prone areas of Kutch and Saurashtra
Narmada Valley Development Project
9-Jul-20 21
Narmada Valley Development Project
9-Jul-20 22
• Location : Sardar Sarovar Dam, Near Navagam, Gujarat.
• Coordinates : 21°49′49″n 73°44′50″e
• Type of dam : gravity dam
• Proposed height of Sardar Sarovar dam: 163metres
• Reservoir total capacity : 9.5 km3
• Catchment area : 88,000 km2
• Construction cost : ₹25 billion INR
• Dam's main power plant houses six 200 mw Francis pump
• Total installed capacity of the power : 1,450 MW.
Details of Sardar Sarovar Dam
9-Jul-20 23
Sardar Sarovar Dam
9-Jul-20 24
• Feed 20 million people, provide domestic and industrial water for about 30
million, employ about 1 million, and valuable electricity.
• Irrigate land spread over 12 districts, 62 talukas and 3393 villages in 'Gujarat'
and 730 km2 in the arid areas of 'Barmer' and 'Jalore' districts of Rajasthan
• Set against the futures of about 70,000 project affected people.
• The ratio of beneficiaries to affected persons 100:1.
• In 1987 after construction of dams the injustices of the government's
relocation program were exposed.
• Consequences: Laid the foundation of “Narmada Bachao Andolan”
Projected Benefits
9-Jul-20 25
Thank You
9-Jul-20 26

More Related Content

What's hot

Civil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notesCivil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notes
Suryenn Edwie Mon
 
Water resources planning and development m5
Water resources planning and development m5Water resources planning and development m5
Water resources planning and development m5
Bibhabasu Mohanty
 
Groundwater modelling (an Introduction)
Groundwater modelling (an Introduction)Groundwater modelling (an Introduction)
Groundwater modelling (an Introduction)
Putika Ashfar Khoiri
 
Floods
FloodsFloods
Chapter 4 groundwater hydrology
Chapter 4 groundwater hydrologyChapter 4 groundwater hydrology
Chapter 4 groundwater hydrology
Mohammed Salahat
 
5 Reservoir Planning
5 Reservoir Planning5 Reservoir Planning
5 Reservoir Planning
pradeepkumawat4142
 
Prioritizing watersheds
Prioritizing watershedsPrioritizing watersheds
Prioritizing watersheds
Meer Raashid
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacity
onyx3
 
Introduction to flood modelling
Introduction to flood modellingIntroduction to flood modelling
Introduction to flood modelling
Rajesh Kumar Mahana
 
Flood forecasting presentation final
Flood forecasting presentation finalFlood forecasting presentation final
Flood forecasting presentation final
Abir Mohammad
 
Application of GIS and RS in Watershed Management
Application of GIS and RS in Watershed ManagementApplication of GIS and RS in Watershed Management
Application of GIS and RS in Watershed Management
holegajendra
 
Precipitation and rain gauges
Precipitation and rain gaugesPrecipitation and rain gauges
Precipitation and rain gauges
Nikhil Holsamudrkar
 
Water Policies in India
Water Policies in IndiaWater Policies in India
Water Policies in India
Meghana Agrawal
 
1 d & 2d Hydraulic modelling
1 d & 2d Hydraulic modelling1 d & 2d Hydraulic modelling
1 d & 2d Hydraulic modelling
Rajesh Kumar Mahana
 
Rainfall-Runoff Modelling
Rainfall-Runoff ModellingRainfall-Runoff Modelling
Rainfall-Runoff Modelling
Cobain Schofield
 
GROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEMGROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEM
Shyam Mohan Chaudhary
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Ramanuj Jaldhari
 
Water resources
Water resourcesWater resources
Water resources
Manoharan Moorthy
 
Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)
Latif Hyder Wadho
 
Integrated water resource management
Integrated water resource managementIntegrated water resource management
Integrated water resource management
CPWF Mekong
 

What's hot (20)

Civil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notesCivil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notes
 
Water resources planning and development m5
Water resources planning and development m5Water resources planning and development m5
Water resources planning and development m5
 
Groundwater modelling (an Introduction)
Groundwater modelling (an Introduction)Groundwater modelling (an Introduction)
Groundwater modelling (an Introduction)
 
Floods
FloodsFloods
Floods
 
Chapter 4 groundwater hydrology
Chapter 4 groundwater hydrologyChapter 4 groundwater hydrology
Chapter 4 groundwater hydrology
 
5 Reservoir Planning
5 Reservoir Planning5 Reservoir Planning
5 Reservoir Planning
 
Prioritizing watersheds
Prioritizing watershedsPrioritizing watersheds
Prioritizing watersheds
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacity
 
