Contents
 Multi-Disciplinary Model: PMO, Six Sigma, & Agile Operational Services
 Multi-Department View
 Governance & Escalation Structure
 Project Portfolio Management (PPM)
 Maturity Model
 Change Management
 Communications Management
 Questions
3
Multi-Disciplinary Model
Program Service Office (PSO) Center of Excellence Goals:
 Combination of PMO, Lean, & Agile services
 Strategic planning & choosing the right projects
 Service coaching (delivery excellence & threat avoidance)
 Integrated project status reporting & scheduling
 Resource knowledge transfer & communication
 Operations planning & forecasting
Expected Outcomes:
 Accelerate project delivery
 Cancel non-strategic & under-performing projects
 Re-rank projects
 Re-establish order of importance
 Reassign resources based on importance
 Identify opportunities for business process improvement
 Identify delays, cost overruns, & resource overloads
4
Multi-Department View
Business Departments (Finance/Marketing/Sales) Alignment:
 Business case writing
 Vendor selection & contracting
 Software development lifecycles/standards
 Project planning
 Project risk & issue management
 Business metric identification
 Continuous process improvement
IT Department Alignment:
 Decrease maintenance budget & increase new development budget
 Software As A Service (SAAS) model (reduced infrastructure)
 Advanced technology implementation (cloud, mobile, big data)
 Product, services, & standards development
5
Governance & Escalation Structure
Executive
Committee
(Level 4)
Senior level representatives who are key stakeholders and are
representing the program (i.e. IT Sponsor, etc). Members are
liaisons and owners for their areas (i.e. BPS, BAS, IS, SSO,
etc.) and are champions of the program. Provide feedback on
the project status and assist with socialization of key program
activities to their organization and various committees, as
applicable. Provide resources to the project and works with the
Program Office to remove roadblocks.
Program Office
(Level 3)
End-to-end program execution level governance. The Program
Office will be accountable and responsible for the overall success of
the program and provide strategic direction to each team. Makes
strategic level recommendations and decisions on scope, schedule,
costs, quality and other potential impacts to the program. Works
with the IT Sponsor, and Executive Committee to escalate and
address high/critical priority issues and risks.
Project Leadership
Team
(Level 2)
Program
Financials/
Metrics
Committee
Responsible for analyzing the financial actuals and forecasts and
resolving issues financially related (i.e. PFR discrepancies, missing
invoice payment, HW/SW not hitting the books, etc.).
Project Teams
(Level 1)
Reports up through the Project Leadership Team, executes against
strategic scope and schedule within budget. Responsible for delivering
the work packages defined by the Project Leadership Team, within the
project schedule. Project team escalates roadblocks and unresolved
issues to the Project Leadership Team to resolve.
Process Results
 Guides and directs the initiation,
planning, execution, close-out, and
controlling & reporting of all projects
that are part of the program by directly
influencing key project management
areas
Process Benefits
 Defines team roles and responsibilities,
to mitigate the risk of team confusion
on what work product they are
accountable to deliver
 Guides issue escalation process to
communicate and resolve issues and
risks in a timely basis
 Guides risk escalation and reporting, to
address appropriate items before they
impact the project
 Guides schedule development to
ensure milestones are being achieved
 Guides approval process for scope
changes
 Mitigates the risk of too many/not
enough resources, impacts to budget
over/under spend and threats to
completing deliverables within
expected timeframes
Reports up through the Program Office, taking direction on project
scope, schedule, costs, quality and other potential impacts to the
project. Makes tactical recommendations and decisions on scope,
schedule, costs, quality, and other potential impacts to the project
based on the Program Office strategic guidance. Works with the
Program Office to escalate and address high/critical issues/ risks.
6
Project Portfolio Management (PPM)
Program & Project Facilitation
 Determine viable project mix (meet organizational goals)
 Balance portfolio (short-term vs long-term, risk vs reward, complex vs simple)
 Monitor project planning & execution
 Analyze & improve portfolio performance
 Evaluate new portfolio opportunities
 Provide information to executive decision makers
Steps to Successful Results
 Gather & report portfolio information
 Develop goals, resource plans, & asset portfolios
 Link project, goals, & assets to strategic plans
 Determine organizational capacity for multiple projects
 Prioritize portfolio based on current information
 Develop recommendations for improving ROI
 Facilitate Governance Board meetings
7
Maturity Model
Levels of Service Delivery Maturity
 Level 1: Define project management, lean, & agile value proposition
 Level 2: Bring consistency to project delivery
 Level 3: Increase delivery value (lean & agile process improvements)
 Level 4: Identify portfolio interdependencies
 Level 5: Gain buy-in from community & governance board
 Level 6: Identify key benefits from lean & agile process improvements
 Level 7: Increase portfolio throughput
 Level 8: Exceed organizational strategic objectives
8
Change Management
The change will be entered in the Action Item Log with an issue type
of “Change Request” and the Program Manager will be notified
Critical = implementation should not proceed unless the
change is made
Medium = needed functionality, but not required to complete
the implementation
Low = nice to have functionality
Process Results
 Change management execution, against approve project charter
 Program Charter, Project Charter, and Action Item Log Updates (as
required)
 PPM Project Update (as required)
Process Benefits
 Mitigate risk of unknown impacts to scope, budget, timelines and
quality by introducing unplanned changes
 Appropriately plan and obtain approvals for new scope items before
communicating to team
 Assists with ensuring team stays focused on tasks at hand
 Ensure existing scope objectives are achieved within budget,
targeted timeframes, and with quality standards so program
strategic objectives are achieved
9
Communication Management
Communication Management Process
 Identify who is responsible, accountable, consulted and informed (RACI) for the completion of documents and
reports
 Identify all standing meetings, meeting purpose, frequency, & attendees
 Identify document reporting and meeting ground rules
Process Results
 Input into project schedule creation
 Influence standing meetings and invitees
 Provide organizational management plan as input
Process Benefits
 Ensure the right people are at the right meetings
 Ensurs standing meetings are planned out so appropriate communications occurs at all levels throughout the
program. Additionally measures the amount of time team members will be spending in meetings, to mitigate
risk of too much time spent in meetings
 Ensure appropriate internal / external project communications are occurring to proactively encourage
information sharing
 Ensure that meetings are held / deliverables are produced within quality standards (i.e. agenda, minutes,
document naming structure, document peer reviews, etc.)
DCII PgM
Processes
10
Contact Information
Douglas Floyd
312.502.3113 (cell)
douglas.vincent.floyd@gmail.com
www.linkedin.com/in/dougvfloyd
@DougVFloyd
Slideshare Presentations:
 Next Gen Agile 3.0: www.slideshare.net/dvfloyd/agile-30
 Next Gen Lean 3.0: www.slideshare.net/dvfloyd/lean-30
 Next Gen PMO 3.0: www.slideshare.net/dvfloyd/pmo-30

