Padma Multipurpose BridgePadma Multipurpose Bridge
Munshiganj Part
Deputy Commissioner Munshiganj
Construction of Padma
Bridge and its Economic
Aspects
Group:05
Group MembersGroup Members
Md. Sajib Chowdhury (16411069)Md. Sajib Chowdhury (16411069)
Md. Ariful Islam(16411070)
Mahmuda Akter (16411071)Mahmuda Akter (16411071)
Golam Maruf Saqline Abir
(16411075)
Golam Maruf Saqline Abir
(16411075)
Sahin Alam (16411077)
 Padma River is
approximately 100
Km long.
Third largest river
in the world
(discharge
150,000m3
/s, average
sediment freight: 1
Billon tons/year).
Padma Bridge
located 35km south-
west of Dhaka.
 Padma River is
approximately 100
Km long.
Third largest river
in the world
(discharge
150,000m3
/s, average
sediment freight: 1
Billon tons/year).
Padma Bridge
located 35km south-
west of Dhaka.
CY 1
RS 2
RS 3
RS 5 RS 4
SA 1
SA 2
CY 2
SA 3
Inland Bridge( Viaduct) length
North End road viaduct = 1.48
km
South End road viaduct = 1.67
km
This will be the
biggest floor
level on the river in
Asia.
This will be the
biggest floor
level on the river in
Asia.
8
• Dual gauge Rail Track
• DFC loading
• Double stack container train to fulfill present and future
transportation task.
• Speed for passenger Train– 160 Km/h and Goods train –
120km/h
• Per day 80 No. train can cross.
• Dual gauge Rail Track
• DFC loading
• Double stack container train to fulfill present and future
transportation task.
• Speed for passenger Train– 160 Km/h and Goods train –
120km/h
• Per day 80 No. train can cross.
19
Selected Bridge End Facilities of PMB.
20
 The bridge will carry not only the rail and road traffic it will also be a
bridge for “ stop and shop”.
 This will be an ICONIC bridge – a magnet for tourism development in
Bangladesh.
 Dredged Material Management Plan
 Top Soil Stripping, Storage and Reuse
 Noise and vibration management
 Dust management
 Hydro-meteorological station
 Community Environmental Management Plan of Resettlement Sites (RS)
 Emergency Response Plan
 Tree Plantation and Greenbelt Development Plan
 Biodiversity Management Plan (Wildlife baseline and monitoring)
 Hilsha migration monitoring
 Development of Visitor center,
 Community awareness.
 Resettlement Action plans
 Public Health Action Plan
 Income and Livelihood Restoration Plan
 Padma Protected Sanctuary
2
5
Cost (Million US$)
A. Main Bridge
A1 Main Bridge and Viaducts 1.339.8
A2 Approach Roads and Bridge End Facilities
A2.1 Mawa Side 35.0
A2.2 Janjira Side 193.9
A3 Construction Yards 57.5
Sub-total A 1,626.2
B. River Training Works 799.9
C. Implementation of SAP and EMP
C1. Social Action Plan (SAP) 273.2
C2. Environmental Management Plan (EMP) 18.7
Sub-Total C 291.9
D. Consultancies for Supervision
D1 Construction Supervision and PM support 65.0
D2 M&E and supervision of EMP and SAP 7.0
Sub-Total D 72.0
E. Project Management, TA, Training
E1 PM support and audits 7.0
E2 BBA stregthening, TA, PPE, training 14.0
E3 Strategic studies 5.0
Sub-Total E 26.0
Total Cost 2,816.0
Interest / Service Charge during Project 96.0
Refinancing of PPF Advance 3.0
Total Project Cost 2,915.0
Cost EstimateCost Estimate
Economic ImpactsEconomic Impacts
Use of Mongla Port will be optimized.
Natural and industrial products of south and
south western part of Bangladesh can be
transported to other parts very quickly.
Tourism in Sundarban and Kuakata will
flourish.
An addition of 1.26% in the GDP is expected
after the bridge is operational.

