An Overview of PCAPP’s
Pilot Demonstration Testing
Presented by:
Kim Jackson, PCAPP Operations Manager &
George Lecakes, PCAPP Chief Scientist
Timeline –
Pilot Test Demonstration
2
PCAPP Pilot Test Demonstration
Objectives1
1. Demonstrate agent removal, agent neutralization, and related agent
neutralization sampling and analysis.
2. Demonstrate munition body treatment (washout, thermal treatment).
3. Establish bounding operating ranges and set points for operating
parameters critical to agent removal, munition body treatment, and agent
neutralization operations.
4. Demonstrate energetics removal and establish bounding operating ranges
and set points for operating parameters critical to ensuring energetics
removal operations.
5. Validate monitoring protocols for all equipment and work areas in the ERB
and APB.
6. Validate treatment and monitoring protocols for disposition of dunnage,
energetics, and miscellaneous waste (e.g., OPP, PME, SDU, Autoclave as
designated for each waste material)
7. Demonstrate removal of TDG and document removal of other organic
compounds from hydrolysate waste stream (e.g., ICB, BRS)
8. Demonstrate processing systems can operate at a ramp rate that safely
supports the operating schedule.
1DERIVED FROM THE TEST CONCEPT PLAN, APPENDIX D; 3/21/2011
3
PCAPP Pilot Test Demonstration
Objectives (CONT.)
9. Demonstrate integrated facility operations with agent and energetics to verify
the following:
a) Compliance with safety requirements
b) Compliance with surety and security requirements
c) Integrated system operability
d) Plant-wide operations while remaining within emissions requirements (as stated in the Multiple
Pathway Health Risk Assessment Report for PCAPP Project [MPHRA], 24852-RD-3RC-000-V0004)
e) Handling and movement of munitions for current munitions campaign
f) Sampling and analysis protocols (e.g., agent, hydrolysate, brine, emissions)
g) Decontamination operations
h) Ability to perform routine and selected off-normal maintenance activities
i) Waste handling and disposition, including dust and odor control
10.Validate agent monitoring protocols for detecting agent (e.g., MINICAMS, Depot
Area Air Monitoring System [DAAMS]).
11.Demonstrate off-gas treatment performance. This will include demonstration of
agent destruction and removal at the OTS and AFA, odor control at the BTA.
4
Finally, the collection of site-wide emissions data for
finalization of the RCRA Part B Permit
Block 1 –
Systems, Fit, and Function
5
Systems: Block 1 – Baseline and Enhanced Reconfiguration includes OPP Monitoring, Munitions Monitoring
Table (Baseline Reconfiguration), PMD Operations and MME/PME Operations
Fit: After transport and receipt of munitions at PCAPP and prior to agent removal activities
Function: Prepares munitions for access and removal of agent by separating packing material (e.g., wooden
pallets, strapping, boxes) and energetics/miscellaneous parts from the munitions bodies
Explosion Containment
Room
MWS
MTU
Block 2 –
Systems, Fit, and Function
Systems: Block 2 – Munitions Body Treatment includes Munitions Washout System (MWS) and Munitions
Treatment Unit (MTU)
Fit: After Baseline and Enhanced Reconfiguration and prior to Agent Collection and Neutralization
Function: Drains and washes agent from energetics-free munitions bodies and thermally treats munitions
bodies to Clean Unrestricted, Releasable to the General Population (Clean Unrestricted)
6
Block 3 –
Systems, Fit, and Function
7
Systems: Block 3 – Agent Collection and Neutralization includes the Agent Water Separators, Wash Water Holding
Tanks, Agent Hydrolyzers, Hydrolysate Hold Tanks and 30-Day Storage Tanks
Fit: After Agent Collection and prior to Bio-Treatment of the cleared hydrolysate
Function: Separates the MWS agent drained and rinse water, hydrolyzes the mustard agent, and verifies destruction
prior to treatment in the Immobilized Cell Bio Reactors
Block 4 –
Systems, Fit, and Function
8
Systems: Block 4 – Hydrolysate Treatment and Water Recovery includes the Bio-Treatment System, Water Recovery
System (Brine Concentrate Feed Tanks), and the Brine Reduction System plus associated off-gas treatment units
Fit: After agent neutralization and clearing in Block 3 and prior to process water recycle or to off-site shipment of
secondary wastes (salt cake / bio sludge)
Function: Removes thiodiglycol (TDG) and other organics through biodegradation, recovers process water, de-
waters sludge for disposal and treats off-gasses for discharge.
Block 5 –
Systems, Fit, and Function
Systems: Block 5 – Supplemental Decon Units and Autoclave
Fit: Receives materials, equipment, components, and waste materials from other process areas including ERB, APB,
ESM, MSM.
Function: Reduces agent contamination levels to acceptable levels for either reuse and/or off-site disposal
9
Block 6 –
Systems, Fit, and Function
10
Systems: Block 6 – Off-gas treatment system including thermal oxidizer and scrubbers, the agent filtration area
(including particulate & HEPA filtration, granulated activated carbon and sulfur impregnated carbon) and the AFA stack
Fit: Receives process off-gas from the OTS and HVAC exhaust from ERB and APB ventilation systems
Function: Treat process off-gasses and HVAC exhaust from engineering controlled spaces to remove agent and other
COC’s to prescribed levels before releasing to the atmosphere.
Process Layout by Blocks
PCAPP PROCESS DIAGRAM
11
EDT REMOVED FROM PCAPP SCOPE
CONTAMINATED ENERGETICS AND IN-PROCESS LEAKERS &
REJECTS SENT TO G-BLOCK FOR SUBSEQUENT PROCESSING
IN A GOVERNMENT SYSTEM
Test Sequence
Pilot Testing (155mm)
 Block 1
 Block 2
 Block 3
 Block 4
 Block 5
 Block 6
Changeover Testing
 105mm Campaign
 4.2in Campaign
• Testing ≡ to define optimized
operating parameters
• Ramp-up ≡ capability of
personnel and equipment to
sustain operations
• Demonstration ≡ capability
of each process system
within the facility to process
munitions for 4-hour periods
per shift
Block 1 – Munitions Receipt and Enhanced Reconfiguration is to
support the testing, ramp-up and demonstration of the other
systems within Blocks 2, 3, 4 and 6.
Block 5 – Secondary Waste Treatment
Operating
Permit
INTEGRATED FACILITY DEMONSTRATION TEST
• Emissions Sampling
12
13
QUESTIONS

