Health & Safety Awareness  Training: Safe Permits to Work:   Safe Permits to Work
Safe Permits to Work ,[object Object],Risk Method Control
Safe Permits to Work Why are we here? The company requires the evaluation of hazardous, Non routine jobs for which there are no Safe Task Procedures or approved Task Safety Plans. Certain tasks always require that a Safe Permit to Work be issued by a qualified individual. In our case the  Appointed Person
Safe Permits to Work Goals and Objectives: At the end of this session you will: - be familiar with jobs requiring safe  work  permits. - be familiar with the Safe Permit to  Work system.
WE DON’T WANT YOU OR US TO END UP LIKE THIS
Responsibilities: Appointed Persons. ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Safe Permits to Work Cutting / Welding Permit Location:   Job No. Date: Job No. Confined Space Entry Permit  Location and description of confined space: Reason for entry: Permit issued to: Supervisor’s Name: Attendant’s name: Permit issuer’s name: % oxygen: % lower explosive limit:  ppm CO:  H 2 S: Requirements  Emergency Rescuer yes no Continuous Gas Monitor yes no Barrier for ground openings yes no Warning Signs yes no Safe Work Permit Permit # Type:  (hot work, confined space, line break, etc..... location: Valid  __/___/___  ____  __/___/___  ____ Issued to: From:  M  D  Y  time  to  M  D  Y  time Work Description: ________________________________ ____________________________________________ Supervisor’s Signature  Print name ____________________________________________ ____________________________________________ Work Order No. Atm  Combustible vapors or gases (<10%)  Oxygen Concentration (>19.5% & <21%)  Toxic Material Concentration Tests Precautions Always Required: There are various documents which are called “ safe permits to work.”
Safe Permits to Work Cutting / Welding Permit Location:   Job No. Date: Job No. Location & Building: Floor Nature of Job: Welder’s Name: The above location has been examined.  The precautions  checked on the reverse of this card have been taken to prevent fire. Permission is granted for this work. Permit Date: Time: Expires AM PM The  Hot Work Permit   is a form of Safe Work Permit issued by the  Appointed Person , or other responsible person. This permit is required for all situations which may result in fires or explosions.
Safe Permits to Work CAUTION Confined Space Keep Out ! The “Confined Space Entry Permit” is another form of safe permit to work, regulating entry into pits, tanks, and vessels and other confined spaces . Confined Space Entry Permit  Location and description of confined space: Reason for entry: Permit issued to: Supervisor’s Name: Attendant’s name: Permit issuer’s name: % oxygen: % lower explosive limit:  ppm CO:  H 2 S: Requirements  Emergency Rescuer yes no Continuous Gas Monitor yes no Barrier for ground openings yes no Warning Signs yes no Safety Harness with life line yes no Tripod / Hoist / Pulley yes no
Safe Permits to Work Cutting / Welding Permit Location:   Job No. Date: Job No. Confined Space Entry Permit  Location and description of confined space: Reason for entry: Permit issued to: Supervisor’s Name: Attendant’s name: Permit issuer’s name: % oxygen: % lower explosive limit:  ppm CO:  H 2 S: Requirements  Emergency Rescuer yes no Continuous Gas Monitor yes no Barrier for ground openings yes no Warning Signs yes no Confined Space Entry Permits, Hot Work Permits and others will be discussed in detail later on.
Safe Permits to Work Safe Work Permit Permit # Type:  (hot work, confined space, line break, etc.... location: Valid  __/___/___  ____  __/___/___  ____ Issued to: From:  M  D  Y  time  to  M  D  Y  time Work Description: ________________________________ ____________________________________________ Supervisor’s Signature  Print name ____________________________________________ ____________________________________________ Work Order No. Atm  Combustible vapours or gases (<10%)  Oxygen Concentration (>19.5% & <21%)  Toxic Material Concentration Tests Precautions Always Required: The objective of the Safe Permit to Work system is to identify hazards associated with a non routine job, and to develop precautions required to control each hazard identified.
Safe Permits to Work Let’s begin with a look at the hazards associated with specific jobs, and examine how Safe  Permits to Work can  help to prevent them from causing damage or injury. Risk Assessments Method Statements Control Documents
Something with the Potential For Causing Harm (ie Injury, Damage) Risk Assessment.   What is a hazard?
Risk Assessment.   What is likelihood or probability? The likelihood that the harm from the particular hazard is realised .   ie  AN EXPRESSION OF POSSIBLE  LOSS  IN TERMS OF SEVERITY AND PROBABILITY
Method Statements ,[object Object],[object Object],[object Object]
Safe Permits to Work Examples of tasks requiring permits are: 1.  Hot Work - the use of open flame, oxyacetylene burning, tar kettles, etc...., and the use of portable spark or heat producing equipment in flammable storage or handling areas. 2.  High Voltage work. 3.  Confined Space Entry 4.  Excavations 5.  Hilti Guns. 6.  Whenever required by existing company or contractor procedures or required in the contractor’s Project Safety Plan. 7.  Use of internal combustion engines, or vehicles  with internal combustion engines inside company buildings. 8.  Use of company owned equipment, such as personnel   lifts, fork trucks, vehicles, etc.,   by employees of a contractor. This list is not exhaustive!
Safe Permits to Work  Excavations  can result in: head Injuries from materials falling from overhead surfaces, rupture of high pressure hydraulic lines used on backhoes, shovels, and drills. excessive noise from concrete breaking and cutting equipment, and collapse of excavation walls and piles due to poorly secured soil, sudden weather changes, or other factors. Permits are written to ensure that necessary equipment is present and in good working order.
Safe Permits to Work Excavations  : Poorly planned excavations can result in  damage to underground services, such as electrical lines, natural gas lines, water sewers and drains. The consequence of damaged utility services is often complete shutdown of  operations resulting in major business losses. Permits are written to protect the employee  and prevent damage to underground  equipment and services .
Safe Permits to Work Excavations  may expose hazardous materials, which have leaked and are contaminating the soil. Permits ensure that procedures to protect workers from exposure to toxic  substances have been identified and for  the protection of the environment.
Safe Permits to Work  Use of Hilti Type Guns. Permits are issued to ensure procedures are followed that prevent injury to users and fellow  employees.
Safe Permits to Work Internal combustion engines produce poisonous gases such as carbon monoxide, and oxides of nitrogen. Permits ensure that procedures are followed that will prevent  equipment emissions from contaminating air inside buildings  and confined spaces.
Safe Permits to Work Unauthorized use of company equipment can result in lost production and injury to untrained operators. Permits prevent company equipment from being taken by contractors without the permission of management, and require verification   of equipment  Operator training .
Safe Permits to Work Work which ordinarily does not require safe work  permits  may be included  at the discretion of the : The Appointed Person. Safety Representative. The Contractor .
Safe Permits to Work Following are  examples  of  situations which may require discretionary safe work permits. There could be many others :
Safe Permits to Work Movement of large pieces of equipment, especially while other personnel are working nearby, can result in employee injury. Permits may be issued to ensure the use of procedures that will prevent employee injury from  falling material, or being  struck  by equipment.  (LOLER Regulations)
Safe Permits to Work Abandoned tanks, pipe lines, drums, and vessels may contain hazardous vapors and gases. Permits may be issued to prevent toxic or corrosive exposures to workers when working on abandoned equipment,  complementing hot work and confined space permits. ?
Safe Permits to Work Many construction processes create noise levels high enough to cause hearing loss. Permit requirements may be issued to reduce noise to acceptable limits, or to provide both construction and other employees with required hearing protection.
Safe Permits to Work Boilers, high pressure vessels, tanks, etc can undergo sudden failure resulting in disastrous consequences. Permits may be issued requiring precautions and equipment to prevent system failures  not covered by safe job procedures or project safety plans.
Safe Permits  to Work Permits may be required where the consequence of non-compliance with fall protection requirements is severe, or where dropped materials may endanger other workers below: i.e. working over water or  working at height.
Safe Permits to Work Permits  are required before work begins near energized lines which cannot be shut off if there is danger of fire, shock or electrocution. Electricity At Work Regulations
Safe Permits to Work CAUTION “ Safe Permit to Work Required!” Hazardous Materials! Confined Space! High Pressure Gas Mains! High Voltage! Permits are  mandatory  where signs are  posted which require them.
