Construction of pre-cust
pile of a ten storied commercial building
2
 Introduction
 Objective
 Company profile
 Company Organogram
 Structure Drawing criterion
 Skin friction
 Estimation
 Uses materials
 Working procedure
 Problem
 Solution
 Conclusion
3
 STC group and Holdings Ltd. were starting as civil Engineering
consultant. It has become one of the most experienced and well
reputed real estate developer companies in Bangladesh. The STC
group has many construction site. But now I want present the Cast in situ
pile of a ten storied building at STC group . The reason of this
presentation is to understand the whole construction process of pile with
minimum rules and also understand the procedure of construction
problem and solution, site supervision, site safety & security.
4
 For understand the quality in construction work.
 For learn about estimating process of cast in situ pile.
 For Know the construction procedure of cast in situ
pile.
 For cheek the preferable condition of cast in situ pile.
 For know the construction materials type of cast in
situ pile.
5
 Dominage Group is working in Real Estate, Prefabricated
Steel Building Construction, Architectural & Engineering
Consultancy, Interior–Exterior designing, Decoration &
Power Sectors.
 It was established in 2003.
 Within the very short span, it has received number of
satisfied clients and very good reputation as committed
and consistent quality Provider Company.
 Here has some good architects who takes good care of you,
your loving children, your guest and other family
members.
6
Company Organogram
Company Organogram
Company Organogram
Company Organogram
7
Dominage Oasis, Plot#15, Road#8, Sec.#4, Uttara, Dhaka.
8
Dominage Pride, Plot#37, Road#11, Sec.#13, Uttara, Dhaka
9
Dominage parloto sisily, Plot#43, Road#108, Block# D, Boshundhara, Dhaka.
10
Dominage Heaven
 Name of the project:
“Dominage Heaven”
 Adders of the project:
Road-12, House No-7/4, Block-
A, Bosundhara R/A, Dhaka.
 Area of the project: 5 katha
11
 The pile can take load vertically end bearing and also by skin friction.
 When the soil bearing capacity was not sufficient for carrying the
design load by the column footing that is why the pile foundation was
preferred for constructing a multistoried building in such a soil
condition.
 Now Dominage Consultancy Ltd of “Dominage Group” is preferred to
construct the cast-in-site pile at Dominge Heaven.
12
 When A pile develops the upward pressure on
its skin surface against the super imposed load
this is called skin friction.
 Now we can say the skin friction of pile is
transferring the loads to the soil by the surface
of the pile.
 In the design time we must have to care full about
skin friction value because it must be grater
then design load.
13
Dominage Group
 This is the pile lay
out of the
dominage Heaven.
 Here has 56 pile in
this project.
 Total area = 5840
sft .
17'-5"
11'-1"
9'-0"
6'-8"
11'-3"
17'-5"
B
C
D
E
F
G
H
14'-11"
13'-7"
8'-1"
21'-4"
14'-11"
B
C
D
E
F
H
1'-9"
2'-3"
2'-3"
1'-9"
1'-9"
1'-9"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9"
1'-9"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9"
1'-9"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9"
1'-9"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9"
1'-9"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9"
1'-9"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9"
1'-9"
1'-9"
2'-3"
2'-3"
1'-9" 1'-3" 3'-3" 1'-9"
2'-10"
1'-2"
2'-10"
1'-9"
1'-2"
1'-9"
2'-3"
2'-3"
1'-9" 1'-3" 3'-3" 1'-9"
2'-10"
1'-2"
2'-10"
1'-9"
1'-2"
1'-9"
2'-3"
2'-3"
1'-9" 1'-3" 3'-3" 1'-9"
2'-10"
1'-2"
2'-10"
1'-9"
1'-2"
1'-9"
2'-3"
2'-3"
1'-9" 1'-3" 3'-3" 1'-9"
2'-10"
1'-2"
2'-10"
1'-9"
1'-2"
1'-9"
2'-3"
2'-3"
1'-9" 1'-3" 3'-3" 1'-9"
2'-10"
1'-2"
2'-10"
1'-9"
1'-2"
1'-9"
2'-3"
2'-3"
1'-9" 1'-3" 3'-3" 1'-9"
2'-10"
1'-2"
2'-10"
1'-9"
1'-2"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9" 2'-3" 2'-3" 1'-9"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9" 2'-3" 2'-3" 1'-9"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9" 2'-3" 2'-3" 1'-9"
1'-9"
2'-3"
2'-3"
1'-9"
1'-9" 2'-3" 2'-3" 1'-9"
3"
3"
3"
4"
6"
3"
1'-9"
10"
1'-9"
3'-4"
3'-4"
10"
1'-9"
1'-1.5"
3'-4.5" 3'-3.5"
1'-2.5"
1'-9"
82'-11"
70'-5"
14
 In the pile use :
 Length of pile = 70 ft.
 Longitudinal bar= 60
grade.
 Spiral rod = 40 grade.
 Side clear cover = 3”.
