Introduction:
•
The term Prestartup Safety Review (PSSR) first received prominence in the
process industries with the introduction of the Process Safety Management
(PSM) regulations.
• In the United States two federal agencies, the Occupational Safety & Health
Administration (OSHA) and the Environmental Protection Agency (EPA)
require that companies conduct prestart up safety reviews.
• The wording of the two standards regarding PSSRs is virtually identical,
although the industries covered and the reporting requirements differ slightly.
• The basic fundamental purpose of a prestart up safety review is to ensure that
any changes that are made to a facility or item of equipment meet the original
design or operating intent.
• The PSSR aims to catch any changes that may have crept into to the system
during the detailed engineering and construction phases of a project. PSSR
covers not only equipment, but also soft issues, such as operating procedures
and training.
TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
• PSSRs play an important role in large projects because such projects all too
often fall behind schedule and/or run over budget, thus creating pressure
on the whole project team to eliminate or postpone the installation of any
items that are not absolutely necessary for the start-up. If not controlled
properly, this can lead to corner-cutting ⎯ either intentional or inadvertent
⎯ which may lead to jeopardize safety.
• By carrying out a PSSR, the operations and maintenance
departments have the authority to refuse to accept responsibility for a
plant or item of equipment that they judge to be unsafe. In effect, a
prestart up safety review provides a breathing space for everyone to make
sure that the plant that they are about to start is safe and operable.
• It is not the purpose of PSSR to replace this normal punching out of a new
or modified facility. Indeed, one of the purposes of a PSSR is to make sure
that routine checking processes were in place and that they were
followed. Nor is a PSSR a last-minute hazards analysis.
TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
What is Pre Startup Safety Review (PSSR)?
• The PSSR is a safety review conducted prior to startup or commissioning of
new modified processing/manufacturing plant or facility so as to ensure that
the new installations meet the original design to catch any potential hazard
due to changes during the engineering and construction phase of the
project.
• In other words it ensures the ready for startup status of a process unit.
• It not only covers the equipment but also the procedures and trainings. It is
basically a part of pre commissioning documentation.
What is the purpose of Pre Startup Safety Review?
• To ensure safety, operating, maintenance and emergency procedures are in
place and adequate in the process.
• To ensure appropriate safety reviews during engineering phase (HAZOP study,
model review etc.) have been carried out and all action items have been
completed efficiently.
• To ensure any site modifications during construction phase have been
properly controlled and noted down.
• To ensure that training of each of the employees involved in the operating
process is completed on time.
• In addition, the pre startup safety review plays an important role in large
projects as it may give plant operators the authority to refuse or accept
responsibility for a plant or equipment that they judge to be unsafe through
the PSSR. This is very crucial point and effects the whole organization in great
way.
TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
Main activities in PSSR of a project are defined below:
• Following activities are carried out in a PSSR with coordination
between Contractor and Owner of the plant:
• Coordinate PSSR participation from knowledgeable and experienced
Contractor and Owner personnel.
• Conduct Technical and HSE reviews of documentation and on site.
• Verify that all construction and equipment is in accordance with
safety, environmental and health regulation and standards.
• Complete all corrective action items raised in the PSSR.
• Complete Post- Start-up corrective action items.
• Representative of the Project Owner sign the PSSR checklists
TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
Scope of PSSR:
• This document summarizes how General Manager, Operation complies
with the pre-startup safety review requirements that are needed. Pre-
startup safety reviews are required for all new facilities and for all
facility modifications that result in a change to the process safety
information.
•
•
• There is a sheet below which determines or confirms if the PSSR is
needed or not in a specific case.
TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
The diagram below tells us about the documentation is
needed for PSSR or not:
Procedures for Conducting a Pre-Startup Safety
Review:
The steps involved in conducting a pre-startup safety review are:
Initiate the Pre-Startup Safety Review
Conduct the Pre-Startup Safety Review
Authorize the Addition of a Chemical
Complete Follow-Up Activities
1. Initiate the Pre-Startup Safety Review:
For starting a Pre Startup Safety survey, there are mainly two main events which cause it:
Construction of a new facility. A new facility would consist of a facility constructed on a
worksite where there are no other facilities or a facility subsequently constructed such that it
is physically separates from and otherwise independent from existing facilities.
Modify an existing facility where the modifications are significant enough to require a
change in the process safety information. The modifications would be connected to or
otherwise dependent on an existing facility Documentation should be established to verify
completion of this activity.
• Ensure that all safety, operating, maintenance and emergency action and
response procedures are written, implemented, and are adequate.
Recognized standards or codes, manufacturers’ instructions, and other
applicable regulations may be considered in drafting procedures.
• Ensure that construction and equipment is in accordance with the design
specifications. The construction codes and standards used should be