Safe Permits to Work Safe Work Permit Permit # Type:  (hot work, confined space, line break, etc.... location: Valid  __/___/___  ____  __/___/___  ____ Issued to: From:  M  D  Y  time  to  M  D  Y  time Work Description: ________________________________ ____________________________________________ Supervisor’s Signature  Print name ____________________________________________ ____________________________________________ Work Order No. Permits are issued: - for a specific date and time range, - for a specific job, - and to specific individuals.
Safe Permits to Work Safe Work Permit Permit # ------------------------------------------------------------------------------------------------------------------------------------------------------------------- Work Description: ________________________________ ____________________________________________ Supervisor’s Signature  Print name ____________________________________________ ____________________________________________ Work Order No. Atm.  Combustible Vapors or gases (<10%)  Oxygen Concentration ( >19.5% & < 21%)  Toxic Material Concentration Tests Permit Issued by:  _________________________/____/___  Work Area Manager Approval  _______________/___/__ ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Safe Permits to Work Safe Work Permit ---------------------------------------------------------------------- Precautions Always required: o  Emergency procedures review by: o  Emergency equipment & location review by: o  Area inherent hazards review by: o  Material Safety Data Sheets review by: Workers must be informed of required emergency procedures, location and operation of emergency equipment, and area inherent hazards. (Site briefing or similar). Material Safety Data Sheets must be supplied and special precautions reviewed with workers and their supervisors.
Safe Permits to Work Safe Permit to Work  ---------------------------------------------------------------------- Special Precautions Required: o  Buddy System o Sprinklers in Service o  Cleaning of _________  o  Purging of ________ o  Remove materials from ___________________ o  Piping  o Drain  o  Disconnect  o Blank off / Capped o  Clean  o  Ventilate o  Remove combustibles from other side of wall. o  Floor Swept Clean of Combustibles o  Clean area within 10m.  o Wet down floor. o  Adjacent areas:  __________________________ o  Cover floor with:  __________________________ o  Non-combustible Tarpaulins or Metal Shields Over: o  Electrical Switches or Valves off, locked-out, and Tagged: o  Electrical Grounding of: ________________________ o  Atmosphere monitored during work for: ____________ periodically: __________  continuously: __________ o  Safety Monitor(s) present from _________ to _________ o  Fire Watch Present during work and for 30 minutes after... o  Respirator to be worn____ or be readily available ___ Required special precautions must be clearly indicated and communicated to workers, and their supervision. It is the safety representative’s responsibility to determine if and when special measures are required. Permits differ from company  to company
Safe Permits to Work Safe Work Permit ---------------------------------------------------------------------- Safety Equipment Required o  safety glasses o  hard hat o  face shield o safety shoes o  fire extinguishers - type ___ #___ size ___ o  fire hose o  supplementary illumination o  warning signs o  barricades o  non-sparking tools o  explosion proof equipment o  safety harness o  life line o  tripod emergency escape unit o  2-way radio or phone o  respirators o  impervious gloves o  protective clothing _____________________ o  mechanical ventilation o  shower & eyewash o  self contained breathing apparatus o  ground fault circuit interrupter o  ladder / lift / scaffold o  other________________________________ Personal protective equipment and other safety equipment required is specified. For each hazard present at the work site, the safety representative must specify a hazard control.
The Law ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Flow Chart
Permit-Required Specified Confined Spaces ,[object Object],[object Object],[object Object],CAUTION Confined Space Keep Out !
[object Object],[object Object],[object Object],[object Object],[object Object]
Complete Entry Permit Form ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
High Voltage Permit
Hot Work Permits Examples of  hot work  are: welding burning brazing propane soldering oxyacetylene cutting grinding ferrous metals
Hot Work Permits Cutting / Welding Permit Location:   Job No. Date: Job No. Location & Building: Floor Nature of Job: Welder’s Name: The above location has been examined.  The precautions  checked on the reverse of this card have been taken to prevent fire. Permission is granted for this work. Permit Date: Time: Expires AM PM Permits are issued for the specific job being done, And For a specific time period, the time period is usually for the working shift, But may never exceed twenty-four hours.
Hot Work Permits Necessary Precautions O  Sprinklers are in service. O  Cutting and welding equipment in good repair. Precautions within 35 ft. (10 m.) of work. O  Floors swept clean of combustibles. O  Combustible floors wet down, covered with damp sand or fire-resistive sheets. O  Flammable liquids removed; other combustibles, if not removed protected with fire-resistive tarpaulins or metal shields.  O  Explosive atmosphere in area eliminated. O  All wall and floor openings covered. O  Fire-resistive tarpaulins suspended beneath work. Work on Walls or Ceilings O  Construction is noncombustible and without combustible  covering or isolation. O  Combustibles moved away from other side of wall. Work on Enclosed Equipment O  Enclosed  equipment cleaned of all combustibles. O  Containers purged of flammable liquids. Fire Watch O  Fire watch will be provided during and for at least 30 minutes after work, and during any coffee or lunch breaks. O  Fire watch is supplied with suitable extinguishers, or charged small hose. O  Fire watch is trained in use of this equipment and in  sounding alarm. The Fire Marshal, Safety Engineer, Maintenance Manager or Appointed Person  has the responsibility to verify that all necessary precautions have been taken at the worksite.
Hot Work Permits Necessary Precautions O  Sprinklers are in service. Welding and other hot work have been found to be high ranking causes of industrial fires. Sprinkler systems must remain in service in the hot work area,  unless specifically approved by the Fire Marshal, Safety Engineer, or Maintenance Manager.
Hot Work Permits Necessary Precautions O  Cutting and welding equipment  in good repair. Gas hoses, backflow preventors, fire resistive tarpaulins, curtains and other cutting and welding equipment must be in good repair before the permit is issued.
Hot Work Permits Necessary Precautions Precautions within 35 ft. (10 m.) of work. O  Floors swept clean of combustibles. O  Combustible floors wet down, covered with damp sand or fire-resistive sheets. O  Flammable liquids removed; other combustibles, if not removed protected with fire-resistive tarpaulins or metal shields.  O  Explosive atmosphere in area eliminated. O  All wall and floor openings covered. O  Fire-resistive tarpaulins suspended beneath work. Work on Walls or Ceilings O  Construction is noncombustible and without combustible  covering or isolation. O  Combustibles moved away from other side of wall. Work on Enclosed Equipment O  Enclosed  equipment cleaned of all combustibles. O  Containers purged of flammable liquids. Anything that can burn must be removed from the immediate work area.
Hot Work Permits Necessary Precautions Fire Watch O  Fire watch will be provided during and for at least 30 minutes after work, and during any coffee or lunch breaks. O  Fire watch is supplied with suitable extinguishers, or charged small hose. O  Fire watch is trained in use of this equipment and in  sounding alarm. Fire Watch Personnel  may not do  other jobs which detract from their primary responsibility. Fire Watch Personnel must be trained to use fire extinguishment media provided. Fire Watch Personnel must be aware of how to report emergencies, and in emergency evacuation procedures. Fire Watch Personnel must be identified and their qualifications verified, before permits are issued .
Hot Work Permits Final Checkup By Welder Work area and all adjacent areas to which sparks and heat might have spread (such as floors above and below and on opposite side of walls)  were inspected after the work was completed and were found firesafe. Signed:  After signing, return to person who issued it. Before leaving the area for the day, verify that no  smoldering fires  have developed within walls, cracks in floors, or in ceiling areas where you have been working.  Return the work permit to the person who issued it  within 30 minutes of job completion , so that they may complete any necessary job follow-up.
Lifting Operations & Lifting Equipment . ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Safe Dig Permit.  Safe Work Permit ---------------------------------------------------------------------- EXCAVATION PRECAUTIONS REQUIRED: o  Underground Utility Hazard Review o  Soil Excavation Reviewed o  Underground Utility Stakeout Performed o  Excavation cut back walls reinforced o  Means of exiting.  The safety representative must verify that all underground utilities have been located and staked out by the use of  Plans, Drawings etc, and by the use of trained persons using Cable Avoidance Tools.  Provisions must be made to  barricade the open trench, prevent collapse of trench walls, provide employees with a means of exit, reroute ground water, and all other requirements of excavating. If soil is contaminated, the safety representative will ask for a written health and safety plan.
 