10Ø
@
6"
C/C
FOR
THE
REST
LONG SECTION OF PILE
1'-6"
10mm Ø @ 6"c/c
3'-0"
(min.)
10mm Ø @ 5" c/c
CASTING LEVEL
ROAD LEVEL ± (0'-0")
BREAKING LEVEL (MIN. 3'-0")
H
H = 6'-0" FOR PILE SUPPORTING WATER TANK
H = 3'-0" FOR ALL OTHER PILE
A
A
B
70'
40'
20
15
 Dept of a pile cap =
36”.
 Dia of a pile = 18” .
 Nos of longitudinal
bare =
 Upto 40’ = 16 mm 6
nos others =16 mm
3 and 3 #12 mm.
1"
Grade Beam
PILE
PILE CAP SECTION OF FIVE PILE OR OTHER
3"CC
PARKING LEVEL (ARCH.)
3"
36"
CAP WITH 7 PILE
16mm Ø @ 4" C/C
16
 Here is
 The length of the pile, L = 70 ft
 The diameter of the pile, D = 18 inch
 Concrete Volume = V
 Now,
 V= L X A
 = 70 ft X 1.77 sft
 = 123.9 cft
17
 Where,
 L = 60 ft
 The cross sectional area of the pile is
 A = Π D2
/4
= {3.142 X (18/12)2
}/ 4 = 1.77 cft
 Let, Volume= 123.9 cft
 Ratio= 1:2:3
 4.2.1 Portland Cement:
 = (1X1.5 X123.9)/ (7) [Here, 1.5 is multiplied for dry
volume]
 = 26.55 cft / 1.15 cft @ 1.15 cft per bag cement
18
 = 23.08 bag
 = 24 bags (say)
 4.2.2 Sylhet Sand:
 = (2 X 1.5 X 123.9) / (7)
 = 53.10 cft
 = 54 cft (say)
 4.2.3 Stone Chips:
 = (4 X 1.5 X 123.9) / (7)
 = 106.2 cft = 106 cft (say)
19
 Stirrup:
 The no of ring in a single pile is = (70/4 + 12) = 29.5 ft @ 5”C/C
= {29.5*12 / (5-1)} + 1 = 90 nos
 Length required for a single coil = Π X D = 3.142 X (18-3 X 2)/12
 = 3.14 ft we can say
= 90 X 3.14 ft = 282.6 ft @ 0.19 kg = 53.69 kg
= 54 kg (say)
 The no of ring in a single pile is = 70/2 = 35 ft@6”C/C
= {35*12 / (6-1)} + 1 = 85 Nos.
= 85 X 3.14 ft = 266.99 m @ 0.19 kg = 50.71 kg = 51 kg (say)
 Total quantity of 10 mm Φ rod is for a pile = (54 + 51) kg = 105 kg.
20
 Longitudinal bar:
 16 mm dia of bar= 40 X .48 = 19.2 kg = 20 kg(say)X 6 nos of bar = 120 kg.
 16 mm dia of bar= 20 X .48 = 9.6 kg = 10 kg (say) X 3 nos of bar = 30 kg.
 12 mm dia of bar = 20 X .27 = 5.4 kg = 6 kg (say) X 3 nos of bar = 18 kg.
21
 The Summery of Estimated Materials for Cast in situ pile for the Project:
Sl No Name of the
Material
Unit No of
Pile
Required
Quantity
Per Pile
Total
Required
Quantity
1 Ordinary Portland
Cement
Bags 56 24 1344 bag
2 Sylhet Sand CFT 56 54 3024 cft
3 Stone Chips CFT 56 106 5936 cft
4 Rod 16 mm Φ Ton 56 150 kg 8.4 ton
5 Rod 12 mm Φ Ton 56 18 kg 1 .0 ton
5 Rod 10 mm Φ Ton 56 105 kg 5.88 ton
22
 Tripod stand: it is used for
making frame to handle the
total works including boring,
washing and concreting, etc.
 Centrifugal Pump: It is used
for throw the drilling fluid
inside the borehole to make
easy the work and at the same
time wash the cutting materials
by chopping
Tripod stand
Centrifugal Pump
23
 Winch machine: it is used for
lifting the drilling rod, heavy
pipe and also the reinforcement
case by a wire.
 Funnel: A funnel is used for
the replacing concrete at the
pile required depth through the
trimmi pipe.
Winch Machine
Funnel
24
 Mixer Machine: The mixer
machine is used for preparing
the concrete in its proper ratio.
 Pipe Holder: The pipe holder is
used for holding the drilling rod
and trimmi pipe on the
temporary casing pipe or bore
hole. also it is needed at the
time of removing the pipe from
its inter joint and adjusting a
new one for make it longer
during drilling and concreting.
Mixer machine
Pipe Holder
25
 Bucket: The bucket is used for
replacing concrete inside the
funnel. Bucket has a gate at the
bottom.
 Pile Drum: Pipe drum is used for
the coiling the spiral strirup. It is
made by steel bar and it is
operated by the two person from
the two side.
 Cashing Pipe: The cashing pipe is
the like a metal pipe which is 12 to
15 ft long and its in side diameter
is 20 to 30 inch or more then the
chisel diameter.
Bucket
Cashing pipe
26
 Trimmi pipe: It is the steel pipe
which is inner side diameter is 8
to 10 inch. It helps to replace the
concrete to its end depth easily
and it as also protects the water to
enter the concrete. It is also used
the compaction work.
 Chisel or Drill bit: The chisel
is the made of steel having in
side hollow drill bit which has
five equal flanges and that
flanges is bonded with a metal
ring that is help to cut the loose
soil easily by the boring. This
drill bit diameter is depending
upon the borehole.
Trimmi pipe
Drill bit
27
Dominage Group
Drilling Rod
 Drilling rod: It is made of steel
and its diameter is 6 to 8 inch. It
is used for drill the bore hole.
28