More Related Content

What's hot

Pmipmo
PmipmoPmipmo
Project Management: How the MBA Can Help You Succeed
Project Management: How the MBA Can Help You SucceedProject Management: How the MBA Can Help You Succeed
Project Management: How the MBA Can Help You Succeed
David Edgerton, Jr.
 
The Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering ValueThe Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering Value
Matthew Hillhouse
 
The pmo strategy discipline execution value
The pmo   strategy discipline execution valueThe pmo   strategy discipline execution value
The pmo strategy discipline execution value
Orlando Lugo
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service Introduction
Keith Rackley
 
PMO Setup with Microsoft Project Online
PMO Setup with Microsoft Project OnlinePMO Setup with Microsoft Project Online
PMO Setup with Microsoft Project Online
Gonzague PATINIER
 
Integrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi ProspectiveIntegrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi Prospective
Ashok Jain
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMO
Syed Raashid
 
eCIO PPT What is a PMO
eCIO PPT What is a PMOeCIO PPT What is a PMO
eCIO PPT What is a PMO
David Niles
 
PMO - Added value instead of administration
PMO - Added value instead of administrationPMO - Added value instead of administration
PMO - Added value instead of administration
Andreas Splett
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
Erin Jones
 
The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014
PM Solutions
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
Lou Bahrmasel, PMP, MBA
 
Emerging Trends in PMO Governance
Emerging Trends in PMO Governance Emerging Trends in PMO Governance
Emerging Trends in PMO Governance
International Institute for Learning
 
PMO Mandate
PMO MandatePMO Mandate
PMO Mandate
Talha Masood
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
Business Beam
 
Building a pmo
Building a pmoBuilding a pmo
Building a pmo
emre_demir
 
Project management best practices ispi-fritsch
Project management best practices ispi-fritschProject management best practices ispi-fritsch
Project management best practices ispi-fritsch
Michael Fritsch
 