 
 
 
Safe Permits to Work -  SUMMARY ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Where to Get Help? ,[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
2 1 3 4 PERMIT TO WORK Site:  __________________________________ Permit No.  Check Work Complete Cancel Permit Signed: ___________  Time _____:______  Signed: ___________  Time _____:______ Date ___/___/___ Date ___/___/___ Name: Request to the Authorised Person ___________________________________________ ( Discipline e.g. Foreman Supervisor) From  __________________________________________ Job: Detail equipment, plant   ________________________________________________________ Process or activity upon   ________________________________________________________ which work is required ________________________________________________________ ________________________________________________________ Action: Signed: _____________________________  Time _____:______  Date ___/___/___ Position:______________________________________ Detail action and  I have read the above request and certify that the above equipment is available, to the precautions taken  degree of safety required by you to perform your work as follows: to achieve safe working  ______________________________________________________________________ and to avoid perceived ______________________________________________________________________  hazards ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________________ Action:  Signed: _____________________________  Time _____:______  Date ___/___/___ Permit   Valid until:  Time _____:______  Date ___/___/___ Position: _____________________________________ I hereby declare that I accept responsibility for carrying out the work on the equipment/task defined in section (1) above.   I will comply with the Safety Rules upon which I have received instructions  . Action: Signed: _____________________________  Time _____:______  Date ___/___/___ (Competent Person e.g. Engineer/Electrician) I hereby declare that I have withdrawn from the equipment/task specified in this permit, and have warned any men who assisted me that it is no longer safe to work on the equipment. All tools, safety devices, earths applied/connected/fixed by my authority have been removed. Action: Signed: _____________________________  Time _____:______  Date ___/___/___ (Competent Person e.g. Engineer/Electrician)