In the Bangladesh most commonly useable process is percussion boring
process for cast in situ pile.
◦ Boring operation
◦ Borehole stabilization
◦ Preparation of reinforcement casing
◦ Placement of the rebar case into the borehole
◦ Concreting into the borehole.
29
 Boring operation:
 At first, according to the pile layout plan the
locations of the center of the piles are selected
carefully on the ground.
 Before starting the boring work we must have
to do the investigation of cast-in-situ pile the
construction site.
Then set the tripod and drill bit on the top of
the pile point center. Then top of the drilling
pipe adjusted with a head where a hose pipe is
connected from the centrifugal pump.
That pump is always circulating the drilling
fluid from the settling tank to maintain the
properties of drilling fluid during borehole
operation.
30
 Borehole stabilization:
 The drilling purpose fluid is used for hole or loose the inside soil of
borehole.
 In percussion boring one subjects is must follow is that fresh water should
not be used as a drilling fluid in boring operation.
 For maintain the better quality bentonite is used as admixture with
drilling fluid inside the borehole.
 After that it should be washed properly not more or less.
 When we will see no cutting material mixed with the wash water we have
to stop the washing.
 Then we can tell that the borehole is totally washed.
31
 Preparation of reinforcement casing:
 This work is must be done by the expert
labor.
 The reinforcement case made by expert
because the longitudinal bars are cut
according to the measurement of the
structural drawing and it is bound with
wire and welded properly with electrodes
on a temporary hanger.
 There are 8 mm to 10 mm 40 graded rod is
used as spiral stirrup.
 To make the spiral ring the pile drum is
used in the field.
 After the boring operation we should
have to place the reinforcement case as
soon as possible.
32
 Placement of the rebar case into the borehole:
 After ready the reinforcement case engineer must check the rebar case
is properly bound and welded.
 The engineer has to be careful about the place, through which the
rebar case will be pulled over the borehole.
 The rebar case should be placed by its self weight not by providing any
extra force.
 If the rebar case is placed by any external force then there is a
possibility of caving or misguiding the rebar case inside the borehole.
 In reinforcement case we should give the proper clear cover.
 Finally the rebar case should have to hang with the case pipe .
 Otherwise it will be grounded into the bore hole bottom which will be
very harmful for pile.
33
Image of Rebar case Placing
34
 Concrete on the borehole:
 Finally we have to place the concrete on the borehole.
 For this work we are use the trimmi pipe, funnel, bucket etc.
 We should not wait so long because then there is a possibility of caving
or settling inside by the suspended particles.
 After discharge the concrete from the bucket then that time trimmi pipe
and funnel have to move up and down that time it cleaned properly.
 From this up and down process concrete will be compressed.
 Finally the concreting case pipe will be withdrawn carefully so that
there is no chance for withdrawing the concrete or the rebar casing.
35
Image of concreting
36
 The proportion of the concrete was not maintained carefully.
 Stone chips is not well graded and not bolder crash.
 Trimmi pipe was divided from the joint.
 Safety and security is not proper maintained.
 Rebar case was displaced from the same position.
 Rebar case caring time happen some accident.
 Fast aid box is not available in the projects.
 Pile caving occurred during replacing rebar case for two piles.
37
Fig- stone chips
38
 To the mixing time we have to careful for supervision.
 Stone chips must take the bolder crashed.
 Before joint must cheek the threat of the trimmi pipe.
 Rebar case replace time we should be very careful about the accident.
 Fast aid box must have to stoke in the site.
 Washing time must have to care about the boring fluid.
39
 To understand the layout and project preparation
are very important in any construction.
 To supervision of cast in situ pile & design work in
an appropriate manner.
 To control the quality of cast in situ pile.
 Otherwise our dreams will not comes in true.
40
 Any Question?
41