Introduction to flood modelling
Introduction to flood modellingIntroduction to flood modelling
Introduction to flood modelling
 
Flood forecasting presentation final
Flood forecasting presentation finalFlood forecasting presentation final
Flood forecasting presentation final
 
Application of GIS and RS in Watershed Management
Application of GIS and RS in Watershed ManagementApplication of GIS and RS in Watershed Management
Application of GIS and RS in Watershed Management
 
Precipitation and rain gauges
Precipitation and rain gaugesPrecipitation and rain gauges
Precipitation and rain gauges
 
Water Policies in India
Water Policies in IndiaWater Policies in India
Water Policies in India
 
1 d & 2d Hydraulic modelling
1 d & 2d Hydraulic modelling1 d & 2d Hydraulic modelling
1 d & 2d Hydraulic modelling
 
Rainfall-Runoff Modelling
Rainfall-Runoff ModellingRainfall-Runoff Modelling
Rainfall-Runoff Modelling
 
GROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEMGROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEM
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
 
Water resources
Water resourcesWater resources
Water resources
 
Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)
 
Integrated water resource management
Integrated water resource managementIntegrated water resource management
Integrated water resource management
 

Similar to Planning of Water Resource Planning Projects

Advance in irrigation management, irrigation project
Advance in irrigation management, irrigation projectAdvance in irrigation management, irrigation project
Advance in irrigation management, irrigation project
Swati Shukla
 
Sudan workshop | Morocco Country Presentation (Part 2)
Sudan workshop | Morocco Country Presentation (Part 2)Sudan workshop | Morocco Country Presentation (Part 2)
Sudan workshop | Morocco Country Presentation (Part 2)
ÖMER KILIÇ
 
My presentation at N.P.T.I
My presentation at N.P.T.IMy presentation at N.P.T.I
My presentation at N.P.T.I
Santosh Singh
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
sandeepprasad87
 
Water Programme
Water ProgrammeWater Programme
Water Programme
OECD Environment
 
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
India-EU Water Partnership
 
IWRM in Karnataka India. Crafting a New Future
IWRM in Karnataka India. Crafting a New FutureIWRM in Karnataka India. Crafting a New Future
IWRM in Karnataka India. Crafting a New Future
Oswar Mungkasa
 
Multipurpose River Valley Projects and alternate water supply methods
Multipurpose River Valley Projects and alternate water supply methodsMultipurpose River Valley Projects and alternate water supply methods
Multipurpose River Valley Projects and alternate water supply methods
Tannya
 
DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...
DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...
DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...
Deltares
 
Climate Resilience Improvement Project
Climate Resilience Improvement ProjectClimate Resilience Improvement Project
Climate Resilience Improvement Project
Janathakshan Gte Ltd
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
India UK Water Centre (IUKWC)
 
National Water Mission
National Water MissionNational Water Mission
National Water Mission
Akansha Ganguly
 
Resource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder MeetingResource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder Meeting
Mashilo Kabedi
 
India’s national river linking project [nrlp]
India’s national river linking project [nrlp]India’s national river linking project [nrlp]
India’s national river linking project [nrlp]
'Denish Makvana'
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
JunaidAshraf31
 
Water resources planning & environmental considerations
Water resources planning & environmental considerationsWater resources planning & environmental considerations
Water resources planning & environmental considerations
AMIE(I) Study Circle
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
Matt Meaker
 
Victorian desalination plant case study_FM
Victorian desalination plant case study_FMVictorian desalination plant case study_FM
Victorian desalination plant case study_FM
sayandeep chandra
 
Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub
PAS_Team
 
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Robert Muir
 

Similar to Planning of Water Resource Planning Projects (20)

Advance in irrigation management, irrigation project
Advance in irrigation management, irrigation projectAdvance in irrigation management, irrigation project
Advance in irrigation management, irrigation project
 
Sudan workshop | Morocco Country Presentation (Part 2)
Sudan workshop | Morocco Country Presentation (Part 2)Sudan workshop | Morocco Country Presentation (Part 2)
Sudan workshop | Morocco Country Presentation (Part 2)
 
My presentation at N.P.T.I
My presentation at N.P.T.IMy presentation at N.P.T.I
My presentation at N.P.T.I
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
 
Water Programme
Water ProgrammeWater Programme
Water Programme
 
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
 
IWRM in Karnataka India. Crafting a New Future
IWRM in Karnataka India. Crafting a New FutureIWRM in Karnataka India. Crafting a New Future
IWRM in Karnataka India. Crafting a New Future
 
Multipurpose River Valley Projects and alternate water supply methods
Multipurpose River Valley Projects and alternate water supply methodsMultipurpose River Valley Projects and alternate water supply methods
Multipurpose River Valley Projects and alternate water supply methods
 
DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...
DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...
DSD-Kampala 2023 Analytic Tools for Cooperative Water Resources Assessments i...
 