More Related Content

What's hot

Bangladesh studies presentation slide
Bangladesh studies presentation slideBangladesh studies presentation slide
Bangladesh studies presentation slide
MD Jannatul Giyem
 
Potential Economic Impact of The Padma Bridge
Potential Economic Impact of The Padma Bridge Potential Economic Impact of The Padma Bridge
Potential Economic Impact of The Padma Bridge
Shahriar Ferdous
 
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goalsPADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
Sajal Eahsan
 
Dhaka Metro Rail Project.pptx
Dhaka Metro Rail Project.pptxDhaka Metro Rail Project.pptx
Dhaka Metro Rail Project.pptx
Zunayet Shibly
 
Presentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxPresentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptx
SabujMahmud2
 
Metro Rail in Dhaka City
Metro Rail in Dhaka CityMetro Rail in Dhaka City
Metro Rail in Dhaka City
Zunayet Shibly
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
Nikita James
 
Dhaka metro rail
Dhaka metro railDhaka metro rail
Dhaka metro rail
Mohammad Alamin
 
Road construction report
Road construction reportRoad construction report
Road construction report
mohammad danish anwar
 
Dhaka metro rail project
Dhaka metro rail projectDhaka metro rail project
Dhaka metro rail project
United Commercial Bank Limited
 
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
Muhammad Awais
 
River system of bangladesh. 01774690633.pdf
River system of bangladesh. 01774690633.pdfRiver system of bangladesh. 01774690633.pdf
River system of bangladesh. 01774690633.pdf
presentation maker.bd
 
Traffic Jam in Dhaka City
Traffic Jam in Dhaka CityTraffic Jam in Dhaka City
Traffic Jam in Dhaka City
Badruzzman Jhon
 
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
shashanksingh593
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
Nishant Mittal
 
IRC:15-2017 CODE OF PRACTICE FOR CONSTRUCTION OF JOINTED PLAIN CONCRETE PAVEM...
IRC:15-2017 CODE OF PRACTICE FOR CONSTRUCTION OF JOINTED PLAIN CONCRETE PAVEM...IRC:15-2017 CODE OF PRACTICE FOR CONSTRUCTION OF JOINTED PLAIN CONCRETE PAVEM...
IRC:15-2017 CODE OF PRACTICE FOR CONSTRUCTION OF JOINTED PLAIN CONCRETE PAVEM...
BrahmaV1
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
Vikas Sukhwal
 

What's hot (20)

PMBP SALIENTS
PMBP SALIENTSPMBP SALIENTS
PMBP SALIENTS
 
Bangladesh studies presentation slide
Bangladesh studies presentation slideBangladesh studies presentation slide
Bangladesh studies presentation slide
 
Potential Economic Impact of The Padma Bridge
Potential Economic Impact of The Padma Bridge Potential Economic Impact of The Padma Bridge
Potential Economic Impact of The Padma Bridge
 
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goalsPADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
 
Dhaka Metro Rail Project.pptx
Dhaka Metro Rail Project.pptxDhaka Metro Rail Project.pptx
Dhaka Metro Rail Project.pptx
 
Presentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxPresentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptx
 
Metro Rail in Dhaka City
Metro Rail in Dhaka CityMetro Rail in Dhaka City
Metro Rail in Dhaka City
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Dhaka metro rail
Dhaka metro railDhaka metro rail
Dhaka metro rail
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Dhaka metro rail project
Dhaka metro rail projectDhaka metro rail project
Dhaka metro rail project
 
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
METRO BUS PROJECT ISB/RWP (HR & COMMUNICATION MANAGEMENT PLAN)
 
River system of bangladesh. 01774690633.pdf
River system of bangladesh. 01774690633.pdfRiver system of bangladesh. 01774690633.pdf
River system of bangladesh. 01774690633.pdf
 
Traffic Jam in Dhaka City
Traffic Jam in Dhaka CityTraffic Jam in Dhaka City
Traffic Jam in Dhaka City
 