documented in the process safety information. Ensure that training for
each employee involved in handling hazardous chemicals has been
completed. The modifications or additions reflected in the pre-startup
safety review may create a need for additional training in other areas such
as maintenance, emergency action and response, or hazard
communication.
• Ensure that the changes or revisions to the PSM documentation (e.g. process
safety information, process hazard analysis, and material handling policies) are
made available to facility employees.
• Ensure that any startup of new equipment is conducted in accordance with
applicable industry standards, manufacturers’ recommendations, or plant
procedures.
2. Conduct the Pre-Startup Safety Review:
New Facilities - For a new facility the following actions should be
taken:
Compile the process safety information including information
concerning the hazards of hazardous chemicals. The process
safety information should be compiled before the process hazard
analysis is performed.
Perform a process hazard analysis that complies with the
requirements of this PSM Program. Refer to the Process Hazard
Analysis section for more details
Resolve or implement all recommendations from the process hazard
analysis prior to startup.
Modified Facilities - For modifications to an existing facility the following actions s be taken:
• Ensure that all process safety information is updated.
• Ensure that the requirements for a Management of Change have been completed. A safety
and health review must be performed for a modified facility; the review may involve the
completion of a formal Process Hazard Analysis (PHA) study PSM of a safety review checklist,
depending on the significance of the modification. Refer to the Management of Change
section of the PSM.
• Ensure that the relevant safety, operating, maintenance and emergency evacuation
procedures are in place, have been changed to reflect the modifications or additions if
necessary, and are adequate. All procedures should follow, where applicable, recognized
standards and/or codes, manufacturers’ instructions, and other applicable regulations.
• Ensure that construction and equipment is in accordance with the design specifications. The
construction codes and standards used should be documented in the process safety
information.
• Ensure that training for each employee involved in handling the hazardous chemicals has
been completed including a review of any changes to relevant procedures. The modifications
reflected in the pre-startup safety review may create a need for additional training in other
areas such as maintenance, emergency response, or hazard communication.
• Ensure that the changes or revisions to the PSM documentation (e.g. process safety
information, process hazard analysis, and material handling policies) are made available to
facility employees.
• Ensure that any startup of new equipment is conducted in accordance with applicable
industry standards, manufacturers’ recommendations, or facility procedures.
Documenting the Pre-Startup Safety Review:
The Pre-Startup Safety Review Verification Form
should be handed to the individuals responsible for
each of the listed requirements. Signatures and dates
should be gathered on the form after satisfactory
completion of the listed requirement such as updating
all written process safety information, conducting a
process hazard analysis, and completing the
requirements of the management of change
procedures.
The pre-start up safety review involves employees
with expertise in chemical inventory and storage
requirement. The employees are selected based upon
their experience and understanding of the process
systems being evaluated.
The following personnel are typically involved in verifying the requirements on the Pre-Startup
Safety Review Verification Form:
• Director of management
• General Manager, Operations
• Director Customer Service & Compliance
• Warehouse Coordinator acceptance of the pre-startup safety review requirements.
The last step of the process is to authorize startup of the process by signing and dating the
approval lines on the Pre-Startup Safety Review Verification Form. Once these approval
signatures and dates have been gathered on the form, modifications to the new equipment or
facility can be made successfully.
3. Authorization of the Startup of the Process:
The Pre-Startup Safety Review Verification Form provides a sign-off
4) Complete Follow-Up Activities:
Occasionally, some action items may not be completed before the startup of the
modified system. The follow-up section of the Pre-Startup Safety Review Verification
Form should be used to document the resolution of any open items that were not
completed before the system startup.
Each open item should be documented in this table along with a due date, the
completion date and an explanation describing why the item was not completed
prior to startup.
The individuals who are authorized to approve the startup (i.e. those who sign the
Verification Form) should ensure that the modified system is safe to startup even
though these items have not been completed, i.e. the follow up items should have
no impact on system safety.
Below is the image of what a Pre Startup Safety Review
(PSSR) verification form looks like
We the TSM TheSafetyMaster Pvt Ltd, is a young organization with a
dedicated team of young, innovative, research driven & experienced
professionals, who want to create value for their customers by providing
ingenious services in the field of Safety. You can send your enquiry to
info@thesafeymaster.com. In this era of industrial growth, safety is not
just a practice to be followed; it reflects an essence of the values, an
organization believes in. But unfortunately, even after such a prominent
emphasis by our legislative bodies, there is still a definite gap in the
requirements to be met for occupational safety. We are here to bridge
this gap and fully eradicate or minimize these accidents and their root
causes .We innovate better ways of working with clients to solve their
safety issues.
How can we help?
Prestartup Safety Review (PSSR)

