Creating a WBS A Project Management Approach May 29, 2010 Ajcon IT.com Ltd.
Why do projects fail? Lack of clarity on what’s really needed Problems avoided, covered up, or minimized Inadequate planning (the devil is in the details) Ineffective process to deal with changes or problems Lack of willingness or discipline to monitor progress Unresolved conflicts Lack of committed, dedicated resources Lack of understanding of project management
What is a project? Has a goal, defined output or concrete deliverable, and scope Has a defined beginning and ending Resources are dedicated to it, or it has a budget Has a logical sequence of activities that produce the deliverables Is usually unique, never before done, one of kind One person is responsible, the Project Team Leader
Block Diagram Example Begin End Logical sequence of events Time-Lines are included
Project Phases Phase 1 Definition Phase 2 Planning Phase 3 Execution Phase 4 Closeout Steps 1 - 3 Steps 4 - 10 Steps 11 - 12 Step 13 Planned Systemic Change (From next page) Phases 1a, 2a, 3a, 4a }
Planned Systemic Change Phase 1a :  Clarifying Expectations and Roles for Change Process Phase 2a :  Joint Discovery to Identify Priorities for Change Preparation -- Establishing a Project Team One of the most powerful means to cultivate collaboration is by working with a project team. No change agent sees all aspects of the situation in the organization -- team members help to see more of those various aspects  Phase 3a :  Joint Planning of Organizational Development Activities to Address Priorities Phase 4a :  Implementation - Change Management and Joint Evaluation
Phase 1 - Definition Find out what is wanted/needed Analyze factors, hazards, risks, and elements of practical solution and approach 3.  Define specifically what is to be accomplished, make it into a project Key Stakeholders Interviewed Complex or competing needs identified Alternatives Analyzed Hazards, risks, and factors identified Technical routes and issues identified Elements of Solution/approach identified Project definition: Goal, Objectives, Scope, Constraints
Phase 2 - Planning Identify what it will take to do the project  Decide the best approach Determine who will do each task Figure out how long it will take Calculate the project completion date and milestone schedule Calculate resource requirements and project costs Creatively optimize trade-offs to deliver the best results in the shortest time Work Breakdown Structure of Tasks Logic Task Network Detailed responsibility chart Work and duration time estimates Pert-CPM Chart Gantt Chart Workload charts Budget spreadsheets Earned value charts Risks and trade-offs managed Decision paper(s) developed Final project plan
Phase 3 - Execution Develop a baseline project plan to track progress and control costs Establish procedures to track progress against the plan Data entered into project management software.  Work loads leveled & smoothed Baseline reports and charts produced Final plan signed off by sponsor, champion, project team leader, team, and key stakeholders  Agreed procedures: Status reporting Change control
Phase 4 - Closeout Closeout the project Project completed and results delivered Project killed if unable to deliver what is needed Lessons learned captured  Documentation completed and filed Final payments made and account closed Project Close Out Report completed
A Work Breakdown Structure decomposes a project into Activities and tasks . Mission Project Goal  Statement Objective Major Step Activity Task Task Task Task Task Task Task Task Task Task Objective Major Step Objective Major Step Activity Activity Activity Activity Work Breakdown Structure Level 1 Level 2 Level 3
Project Schedule
Project Schedule
SO HOW DO YOU WANT TO PROCEED NOW? Take Home Message Plan Projects Carefully through Work Breakdown Structure
Thanks Regards,  Ashish Mittal

More Related Content

What's hot

How to monitor your project progress
How to monitor your project progressHow to monitor your project progress
How to monitor your project progress
Asif A. Kabani
 
Microsoft_Project_101_How_to_Build_a_Project_Plan.
Microsoft_Project_101_How_to_Build_a_Project_Plan.Microsoft_Project_101_How_to_Build_a_Project_Plan.
Microsoft_Project_101_How_to_Build_a_Project_Plan.
TURKI , PMP
 
Planning fundamentals - Project Management
Planning fundamentals - Project ManagementPlanning fundamentals - Project Management
Planning fundamentals - Project Management
Association for Project Management
 
