Report on what I did during the week
01/12/08/-05/12-08
Compiled by: Tshepo Makgakge
Position: Industrial Engineering Trainee
Submission Date: 08 December 2008
1. Terms of reference
On the 24th
November 2008, Ms Charity Van Wyk the process engineer of Plastop requested a
report on what I (Tshepo Makgakge) did during the week and what I saw. The report with
recommendations is due on the 08 December 2008.
2. Procedure
2.1 Work measurement- is the application of techniques designed to establish the time for a
qualified worker to carry out a task at a defined rate of working
2.1.1 The basic approach to method study consist of the following six steps
SELECT- the work to be studied and define its boundaries.
RECORD- The relevant facts about the job by direct observation and collect such additional
data as may be needed from appropriate sources.
EXAMINE- the recorded data and the detailed breakdown critically to ensure that the most
effective method and motions are being used and those unproductive and foreign
elements are separated from productive elements.
MEASURE- the quantity of work involved in each element, in terms of time, using a stopwatch
and time study sheet
COMPILE- the standard time for the operation.
DEFINE- precisely the series of activities and method of operation for which the time has
been compiled and issue the time as standard for the activities and methods
specified
NB (Because the times measured in this case form basis for the real time studies, I selected,
recorded, examined and measured the job only)
3. Findings
Select- the job to be measured is requesting a mould from Kiewiet (storekeeper) and moving it
from the mould store to the machine.
Record- the elements of this differed every time, there are many stoppages in this process mainly
because of tea breaks and smoking breaks in between the elements. Sometimes the process is
started by one person and then finished by another.
Examine- the elements were broken down as follows;
- Request for mold
- Kiewit Move to the rack to search for mould
- Kiewit Search for the mold
- Setter Leave the mold store
Measure- the results for the timing can be found in the appendix page at end of the report. It can
be noticed that in 2nd
observation, the time is much longer than that of the 1st
observation. This is
so because when the mould was requested, the person who requested the mould did not have a
reference number therefore he was sent to QC (Quality Control) to ask for a sample so that they
can give him the mould. When he came back, he had the wrong sample.
4. Conclusion
There is no specified procedure for mould requesting. Not all the moulds are placed in their
positions. The unspecified tea times and smoking breaks are affecting the rate of productivity, as
there are many stoppages in between work cycles. It is very important that the mould store is
organized so that a lot of time and money is saved.
5. Recommendations
I recommend that everyone in the factory should work together in practicing good housekeeping,
we should all take responsibility for maintaining an organized factory and always remind our
colleagues when they forget to put things in their place. A sequence has to be put in place for all
the processes and more time studies must be conducted in order to establish the standard time.
There is a high probability that many moulds will be requested on Monday and Tuesday.

More Related Content

What's hot

Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
Shifas ibrahim MBA student @ ILAHIA SCHOOL OF MANAGEMENT STUDIES
 
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
ijtsrd
 
Method study
Method studyMethod study
Method study
Md Jawed Akbar
 
Sanket work study-1
Sanket work study-1Sanket work study-1
Sanket work study-1
Sanket Rahane
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
Md. Mazadul Hasan Shishir
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
Md. Mazadul Hasan Shishir
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
Joshua Paul Salazar
 
Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study
Ananth Palaniappan
 
Methods Enigeering
Methods EnigeeringMethods Enigeering
Methods Enigeering
Rafael Labunog
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel production
Niloy Rahman
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
Vishal Shinde
 
Kaizen Lean Assessment Audit
Kaizen Lean Assessment AuditKaizen Lean Assessment Audit
Kaizen Lean Assessment Audit
kaizeninstituteindia
 
1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics
Dr. Surya Prakash
 
ROB CV_2015
ROB CV_2015ROB CV_2015
ROB CV_2015
Robert Dodson
 
Bishoy Sefen Derias CV - Copy
Bishoy Sefen Derias CV - CopyBishoy Sefen Derias CV - Copy
Bishoy Sefen Derias CV - Copy
bishoy sefen
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
vish0110
 
Work Study(Operatiiion management)
Work Study(Operatiiion management)Work Study(Operatiiion management)
Work Study(Operatiiion management)
BABARIA INSTITUTE OF TECHNOLOGY,VARNAMA,VADODARA 005
 
Work study - production and operations management
Work study - production and operations managementWork study - production and operations management
Work study - production and operations management
Apurb Sinha - ITIL® Expert,Prince2® Practitioner,SSBB
 
7 mudas
7 mudas7 mudas
Productivity
ProductivityProductivity
Productivity
Ratnadeepsinh Jadeja
 

What's hot (20)

Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
 
Method study
Method studyMethod study
Method study
 
Sanket work study-1
Sanket work study-1Sanket work study-1
Sanket work study-1
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
 
Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study
 
Methods Enigeering
Methods EnigeeringMethods Enigeering
Methods Enigeering
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel production
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
 
Kaizen Lean Assessment Audit
Kaizen Lean Assessment AuditKaizen Lean Assessment Audit
Kaizen Lean Assessment Audit
 
1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics
 
ROB CV_2015
ROB CV_2015ROB CV_2015
ROB CV_2015
 
Bishoy Sefen Derias CV - Copy
Bishoy Sefen Derias CV - CopyBishoy Sefen Derias CV - Copy
Bishoy Sefen Derias CV - Copy
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
 
Work Study(Operatiiion management)
Work Study(Operatiiion management)Work Study(Operatiiion management)
Work Study(Operatiiion management)
 
Work study - production and operations management
Work study - production and operations managementWork study - production and operations management
Work study - production and operations management
 