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
IRC:15-2017 CODE OF PRACTICE FOR CONSTRUCTION OF JOINTED PLAIN CONCRETE PAVEM...
IRC:15-2017 CODE OF PRACTICE FOR CONSTRUCTION OF JOINTED PLAIN CONCRETE PAVEM...IRC:15-2017 CODE OF PRACTICE FOR CONSTRUCTION OF JOINTED PLAIN CONCRETE PAVEM...
IRC:15-2017 CODE OF PRACTICE FOR CONSTRUCTION OF JOINTED PLAIN CONCRETE PAVEM...
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
Plastic roads
Plastic roadsPlastic roads
Plastic roads
 

Viewers also liked

Environmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeEnvironmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridge
Zuhair Ahmed Kowshik
 
Land Acquisition For Padma Bridge, Bangladesh.
Land Acquisition For Padma Bridge, Bangladesh.Land Acquisition For Padma Bridge, Bangladesh.
Land Acquisition For Padma Bridge, Bangladesh.
guestaedab24
 
Allegation-on-Padma-Bridge_Kamalendu-Das
Allegation-on-Padma-Bridge_Kamalendu-DasAllegation-on-Padma-Bridge_Kamalendu-Das
Allegation-on-Padma-Bridge_Kamalendu-DasKamalendu Das
 
Hrm raw ppt
Hrm raw pptHrm raw ppt
Hrm raw ppt
Shimanto Deb
 
Padma bridge project impact on fisheries,water supply and sanitation system
Padma bridge project impact on fisheries,water supply and sanitation systemPadma bridge project impact on fisheries,water supply and sanitation system
Padma bridge project impact on fisheries,water supply and sanitation system
Rifat Bin Ahmed
 
Padma bridge case is a hearsay
Padma bridge case is a hearsayPadma bridge case is a hearsay
Padma bridge case is a hearsay
M S Siddiqui
 
Case App;ication- A Curtain Fall
Case App;ication- A Curtain FallCase App;ication- A Curtain Fall
Case App;ication- A Curtain Fall
shabbirashab
 
Independence day
Independence dayIndependence day
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxMd. Mahmudor Rahman
 
Eia basic concepts_15_dec05
Eia basic concepts_15_dec05Eia basic concepts_15_dec05
Eia basic concepts_15_dec05
Shimalsh
 
National Budget of Bangladesh (FY) 2016-17
National Budget of Bangladesh (FY) 2016-17National Budget of Bangladesh (FY) 2016-17
National Budget of Bangladesh (FY) 2016-17
TAREK MAHMUD
 
Rampal power plant
Rampal power plantRampal power plant
Rampal power plant
Uzzal Mridha
 
Trumps immigration ban
Trumps immigration ban Trumps immigration ban
Trumps immigration ban
Zanib Ahmad
 
What is eia
What is eiaWhat is eia
Cannabis
CannabisCannabis
Cannabis
Luis Lazo-Silva
 
Eia act 2006
Eia act 2006Eia act 2006
Eia act 2006Tej Kiran
 
Rampal Power Station
Rampal Power StationRampal Power Station
Rampal Power Station
manarat international university
 
Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)
Priyanka Singh
 
Rampal power station
Rampal power stationRampal power station
Rampal power station
moinul islam mohin
 

Viewers also liked (20)

Environmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeEnvironmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridge
 
Land Acquisition For Padma Bridge, Bangladesh.
Land Acquisition For Padma Bridge, Bangladesh.Land Acquisition For Padma Bridge, Bangladesh.
Land Acquisition For Padma Bridge, Bangladesh.
 
Allegation-on-Padma-Bridge_Kamalendu-Das
Allegation-on-Padma-Bridge_Kamalendu-DasAllegation-on-Padma-Bridge_Kamalendu-Das
Allegation-on-Padma-Bridge_Kamalendu-Das
 
Hrm raw ppt
Hrm raw pptHrm raw ppt
Hrm raw ppt
 
Padma bridge project impact on fisheries,water supply and sanitation system
Padma bridge project impact on fisheries,water supply and sanitation systemPadma bridge project impact on fisheries,water supply and sanitation system
Padma bridge project impact on fisheries,water supply and sanitation system
 
Padma bridge case is a hearsay
Padma bridge case is a hearsayPadma bridge case is a hearsay
Padma bridge case is a hearsay
 