TBO PMO Model
TBO PMO ModelTBO PMO Model
TBO PMO Model
tholtz11
 
Setting up pmo
Setting up pmoSetting up pmo
Setting up pmo
Dimitri Bekinin
 

What's hot (20)

Pmipmo
PmipmoPmipmo
Pmipmo
 
Project Management: How the MBA Can Help You Succeed
Project Management: How the MBA Can Help You SucceedProject Management: How the MBA Can Help You Succeed
Project Management: How the MBA Can Help You Succeed
 
The Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering ValueThe Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering Value
 
The pmo strategy discipline execution value
The pmo   strategy discipline execution valueThe pmo   strategy discipline execution value
The pmo strategy discipline execution value
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service Introduction
 
PMO Setup with Microsoft Project Online
PMO Setup with Microsoft Project OnlinePMO Setup with Microsoft Project Online
PMO Setup with Microsoft Project Online
 
Integrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi ProspectiveIntegrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi Prospective
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMO
 
eCIO PPT What is a PMO
eCIO PPT What is a PMOeCIO PPT What is a PMO
eCIO PPT What is a PMO
 
PMO - Added value instead of administration
PMO - Added value instead of administrationPMO - Added value instead of administration
PMO - Added value instead of administration
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 
The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
Emerging Trends in PMO Governance
Emerging Trends in PMO Governance Emerging Trends in PMO Governance
Emerging Trends in PMO Governance
 
PMO Mandate
PMO MandatePMO Mandate
PMO Mandate
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
Building a pmo
Building a pmoBuilding a pmo
Building a pmo
 
Project management best practices ispi-fritsch
Project management best practices ispi-fritschProject management best practices ispi-fritsch
Project management best practices ispi-fritsch
 
TBO PMO Model
TBO PMO ModelTBO PMO Model
TBO PMO Model
 
Setting up pmo
Setting up pmoSetting up pmo
Setting up pmo
 

Viewers also liked

A Leaner PMO in The Federal Government
A Leaner PMO in The Federal GovernmentA Leaner PMO in The Federal Government
A Leaner PMO in The Federal Government
Fadi Stephan
 
Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management Office
Macrosolutions SA
 
How will the PMO at the Future be like?
How will the PMO at the Future be like?How will the PMO at the Future be like?
How will the PMO at the Future be like?
Ricardo Viana Vargas
 
Lean PMO - Oxymoron or Possible - SDEC'12
Lean PMO  - Oxymoron or Possible - SDEC'12Lean PMO  - Oxymoron or Possible - SDEC'12
Lean PMO - Oxymoron or Possible - SDEC'12
Mike Edwards
 
3 Critical Steps to Project Management Office (PMO) Development
3 Critical Steps to Project Management Office (PMO) Development3 Critical Steps to Project Management Office (PMO) Development
3 Critical Steps to Project Management Office (PMO) Development
GravesSE
 
PMO 3.0 - Program Management Office
PMO 3.0 - Program Management OfficePMO 3.0 - Program Management Office
PMO 3.0 - Program Management Office
Michel Raimondo Industrial Engineer
 
Michael Nir - The Agile PMO
Michael Nir - The Agile PMO Michael Nir - The Agile PMO
Leading Agile Product Discovery
Leading Agile Product DiscoveryLeading Agile Product Discovery
Leading Agile Product Discovery
Armond Mehrabian
 
Leadership and project management concepts
Leadership and project management conceptsLeadership and project management concepts
Leadership and project management concepts
GravesSE
 
Organizing a Project Management Office
Organizing a Project Management OfficeOrganizing a Project Management Office
Organizing a Project Management Office
Self employed
 
The Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive LeadershipThe Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive Leadership
LitheSpeed
 
Lean Product Discovery
Lean Product DiscoveryLean Product Discovery
Lean Product Discovery
David Hawks
 
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & OrganisationsTraditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
Barry O'Reilly
 
Gartner pmo best in class
Gartner pmo best in classGartner pmo best in class
Gartner pmo best in class
Helene Heller, PMP
 

Viewers also liked (14)

A Leaner PMO in The Federal Government
A Leaner PMO in The Federal GovernmentA Leaner PMO in The Federal Government
A Leaner PMO in The Federal Government
 
Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management Office
 
How will the PMO at the Future be like?
How will the PMO at the Future be like?How will the PMO at the Future be like?
How will the PMO at the Future be like?
 