Climate Resilience Improvement Project
Climate Resilience Improvement ProjectClimate Resilience Improvement Project
Climate Resilience Improvement Project
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
National Water Mission
National Water MissionNational Water Mission
National Water Mission
 
Resource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder MeetingResource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder Meeting
 
India’s national river linking project [nrlp]
India’s national river linking project [nrlp]India’s national river linking project [nrlp]
India’s national river linking project [nrlp]
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
Water resources planning & environmental considerations
Water resources planning & environmental considerationsWater resources planning & environmental considerations
Water resources planning & environmental considerations
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
 
Victorian desalination plant case study_FM
Victorian desalination plant case study_FMVictorian desalination plant case study_FM
Victorian desalination plant case study_FM
 
Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub
 
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
 

Recently uploaded

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 

Recently uploaded (20)

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 

Planning of Water Resource Planning Projects

  • 1. Topic of Lecture: River Valley Development Project & Planning of Water Resource Development Projects Prepared by: Prof. Darshan J Mehta Assistant Professor, Civil Engineering Department, Dr. S. & S. S. Ghandhy Government Engineering College, Surat 1 Subject: Water Resources Planning [3723303] Dr. S & S. S. Ghandhy Government Engineering College, Surat 9-Jul-20
  • 2. Outline • Multipurpose Projects • Role of Multipurpose Projects • Planning Of Multipurpose Projects • Functional Requirements of Multipurpose Projects • Merits & Demerits of Multipurpose Projects • Estimation of Benefit Cost Ratio • Case Study: Sardar Sarovar Dam 29-Jul-20
  • 3. • Planning of Multi-purpose River Project represents the integrated construction of two or more projects, each having a particular purpose or function. Multipurpose Projects 9-Jul-20 3
  • 4. • Water is essential for sustenance of all forms of life on earth. It is not evenly distributed all over the world and even its availability at the same locations is not uniform over the year. • The River valley projects which are constructed to meet several objectives simultaneously or tackle various problems associated with river valleys in an integrated manner. • The basic motive behind the construction of multipurpose river valley projects in India is to meet the critical requirements of irrigation for agriculture, electricity for industries and flood control. Introduction : Multipurpose River Valley Projects 9-Jul-20 4
  • 5. Role of Multipurpose River Valley Projects • Reduce the threat of seasonal floods and bolster local economies. • Aim to integrate agricultural development with the local economy through rapid industrialization and growth. • Irrigation for agriculture and electricity for industries • Provide water for irrigation to towns, improve navigation, create habitats for fish and wildlife and generate hydroelectric power for industrial purposes. • The development of transportation facilities • The creation of hydroelectric power. • Economic self-sufficiency and improve the standard of living for citizens. 9-Jul-20 5
  • 6. Planning of Multipurpose Projects 9-Jul-20 6 • Statement of Objectives • Preparing Inventory of available resources • Collection of Data • Future Projection • Project Formulation • Project Evaluation • Environmental Condition
  • 7. Statement of Objectives 9-Jul-20 7 • Increased agricultural production • Industrial development • Improving the living standard of the people • Social Stability
  • 8. Preparing Inventory of available resources 9-Jul-20 8 • Water Resources • Water Quality • Land Resources • Human Resources • Means of Communications • Financial Resources
  • 9. Collection of Data 9-Jul-20 9 GENERAL DATA • Physical Data • Hydrological Data • Geographical Data • Cartographic Data • Ecological Data • Legal Data • Demographic Data • Economic Data • Data on public opinion • Data on existing data
  • 10. Collection of Data 9-Jul-20 10 SPECIAL DATA • Agricultural Data • Water Supply Data • Navigation Data • Flood Control Data • Hydropower Generation Data • Pollution Control Data • Fish and Wildlife Data • Recreation and Tourism Data
  • 11. Project for Future Planning 9-Jul-20 11 • Any project to be taken in hand should ne designed to serve not only or the present need but also to serve for future needs for a period of at least 25 years. • The historical and collected data (current) for project planning should be serve as a base for future projection condition. • All project must be plan to meet the future requirements.