More Related Content

What's hot

LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
Bimal Chandra Das
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Worklifecombo
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysis
vtsiri
 
Hot Work
Hot WorkHot Work
Hot Work
JulieMaeuser
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
Jomish John
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
shanmukh rao
 
Safety committees duties 1
Safety committees duties 1Safety committees duties 1
Safety committees duties 1Roger Maxson
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slides
Maffino
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
Gaurav Singh Rajput
 
New Employee Safety Orientation
New Employee Safety OrientationNew Employee Safety Orientation
New Employee Safety Orientation
Beamer
 
HIRA training
HIRA   trainingHIRA   training
HIRA training
himu_kamrul
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
Lucy Reimer
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meetingsssaravana
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
Chandrakant Singh
 
Safety Audit: An Overview
Safety Audit: An OverviewSafety Audit: An Overview
Safety Audit: An Overview
Verde Ventures Pvt. Ltd.
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
Dwarika Bhushan Sharma
 
LOTO Training
LOTO TrainingLOTO Training
LOTO TrainingCM Tiwari
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space Ppt
Dan Gauthier
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overview
zz_bedee
 

What's hot (20)

LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysis
 
Hot Work
Hot WorkHot Work
Hot Work
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
Safety committees duties 1
Safety committees duties 1Safety committees duties 1
Safety committees duties 1
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slides
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
New Employee Safety Orientation
New Employee Safety OrientationNew Employee Safety Orientation
New Employee Safety Orientation
 
HIRA training
HIRA   trainingHIRA   training
HIRA training
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meeting
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
Safety Audit: An Overview
Safety Audit: An OverviewSafety Audit: An Overview
Safety Audit: An Overview
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space Ppt
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overview
 

Similar to Safeworkpmits

SAFE WORK PERMIT
SAFE WORK PERMITSAFE WORK PERMIT
SAFE WORK PERMIT
ssusera9e3cc
 
419237835-Safe-Work-Permit-1-ppt.ppt
419237835-Safe-Work-Permit-1-ppt.ppt419237835-Safe-Work-Permit-1-ppt.ppt
419237835-Safe-Work-Permit-1-ppt.ppt
naseemhayat2
 
26_SGW-_Permit_To_Work- At Job Site.pptx
26_SGW-_Permit_To_Work- At Job Site.pptx26_SGW-_Permit_To_Work- At Job Site.pptx
26_SGW-_Permit_To_Work- At Job Site.pptx
safetygoodwe
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdf
RazFazwan
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work Procedure
HENRY EROMOSELE OIGIANGBE
 
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.pptAIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AhmadNadzir4
 
WORK PERMITS.ppt
WORK PERMITS.ppt WORK PERMITS.ppt
WORK PERMITS.ppt
RamyElkholy1
 
Work permit system
Work permit systemWork permit system
Work permit system
Bimal Chandra Das
 
Work permit system
Work permit systemWork permit system
Work permit system
Bimal Chandra Das
 