CSC-PMBP
CSC-PMBPCSC-PMBP
CSC-PMBP
 
Case App;ication- A Curtain Fall
Case App;ication- A Curtain FallCase App;ication- A Curtain Fall
Case App;ication- A Curtain Fall
 
Independence day
Independence dayIndependence day
Independence day
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
 
Eia basic concepts_15_dec05
Eia basic concepts_15_dec05Eia basic concepts_15_dec05
Eia basic concepts_15_dec05
 
National Budget of Bangladesh (FY) 2016-17
National Budget of Bangladesh (FY) 2016-17National Budget of Bangladesh (FY) 2016-17
National Budget of Bangladesh (FY) 2016-17
 
Rampal power plant
Rampal power plantRampal power plant
Rampal power plant
 
Trumps immigration ban
Trumps immigration ban Trumps immigration ban
Trumps immigration ban
 
What is eia
What is eiaWhat is eia
What is eia
 
Cannabis
CannabisCannabis
Cannabis
 
Eia act 2006
Eia act 2006Eia act 2006
Eia act 2006
 
Rampal Power Station
Rampal Power StationRampal Power Station
Rampal Power Station
 
Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)
 
Rampal power station
Rampal power stationRampal power station
Rampal power station
 

Similar to padma

41946 ind-seia
41946 ind-seia41946 ind-seia
41946 ind-seia
PRABIR DATTA
 
WB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCPWB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCP
Dr Deepak Kumar Tripathi
 
Transport and communications
Transport and communicationsTransport and communications
Transport and communications
MasudHossain27
 
Eia of Ring road report of Jammu City
Eia of Ring road report of Jammu CityEia of Ring road report of Jammu City
Eia of Ring road report of Jammu City
Saksham Mahajan
 
Guidelines for Planning and Construction of Roads in cyclone Prone Areas
Guidelines for Planning and Construction of Roads in cyclone Prone AreasGuidelines for Planning and Construction of Roads in cyclone Prone Areas
Guidelines for Planning and Construction of Roads in cyclone Prone Areas
Phani Mohan K
 
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
Oswar Mungkasa
 
R.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdfR.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdf
MohamedShehlanShafee1
 
Frermip presentation navigation in main rivers .ppt v4
Frermip presentation    navigation in main rivers .ppt v4Frermip presentation    navigation in main rivers .ppt v4
Frermip presentation navigation in main rivers .ppt v4
Nazmul Hasan Diptu
 
DMIC Development in Gujarat
DMIC Development in GujaratDMIC Development in Gujarat
Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Project
zubeditufail
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
Abhishek kumar Pandey
 
Introduction to tranportation
Introduction to tranportationIntroduction to tranportation
Introduction to tranportation
Satyamkumar Jha
 
Kshipra river convergence plan
Kshipra river convergence planKshipra river convergence plan
Kshipra river convergence plan
Dr. Ravindra Pastor
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
KANTHARAJAN GANESAN
 
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIRENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
IRJET Journal
 
Kathmandu – Hetauda Fast Track Highway
Kathmandu – Hetauda Fast Track HighwayKathmandu – Hetauda Fast Track Highway
Kathmandu – Hetauda Fast Track Highway
Desh Sonyok
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
RituSaha3
 
ENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHORE
ENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHOREENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHORE
ENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHORE
BilalAnwar50
 
GMLR PPT MC 22-06-15-final
GMLR PPT MC 22-06-15-finalGMLR PPT MC 22-06-15-final
GMLR PPT MC 22-06-15-finalDurgesh Gawde
 
10 amarjeet benipal
10 amarjeet benipal10 amarjeet benipal

Similar to padma (20)

41946 ind-seia
41946 ind-seia41946 ind-seia
41946 ind-seia
 
WB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCPWB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCP
 
Transport and communications
Transport and communicationsTransport and communications
Transport and communications
 
Eia of Ring road report of Jammu City
Eia of Ring road report of Jammu CityEia of Ring road report of Jammu City
Eia of Ring road report of Jammu City
 
Guidelines for Planning and Construction of Roads in cyclone Prone Areas
Guidelines for Planning and Construction of Roads in cyclone Prone AreasGuidelines for Planning and Construction of Roads in cyclone Prone Areas
Guidelines for Planning and Construction of Roads in cyclone Prone Areas
 