  • 12. Project Formulation 9-Jul-20 12 • After collection of basic data and evaluation future needs is completed actual formulation of the project commence. • This is a phase of planning where skill and imagination is required. • Now, important step is compilation of a comprehensive list of alternatives. At the time of compilation following steps are involved: 1) Define the boundary conditions 2) List all possible land use planning and their water requirements 3) List all possible projects 4) Prepare preliminary design and cost estimates for the projects 5) Estimates the benefits for all projects 6) Reject the projects which are no economical 7) Select 2/3rd combination which can give maximum return for detail study and select final alternative 8) Prepare detailed report on final alternative which show costs, benefits, etc.
  • 13. Project Evaluation 9-Jul-20 13 • The selection of most economical alternative from the various alternatives known as Project Evaluation. • For economic evaluation data on benefits and cost are collected. • Economically Independent unit • Physically Independent Unit
  • 14. • A complete environmental impact assessment should be conducted before the project is considered for clearance, and the results of the analysis should be used to judge the viability and desirability of the project • If the project is considered viable and desirable on social, economic, environmental, and technical grounds, it is necessary to take preventive measures related to the negative environmental impacts. • This requires the formulation of precise and comprehensive work-plans, and their implementation. • At this stage it may even be necessary to redesign the project, if environmental, social, or economic imperatives demand it. Environmental Considerations : 9-Jul-20 14
  • 15. Functional Requirement of Multi-Purpose Projects • Irrigation Facility • Flood Control • Generating Electricity • Navigation • Forests and Fisheries • Drinking Water • Development of Industry and Employment Generation • Recreation 9-Jul-20 15
  • 16. Demerits of Multi-Purpose Projects • Exaggerated Benefits on Irrigation • Higher Cost of Hydropower • Least Flood Control Benefit • Adverse Environmental Impact 9-Jul-20 16
  • 17. Benefit Cost Ratio • The benefit cost ratio is the ratio of annual benefits to the annual cost • In India, the project is economical viable whose benefit cost ratio is greater than unity. • For Irrigation purpose this ratio is generally 1.5 and for flood control this ratio is 1.10. Annual Cost • It is the summation of Annual Recovery cost and Recurring cost. • Capital Cost – Expenditure done at the time of construction of a project. • Recurring cost – Expenditure done on operation and maintenance of the project during life span, Estimation of Benefit Cost Ratio 9-Jul-20 17
  • 18. Annual Benefits • Benefits that are likely to be occur due to construction of project which should fairly estimated. • If there is an single purpose project it is easier to calculate those benefits for multipurpose project. • Damage data in India are generally collected from revenue department but it is very difficult job to obtain such huge data. Annual Cost • It is the summation of Annual Recovery cost and Recurring cost. • Capital Cost – Expenditure done at the time of construction of a project. • Recurring cost – Expenditure done on operation and maintenance of the project during life span, Estimation of Benefit Cost Ratio 9-Jul-20 18
  • 19. • Direct Cost • Indirect Cost Types of Cost 9-Jul-20 19 Types of Benefits • Direct Benefits • Indirect Benefits • Tangible Benefits • Intangible Benefits
  • 20. India's One of the Most Productive Multipurpose Projects Sardar Sarovar Dam 9-Jul-20 20
  • 21. • One of the most controversial and protested government schemes . • Approved by “Narmada Water Disputes Tribunal” in 1978 which included 30 large dams, 135 medium dams, and 3,000 small dams. • Initially, started at small level but later in 1985 the World Bank agreed to finance. • Estimated that project will irrigate more than 18,000 km2, most of it in drought prone areas of Kutch and Saurashtra Narmada Valley Development Project 9-Jul-20 21
  • 22. Narmada Valley Development Project 9-Jul-20 22
  • 23. • Location : Sardar Sarovar Dam, Near Navagam, Gujarat. • Coordinates : 21°49′49″n 73°44′50″e • Type of dam : gravity dam • Proposed height of Sardar Sarovar dam: 163metres • Reservoir total capacity : 9.5 km3 • Catchment area : 88,000 km2 • Construction cost : ₹25 billion INR • Dam's main power plant houses six 200 mw Francis pump • Total installed capacity of the power : 1,450 MW. Details of Sardar Sarovar Dam 9-Jul-20 23
  • 25. • Feed 20 million people, provide domestic and industrial water for about 30 million, employ about 1 million, and valuable electricity. • Irrigate land spread over 12 districts, 62 talukas and 3393 villages in 'Gujarat' and 730 km2 in the arid areas of 'Barmer' and 'Jalore' districts of Rajasthan • Set against the futures of about 70,000 project affected people. • The ratio of beneficiaries to affected persons 100:1. • In 1987 after construction of dams the injustices of the government's relocation program were exposed. • Consequences: Laid the foundation of “Narmada Bachao Andolan” Projected Benefits 9-Jul-20 25