More Related Content

What's hot

Manufacturing of concrete
Manufacturing of  concreteManufacturing of  concrete
Manufacturing of concreteBasirat Amir
 
Machinery for crushing and grinding
Machinery for crushing and grindingMachinery for crushing and grinding
Machinery for crushing and grindingAsad Imran Munawwar
 
Grinding machine
Grinding machineGrinding machine
Grinding machinevivek vala
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingAnchit Agrawal
 
Concrete Mixers - Types, Suitability & Specifications
Concrete Mixers - Types, Suitability & SpecificationsConcrete Mixers - Types, Suitability & Specifications
Concrete Mixers - Types, Suitability & SpecificationsAbhishek Bharti
 
Process of manufacturing of concrete
Process of manufacturing of concreteProcess of manufacturing of concrete
Process of manufacturing of concreteFayaz Ahamed A P
 
Diamond grinding cup plate catalog from diamond tools manufacturer bsptools.com
Diamond grinding cup plate catalog from diamond tools manufacturer bsptools.comDiamond grinding cup plate catalog from diamond tools manufacturer bsptools.com
Diamond grinding cup plate catalog from diamond tools manufacturer bsptools.com超 董
 
Grinding machine
Grinding machineGrinding machine
Grinding machineSunit Neeli
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Size reduction equipments
Size reduction equipmentsSize reduction equipments
Size reduction equipmentsKarnav Rana
 
Grinding machine by- Diparsh Modh
Grinding machine by- Diparsh ModhGrinding machine by- Diparsh Modh
Grinding machine by- Diparsh ModhDiparsh
 
Concret production
Concret productionConcret production
Concret productionRabinPanthi1
 
Grinding machines and abrasives
Grinding machines and abrasivesGrinding machines and abrasives
Grinding machines and abrasivesNishant Narvekar
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadLachhmikant. Prasad
 
Fabrication of abrasive belt grinder saravanan
Fabrication of abrasive belt grinder   saravananFabrication of abrasive belt grinder   saravanan
Fabrication of abrasive belt grinder saravanandinnusara
 
PARTICLE SIZE REDUCTION TECHNIQUES
PARTICLE SIZE REDUCTION TECHNIQUESPARTICLE SIZE REDUCTION TECHNIQUES
PARTICLE SIZE REDUCTION TECHNIQUESSagar Savale
 
Grinding wheel designation and selection
Grinding wheel designation and selectionGrinding wheel designation and selection
Grinding wheel designation and selectioncpandiv
 

What's hot (19)

Manufacturing of concrete
Manufacturing of  concreteManufacturing of  concrete
Manufacturing of concrete
 
Machinery for crushing and grinding
Machinery for crushing and grindingMachinery for crushing and grinding
Machinery for crushing and grinding
 
Grinding machine
Grinding machineGrinding machine
Grinding machine
 
Grinding
GrindingGrinding
Grinding
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Concrete Mixers - Types, Suitability & Specifications
Concrete Mixers - Types, Suitability & SpecificationsConcrete Mixers - Types, Suitability & Specifications
Concrete Mixers - Types, Suitability & Specifications
 