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
 
R.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdfR.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdf
 
Frermip presentation navigation in main rivers .ppt v4
Frermip presentation    navigation in main rivers .ppt v4Frermip presentation    navigation in main rivers .ppt v4
Frermip presentation navigation in main rivers .ppt v4
 
DMIC Development in Gujarat
DMIC Development in GujaratDMIC Development in Gujarat
DMIC Development in Gujarat
 
Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Project
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
 
Introduction to tranportation
Introduction to tranportationIntroduction to tranportation
Introduction to tranportation
 
Kshipra river convergence plan
Kshipra river convergence planKshipra river convergence plan
Kshipra river convergence plan
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
 
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIRENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
 
Kathmandu – Hetauda Fast Track Highway
Kathmandu – Hetauda Fast Track HighwayKathmandu – Hetauda Fast Track Highway
Kathmandu – Hetauda Fast Track Highway
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
 
ENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHORE
ENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHOREENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHORE
ENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHORE
 
GMLR PPT MC 22-06-15-final
GMLR PPT MC 22-06-15-finalGMLR PPT MC 22-06-15-final
GMLR PPT MC 22-06-15-final
 
10 amarjeet benipal
10 amarjeet benipal10 amarjeet benipal
10 amarjeet benipal
 

More from Md. Sajib Chowdhury

China and international institutions
China and international institutions China and international institutions
China and international institutions
Md. Sajib Chowdhury
 
Functions and powers of the security council
Functions and powers of the security councilFunctions and powers of the security council
Functions and powers of the security council
Md. Sajib Chowdhury
 
New media &bangladesh
New media &bangladeshNew media &bangladesh
New media &bangladesh
Md. Sajib Chowdhury
 
Politics and government(sociology)
Politics and government(sociology)Politics and government(sociology)
Politics and government(sociology)Md. Sajib Chowdhury
 
Moral philosophy-presentation( sajib)
Moral philosophy-presentation( sajib)Moral philosophy-presentation( sajib)
Moral philosophy-presentation( sajib)
Md. Sajib Chowdhury
 
Street children
Street childrenStreet children
Street children
Md. Sajib Chowdhury
 
Humantrafficking (sajib file)
Humantrafficking (sajib file)Humantrafficking (sajib file)
Humantrafficking (sajib file)
Md. Sajib Chowdhury
 
Political science term paper presentaion
Political science term paper presentaionPolitical science term paper presentaion
Political science term paper presentaion
Md. Sajib Chowdhury
 
Presentation bd-151221170400
Presentation bd-151221170400Presentation bd-151221170400
Presentation bd-151221170400
Md. Sajib Chowdhury
 
Democracy in india ( sajib)
Democracy in india ( sajib)Democracy in india ( sajib)
Democracy in india ( sajib)
Md. Sajib Chowdhury
 

More from Md. Sajib Chowdhury (13)

China and international institutions
China and international institutions China and international institutions
China and international institutions
 
Functions and powers of the security council
Functions and powers of the security councilFunctions and powers of the security council
Functions and powers of the security council
 
New media &bangladesh
New media &bangladeshNew media &bangladesh
New media &bangladesh
 
Politics and government(sociology)
Politics and government(sociology)Politics and government(sociology)
Politics and government(sociology)
 
Industries of BD
Industries of BDIndustries of BD
Industries of BD
 
Napoleon Bonaparte
Napoleon BonaparteNapoleon Bonaparte
Napoleon Bonaparte
 
partitionofbengal
partitionofbengalpartitionofbengal
partitionofbengal
 
Moral philosophy-presentation( sajib)
Moral philosophy-presentation( sajib)Moral philosophy-presentation( sajib)
Moral philosophy-presentation( sajib)
 
Street children
Street childrenStreet children
Street children
 
Humantrafficking (sajib file)
Humantrafficking (sajib file)Humantrafficking (sajib file)
Humantrafficking (sajib file)
 
Political science term paper presentaion
Political science term paper presentaionPolitical science term paper presentaion
Political science term paper presentaion
 
Presentation bd-151221170400
Presentation bd-151221170400Presentation bd-151221170400
Presentation bd-151221170400
 