Lean PMO - Oxymoron or Possible - SDEC'12
Lean PMO  - Oxymoron or Possible - SDEC'12Lean PMO  - Oxymoron or Possible - SDEC'12
Lean PMO - Oxymoron or Possible - SDEC'12
 
3 Critical Steps to Project Management Office (PMO) Development
3 Critical Steps to Project Management Office (PMO) Development3 Critical Steps to Project Management Office (PMO) Development
3 Critical Steps to Project Management Office (PMO) Development
 
PMO 3.0 - Program Management Office
PMO 3.0 - Program Management OfficePMO 3.0 - Program Management Office
PMO 3.0 - Program Management Office
 
Michael Nir - The Agile PMO
Michael Nir - The Agile PMO Michael Nir - The Agile PMO
Michael Nir - The Agile PMO
 
Leading Agile Product Discovery
Leading Agile Product DiscoveryLeading Agile Product Discovery
Leading Agile Product Discovery
 
Leadership and project management concepts
Leadership and project management conceptsLeadership and project management concepts
Leadership and project management concepts
 
Organizing a Project Management Office
Organizing a Project Management OfficeOrganizing a Project Management Office
Organizing a Project Management Office
 
The Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive LeadershipThe Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive Leadership
 
Lean Product Discovery
Lean Product DiscoveryLean Product Discovery
Lean Product Discovery
 
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & OrganisationsTraditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
 
Gartner pmo best in class
Gartner pmo best in classGartner pmo best in class
Gartner pmo best in class
 

Similar to PMO 3.0 - Next Gen Lean Model - Doug Floyd

Leon Tisdale Show
Leon Tisdale ShowLeon Tisdale Show
Leon Tisdale Show
Leon Tisdale
 
Projects Management
Projects ManagementProjects Management
Projects Management
Nirmal Shah
 
It Project Management
It Project ManagementIt Project Management
It Project Management
TJ Rains
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
PMOfficers PMOAcademy
 
Project Management: More Caught Than Taught
Project Management: More Caught Than TaughtProject Management: More Caught Than Taught
Project Management: More Caught Than Taught
edward_uy
 
Project Management
Project ManagementProject Management
Project Management
ahmad bassiouny
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
Asa Chan
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
UW Madison
 
Erp-PMO
Erp-PMOErp-PMO
Erp-PMO
Sunayan Pal
 
Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional Designers
Kimberly Kaye
 
Executive summary lee-ann sullivan_2018(pdf)
Executive summary lee-ann sullivan_2018(pdf)Executive summary lee-ann sullivan_2018(pdf)
Executive summary lee-ann sullivan_2018(pdf)
Lee-ann Sullivan, PMP
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance Structure
Saurabh Sardesai
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
flexibleresources
 
Project management
Project managementProject management
Project management
Anshu Suri
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
Wadhwani Foundation
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
ejlp12
 
Project Management
Project ManagementProject Management
Project management for instructional designers
Project management for instructional designersProject management for instructional designers
Project management for instructional designers
Kimberly Klotz
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
Cheryl Burcham
 
Creating Wbs
Creating WbsCreating Wbs
Creating Wbs
Ashish Mittal
 

Similar to PMO 3.0 - Next Gen Lean Model - Doug Floyd (20)

Leon Tisdale Show
Leon Tisdale ShowLeon Tisdale Show
Leon Tisdale Show
 
Projects Management
Projects ManagementProjects Management
Projects Management
 
It Project Management
It Project ManagementIt Project Management
It Project Management
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
 
Project Management: More Caught Than Taught
Project Management: More Caught Than TaughtProject Management: More Caught Than Taught
Project Management: More Caught Than Taught
 
Project Management
Project ManagementProject Management
Project Management
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Erp-PMO
Erp-PMOErp-PMO
Erp-PMO
 
Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional Designers
 
Executive summary lee-ann sullivan_2018(pdf)
Executive summary lee-ann sullivan_2018(pdf)Executive summary lee-ann sullivan_2018(pdf)
Executive summary lee-ann sullivan_2018(pdf)
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance Structure
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
 
Project management
Project managementProject management
Project management
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
Project Management
Project ManagementProject Management
Project Management
 
Project management for instructional designers
Project management for instructional designersProject management for instructional designers
Project management for instructional designers
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
 
Creating Wbs
Creating WbsCreating Wbs
Creating Wbs
 

Recently uploaded

Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
dpbossdpboss69
 
Enhancing Adoption of AI in Agri-food: Introduction
Enhancing Adoption of AI in Agri-food: IntroductionEnhancing Adoption of AI in Agri-food: Introduction
Enhancing Adoption of AI in Agri-food: Introduction
Cor Verdouw
 