More Related Content

What's hot

Process Hazard Analysis
Process Hazard AnalysisProcess Hazard Analysis
Process Hazard Analysis
NGE
 
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh RajputHazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Elements of Process Safety Management
Elements of Process Safety ManagementElements of Process Safety Management
Elements of Process Safety Management
Shirazeh arghami
 
Hazop ppt
Hazop pptHazop ppt
Hazop ppt
Sangeeta Phadke
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_ManagementEssam Osmaan
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management System
ACM Facility Safety
 
OSHA PSM Regulations
OSHA PSM RegulationsOSHA PSM Regulations
OSHA PSM Regulations
sanjeev saraf
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Cairn India Limited
 
Promoting a positive health and safety culture
Promoting a positive health and safety culturePromoting a positive health and safety culture
Promoting a positive health and safety culture
James McCann
 
General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)
Obalim Esedebe - PMP, MSC
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmitsistrain
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
Gagan Tanwar
 
Pre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdfPre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdf
AssyaMohammed
 
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh RajputLOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive Training
John Kingsley
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
Karnav Rana
 
Hazop method
Hazop methodHazop method
Introduction to oil & gas health safety environment
Introduction to oil & gas health safety environmentIntroduction to oil & gas health safety environment
Introduction to oil & gas health safety environment
Ir. Puput Risanto, IPM, PMP, PMI-RMP, ASEAN Eng
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
Fitri Ifony
 

What's hot (20)

Process Hazard Analysis
Process Hazard AnalysisProcess Hazard Analysis
Process Hazard Analysis
 
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh RajputHazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
 
Elements of Process Safety Management
Elements of Process Safety ManagementElements of Process Safety Management
Elements of Process Safety Management
 
Hazop ppt
Hazop pptHazop ppt
Hazop ppt
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_Management
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management System
 
OSHA PSM Regulations
OSHA PSM RegulationsOSHA PSM Regulations
OSHA PSM Regulations
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
 
Promoting a positive health and safety culture
Promoting a positive health and safety culturePromoting a positive health and safety culture
Promoting a positive health and safety culture
 
General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
Pre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdfPre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdf
 
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh RajputLOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
 
management of change
management of changemanagement of change
management of change
 
Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive Training
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Hazop method
Hazop methodHazop method
Hazop method
 
Introduction to oil & gas health safety environment
Introduction to oil & gas health safety environmentIntroduction to oil & gas health safety environment
Introduction to oil & gas health safety environment
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 

Similar to Prestartup Safety Review (PSSR)

Moc for lcl
Moc for lclMoc for lcl
Moc for lcl
vishnu gupta
 
Moc for lcl
Moc for lclMoc for lcl
Moc for lcl
vishnu gupta
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptx
MoonJ3
 