Process of manufacturing of concrete
Process of manufacturing of concreteProcess of manufacturing of concrete
Process of manufacturing of concrete
 
Ball mill
Ball millBall mill
Ball mill
 
Diamond grinding cup plate catalog from diamond tools manufacturer bsptools.com
Diamond grinding cup plate catalog from diamond tools manufacturer bsptools.comDiamond grinding cup plate catalog from diamond tools manufacturer bsptools.com
Diamond grinding cup plate catalog from diamond tools manufacturer bsptools.com
 
Grinding machine
Grinding machineGrinding machine
Grinding machine
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Size reduction equipments
Size reduction equipmentsSize reduction equipments
Size reduction equipments
 
Grinding machine by- Diparsh Modh
Grinding machine by- Diparsh ModhGrinding machine by- Diparsh Modh
Grinding machine by- Diparsh Modh
 
Concret production
Concret productionConcret production
Concret production
 
Grinding machines and abrasives
Grinding machines and abrasivesGrinding machines and abrasives
Grinding machines and abrasives
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasad
 
Fabrication of abrasive belt grinder saravanan
Fabrication of abrasive belt grinder   saravananFabrication of abrasive belt grinder   saravanan
Fabrication of abrasive belt grinder saravanan
 
PARTICLE SIZE REDUCTION TECHNIQUES
PARTICLE SIZE REDUCTION TECHNIQUESPARTICLE SIZE REDUCTION TECHNIQUES
PARTICLE SIZE REDUCTION TECHNIQUES
 
Grinding wheel designation and selection
Grinding wheel designation and selectionGrinding wheel designation and selection
Grinding wheel designation and selection
 

Similar to pilefoundation-141216072447-conversion-gate01.pdf

signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentationPravin Gaurav
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methodsHalim Rahman
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCAl Hakam Khan
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
publication_1580218342.pdf
publication_1580218342.pdfpublication_1580218342.pdf
publication_1580218342.pdfPradeepPokhrel5
 
PNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docxPNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docxstilliegeorgiana
 
Developers Transflex Installation
Developers Transflex InstallationDevelopers Transflex Installation
Developers Transflex Installationguest470ea8
 

Similar to pilefoundation-141216072447-conversion-gate01.pdf (20)

Pile foundation
Pile foundationPile foundation
Pile foundation
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
Metroppt
MetropptMetroppt
Metroppt
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methods
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
railway_plant_layout
railway_plant_layoutrailway_plant_layout
railway_plant_layout
 
Project report
Project reportProject report
Project report
 
mbl
mblmbl
mbl
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
DMC Piling
DMC PilingDMC Piling
DMC Piling
 
DMC piling
DMC pilingDMC piling
DMC piling
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
Post tensioning
Post tensioningPost tensioning
Post tensioning
 
publication_1580218342.pdf
publication_1580218342.pdfpublication_1580218342.pdf
publication_1580218342.pdf
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
 
PNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docxPNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docx
 
Casing_Design(1).ppt
Casing_Design(1).pptCasing_Design(1).ppt
Casing_Design(1).ppt
 
Pipe bending machine
Pipe bending machinePipe bending machine
Pipe bending machine
 
Intership in DMRC
Intership in DMRCIntership in DMRC
Intership in DMRC
 
Developers Transflex Installation
Developers Transflex InstallationDevelopers Transflex Installation
Developers Transflex Installation
 

Recently uploaded

Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdfKamal Acharya
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.benjamincojr
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxMustafa Ahmed
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..MaherOthman7
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfSkNahidulIslamShrabo
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxMustafa Ahmed
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1T.D. Shashikala
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 

Recently uploaded (20)

Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 

pilefoundation-141216072447-conversion-gate01.pdf

  • 1. MD. RASHEDUL ISLAM ID: 12106068 SUB: ART 203 SEC: B IUBAT- International University of Business Agriculture and Technology. 1
  • 2. Construction of pre-cust pile of a ten storied commercial building 2
  • 3.  Introduction  Objective  Company profile  Company Organogram  Structure Drawing criterion  Skin friction  Estimation  Uses materials  Working procedure  Problem  Solution  Conclusion 3
  • 4.  STC group and Holdings Ltd. were starting as civil Engineering consultant. It has become one of the most experienced and well reputed real estate developer companies in Bangladesh. The STC group has many construction site. But now I want present the Cast in situ pile of a ten storied building at STC group . The reason of this presentation is to understand the whole construction process of pile with minimum rules and also understand the procedure of construction problem and solution, site supervision, site safety & security. 4
  • 5.  For understand the quality in construction work.  For learn about estimating process of cast in situ pile.  For Know the construction procedure of cast in situ pile.  For cheek the preferable condition of cast in situ pile.  For know the construction materials type of cast in situ pile. 5
  • 6.  Dominage Group is working in Real Estate, Prefabricated Steel Building Construction, Architectural & Engineering Consultancy, Interior–Exterior designing, Decoration & Power Sectors.  It was established in 2003.  Within the very short span, it has received number of satisfied clients and very good reputation as committed and consistent quality Provider Company.  Here has some good architects who takes good care of you, your loving children, your guest and other family members. 6
  • 7. Company Organogram Company Organogram Company Organogram Company Organogram 7
  • 8. Dominage Oasis, Plot#15, Road#8, Sec.#4, Uttara, Dhaka. 8
  • 9. Dominage Pride, Plot#37, Road#11, Sec.#13, Uttara, Dhaka 9
  • 10. Dominage parloto sisily, Plot#43, Road#108, Block# D, Boshundhara, Dhaka. 10
  • 11. Dominage Heaven  Name of the project: “Dominage Heaven”  Adders of the project: Road-12, House No-7/4, Block- A, Bosundhara R/A, Dhaka.  Area of the project: 5 katha 11
  • 12.  The pile can take load vertically end bearing and also by skin friction.  When the soil bearing capacity was not sufficient for carrying the design load by the column footing that is why the pile foundation was preferred for constructing a multistoried building in such a soil condition.  Now Dominage Consultancy Ltd of “Dominage Group” is preferred to construct the cast-in-site pile at Dominge Heaven. 12
  • 13.  When A pile develops the upward pressure on its skin surface against the super imposed load this is called skin friction.  Now we can say the skin friction of pile is transferring the loads to the soil by the surface of the pile.  In the design time we must have to care full about skin friction value because it must be grater then design load. 13
  • 14. Dominage Group  This is the pile lay out of the dominage Heaven.  Here has 56 pile in this project.  Total area = 5840 sft . 17'-5" 11'-1" 9'-0" 6'-8" 11'-3" 17'-5" B C D E F G H 14'-11" 13'-7" 8'-1" 21'-4" 14'-11" B C D E F H 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-3" 3'-3" 1'-9" 2'-10" 1'-2" 2'-10" 1'-9" 1'-2" 1'-9" 2'-3" 2'-3" 1'-9" 1'-3" 3'-3" 1'-9" 2'-10" 1'-2" 2'-10" 1'-9" 1'-2" 1'-9" 2'-3" 2'-3" 1'-9" 1'-3" 3'-3" 1'-9" 2'-10" 1'-2" 2'-10" 1'-9" 1'-2" 1'-9" 2'-3" 2'-3" 1'-9" 1'-3" 3'-3" 1'-9" 2'-10" 1'-2" 2'-10" 1'-9" 1'-2" 1'-9" 2'-3" 2'-3" 1'-9" 1'-3" 3'-3" 1'-9" 2'-10" 1'-2" 2'-10" 1'-9" 1'-2" 1'-9" 2'-3" 2'-3" 1'-9" 1'-3" 3'-3" 1'-9" 2'-10" 1'-2" 2'-10" 1'-9" 1'-2" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 1'-9" 2'-3" 2'-3" 1'-9" 3" 3" 3" 4" 6" 3" 1'-9" 10" 1'-9" 3'-4" 3'-4" 10" 1'-9" 1'-1.5" 3'-4.5" 3'-3.5" 1'-2.5" 1'-9" 82'-11" 70'-5" 14
  • 15.  In the pile use :  Length of pile = 70 ft.  Longitudinal bar= 60 grade.  Spiral rod = 40 grade.  Side clear cover = 3”. 10Ø @ 6" C/C FOR THE REST LONG SECTION OF PILE 1'-6" 10mm Ø @ 6"c/c 3'-0" (min.) 10mm Ø @ 5" c/c CASTING LEVEL ROAD LEVEL ± (0'-0") BREAKING LEVEL (MIN. 3'-0") H H = 6'-0" FOR PILE SUPPORTING WATER TANK H = 3'-0" FOR ALL OTHER PILE A A B 70' 40' 20 15