7 mudas
7 mudas7 mudas
7 mudas
 
Productivity
ProductivityProductivity
Productivity
 

Similar to Plastop report

A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
IJECSJournal
 
Management tools
Management toolsManagement tools
Management tools
Paritosh Kasaudhan
 
Work study manual
Work study manualWork study manual
Work study manual
shamim hossain
 
Presentation1 work study.pptx
Presentation1 work study.pptxPresentation1 work study.pptx
Presentation1 work study.pptx
mesfin88
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
karthi keyan
 
Civil Construction management : time and motion study
Civil Construction management : time and motion study Civil Construction management : time and motion study
Civil Construction management : time and motion study
Yash Shah
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
Joseph Konnully
 
Work Study Part- I
Work Study Part- IWork Study Part- I
Work Study Part- I
Joseph Konnully
 
Work Study
Work Study Work Study
Work Study
PraveenManickam2
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systems
aizellbernal
 
Work design & measurement
Work design & measurementWork design & measurement
Work design & measurement
Andrew Lengkong
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
LakshayKumar504432
 
Time and motion study
Time and motion study Time and motion study
Time and motion study
Fathima Naseela
 
PPC -UNIT-II.ppt
PPC -UNIT-II.pptPPC -UNIT-II.ppt
PPC -UNIT-II.ppt
VELMURUGANM19
 
PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2
prakash0712
 
Unit 2
Unit 2Unit 2
Unit 2
MeganathanJ4
 
Unit 2 PPC
Unit 2 PPCUnit 2 PPC
Unit 2 PPC
sivaprakash250
 
Unit 2-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 2-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 2-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 2-IE6605 & PRODUCTION PLANNING AND CONTROL
Mohanumar S
 
Unit 2
Unit 2Unit 2
Unit 2
Aravind Ra
 
Unit 2
Unit 2Unit 2
Unit 2
dinesh babu
 

Similar to Plastop report (20)

A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
 
Management tools
Management toolsManagement tools
Management tools
 
Work study manual
Work study manualWork study manual
Work study manual
 
Presentation1 work study.pptx
Presentation1 work study.pptxPresentation1 work study.pptx
Presentation1 work study.pptx
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
 
Civil Construction management : time and motion study
Civil Construction management : time and motion study Civil Construction management : time and motion study
Civil Construction management : time and motion study
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Work Study Part- I
Work Study Part- IWork Study Part- I
Work Study Part- I
 
Work Study
Work Study Work Study
Work Study
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systems
 
Work design & measurement
Work design & measurementWork design & measurement
Work design & measurement
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Time and motion study
Time and motion study Time and motion study
Time and motion study
 
PPC -UNIT-II.ppt
PPC -UNIT-II.pptPPC -UNIT-II.ppt
PPC -UNIT-II.ppt
 
PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2
 
Unit 2
Unit 2Unit 2
Unit 2
 
Unit 2 PPC
Unit 2 PPCUnit 2 PPC
Unit 2 PPC
 
Unit 2-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 2-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 2-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 2-IE6605 & PRODUCTION PLANNING AND CONTROL
 
Unit 2
Unit 2Unit 2
Unit 2
 
Unit 2
Unit 2Unit 2
Unit 2
 

Plastop report

  • 1. Report on what I did during the week 01/12/08/-05/12-08 Compiled by: Tshepo Makgakge Position: Industrial Engineering Trainee Submission Date: 08 December 2008
  • 2. 1. Terms of reference On the 24th November 2008, Ms Charity Van Wyk the process engineer of Plastop requested a report on what I (Tshepo Makgakge) did during the week and what I saw. The report with recommendations is due on the 08 December 2008. 2. Procedure 2.1 Work measurement- is the application of techniques designed to establish the time for a qualified worker to carry out a task at a defined rate of working 2.1.1 The basic approach to method study consist of the following six steps SELECT- the work to be studied and define its boundaries. RECORD- The relevant facts about the job by direct observation and collect such additional data as may be needed from appropriate sources. EXAMINE- the recorded data and the detailed breakdown critically to ensure that the most effective method and motions are being used and those unproductive and foreign elements are separated from productive elements. MEASURE- the quantity of work involved in each element, in terms of time, using a stopwatch and time study sheet COMPILE- the standard time for the operation. DEFINE- precisely the series of activities and method of operation for which the time has been compiled and issue the time as standard for the activities and methods specified NB (Because the times measured in this case form basis for the real time studies, I selected, recorded, examined and measured the job only) 3. Findings
  • 3. Select- the job to be measured is requesting a mould from Kiewiet (storekeeper) and moving it from the mould store to the machine. Record- the elements of this differed every time, there are many stoppages in this process mainly because of tea breaks and smoking breaks in between the elements. Sometimes the process is started by one person and then finished by another. Examine- the elements were broken down as follows; - Request for mold - Kiewit Move to the rack to search for mould - Kiewit Search for the mold - Setter Leave the mold store Measure- the results for the timing can be found in the appendix page at end of the report. It can be noticed that in 2nd observation, the time is much longer than that of the 1st observation. This is so because when the mould was requested, the person who requested the mould did not have a reference number therefore he was sent to QC (Quality Control) to ask for a sample so that they can give him the mould. When he came back, he had the wrong sample. 4. Conclusion There is no specified procedure for mould requesting. Not all the moulds are placed in their positions. The unspecified tea times and smoking breaks are affecting the rate of productivity, as there are many stoppages in between work cycles. It is very important that the mould store is organized so that a lot of time and money is saved. 5. Recommendations I recommend that everyone in the factory should work together in practicing good housekeeping, we should all take responsibility for maintaining an organized factory and always remind our colleagues when they forget to put things in their place. A sequence has to be put in place for all the processes and more time studies must be conducted in order to establish the standard time. There is a high probability that many moulds will be requested on Monday and Tuesday.