Project Monitoring & Evaluation
Project Monitoring & EvaluationProject Monitoring & Evaluation
Project Monitoring & Evaluation
Srinivasan Rengasamy
 
Mkcl Project Management Session 3
Mkcl Project Management Session 3Mkcl Project Management Session 3
Mkcl Project Management Session 3
kalarianitya
 
Project management cycle
Project management  cycleProject management  cycle
Project management cycle
Megha BHardwaj
 
Features of project
Features of projectFeatures of project
Features of project
Raj Sampat
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Erik Kijne
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
Imran Jamil
 
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Andrew Schwartz
 
Best Practices - Project Management & Implementation
Best Practices - Project Management & ImplementationBest Practices - Project Management & Implementation
Best Practices - Project Management & Implementation
Synerion North America Inc.
 
Project implementation
Project implementationProject implementation
Project implementation
Bishnu Deo Yadav
 
Almm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acmAlmm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acm
Alberto Mico
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
Mazhar Poohlah
 
Ch03
Ch03Ch03
Ch03
蕭美蓮
 
post project review
post project reviewpost project review
post project review
Vinold John
 
Project management
Project managementProject management
Project management
Anshu Suri
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
ProofHub
 
Implementation and Evaluation
Implementation and EvaluationImplementation and Evaluation
Implementation and Evaluation
Jo Balucanag - Bitonio
 

What's hot (19)

How to monitor your project progress
How to monitor your project progressHow to monitor your project progress
How to monitor your project progress
 
Microsoft_Project_101_How_to_Build_a_Project_Plan.
Microsoft_Project_101_How_to_Build_a_Project_Plan.Microsoft_Project_101_How_to_Build_a_Project_Plan.
Microsoft_Project_101_How_to_Build_a_Project_Plan.
 
Planning fundamentals - Project Management
Planning fundamentals - Project ManagementPlanning fundamentals - Project Management
Planning fundamentals - Project Management
 
Project Monitoring & Evaluation
Project Monitoring & EvaluationProject Monitoring & Evaluation
Project Monitoring & Evaluation
 
Mkcl Project Management Session 3
Mkcl Project Management Session 3Mkcl Project Management Session 3
Mkcl Project Management Session 3
 
Project management cycle
Project management  cycleProject management  cycle
Project management cycle
 
Features of project
Features of projectFeatures of project
Features of project
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
 
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
Project Management (Comprehensive) PowerPoint Presentation 228 slides with 21...
 
Best Practices - Project Management & Implementation
Best Practices - Project Management & ImplementationBest Practices - Project Management & Implementation
Best Practices - Project Management & Implementation
 
Project implementation
Project implementationProject implementation
Project implementation
 
Almm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acmAlmm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acm
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Ch03
Ch03Ch03
Ch03
 
post project review
post project reviewpost project review
post project review
 
Project management
Project managementProject management
Project management
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Implementation and Evaluation
Implementation and EvaluationImplementation and Evaluation
Implementation and Evaluation
 

Viewers also liked

QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Management
handbook
 
QUALITY MANAGEMENT - BENCHMARKING
QUALITY MANAGEMENT - BENCHMARKINGQUALITY MANAGEMENT - BENCHMARKING
QUALITY MANAGEMENT - BENCHMARKING
NadNadReza
 
Introduction To Cmm1
Introduction To Cmm1Introduction To Cmm1
Introduction To Cmm1
suhas deshpande
 
OWASP San Antonio: Open Software Assurance Maturity Model (OpenSAMM)
OWASP San Antonio: Open Software Assurance Maturity Model (OpenSAMM)OWASP San Antonio: Open Software Assurance Maturity Model (OpenSAMM)
OWASP San Antonio: Open Software Assurance Maturity Model (OpenSAMM)
Denim Group
 
Six Sigma[1]
Six Sigma[1]Six Sigma[1]
Six Sigma[1]
Vishal Wadekar
 
Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessWork Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management Process
Dhawal Thakkar PMP
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication Management
Ahmad Maharma, PMP,RMP
 