MODULE 4.pptx
MODULE 4.pptxMODULE 4.pptx
MODULE 4.pptx
LikhilGopalan1
 
Dig cut comms
Dig cut commsDig cut comms
Dig cut comms
Garry Pepper
 
jsa-grinding-welding-gas-cutting. riskpdf
jsa-grinding-welding-gas-cutting. riskpdfjsa-grinding-welding-gas-cutting. riskpdf
jsa-grinding-welding-gas-cutting. riskpdf
Hedi Ben Mohamed
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
Aanand Subi
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptx
ssuserb8f3fd2
 
Confined space entry
Confined space entryConfined space entry
Confined space entry
ER SYED ABRAR UL HAQ
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docx
olorunyomi wale
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
FESTUS RICHARD SIAME
 
rt_managment_practices_hot_work_permit_required_areas.pdf
rt_managment_practices_hot_work_permit_required_areas.pdfrt_managment_practices_hot_work_permit_required_areas.pdf
rt_managment_practices_hot_work_permit_required_areas.pdf
ssuserc4aee4
 

Similar to Safeworkpmits (20)

SAFE WORK PERMIT
SAFE WORK PERMITSAFE WORK PERMIT
SAFE WORK PERMIT
 
419237835-Safe-Work-Permit-1-ppt.ppt
419237835-Safe-Work-Permit-1-ppt.ppt419237835-Safe-Work-Permit-1-ppt.ppt
419237835-Safe-Work-Permit-1-ppt.ppt
 
26_SGW-_Permit_To_Work- At Job Site.pptx
26_SGW-_Permit_To_Work- At Job Site.pptx26_SGW-_Permit_To_Work- At Job Site.pptx
26_SGW-_Permit_To_Work- At Job Site.pptx
 
Permit Issue consideration#1
Permit Issue consideration#1Permit Issue consideration#1
Permit Issue consideration#1
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdf
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work Procedure
 
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.pptAIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
 
WORK PERMITS.ppt
WORK PERMITS.ppt WORK PERMITS.ppt
WORK PERMITS.ppt
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Abdulsaid CV 2016
Abdulsaid CV 2016Abdulsaid CV 2016
Abdulsaid CV 2016
 
MODULE 4.pptx
MODULE 4.pptxMODULE 4.pptx
MODULE 4.pptx
 
Dig cut comms
Dig cut commsDig cut comms
Dig cut comms
 
jsa-grinding-welding-gas-cutting. riskpdf
jsa-grinding-welding-gas-cutting. riskpdfjsa-grinding-welding-gas-cutting. riskpdf
jsa-grinding-welding-gas-cutting. riskpdf
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptx
 
Confined space entry
Confined space entryConfined space entry
Confined space entry
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docx
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
rt_managment_practices_hot_work_permit_required_areas.pdf
rt_managment_practices_hot_work_permit_required_areas.pdfrt_managment_practices_hot_work_permit_required_areas.pdf
rt_managment_practices_hot_work_permit_required_areas.pdf
 

Recently uploaded

Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 

Recently uploaded (20)

Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 

Safeworkpmits

  • 1. Health & Safety Awareness Training: Safe Permits to Work: Safe Permits to Work
  • 2.
  • 3. Safe Permits to Work Why are we here? The company requires the evaluation of hazardous, Non routine jobs for which there are no Safe Task Procedures or approved Task Safety Plans. Certain tasks always require that a Safe Permit to Work be issued by a qualified individual. In our case the Appointed Person
  • 4. Safe Permits to Work Goals and Objectives: At the end of this session you will: - be familiar with jobs requiring safe work permits. - be familiar with the Safe Permit to Work system.
  • 5. WE DON’T WANT YOU OR US TO END UP LIKE THIS
  • 6.
  • 7. Safe Permits to Work Cutting / Welding Permit Location: Job No. Date: Job No. Confined Space Entry Permit Location and description of confined space: Reason for entry: Permit issued to: Supervisor’s Name: Attendant’s name: Permit issuer’s name: % oxygen: % lower explosive limit: ppm CO: H 2 S: Requirements Emergency Rescuer yes no Continuous Gas Monitor yes no Barrier for ground openings yes no Warning Signs yes no Safe Work Permit Permit # Type: (hot work, confined space, line break, etc..... location: Valid __/___/___ ____ __/___/___ ____ Issued to: From: M D Y time to M D Y time Work Description: ________________________________ ____________________________________________ Supervisor’s Signature Print name ____________________________________________ ____________________________________________ Work Order No. Atm Combustible vapors or gases (<10%) Oxygen Concentration (>19.5% & <21%) Toxic Material Concentration Tests Precautions Always Required: There are various documents which are called “ safe permits to work.”
  • 8. Safe Permits to Work Cutting / Welding Permit Location: Job No. Date: Job No. Location & Building: Floor Nature of Job: Welder’s Name: The above location has been examined. The precautions checked on the reverse of this card have been taken to prevent fire. Permission is granted for this work. Permit Date: Time: Expires AM PM The Hot Work Permit is a form of Safe Work Permit issued by the Appointed Person , or other responsible person. This permit is required for all situations which may result in fires or explosions.
  • 9. Safe Permits to Work CAUTION Confined Space Keep Out ! The “Confined Space Entry Permit” is another form of safe permit to work, regulating entry into pits, tanks, and vessels and other confined spaces . Confined Space Entry Permit Location and description of confined space: Reason for entry: Permit issued to: Supervisor’s Name: Attendant’s name: Permit issuer’s name: % oxygen: % lower explosive limit: ppm CO: H 2 S: Requirements Emergency Rescuer yes no Continuous Gas Monitor yes no Barrier for ground openings yes no Warning Signs yes no Safety Harness with life line yes no Tripod / Hoist / Pulley yes no
  • 10. Safe Permits to Work Cutting / Welding Permit Location: Job No. Date: Job No. Confined Space Entry Permit Location and description of confined space: Reason for entry: Permit issued to: Supervisor’s Name: Attendant’s name: Permit issuer’s name: % oxygen: % lower explosive limit: ppm CO: H 2 S: Requirements Emergency Rescuer yes no Continuous Gas Monitor yes no Barrier for ground openings yes no Warning Signs yes no Confined Space Entry Permits, Hot Work Permits and others will be discussed in detail later on.
  • 11. Safe Permits to Work Safe Work Permit Permit # Type: (hot work, confined space, line break, etc.... location: Valid __/___/___ ____ __/___/___ ____ Issued to: From: M D Y time to M D Y time Work Description: ________________________________ ____________________________________________ Supervisor’s Signature Print name ____________________________________________ ____________________________________________ Work Order No. Atm Combustible vapours or gases (<10%) Oxygen Concentration (>19.5% & <21%) Toxic Material Concentration Tests Precautions Always Required: The objective of the Safe Permit to Work system is to identify hazards associated with a non routine job, and to develop precautions required to control each hazard identified.
  • 12. Safe Permits to Work Let’s begin with a look at the hazards associated with specific jobs, and examine how Safe Permits to Work can help to prevent them from causing damage or injury. Risk Assessments Method Statements Control Documents
  • 13. Something with the Potential For Causing Harm (ie Injury, Damage) Risk Assessment. What is a hazard?
  • 14. Risk Assessment. What is likelihood or probability? The likelihood that the harm from the particular hazard is realised . ie AN EXPRESSION OF POSSIBLE LOSS IN TERMS OF SEVERITY AND PROBABILITY
  • 15.
  • 16. Safe Permits to Work Examples of tasks requiring permits are: 1. Hot Work - the use of open flame, oxyacetylene burning, tar kettles, etc...., and the use of portable spark or heat producing equipment in flammable storage or handling areas. 2. High Voltage work. 3. Confined Space Entry 4. Excavations 5. Hilti Guns. 6. Whenever required by existing company or contractor procedures or required in the contractor’s Project Safety Plan. 7. Use of internal combustion engines, or vehicles with internal combustion engines inside company buildings. 8. Use of company owned equipment, such as personnel lifts, fork trucks, vehicles, etc., by employees of a contractor. This list is not exhaustive!
  • 17. Safe Permits to Work Excavations can result in: head Injuries from materials falling from overhead surfaces, rupture of high pressure hydraulic lines used on backhoes, shovels, and drills. excessive noise from concrete breaking and cutting equipment, and collapse of excavation walls and piles due to poorly secured soil, sudden weather changes, or other factors. Permits are written to ensure that necessary equipment is present and in good working order.
  • 18. Safe Permits to Work Excavations : Poorly planned excavations can result in damage to underground services, such as electrical lines, natural gas lines, water sewers and drains. The consequence of damaged utility services is often complete shutdown of operations resulting in major business losses. Permits are written to protect the employee and prevent damage to underground equipment and services .
  • 19. Safe Permits to Work Excavations may expose hazardous materials, which have leaked and are contaminating the soil. Permits ensure that procedures to protect workers from exposure to toxic substances have been identified and for the protection of the environment.
  • 20. Safe Permits to Work Use of Hilti Type Guns. Permits are issued to ensure procedures are followed that prevent injury to users and fellow employees.
  • 21. Safe Permits to Work Internal combustion engines produce poisonous gases such as carbon monoxide, and oxides of nitrogen. Permits ensure that procedures are followed that will prevent equipment emissions from contaminating air inside buildings and confined spaces.
  • 22. Safe Permits to Work Unauthorized use of company equipment can result in lost production and injury to untrained operators. Permits prevent company equipment from being taken by contractors without the permission of management, and require verification of equipment Operator training .