More Related Content

Similar to An Overview of PCAPP’s Pilot Demonstration Testing

Guidelines for Preparing Laboratory Information File
Guidelines for Preparing Laboratory Information FileGuidelines for Preparing Laboratory Information File
Guidelines for Preparing Laboratory Information FileMD. SELIM REZA
 
6e16e9dd2698fa8d8a64797106194aef.ppt
6e16e9dd2698fa8d8a64797106194aef.ppt6e16e9dd2698fa8d8a64797106194aef.ppt
6e16e9dd2698fa8d8a64797106194aef.pptIdenyiDanielEwaEde
 
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...IES / IAQM
 
Wastewater Treatment Plant
Wastewater Treatment PlantWastewater Treatment Plant
Wastewater Treatment PlantRanjit Dabhi
 
Nanoparticle sampling in academic labs
Nanoparticle sampling in academic labsNanoparticle sampling in academic labs
Nanoparticle sampling in academic labsDIv CHAS
 
Cleaning Validation - A lifecycle approach.pdf
Cleaning Validation - A lifecycle approach.pdfCleaning Validation - A lifecycle approach.pdf
Cleaning Validation - A lifecycle approach.pdfLdiaSabino
 
IRJET - Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
IRJET -  	  Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...IRJET -  	  Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
IRJET - Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...IRJET Journal
 