Meditation power point
Meditation power pointMeditation power point
Meditation power point
gman721
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
Imran Jamil
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
Mudassar Salman
 
Capability Maturity Model (CMM)
Capability Maturity Model (CMM)Capability Maturity Model (CMM)
Capability Maturity Model (CMM)
Ali Sadhik Shaik
 

Viewers also liked (11)

QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Management
 
QUALITY MANAGEMENT - BENCHMARKING
QUALITY MANAGEMENT - BENCHMARKINGQUALITY MANAGEMENT - BENCHMARKING
QUALITY MANAGEMENT - BENCHMARKING
 
Introduction To Cmm1
Introduction To Cmm1Introduction To Cmm1
Introduction To Cmm1
 
OWASP San Antonio: Open Software Assurance Maturity Model (OpenSAMM)
OWASP San Antonio: Open Software Assurance Maturity Model (OpenSAMM)OWASP San Antonio: Open Software Assurance Maturity Model (OpenSAMM)
OWASP San Antonio: Open Software Assurance Maturity Model (OpenSAMM)
 
Six Sigma[1]
Six Sigma[1]Six Sigma[1]
Six Sigma[1]
 
Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessWork Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management Process
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication Management
 
Meditation power point
Meditation power pointMeditation power point
Meditation power point
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Capability Maturity Model (CMM)
Capability Maturity Model (CMM)Capability Maturity Model (CMM)
Capability Maturity Model (CMM)
 

Similar to Creating Wbs

Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
UW Madison
 
Training pm jan 11 part b
Training pm jan 11 part bTraining pm jan 11 part b
Training pm jan 11 part b
Siep Littooij
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
Irefuser1
 
1548693 (1).ppt
1548693 (1).ppt1548693 (1).ppt
1548693 (1).ppt
AyaGamal610138
 
PMO 3.0 - Next Gen Lean Model - Doug Floyd
PMO 3.0 - Next Gen Lean Model - Doug FloydPMO 3.0 - Next Gen Lean Model - Doug Floyd
PMO 3.0 - Next Gen Lean Model - Doug Floyd
dvfloyd
 
PMP Study Guide
PMP Study GuidePMP Study Guide
PMP Study Guide
nravichandran
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guide
robsonnasc
 
Project Management How To
Project Management How ToProject Management How To
Project Management How To
kellyfrey
 
Pmp
PmpPmp
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6
gatecomro
 
Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional Designers
Kimberly Kaye
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
Asa Chan
 
Project management
Project managementProject management
Project management
Jaya Velagapudi
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
ahmad bassiouny
 
Project Management @ Ektoo
Project Management @ EktooProject Management @ Ektoo
Project Management @ Ektoo
shofiulalom
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"
Shafiyazahoor327
 
NCV 3 Project Management Hands-On Support Slide Show - Module 5
NCV 3 Project Management Hands-On Support Slide Show - Module 5NCV 3 Project Management Hands-On Support Slide Show - Module 5
NCV 3 Project Management Hands-On Support Slide Show - Module 5
Future Managers
 
Project Preparation and Management
Project Preparation and ManagementProject Preparation and Management
Project Preparation and Management
GBPUA&T, Pantnagar
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
Josephine Claire
 
2 project management-level 1
2 project management-level 12 project management-level 1
2 project management-level 1
Juwad AlOmari
 

Similar to Creating Wbs (20)

Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Training pm jan 11 part b
Training pm jan 11 part bTraining pm jan 11 part b
Training pm jan 11 part b
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
1548693 (1).ppt
1548693 (1).ppt1548693 (1).ppt
1548693 (1).ppt
 
PMO 3.0 - Next Gen Lean Model - Doug Floyd
PMO 3.0 - Next Gen Lean Model - Doug FloydPMO 3.0 - Next Gen Lean Model - Doug Floyd
PMO 3.0 - Next Gen Lean Model - Doug Floyd
 