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
ISONIKELtd
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
GraceKohler1
 
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani case
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
ZevinAttisha
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
irhcs
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
dazzjoker
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
msthrill
 
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
Cambridge Product Management Network
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Efficient PHP Development Solutions for Dynamic Web Applications
Efficient PHP Development Solutions for Dynamic Web ApplicationsEfficient PHP Development Solutions for Dynamic Web Applications
Efficient PHP Development Solutions for Dynamic Web Applications
Harwinder Singh
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
Ksquare Energy Pvt. Ltd.
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
PennapaKeavsiri
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
valvereliz227
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
thesiliconleaders
 
High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15
advik4387
 

Recently uploaded (20)

Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
 
Enhancing Adoption of AI in Agri-food: Introduction
Enhancing Adoption of AI in Agri-food: IntroductionEnhancing Adoption of AI in Agri-food: Introduction
Enhancing Adoption of AI in Agri-food: Introduction
 
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
 
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
 
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Efficient PHP Development Solutions for Dynamic Web Applications
Efficient PHP Development Solutions for Dynamic Web ApplicationsEfficient PHP Development Solutions for Dynamic Web Applications
Efficient PHP Development Solutions for Dynamic Web Applications
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
 
High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15High-Quality IPTV Monthly Subscription for $15
High-Quality IPTV Monthly Subscription for $15
 