07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx
AkshayG52
 
SM Unit2.pptx
SM Unit2.pptxSM Unit2.pptx
SM Unit2.pptx
ABHINANDHKA1
 
Building a QMS for Your SaMD Part II
Building a QMS for Your SaMD Part IIBuilding a QMS for Your SaMD Part II
Building a QMS for Your SaMD Part II
EMMAIntl
 
Production checklist for biotech startups
Production checklist for biotech startupsProduction checklist for biotech startups
Production checklist for biotech startups
Công ty Cổ phần Tư vấn Thiết kế GMP EU
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
MANUEL PACINI
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow control
hqdan
 
Manufacturing equipment new vs. remanufacturing
Manufacturing equipment  new vs. remanufacturingManufacturing equipment  new vs. remanufacturing
Manufacturing equipment new vs. remanufacturing
Antonio Reis
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation
Pramod Pal
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
Pharmaceutical
 
Quality Plan Overhauling Of Refinery
Quality Plan Overhauling Of RefineryQuality Plan Overhauling Of Refinery
Quality Plan Overhauling Of Refinery
Ashar Ahmed
 
Validation master plan
Validation master planValidation master plan
Validation master plan
Priyanka Kandhare
 
HAZOP Module.pptx
HAZOP Module.pptxHAZOP Module.pptx
HAZOP Module.pptx
akaash13
 
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...Verhaert Masters in Innovation
 
Operations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioningOperations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioning
Giancarlo Scotti
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdf
haris348605
 
CaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LICaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LISean Cull
 

Similar to Prestartup Safety Review (PSSR) (20)

Moc for lcl
Moc for lclMoc for lcl
Moc for lcl
 
Moc for lcl
Moc for lclMoc for lcl
Moc for lcl
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptx
 
07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx
 
SM Unit2.pptx
SM Unit2.pptxSM Unit2.pptx
SM Unit2.pptx
 
Building a QMS for Your SaMD Part II
Building a QMS for Your SaMD Part IIBuilding a QMS for Your SaMD Part II
Building a QMS for Your SaMD Part II
 
Production checklist for biotech startups
Production checklist for biotech startupsProduction checklist for biotech startups
Production checklist for biotech startups
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow control
 
Manufacturing equipment new vs. remanufacturing
Manufacturing equipment  new vs. remanufacturingManufacturing equipment  new vs. remanufacturing
Manufacturing equipment new vs. remanufacturing
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Quality Plan Overhauling Of Refinery
Quality Plan Overhauling Of RefineryQuality Plan Overhauling Of Refinery
Quality Plan Overhauling Of Refinery
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
HAZOP Module.pptx
HAZOP Module.pptxHAZOP Module.pptx
HAZOP Module.pptx
 
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...
 
Operations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioningOperations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioning
 
Validation
ValidationValidation
Validation
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdf
 
CaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LICaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LI
 

Recently uploaded

How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 

Recently uploaded (20)

How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 

Prestartup Safety Review (PSSR)