PMP Study Guide
PMP Study GuidePMP Study Guide
PMP Study Guide
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guide
 
Project Management How To
Project Management How ToProject Management How To
Project Management How To
 
Pmp
PmpPmp
Pmp
 
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6
 
Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional Designers
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
 
Project management
Project managementProject management
Project management
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
Project Management @ Ektoo
Project Management @ EktooProject Management @ Ektoo
Project Management @ Ektoo
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"
 
NCV 3 Project Management Hands-On Support Slide Show - Module 5
NCV 3 Project Management Hands-On Support Slide Show - Module 5NCV 3 Project Management Hands-On Support Slide Show - Module 5
NCV 3 Project Management Hands-On Support Slide Show - Module 5
 
Project Preparation and Management
Project Preparation and ManagementProject Preparation and Management
Project Preparation and Management
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
2 project management-level 1
2 project management-level 12 project management-level 1
2 project management-level 1
 

Recently uploaded

New Girls Call Mumbai 9910780858 Provide Best And Top Girl Service And No1 in...
New Girls Call Mumbai 9910780858 Provide Best And Top Girl Service And No1 in...New Girls Call Mumbai 9910780858 Provide Best And Top Girl Service And No1 in...
New Girls Call Mumbai 9910780858 Provide Best And Top Girl Service And No1 in...
44annissa
 
WAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdfWAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdf
Western Alaska Minerals Corp.
 
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Aggregage
 
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Philip M Caputo
 
Green Minimalist Aesthetic Project Proposal Presentation.pdf
Green Minimalist Aesthetic Project Proposal Presentation.pdfGreen Minimalist Aesthetic Project Proposal Presentation.pdf
Green Minimalist Aesthetic Project Proposal Presentation.pdf
shivamkush646
 
foodgasm restaurant and Bar pune road.docx
foodgasm restaurant and Bar pune road.docxfoodgasm restaurant and Bar pune road.docx
foodgasm restaurant and Bar pune road.docx
PraghyaBhandari
 
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
emmanuelpulido003
 
Module 4 Business Strategy competitive advantages
Module 4 Business Strategy competitive advantagesModule 4 Business Strategy competitive advantages
Module 4 Business Strategy competitive advantages
Seta Wicaksana
 
TALENT ACQUISITION AND MANAGEMENT LECTURE 5
TALENT ACQUISITION AND MANAGEMENT LECTURE 5TALENT ACQUISITION AND MANAGEMENT LECTURE 5
TALENT ACQUISITION AND MANAGEMENT LECTURE 5
projectseasy
 
Singapore Pharmaceutical Market PPT: Growth, Outlook, Demand, Keyplayer Analy...
Singapore Pharmaceutical Market PPT: Growth, Outlook, Demand, Keyplayer Analy...Singapore Pharmaceutical Market PPT: Growth, Outlook, Demand, Keyplayer Analy...
Singapore Pharmaceutical Market PPT: Growth, Outlook, Demand, Keyplayer Analy...
IMARC Group
 
Managing Customer & User Experience of Customers
Managing Customer & User Experience of CustomersManaging Customer & User Experience of Customers
Managing Customer & User Experience of Customers
SalmanTahir60
 
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual TrainingpptxYou Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
Cynthia Clay
 
Luxury Lifestyle Summit 2024 - Sponsorship
Luxury Lifestyle Summit 2024 - SponsorshipLuxury Lifestyle Summit 2024 - Sponsorship
Luxury Lifestyle Summit 2024 - Sponsorship
uitdiedosfinance
 
Top Digital Marketing Strategy in 2024.pdf
Top Digital Marketing Strategy in 2024.pdfTop Digital Marketing Strategy in 2024.pdf
Top Digital Marketing Strategy in 2024.pdf
Top IT Marketing
 
Gym business MODEL .pdf .
Gym business MODEL .pdf                 .Gym business MODEL .pdf                 .
Gym business MODEL .pdf .
Divyanshu56740
 
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptxSTRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
ImranTabish1
 