Democracy in india ( sajib)
Democracy in india ( sajib)Democracy in india ( sajib)
Democracy in india ( sajib)
 

padma

  • 1. Padma Multipurpose BridgePadma Multipurpose Bridge Munshiganj Part Deputy Commissioner Munshiganj Construction of Padma Bridge and its Economic Aspects Group:05
  • 2. Group MembersGroup Members Md. Sajib Chowdhury (16411069)Md. Sajib Chowdhury (16411069) Md. Ariful Islam(16411070) Mahmuda Akter (16411071)Mahmuda Akter (16411071) Golam Maruf Saqline Abir (16411075) Golam Maruf Saqline Abir (16411075) Sahin Alam (16411077)
  • 3.  Padma River is approximately 100 Km long. Third largest river in the world (discharge 150,000m3 /s, average sediment freight: 1 Billon tons/year). Padma Bridge located 35km south- west of Dhaka.  Padma River is approximately 100 Km long. Third largest river in the world (discharge 150,000m3 /s, average sediment freight: 1 Billon tons/year). Padma Bridge located 35km south- west of Dhaka.
  • 4.
  • 5. CY 1 RS 2 RS 3 RS 5 RS 4 SA 1 SA 2 CY 2 SA 3
  • 6.
  • 7. Inland Bridge( Viaduct) length North End road viaduct = 1.48 km South End road viaduct = 1.67 km This will be the biggest floor level on the river in Asia. This will be the biggest floor level on the river in Asia.
  • 8. 8 • Dual gauge Rail Track • DFC loading • Double stack container train to fulfill present and future transportation task. • Speed for passenger Train– 160 Km/h and Goods train – 120km/h • Per day 80 No. train can cross. • Dual gauge Rail Track • DFC loading • Double stack container train to fulfill present and future transportation task. • Speed for passenger Train– 160 Km/h and Goods train – 120km/h • Per day 80 No. train can cross.
  • 9. 19 Selected Bridge End Facilities of PMB.
  • 10. 20  The bridge will carry not only the rail and road traffic it will also be a bridge for “ stop and shop”.  This will be an ICONIC bridge – a magnet for tourism development in Bangladesh.
  • 11.  Dredged Material Management Plan  Top Soil Stripping, Storage and Reuse  Noise and vibration management  Dust management  Hydro-meteorological station  Community Environmental Management Plan of Resettlement Sites (RS)  Emergency Response Plan  Tree Plantation and Greenbelt Development Plan  Biodiversity Management Plan (Wildlife baseline and monitoring)  Hilsha migration monitoring  Development of Visitor center,  Community awareness.  Resettlement Action plans  Public Health Action Plan  Income and Livelihood Restoration Plan  Padma Protected Sanctuary
  • 12. 2 5 Cost (Million US$) A. Main Bridge A1 Main Bridge and Viaducts 1.339.8 A2 Approach Roads and Bridge End Facilities A2.1 Mawa Side 35.0 A2.2 Janjira Side 193.9 A3 Construction Yards 57.5 Sub-total A 1,626.2 B. River Training Works 799.9 C. Implementation of SAP and EMP C1. Social Action Plan (SAP) 273.2 C2. Environmental Management Plan (EMP) 18.7 Sub-Total C 291.9 D. Consultancies for Supervision D1 Construction Supervision and PM support 65.0 D2 M&E and supervision of EMP and SAP 7.0 Sub-Total D 72.0 E. Project Management, TA, Training E1 PM support and audits 7.0 E2 BBA stregthening, TA, PPE, training 14.0 E3 Strategic studies 5.0 Sub-Total E 26.0 Total Cost 2,816.0 Interest / Service Charge during Project 96.0 Refinancing of PPF Advance 3.0 Total Project Cost 2,915.0 Cost EstimateCost Estimate
  • 13. Economic ImpactsEconomic Impacts Use of Mongla Port will be optimized. Natural and industrial products of south and south western part of Bangladesh can be transported to other parts very quickly. Tourism in Sundarban and Kuakata will flourish. An addition of 1.26% in the GDP is expected after the bridge is operational.