Analyse De Cycle De Vie Life Cycle Analysis
Analyse De Cycle De Vie   Life Cycle AnalysisAnalyse De Cycle De Vie   Life Cycle Analysis
Analyse De Cycle De Vie Life Cycle AnalysisBenjamin Warr
 
FDAs_GMP_Inspection_with_special_regard_to_Aseptic_Process_for_Drugs___Biolog...
FDAs_GMP_Inspection_with_special_regard_to_Aseptic_Process_for_Drugs___Biolog...FDAs_GMP_Inspection_with_special_regard_to_Aseptic_Process_for_Drugs___Biolog...
FDAs_GMP_Inspection_with_special_regard_to_Aseptic_Process_for_Drugs___Biolog...mmmmm624454
 
Technology transfer from Research and development to production
Technology transfer from Research and development  to productionTechnology transfer from Research and development  to production
Technology transfer from Research and development to productionArchana Mandava
 
EOR (feasibility to execution)
EOR (feasibility to execution)EOR (feasibility to execution)
EOR (feasibility to execution)Andi Anriansyah
 
Environmental monitoring - nonviable particle testing
Environmental monitoring - nonviable particle testingEnvironmental monitoring - nonviable particle testing
Environmental monitoring - nonviable particle testingJerry Fahrni
 
Aging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR ProjectAging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR ProjectUkrainian Nuclear Society
 

Similar to An Overview of PCAPP’s Pilot Demonstration Testing (20)

ISO 14067
ISO 14067ISO 14067
ISO 14067
 
Plant shutdown
Plant shutdownPlant shutdown
Plant shutdown
 
Explosive Destruction Technologies Summary 23 October 2013
Explosive Destruction Technologies Summary 23 October 2013Explosive Destruction Technologies Summary 23 October 2013
Explosive Destruction Technologies Summary 23 October 2013
 
Guidelines for Preparing Laboratory Information File
Guidelines for Preparing Laboratory Information FileGuidelines for Preparing Laboratory Information File
Guidelines for Preparing Laboratory Information File
 
6e16e9dd2698fa8d8a64797106194aef.ppt
6e16e9dd2698fa8d8a64797106194aef.ppt6e16e9dd2698fa8d8a64797106194aef.ppt
6e16e9dd2698fa8d8a64797106194aef.ppt
 
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
 
Wastewater Treatment Plant
Wastewater Treatment PlantWastewater Treatment Plant
Wastewater Treatment Plant
 
Nanoparticle sampling in academic labs
Nanoparticle sampling in academic labsNanoparticle sampling in academic labs
Nanoparticle sampling in academic labs
 
Cleaning Validation - A lifecycle approach.pdf
Cleaning Validation - A lifecycle approach.pdfCleaning Validation - A lifecycle approach.pdf
Cleaning Validation - A lifecycle approach.pdf
 
IRJET - Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
IRJET -  	  Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...IRJET -  	  Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
IRJET - Design of Wastewater Treatment Plant in Nagpur City: By Adopting ...
 
Analyse De Cycle De Vie Life Cycle Analysis
Analyse De Cycle De Vie   Life Cycle AnalysisAnalyse De Cycle De Vie   Life Cycle Analysis
Analyse De Cycle De Vie Life Cycle Analysis
 
FDAs_GMP_Inspection_with_special_regard_to_Aseptic_Process_for_Drugs___Biolog...
FDAs_GMP_Inspection_with_special_regard_to_Aseptic_Process_for_Drugs___Biolog...FDAs_GMP_Inspection_with_special_regard_to_Aseptic_Process_for_Drugs___Biolog...
FDAs_GMP_Inspection_with_special_regard_to_Aseptic_Process_for_Drugs___Biolog...
 