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
dimplekumaridk322
 
STEPIC Innovations 2026 futurism publications
STEPIC Innovations 2026 futurism publicationsSTEPIC Innovations 2026 futurism publications
STEPIC Innovations 2026 futurism publications
mcynthus
 
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
Growth Buyouts - The  Dawn of the GBO (Slow Ventures)Growth Buyouts - The  Dawn of the GBO (Slow Ventures)
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
Razin Mustafiz
 
9 Lessons From Jeff Bezos’ ONLY Podcast Appearance
9 Lessons From Jeff Bezos’ ONLY Podcast Appearance9 Lessons From Jeff Bezos’ ONLY Podcast Appearance
9 Lessons From Jeff Bezos’ ONLY Podcast Appearance
Levership
 

Recently uploaded (20)

New Girls Call Mumbai 9910780858 Provide Best And Top Girl Service And No1 in...
New Girls Call Mumbai 9910780858 Provide Best And Top Girl Service And No1 in...New Girls Call Mumbai 9910780858 Provide Best And Top Girl Service And No1 in...
New Girls Call Mumbai 9910780858 Provide Best And Top Girl Service And No1 in...
 
WAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdfWAM Corporate Presentation July 2024.pdf
WAM Corporate Presentation July 2024.pdf
 
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
 
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
Innovation Hub_ Spotlight on Toms River's Role as a Beacon for Entrepreneuria...
 
Green Minimalist Aesthetic Project Proposal Presentation.pdf
Green Minimalist Aesthetic Project Proposal Presentation.pdfGreen Minimalist Aesthetic Project Proposal Presentation.pdf
Green Minimalist Aesthetic Project Proposal Presentation.pdf
 
foodgasm restaurant and Bar pune road.docx
foodgasm restaurant and Bar pune road.docxfoodgasm restaurant and Bar pune road.docx
foodgasm restaurant and Bar pune road.docx
 
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
21stcenturyskillsframeworkfinalpresentation2-240509214747-71edb7ee.pdf
 
Module 4 Business Strategy competitive advantages
Module 4 Business Strategy competitive advantagesModule 4 Business Strategy competitive advantages
Module 4 Business Strategy competitive advantages
 
TALENT ACQUISITION AND MANAGEMENT LECTURE 5
TALENT ACQUISITION AND MANAGEMENT LECTURE 5TALENT ACQUISITION AND MANAGEMENT LECTURE 5
TALENT ACQUISITION AND MANAGEMENT LECTURE 5
 
Singapore Pharmaceutical Market PPT: Growth, Outlook, Demand, Keyplayer Analy...
Singapore Pharmaceutical Market PPT: Growth, Outlook, Demand, Keyplayer Analy...Singapore Pharmaceutical Market PPT: Growth, Outlook, Demand, Keyplayer Analy...
Singapore Pharmaceutical Market PPT: Growth, Outlook, Demand, Keyplayer Analy...
 
Managing Customer & User Experience of Customers
Managing Customer & User Experience of CustomersManaging Customer & User Experience of Customers
Managing Customer & User Experience of Customers
 
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual TrainingpptxYou Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
 
Luxury Lifestyle Summit 2024 - Sponsorship
Luxury Lifestyle Summit 2024 - SponsorshipLuxury Lifestyle Summit 2024 - Sponsorship
Luxury Lifestyle Summit 2024 - Sponsorship
 
Top Digital Marketing Strategy in 2024.pdf
Top Digital Marketing Strategy in 2024.pdfTop Digital Marketing Strategy in 2024.pdf
Top Digital Marketing Strategy in 2024.pdf
 
Gym business MODEL .pdf .
Gym business MODEL .pdf                 .Gym business MODEL .pdf                 .
Gym business MODEL .pdf .
 