  • 23. Safe Permits to Work Work which ordinarily does not require safe work permits may be included at the discretion of the : The Appointed Person. Safety Representative. The Contractor .
  • 24. Safe Permits to Work Following are examples of situations which may require discretionary safe work permits. There could be many others :
  • 25. Safe Permits to Work Movement of large pieces of equipment, especially while other personnel are working nearby, can result in employee injury. Permits may be issued to ensure the use of procedures that will prevent employee injury from falling material, or being struck by equipment. (LOLER Regulations)
  • 26. Safe Permits to Work Abandoned tanks, pipe lines, drums, and vessels may contain hazardous vapors and gases. Permits may be issued to prevent toxic or corrosive exposures to workers when working on abandoned equipment, complementing hot work and confined space permits. ?
  • 27. Safe Permits to Work Many construction processes create noise levels high enough to cause hearing loss. Permit requirements may be issued to reduce noise to acceptable limits, or to provide both construction and other employees with required hearing protection.
  • 28. Safe Permits to Work Boilers, high pressure vessels, tanks, etc can undergo sudden failure resulting in disastrous consequences. Permits may be issued requiring precautions and equipment to prevent system failures not covered by safe job procedures or project safety plans.
  • 29. Safe Permits to Work Permits may be required where the consequence of non-compliance with fall protection requirements is severe, or where dropped materials may endanger other workers below: i.e. working over water or working at height.
  • 30. Safe Permits to Work Permits are required before work begins near energized lines which cannot be shut off if there is danger of fire, shock or electrocution. Electricity At Work Regulations
  • 31. Safe Permits to Work CAUTION “ Safe Permit to Work Required!” Hazardous Materials! Confined Space! High Pressure Gas Mains! High Voltage! Permits are mandatory where signs are posted which require them.
  • 32. Safe Permits to Work Safe Work Permit Permit # Type: (hot work, confined space, line break, etc.... location: Valid __/___/___ ____ __/___/___ ____ Issued to: From: M D Y time to M D Y time Work Description: ________________________________ ____________________________________________ Supervisor’s Signature Print name ____________________________________________ ____________________________________________ Work Order No. Permits are issued: - for a specific date and time range, - for a specific job, - and to specific individuals.
  • 33.
  • 34. Safe Permits to Work Safe Work Permit ---------------------------------------------------------------------- Precautions Always required: o Emergency procedures review by: o Emergency equipment & location review by: o Area inherent hazards review by: o Material Safety Data Sheets review by: Workers must be informed of required emergency procedures, location and operation of emergency equipment, and area inherent hazards. (Site briefing or similar). Material Safety Data Sheets must be supplied and special precautions reviewed with workers and their supervisors.
  • 35. Safe Permits to Work Safe Permit to Work ---------------------------------------------------------------------- Special Precautions Required: o Buddy System o Sprinklers in Service o Cleaning of _________ o Purging of ________ o Remove materials from ___________________ o Piping o Drain o Disconnect o Blank off / Capped o Clean o Ventilate o Remove combustibles from other side of wall. o Floor Swept Clean of Combustibles o Clean area within 10m. o Wet down floor. o Adjacent areas: __________________________ o Cover floor with: __________________________ o Non-combustible Tarpaulins or Metal Shields Over: o Electrical Switches or Valves off, locked-out, and Tagged: o Electrical Grounding of: ________________________ o Atmosphere monitored during work for: ____________ periodically: __________ continuously: __________ o Safety Monitor(s) present from _________ to _________ o Fire Watch Present during work and for 30 minutes after... o Respirator to be worn____ or be readily available ___ Required special precautions must be clearly indicated and communicated to workers, and their supervision. It is the safety representative’s responsibility to determine if and when special measures are required. Permits differ from company to company
  • 36. Safe Permits to Work Safe Work Permit ---------------------------------------------------------------------- Safety Equipment Required o safety glasses o hard hat o face shield o safety shoes o fire extinguishers - type ___ #___ size ___ o fire hose o supplementary illumination o warning signs o barricades o non-sparking tools o explosion proof equipment o safety harness o life line o tripod emergency escape unit o 2-way radio or phone o respirators o impervious gloves o protective clothing _____________________ o mechanical ventilation o shower & eyewash o self contained breathing apparatus o ground fault circuit interrupter o ladder / lift / scaffold o other________________________________ Personal protective equipment and other safety equipment required is specified. For each hazard present at the work site, the safety representative must specify a hazard control.
  • 37.
  • 39.
  • 40.
  • 41.
  • 43. Hot Work Permits Examples of hot work are: welding burning brazing propane soldering oxyacetylene cutting grinding ferrous metals
  • 44. Hot Work Permits Cutting / Welding Permit Location: Job No. Date: Job No. Location & Building: Floor Nature of Job: Welder’s Name: The above location has been examined. The precautions checked on the reverse of this card have been taken to prevent fire. Permission is granted for this work. Permit Date: Time: Expires AM PM Permits are issued for the specific job being done, And For a specific time period, the time period is usually for the working shift, But may never exceed twenty-four hours.
  • 45. Hot Work Permits Necessary Precautions O Sprinklers are in service. O Cutting and welding equipment in good repair. Precautions within 35 ft. (10 m.) of work. O Floors swept clean of combustibles. O Combustible floors wet down, covered with damp sand or fire-resistive sheets. O Flammable liquids removed; other combustibles, if not removed protected with fire-resistive tarpaulins or metal shields. O Explosive atmosphere in area eliminated. O All wall and floor openings covered. O Fire-resistive tarpaulins suspended beneath work. Work on Walls or Ceilings O Construction is noncombustible and without combustible covering or isolation. O Combustibles moved away from other side of wall. Work on Enclosed Equipment O Enclosed equipment cleaned of all combustibles. O Containers purged of flammable liquids. Fire Watch O Fire watch will be provided during and for at least 30 minutes after work, and during any coffee or lunch breaks. O Fire watch is supplied with suitable extinguishers, or charged small hose. O Fire watch is trained in use of this equipment and in sounding alarm. The Fire Marshal, Safety Engineer, Maintenance Manager or Appointed Person has the responsibility to verify that all necessary precautions have been taken at the worksite.