  • 1. Pre-Startup Safety Review (PSSR) for 2 days
  • 2. Introduction: • The term Prestartup Safety Review (PSSR) first received prominence in the process industries with the introduction of the Process Safety Management (PSM) regulations. • In the United States two federal agencies, the Occupational Safety & Health Administration (OSHA) and the Environmental Protection Agency (EPA) require that companies conduct prestart up safety reviews. • The wording of the two standards regarding PSSRs is virtually identical, although the industries covered and the reporting requirements differ slightly. • The basic fundamental purpose of a prestart up safety review is to ensure that any changes that are made to a facility or item of equipment meet the original design or operating intent. • The PSSR aims to catch any changes that may have crept into to the system during the detailed engineering and construction phases of a project. PSSR covers not only equipment, but also soft issues, such as operating procedures and training. TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
  • 3. • PSSRs play an important role in large projects because such projects all too often fall behind schedule and/or run over budget, thus creating pressure on the whole project team to eliminate or postpone the installation of any items that are not absolutely necessary for the start-up. If not controlled properly, this can lead to corner-cutting ⎯ either intentional or inadvertent ⎯ which may lead to jeopardize safety. • By carrying out a PSSR, the operations and maintenance departments have the authority to refuse to accept responsibility for a plant or item of equipment that they judge to be unsafe. In effect, a prestart up safety review provides a breathing space for everyone to make sure that the plant that they are about to start is safe and operable. • It is not the purpose of PSSR to replace this normal punching out of a new or modified facility. Indeed, one of the purposes of a PSSR is to make sure that routine checking processes were in place and that they were followed. Nor is a PSSR a last-minute hazards analysis. TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
  • 4.
  • 5. What is Pre Startup Safety Review (PSSR)? • The PSSR is a safety review conducted prior to startup or commissioning of new modified processing/manufacturing plant or facility so as to ensure that the new installations meet the original design to catch any potential hazard due to changes during the engineering and construction phase of the project. • In other words it ensures the ready for startup status of a process unit. • It not only covers the equipment but also the procedures and trainings. It is basically a part of pre commissioning documentation.
  • 6. What is the purpose of Pre Startup Safety Review? • To ensure safety, operating, maintenance and emergency procedures are in place and adequate in the process. • To ensure appropriate safety reviews during engineering phase (HAZOP study, model review etc.) have been carried out and all action items have been completed efficiently. • To ensure any site modifications during construction phase have been properly controlled and noted down. • To ensure that training of each of the employees involved in the operating process is completed on time. • In addition, the pre startup safety review plays an important role in large projects as it may give plant operators the authority to refuse or accept responsibility for a plant or equipment that they judge to be unsafe through the PSSR. This is very crucial point and effects the whole organization in great way. TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
  • 7. Main activities in PSSR of a project are defined below: • Following activities are carried out in a PSSR with coordination between Contractor and Owner of the plant: • Coordinate PSSR participation from knowledgeable and experienced Contractor and Owner personnel. • Conduct Technical and HSE reviews of documentation and on site. • Verify that all construction and equipment is in accordance with safety, environmental and health regulation and standards. • Complete all corrective action items raised in the PSSR. • Complete Post- Start-up corrective action items. • Representative of the Project Owner sign the PSSR checklists TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
  • 8. Scope of PSSR: • This document summarizes how General Manager, Operation complies with the pre-startup safety review requirements that are needed. Pre- startup safety reviews are required for all new facilities and for all facility modifications that result in a change to the process safety information. • • • There is a sheet below which determines or confirms if the PSSR is needed or not in a specific case. TheSafetyMaster™ accepts no liability for any loss that may occur the content of this article, it’s for awareness purpose.
  • 9.
  • 10. The diagram below tells us about the documentation is needed for PSSR or not:
  • 11. Procedures for Conducting a Pre-Startup Safety Review: The steps involved in conducting a pre-startup safety review are: Initiate the Pre-Startup Safety Review Conduct the Pre-Startup Safety Review Authorize the Addition of a Chemical Complete Follow-Up Activities 1. Initiate the Pre-Startup Safety Review: For starting a Pre Startup Safety survey, there are mainly two main events which cause it: Construction of a new facility. A new facility would consist of a facility constructed on a worksite where there are no other facilities or a facility subsequently constructed such that it is physically separates from and otherwise independent from existing facilities. Modify an existing facility where the modifications are significant enough to require a change in the process safety information. The modifications would be connected to or otherwise dependent on an existing facility Documentation should be established to verify completion of this activity.