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptxSTRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
 
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
 
STEPIC Innovations 2026 futurism publications
STEPIC Innovations 2026 futurism publicationsSTEPIC Innovations 2026 futurism publications
STEPIC Innovations 2026 futurism publications
 
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
Growth Buyouts - The  Dawn of the GBO (Slow Ventures)Growth Buyouts - The  Dawn of the GBO (Slow Ventures)
Growth Buyouts - The Dawn of the GBO (Slow Ventures)
 
9 Lessons From Jeff Bezos’ ONLY Podcast Appearance
9 Lessons From Jeff Bezos’ ONLY Podcast Appearance9 Lessons From Jeff Bezos’ ONLY Podcast Appearance
9 Lessons From Jeff Bezos’ ONLY Podcast Appearance
 

Creating Wbs

  • 1. Creating a WBS A Project Management Approach May 29, 2010 Ajcon IT.com Ltd.
  • 2. Why do projects fail? Lack of clarity on what’s really needed Problems avoided, covered up, or minimized Inadequate planning (the devil is in the details) Ineffective process to deal with changes or problems Lack of willingness or discipline to monitor progress Unresolved conflicts Lack of committed, dedicated resources Lack of understanding of project management
  • 3. What is a project? Has a goal, defined output or concrete deliverable, and scope Has a defined beginning and ending Resources are dedicated to it, or it has a budget Has a logical sequence of activities that produce the deliverables Is usually unique, never before done, one of kind One person is responsible, the Project Team Leader
  • 4. Block Diagram Example Begin End Logical sequence of events Time-Lines are included
  • 5. Project Phases Phase 1 Definition Phase 2 Planning Phase 3 Execution Phase 4 Closeout Steps 1 - 3 Steps 4 - 10 Steps 11 - 12 Step 13 Planned Systemic Change (From next page) Phases 1a, 2a, 3a, 4a }
  • 6. Planned Systemic Change Phase 1a : Clarifying Expectations and Roles for Change Process Phase 2a : Joint Discovery to Identify Priorities for Change Preparation -- Establishing a Project Team One of the most powerful means to cultivate collaboration is by working with a project team. No change agent sees all aspects of the situation in the organization -- team members help to see more of those various aspects Phase 3a : Joint Planning of Organizational Development Activities to Address Priorities Phase 4a : Implementation - Change Management and Joint Evaluation
  • 7. Phase 1 - Definition Find out what is wanted/needed Analyze factors, hazards, risks, and elements of practical solution and approach 3. Define specifically what is to be accomplished, make it into a project Key Stakeholders Interviewed Complex or competing needs identified Alternatives Analyzed Hazards, risks, and factors identified Technical routes and issues identified Elements of Solution/approach identified Project definition: Goal, Objectives, Scope, Constraints
  • 8. Phase 2 - Planning Identify what it will take to do the project Decide the best approach Determine who will do each task Figure out how long it will take Calculate the project completion date and milestone schedule Calculate resource requirements and project costs Creatively optimize trade-offs to deliver the best results in the shortest time Work Breakdown Structure of Tasks Logic Task Network Detailed responsibility chart Work and duration time estimates Pert-CPM Chart Gantt Chart Workload charts Budget spreadsheets Earned value charts Risks and trade-offs managed Decision paper(s) developed Final project plan
  • 9. Phase 3 - Execution Develop a baseline project plan to track progress and control costs Establish procedures to track progress against the plan Data entered into project management software. Work loads leveled & smoothed Baseline reports and charts produced Final plan signed off by sponsor, champion, project team leader, team, and key stakeholders Agreed procedures: Status reporting Change control
  • 10. Phase 4 - Closeout Closeout the project Project completed and results delivered Project killed if unable to deliver what is needed Lessons learned captured Documentation completed and filed Final payments made and account closed Project Close Out Report completed
  • 11. A Work Breakdown Structure decomposes a project into Activities and tasks . Mission Project Goal Statement Objective Major Step Activity Task Task Task Task Task Task Task Task Task Task Objective Major Step Objective Major Step Activity Activity Activity Activity Work Breakdown Structure Level 1 Level 2 Level 3
  • 14. SO HOW DO YOU WANT TO PROCEED NOW? Take Home Message Plan Projects Carefully through Work Breakdown Structure