  • 46. Hot Work Permits Necessary Precautions O Sprinklers are in service. Welding and other hot work have been found to be high ranking causes of industrial fires. Sprinkler systems must remain in service in the hot work area, unless specifically approved by the Fire Marshal, Safety Engineer, or Maintenance Manager.
  • 47. Hot Work Permits Necessary Precautions O Cutting and welding equipment in good repair. Gas hoses, backflow preventors, fire resistive tarpaulins, curtains and other cutting and welding equipment must be in good repair before the permit is issued.
  • 48. Hot Work Permits Necessary Precautions Precautions within 35 ft. (10 m.) of work. O Floors swept clean of combustibles. O Combustible floors wet down, covered with damp sand or fire-resistive sheets. O Flammable liquids removed; other combustibles, if not removed protected with fire-resistive tarpaulins or metal shields. O Explosive atmosphere in area eliminated. O All wall and floor openings covered. O Fire-resistive tarpaulins suspended beneath work. Work on Walls or Ceilings O Construction is noncombustible and without combustible covering or isolation. O Combustibles moved away from other side of wall. Work on Enclosed Equipment O Enclosed equipment cleaned of all combustibles. O Containers purged of flammable liquids. Anything that can burn must be removed from the immediate work area.
  • 49. Hot Work Permits Necessary Precautions Fire Watch O Fire watch will be provided during and for at least 30 minutes after work, and during any coffee or lunch breaks. O Fire watch is supplied with suitable extinguishers, or charged small hose. O Fire watch is trained in use of this equipment and in sounding alarm. Fire Watch Personnel may not do other jobs which detract from their primary responsibility. Fire Watch Personnel must be trained to use fire extinguishment media provided. Fire Watch Personnel must be aware of how to report emergencies, and in emergency evacuation procedures. Fire Watch Personnel must be identified and their qualifications verified, before permits are issued .
  • 50. Hot Work Permits Final Checkup By Welder Work area and all adjacent areas to which sparks and heat might have spread (such as floors above and below and on opposite side of walls) were inspected after the work was completed and were found firesafe. Signed: After signing, return to person who issued it. Before leaving the area for the day, verify that no smoldering fires have developed within walls, cracks in floors, or in ceiling areas where you have been working. Return the work permit to the person who issued it within 30 minutes of job completion , so that they may complete any necessary job follow-up.
  • 51.
  • 52. Safe Dig Permit. Safe Work Permit ---------------------------------------------------------------------- EXCAVATION PRECAUTIONS REQUIRED: o Underground Utility Hazard Review o Soil Excavation Reviewed o Underground Utility Stakeout Performed o Excavation cut back walls reinforced o Means of exiting. The safety representative must verify that all underground utilities have been located and staked out by the use of Plans, Drawings etc, and by the use of trained persons using Cable Avoidance Tools. Provisions must be made to barricade the open trench, prevent collapse of trench walls, provide employees with a means of exit, reroute ground water, and all other requirements of excavating. If soil is contaminated, the safety representative will ask for a written health and safety plan.
  • 53.  
  • 54.  
  • 55.  
  • 56.  
  • 57.
  • 58.
  • 59.
  • 60. 2 1 3 4 PERMIT TO WORK Site: __________________________________ Permit No. Check Work Complete Cancel Permit Signed: ___________ Time _____:______ Signed: ___________ Time _____:______ Date ___/___/___ Date ___/___/___ Name: Request to the Authorised Person ___________________________________________ ( Discipline e.g. Foreman Supervisor) From __________________________________________ Job: Detail equipment, plant ________________________________________________________ Process or activity upon ________________________________________________________ which work is required ________________________________________________________ ________________________________________________________ Action: Signed: _____________________________ Time _____:______ Date ___/___/___ Position:______________________________________ Detail action and I have read the above request and certify that the above equipment is available, to the precautions taken degree of safety required by you to perform your work as follows: to achieve safe working ______________________________________________________________________ and to avoid perceived ______________________________________________________________________ hazards ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________________ Action: Signed: _____________________________ Time _____:______ Date ___/___/___ Permit Valid until: Time _____:______ Date ___/___/___ Position: _____________________________________ I hereby declare that I accept responsibility for carrying out the work on the equipment/task defined in section (1) above. I will comply with the Safety Rules upon which I have received instructions . Action: Signed: _____________________________ Time _____:______ Date ___/___/___ (Competent Person e.g. Engineer/Electrician) I hereby declare that I have withdrawn from the equipment/task specified in this permit, and have warned any men who assisted me that it is no longer safe to work on the equipment. All tools, safety devices, earths applied/connected/fixed by my authority have been removed. Action: Signed: _____________________________ Time _____:______ Date ___/___/___ (Competent Person e.g. Engineer/Electrician)

Editor's Notes

  1. They should contain originator and date. identification of individual(s) who will be responsible for the whole operation and for compliance with the method statement. skills (competencies of those who will do the job) ie crane and fork lift truck drivers the sequence of work including hazard identification and risk control measures Any environmental limitations which may be applicable such as wind speed, rain, temperature. reference to Standards/Procedures Specific safety precautions including materials, storage, transportation handling and security details the position of fencing / barriers to separate the work site from other areas including signs etc. provision of access for visitors to site provision for supervision and inspection of work the position of skips, storage areas, parking, portable toilets etc. details of all personal protective equipment and other measures such as local exhaust ventilation, rescue equipment, fire extinquishers, gas detection equipment The means by which any variations to the method statement will be authorised.