  • 16.  Dept of a pile cap = 36”.  Dia of a pile = 18” .  Nos of longitudinal bare =  Upto 40’ = 16 mm 6 nos others =16 mm 3 and 3 #12 mm. 1" Grade Beam PILE PILE CAP SECTION OF FIVE PILE OR OTHER 3"CC PARKING LEVEL (ARCH.) 3" 36" CAP WITH 7 PILE 16mm Ø @ 4" C/C 16
  • 17.  Here is  The length of the pile, L = 70 ft  The diameter of the pile, D = 18 inch  Concrete Volume = V  Now,  V= L X A  = 70 ft X 1.77 sft  = 123.9 cft 17
  • 18.  Where,  L = 60 ft  The cross sectional area of the pile is  A = Π D2 /4 = {3.142 X (18/12)2 }/ 4 = 1.77 cft  Let, Volume= 123.9 cft  Ratio= 1:2:3  4.2.1 Portland Cement:  = (1X1.5 X123.9)/ (7) [Here, 1.5 is multiplied for dry volume]  = 26.55 cft / 1.15 cft @ 1.15 cft per bag cement 18
  • 19.  = 23.08 bag  = 24 bags (say)  4.2.2 Sylhet Sand:  = (2 X 1.5 X 123.9) / (7)  = 53.10 cft  = 54 cft (say)  4.2.3 Stone Chips:  = (4 X 1.5 X 123.9) / (7)  = 106.2 cft = 106 cft (say) 19
  • 20.  Stirrup:  The no of ring in a single pile is = (70/4 + 12) = 29.5 ft @ 5”C/C = {29.5*12 / (5-1)} + 1 = 90 nos  Length required for a single coil = Π X D = 3.142 X (18-3 X 2)/12  = 3.14 ft we can say = 90 X 3.14 ft = 282.6 ft @ 0.19 kg = 53.69 kg = 54 kg (say)  The no of ring in a single pile is = 70/2 = 35 ft@6”C/C = {35*12 / (6-1)} + 1 = 85 Nos. = 85 X 3.14 ft = 266.99 m @ 0.19 kg = 50.71 kg = 51 kg (say)  Total quantity of 10 mm Φ rod is for a pile = (54 + 51) kg = 105 kg. 20
  • 21.  Longitudinal bar:  16 mm dia of bar= 40 X .48 = 19.2 kg = 20 kg(say)X 6 nos of bar = 120 kg.  16 mm dia of bar= 20 X .48 = 9.6 kg = 10 kg (say) X 3 nos of bar = 30 kg.  12 mm dia of bar = 20 X .27 = 5.4 kg = 6 kg (say) X 3 nos of bar = 18 kg. 21
  • 22.  The Summery of Estimated Materials for Cast in situ pile for the Project: Sl No Name of the Material Unit No of Pile Required Quantity Per Pile Total Required Quantity 1 Ordinary Portland Cement Bags 56 24 1344 bag 2 Sylhet Sand CFT 56 54 3024 cft 3 Stone Chips CFT 56 106 5936 cft 4 Rod 16 mm Φ Ton 56 150 kg 8.4 ton 5 Rod 12 mm Φ Ton 56 18 kg 1 .0 ton 5 Rod 10 mm Φ Ton 56 105 kg 5.88 ton 22
  • 23.  Tripod stand: it is used for making frame to handle the total works including boring, washing and concreting, etc.  Centrifugal Pump: It is used for throw the drilling fluid inside the borehole to make easy the work and at the same time wash the cutting materials by chopping Tripod stand Centrifugal Pump 23
  • 24.  Winch machine: it is used for lifting the drilling rod, heavy pipe and also the reinforcement case by a wire.  Funnel: A funnel is used for the replacing concrete at the pile required depth through the trimmi pipe. Winch Machine Funnel 24
  • 25.  Mixer Machine: The mixer machine is used for preparing the concrete in its proper ratio.  Pipe Holder: The pipe holder is used for holding the drilling rod and trimmi pipe on the temporary casing pipe or bore hole. also it is needed at the time of removing the pipe from its inter joint and adjusting a new one for make it longer during drilling and concreting. Mixer machine Pipe Holder 25
  • 26.  Bucket: The bucket is used for replacing concrete inside the funnel. Bucket has a gate at the bottom.  Pile Drum: Pipe drum is used for the coiling the spiral strirup. It is made by steel bar and it is operated by the two person from the two side.  Cashing Pipe: The cashing pipe is the like a metal pipe which is 12 to 15 ft long and its in side diameter is 20 to 30 inch or more then the chisel diameter. Bucket Cashing pipe 26
  • 27.  Trimmi pipe: It is the steel pipe which is inner side diameter is 8 to 10 inch. It helps to replace the concrete to its end depth easily and it as also protects the water to enter the concrete. It is also used the compaction work.  Chisel or Drill bit: The chisel is the made of steel having in side hollow drill bit which has five equal flanges and that flanges is bonded with a metal ring that is help to cut the loose soil easily by the boring. This drill bit diameter is depending upon the borehole. Trimmi pipe Drill bit 27
  • 28. Dominage Group Drilling Rod  Drilling rod: It is made of steel and its diameter is 6 to 8 inch. It is used for drill the bore hole. 28