  • 12. • Ensure that all safety, operating, maintenance and emergency action and response procedures are written, implemented, and are adequate. Recognized standards or codes, manufacturers’ instructions, and other applicable regulations may be considered in drafting procedures. • Ensure that construction and equipment is in accordance with the design specifications. The construction codes and standards used should be documented in the process safety information. Ensure that training for each employee involved in handling hazardous chemicals has been completed. The modifications or additions reflected in the pre-startup safety review may create a need for additional training in other areas such as maintenance, emergency action and response, or hazard communication. • Ensure that the changes or revisions to the PSM documentation (e.g. process safety information, process hazard analysis, and material handling policies) are made available to facility employees. • Ensure that any startup of new equipment is conducted in accordance with applicable industry standards, manufacturers’ recommendations, or plant procedures.
  • 13. 2. Conduct the Pre-Startup Safety Review: New Facilities - For a new facility the following actions should be taken: Compile the process safety information including information concerning the hazards of hazardous chemicals. The process safety information should be compiled before the process hazard analysis is performed. Perform a process hazard analysis that complies with the requirements of this PSM Program. Refer to the Process Hazard Analysis section for more details Resolve or implement all recommendations from the process hazard analysis prior to startup.
  • 14. Modified Facilities - For modifications to an existing facility the following actions s be taken: • Ensure that all process safety information is updated. • Ensure that the requirements for a Management of Change have been completed. A safety and health review must be performed for a modified facility; the review may involve the completion of a formal Process Hazard Analysis (PHA) study PSM of a safety review checklist, depending on the significance of the modification. Refer to the Management of Change section of the PSM. • Ensure that the relevant safety, operating, maintenance and emergency evacuation procedures are in place, have been changed to reflect the modifications or additions if necessary, and are adequate. All procedures should follow, where applicable, recognized standards and/or codes, manufacturers’ instructions, and other applicable regulations. • Ensure that construction and equipment is in accordance with the design specifications. The construction codes and standards used should be documented in the process safety information. • Ensure that training for each employee involved in handling the hazardous chemicals has been completed including a review of any changes to relevant procedures. The modifications reflected in the pre-startup safety review may create a need for additional training in other areas such as maintenance, emergency response, or hazard communication.
  • 15. • Ensure that the changes or revisions to the PSM documentation (e.g. process safety information, process hazard analysis, and material handling policies) are made available to facility employees. • Ensure that any startup of new equipment is conducted in accordance with applicable industry standards, manufacturers’ recommendations, or facility procedures.
  • 16. Documenting the Pre-Startup Safety Review: The Pre-Startup Safety Review Verification Form should be handed to the individuals responsible for each of the listed requirements. Signatures and dates should be gathered on the form after satisfactory completion of the listed requirement such as updating all written process safety information, conducting a process hazard analysis, and completing the requirements of the management of change procedures. The pre-start up safety review involves employees with expertise in chemical inventory and storage requirement. The employees are selected based upon their experience and understanding of the process systems being evaluated.
  • 17. The following personnel are typically involved in verifying the requirements on the Pre-Startup Safety Review Verification Form: • Director of management • General Manager, Operations • Director Customer Service & Compliance • Warehouse Coordinator acceptance of the pre-startup safety review requirements. The last step of the process is to authorize startup of the process by signing and dating the approval lines on the Pre-Startup Safety Review Verification Form. Once these approval signatures and dates have been gathered on the form, modifications to the new equipment or facility can be made successfully. 3. Authorization of the Startup of the Process: The Pre-Startup Safety Review Verification Form provides a sign-off
  • 18. 4) Complete Follow-Up Activities: Occasionally, some action items may not be completed before the startup of the modified system. The follow-up section of the Pre-Startup Safety Review Verification Form should be used to document the resolution of any open items that were not completed before the system startup. Each open item should be documented in this table along with a due date, the completion date and an explanation describing why the item was not completed prior to startup. The individuals who are authorized to approve the startup (i.e. those who sign the Verification Form) should ensure that the modified system is safe to startup even though these items have not been completed, i.e. the follow up items should have no impact on system safety.
  • 19.
  • 20. Below is the image of what a Pre Startup Safety Review (PSSR) verification form looks like
  • 21.
  • 22.
  • 23. We the TSM TheSafetyMaster Pvt Ltd, is a young organization with a dedicated team of young, innovative, research driven & experienced professionals, who want to create value for their customers by providing ingenious services in the field of Safety. You can send your enquiry to info@thesafeymaster.com. In this era of industrial growth, safety is not just a practice to be followed; it reflects an essence of the values, an organization believes in. But unfortunately, even after such a prominent emphasis by our legislative bodies, there is still a definite gap in the requirements to be met for occupational safety. We are here to bridge this gap and fully eradicate or minimize these accidents and their root causes .We innovate better ways of working with clients to solve their safety issues. How can we help?