Ahmed adel cv2
Ahmed adel cv2Ahmed adel cv2
Ahmed adel cv2
 
Ahmed adel cv2
Ahmed adel cv2Ahmed adel cv2
Ahmed adel cv2
 
Technology transfer from Research and development to production
Technology transfer from Research and development  to productionTechnology transfer from Research and development  to production
Technology transfer from Research and development to production
 
Autoclave validation maliba
Autoclave validation malibaAutoclave validation maliba
Autoclave validation maliba
 
FINALREPORT - Desien
FINALREPORT - DesienFINALREPORT - Desien
FINALREPORT - Desien
 
EOR (feasibility to execution)
EOR (feasibility to execution)EOR (feasibility to execution)
EOR (feasibility to execution)
 
Environmental monitoring - nonviable particle testing
Environmental monitoring - nonviable particle testingEnvironmental monitoring - nonviable particle testing
Environmental monitoring - nonviable particle testing
 
Aging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR ProjectAging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR Project
 

More from Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)

More from Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) (20)

Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
 
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
 
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
 
June '13 cdcab
June '13 cdcabJune '13 cdcab
June '13 cdcab
 
M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013
 
2015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 20142015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 2014
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
 
Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014
 
BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013
 
BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012
 
Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013
 
Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012
 
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons ConventionOPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
 
CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012
 
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
 
Economic Development Working Group Update
Economic Development Working Group UpdateEconomic Development Working Group Update
Economic Development Working Group Update
 

Recently uploaded

World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterChristina Parmionova
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlEdouardHusson
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processNAP Global Network
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...tanu pandey
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...SUHANI PANDEY
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 

Recently uploaded (20)