PMO 3.0 - Next Gen Lean Model - Doug Floyd

  • 1. 1 PMO 3.0 (Program Service Office) Next Generation PMO Model By Doug Floyd 07/01/2013
  • 2. 2 Contents  Multi-Disciplinary Model: PMO, Six Sigma, & Agile Operational Services  Multi-Department View  Governance & Escalation Structure  Project Portfolio Management (PPM)  Maturity Model  Change Management  Communications Management  Questions
  • 3. 3 Multi-Disciplinary Model Program Service Office (PSO) Center of Excellence Goals:  Combination of PMO, Lean, & Agile services  Strategic planning & choosing the right projects  Service coaching (delivery excellence & threat avoidance)  Integrated project status reporting & scheduling  Resource knowledge transfer & communication  Operations planning & forecasting Expected Outcomes:  Accelerate project delivery  Cancel non-strategic & under-performing projects  Re-rank projects  Re-establish order of importance  Reassign resources based on importance  Identify opportunities for business process improvement  Identify delays, cost overruns, & resource overloads
  • 4. 4 Multi-Department View Business Departments (Finance/Marketing/Sales) Alignment:  Business case writing  Vendor selection & contracting  Software development lifecycles/standards  Project planning  Project risk & issue management  Business metric identification  Continuous process improvement IT Department Alignment:  Decrease maintenance budget & increase new development budget  Software As A Service (SAAS) model (reduced infrastructure)  Advanced technology implementation (cloud, mobile, big data)  Product, services, & standards development
  • 5. 5 Governance & Escalation Structure Executive Committee (Level 4) Senior level representatives who are key stakeholders and are representing the program (i.e. IT Sponsor, etc). Members are liaisons and owners for their areas (i.e. BPS, BAS, IS, SSO, etc.) and are champions of the program. Provide feedback on the project status and assist with socialization of key program activities to their organization and various committees, as applicable. Provide resources to the project and works with the Program Office to remove roadblocks. Program Office (Level 3) End-to-end program execution level governance. The Program Office will be accountable and responsible for the overall success of the program and provide strategic direction to each team. Makes strategic level recommendations and decisions on scope, schedule, costs, quality and other potential impacts to the program. Works with the IT Sponsor, and Executive Committee to escalate and address high/critical priority issues and risks. Project Leadership Team (Level 2) Program Financials/ Metrics Committee Responsible for analyzing the financial actuals and forecasts and resolving issues financially related (i.e. PFR discrepancies, missing invoice payment, HW/SW not hitting the books, etc.). Project Teams (Level 1) Reports up through the Project Leadership Team, executes against strategic scope and schedule within budget. Responsible for delivering the work packages defined by the Project Leadership Team, within the project schedule. Project team escalates roadblocks and unresolved issues to the Project Leadership Team to resolve. Process Results  Guides and directs the initiation, planning, execution, close-out, and controlling & reporting of all projects that are part of the program by directly influencing key project management areas Process Benefits  Defines team roles and responsibilities, to mitigate the risk of team confusion on what work product they are accountable to deliver  Guides issue escalation process to communicate and resolve issues and risks in a timely basis  Guides risk escalation and reporting, to address appropriate items before they impact the project  Guides schedule development to ensure milestones are being achieved  Guides approval process for scope changes  Mitigates the risk of too many/not enough resources, impacts to budget over/under spend and threats to completing deliverables within expected timeframes Reports up through the Program Office, taking direction on project scope, schedule, costs, quality and other potential impacts to the project. Makes tactical recommendations and decisions on scope, schedule, costs, quality, and other potential impacts to the project based on the Program Office strategic guidance. Works with the Program Office to escalate and address high/critical issues/ risks.
  • 6. 6 Project Portfolio Management (PPM) Program & Project Facilitation  Determine viable project mix (meet organizational goals)  Balance portfolio (short-term vs long-term, risk vs reward, complex vs simple)  Monitor project planning & execution  Analyze & improve portfolio performance  Evaluate new portfolio opportunities  Provide information to executive decision makers Steps to Successful Results  Gather & report portfolio information  Develop goals, resource plans, & asset portfolios  Link project, goals, & assets to strategic plans  Determine organizational capacity for multiple projects  Prioritize portfolio based on current information  Develop recommendations for improving ROI  Facilitate Governance Board meetings
  • 7. 7 Maturity Model Levels of Service Delivery Maturity  Level 1: Define project management, lean, & agile value proposition  Level 2: Bring consistency to project delivery  Level 3: Increase delivery value (lean & agile process improvements)  Level 4: Identify portfolio interdependencies  Level 5: Gain buy-in from community & governance board  Level 6: Identify key benefits from lean & agile process improvements  Level 7: Increase portfolio throughput  Level 8: Exceed organizational strategic objectives
  • 8. 8 Change Management The change will be entered in the Action Item Log with an issue type of “Change Request” and the Program Manager will be notified Critical = implementation should not proceed unless the change is made Medium = needed functionality, but not required to complete the implementation Low = nice to have functionality Process Results  Change management execution, against approve project charter  Program Charter, Project Charter, and Action Item Log Updates (as required)  PPM Project Update (as required) Process Benefits  Mitigate risk of unknown impacts to scope, budget, timelines and quality by introducing unplanned changes  Appropriately plan and obtain approvals for new scope items before communicating to team  Assists with ensuring team stays focused on tasks at hand  Ensure existing scope objectives are achieved within budget, targeted timeframes, and with quality standards so program strategic objectives are achieved
  • 9. 9 Communication Management Communication Management Process  Identify who is responsible, accountable, consulted and informed (RACI) for the completion of documents and reports  Identify all standing meetings, meeting purpose, frequency, & attendees  Identify document reporting and meeting ground rules Process Results  Input into project schedule creation  Influence standing meetings and invitees  Provide organizational management plan as input Process Benefits  Ensure the right people are at the right meetings  Ensurs standing meetings are planned out so appropriate communications occurs at all levels throughout the program. Additionally measures the amount of time team members will be spending in meetings, to mitigate risk of too much time spent in meetings  Ensure appropriate internal / external project communications are occurring to proactively encourage information sharing  Ensure that meetings are held / deliverables are produced within quality standards (i.e. agenda, minutes, document naming structure, document peer reviews, etc.) DCII PgM Processes
  • 10. 10 Contact Information Douglas Floyd 312.502.3113 (cell) douglas.vincent.floyd@gmail.com www.linkedin.com/in/dougvfloyd @DougVFloyd Slideshare Presentations:  Next Gen Agile 3.0: www.slideshare.net/dvfloyd/agile-30  Next Gen Lean 3.0: www.slideshare.net/dvfloyd/lean-30  Next Gen PMO 3.0: www.slideshare.net/dvfloyd/pmo-30

Editor's Notes

  1. Scope change management (i.e. what happens when someone requests a change to scope...when is action taken on a change request...who approves what...) Issue management (i.e. what are issues...what is a low/med/high/critical issue...when do issues get escalated and to who...) Risk management (i.e. what are risks...when do risks get assessed and communicated...who do they get communicated too...) Organizational management (i.e. what is the program governance...how does it impact communications and escalations...) Communications management (i.e. what are the standing meetings...how much time are we spending in meetings...what is the meeting purpose and audience...) Cost management (i.e. how are we managing costs...what is the procurement process and who approves...what are the cost reports...)