  • 29. In the Bangladesh most commonly useable process is percussion boring process for cast in situ pile. ◦ Boring operation ◦ Borehole stabilization ◦ Preparation of reinforcement casing ◦ Placement of the rebar case into the borehole ◦ Concreting into the borehole. 29
  • 30.  Boring operation:  At first, according to the pile layout plan the locations of the center of the piles are selected carefully on the ground.  Before starting the boring work we must have to do the investigation of cast-in-situ pile the construction site. Then set the tripod and drill bit on the top of the pile point center. Then top of the drilling pipe adjusted with a head where a hose pipe is connected from the centrifugal pump. That pump is always circulating the drilling fluid from the settling tank to maintain the properties of drilling fluid during borehole operation. 30
  • 31.  Borehole stabilization:  The drilling purpose fluid is used for hole or loose the inside soil of borehole.  In percussion boring one subjects is must follow is that fresh water should not be used as a drilling fluid in boring operation.  For maintain the better quality bentonite is used as admixture with drilling fluid inside the borehole.  After that it should be washed properly not more or less.  When we will see no cutting material mixed with the wash water we have to stop the washing.  Then we can tell that the borehole is totally washed. 31
  • 32.  Preparation of reinforcement casing:  This work is must be done by the expert labor.  The reinforcement case made by expert because the longitudinal bars are cut according to the measurement of the structural drawing and it is bound with wire and welded properly with electrodes on a temporary hanger.  There are 8 mm to 10 mm 40 graded rod is used as spiral stirrup.  To make the spiral ring the pile drum is used in the field.  After the boring operation we should have to place the reinforcement case as soon as possible. 32
  • 33.  Placement of the rebar case into the borehole:  After ready the reinforcement case engineer must check the rebar case is properly bound and welded.  The engineer has to be careful about the place, through which the rebar case will be pulled over the borehole.  The rebar case should be placed by its self weight not by providing any extra force.  If the rebar case is placed by any external force then there is a possibility of caving or misguiding the rebar case inside the borehole.  In reinforcement case we should give the proper clear cover.  Finally the rebar case should have to hang with the case pipe .  Otherwise it will be grounded into the bore hole bottom which will be very harmful for pile. 33
  • 34. Image of Rebar case Placing 34
  • 35.  Concrete on the borehole:  Finally we have to place the concrete on the borehole.  For this work we are use the trimmi pipe, funnel, bucket etc.  We should not wait so long because then there is a possibility of caving or settling inside by the suspended particles.  After discharge the concrete from the bucket then that time trimmi pipe and funnel have to move up and down that time it cleaned properly.  From this up and down process concrete will be compressed.  Finally the concreting case pipe will be withdrawn carefully so that there is no chance for withdrawing the concrete or the rebar casing. 35
  • 37.  The proportion of the concrete was not maintained carefully.  Stone chips is not well graded and not bolder crash.  Trimmi pipe was divided from the joint.  Safety and security is not proper maintained.  Rebar case was displaced from the same position.  Rebar case caring time happen some accident.  Fast aid box is not available in the projects.  Pile caving occurred during replacing rebar case for two piles. 37
  • 39.  To the mixing time we have to careful for supervision.  Stone chips must take the bolder crashed.  Before joint must cheek the threat of the trimmi pipe.  Rebar case replace time we should be very careful about the accident.  Fast aid box must have to stoke in the site.  Washing time must have to care about the boring fluid. 39
  • 40.  To understand the layout and project preparation are very important in any construction.  To supervision of cast in situ pile & design work in an appropriate manner.  To control the quality of cast in situ pile.  Otherwise our dreams will not comes in true. 40