World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 

An Overview of PCAPP’s Pilot Demonstration Testing

  • 1. An Overview of PCAPP’s Pilot Demonstration Testing Presented by: Kim Jackson, PCAPP Operations Manager & George Lecakes, PCAPP Chief Scientist
  • 2. Timeline – Pilot Test Demonstration 2
  • 3. PCAPP Pilot Test Demonstration Objectives1 1. Demonstrate agent removal, agent neutralization, and related agent neutralization sampling and analysis. 2. Demonstrate munition body treatment (washout, thermal treatment). 3. Establish bounding operating ranges and set points for operating parameters critical to agent removal, munition body treatment, and agent neutralization operations. 4. Demonstrate energetics removal and establish bounding operating ranges and set points for operating parameters critical to ensuring energetics removal operations. 5. Validate monitoring protocols for all equipment and work areas in the ERB and APB. 6. Validate treatment and monitoring protocols for disposition of dunnage, energetics, and miscellaneous waste (e.g., OPP, PME, SDU, Autoclave as designated for each waste material) 7. Demonstrate removal of TDG and document removal of other organic compounds from hydrolysate waste stream (e.g., ICB, BRS) 8. Demonstrate processing systems can operate at a ramp rate that safely supports the operating schedule. 1DERIVED FROM THE TEST CONCEPT PLAN, APPENDIX D; 3/21/2011 3
  • 4. PCAPP Pilot Test Demonstration Objectives (CONT.) 9. Demonstrate integrated facility operations with agent and energetics to verify the following: a) Compliance with safety requirements b) Compliance with surety and security requirements c) Integrated system operability d) Plant-wide operations while remaining within emissions requirements (as stated in the Multiple Pathway Health Risk Assessment Report for PCAPP Project [MPHRA], 24852-RD-3RC-000-V0004) e) Handling and movement of munitions for current munitions campaign f) Sampling and analysis protocols (e.g., agent, hydrolysate, brine, emissions) g) Decontamination operations h) Ability to perform routine and selected off-normal maintenance activities i) Waste handling and disposition, including dust and odor control 10.Validate agent monitoring protocols for detecting agent (e.g., MINICAMS, Depot Area Air Monitoring System [DAAMS]). 11.Demonstrate off-gas treatment performance. This will include demonstration of agent destruction and removal at the OTS and AFA, odor control at the BTA. 4 Finally, the collection of site-wide emissions data for finalization of the RCRA Part B Permit
  • 5. Block 1 – Systems, Fit, and Function 5 Systems: Block 1 – Baseline and Enhanced Reconfiguration includes OPP Monitoring, Munitions Monitoring Table (Baseline Reconfiguration), PMD Operations and MME/PME Operations Fit: After transport and receipt of munitions at PCAPP and prior to agent removal activities Function: Prepares munitions for access and removal of agent by separating packing material (e.g., wooden pallets, strapping, boxes) and energetics/miscellaneous parts from the munitions bodies Explosion Containment Room
  • 6. MWS MTU Block 2 – Systems, Fit, and Function Systems: Block 2 – Munitions Body Treatment includes Munitions Washout System (MWS) and Munitions Treatment Unit (MTU) Fit: After Baseline and Enhanced Reconfiguration and prior to Agent Collection and Neutralization Function: Drains and washes agent from energetics-free munitions bodies and thermally treats munitions bodies to Clean Unrestricted, Releasable to the General Population (Clean Unrestricted) 6
  • 7. Block 3 – Systems, Fit, and Function 7 Systems: Block 3 – Agent Collection and Neutralization includes the Agent Water Separators, Wash Water Holding Tanks, Agent Hydrolyzers, Hydrolysate Hold Tanks and 30-Day Storage Tanks Fit: After Agent Collection and prior to Bio-Treatment of the cleared hydrolysate Function: Separates the MWS agent drained and rinse water, hydrolyzes the mustard agent, and verifies destruction prior to treatment in the Immobilized Cell Bio Reactors
  • 8. Block 4 – Systems, Fit, and Function 8 Systems: Block 4 – Hydrolysate Treatment and Water Recovery includes the Bio-Treatment System, Water Recovery System (Brine Concentrate Feed Tanks), and the Brine Reduction System plus associated off-gas treatment units Fit: After agent neutralization and clearing in Block 3 and prior to process water recycle or to off-site shipment of secondary wastes (salt cake / bio sludge) Function: Removes thiodiglycol (TDG) and other organics through biodegradation, recovers process water, de- waters sludge for disposal and treats off-gasses for discharge.
  • 9. Block 5 – Systems, Fit, and Function Systems: Block 5 – Supplemental Decon Units and Autoclave Fit: Receives materials, equipment, components, and waste materials from other process areas including ERB, APB, ESM, MSM. Function: Reduces agent contamination levels to acceptable levels for either reuse and/or off-site disposal 9
  • 10. Block 6 – Systems, Fit, and Function 10 Systems: Block 6 – Off-gas treatment system including thermal oxidizer and scrubbers, the agent filtration area (including particulate & HEPA filtration, granulated activated carbon and sulfur impregnated carbon) and the AFA stack Fit: Receives process off-gas from the OTS and HVAC exhaust from ERB and APB ventilation systems Function: Treat process off-gasses and HVAC exhaust from engineering controlled spaces to remove agent and other COC’s to prescribed levels before releasing to the atmosphere.
  • 11. Process Layout by Blocks PCAPP PROCESS DIAGRAM 11 EDT REMOVED FROM PCAPP SCOPE CONTAMINATED ENERGETICS AND IN-PROCESS LEAKERS & REJECTS SENT TO G-BLOCK FOR SUBSEQUENT PROCESSING IN A GOVERNMENT SYSTEM
  • 12. Test Sequence Pilot Testing (155mm)  Block 1  Block 2  Block 3  Block 4  Block 5  Block 6 Changeover Testing  105mm Campaign  4.2in Campaign • Testing ≡ to define optimized operating parameters • Ramp-up ≡ capability of personnel and equipment to sustain operations • Demonstration ≡ capability of each process system within the facility to process munitions for 4-hour periods per shift Block 1 – Munitions Receipt and Enhanced Reconfiguration is to support the testing, ramp-up and demonstration of the other systems within Blocks 2, 3, 4 and 6. Block 5 – Secondary Waste Treatment Operating Permit INTEGRATED FACILITY DEMONSTRATION TEST • Emissions Sampling 12