GOREGAON - MULUND LINK ROAD
NEED OF THE PROJECT
 The population of Greater Mumbai is approximately 16.43
million as per 2011 Census
 The growth in no. of vehicles has resulted in traffic
congestion
 The Western & Central suburbs of the city are developing
in terms of housing infrastructure to accommodate the
growing population
NEED OF THE PROJECT (cont’d)
 The major North-South bound Roads (Suburbs) :
1. Western Express Highway (WEH)
2. Eastern Express Highway (EEH)
3. Sion-Panvel Highway
4. Eastern Freeway
5. Linking Road,
6. Swami Vivekananda (SV) Road
7. Lal Bahadur Shastri (LBS) Marg
NEED OF THE PROJECT (cont’d)
 The East-West corridors connecting the various North-
South routes are as follows
1. Sion – Dharavi - Mahim Link Road,
2. Santacruz - Chembur Link Road (SCLR)
3. Andheri - Ghatkopar Link Road (AGLR)
4. Jogeshwari - Vikhroli Link Road (JVLR)
5. Goregaon - Mulund Link Road (GMLR) [Proposed]
NEED OF THE PROJECT (cont’d)
 Comprehensive Transportation Study (CTS) for
Mumbai Metropolitan Region (MMR) has proposed
extensive transport network for the travel needs of
MMR for the horizon period up to 2031
 GMLR proposed in CTS
 GMLR previously considered under MUTP
CURRENT TRAFFIC SCENARIO (peak hour)
Details JVLR
(TOTAL)
* WEH + JVLR + EEH
Length (km) 10.3 18
Average speed (km/hr) 15 15
Time required (mins) 42 - 45 72 - 75
Road Capacity (PCU) 1,08,000 -
• Start Point – Junction Of WEH & Aarey Road
• End Point - Junction Of EEH (Existing GMLR)
TRAFFIC SCENARIO AFTER GMLR IS CONSTRUCTED
(peak Hour)
Details GMLR JVLR
WEH + JVLR +
EEH
Length (km) 14.36 10.03 18
Average speed
(km/hr)
60 25 35
Time Required
(mins)
15 30 45
Road Capacity
(PCU)
80,000 1,08,000 -
INITIAL PROPOSAL for Alignments : 3 options
VIHAR LAKE
• Alternative A1
• Alternative A2
• Alternative A3
Sr.
No.
Criteria
Points
assignment
for each
Alternative A1 Alternative A2 Alternative A3
Along Pipeline road
Along Pipeline passing
through Tulshetpada Slums
Along Aqueduct passing
throughtembhipada Slums
Quantity Score Quantity Score Quantity Score
A
Technical and Operation
characteristics
25 20 20 19
i Length 5 6.91 km 3 6.2 km 4 6.78 km 3
ii Geometry 5 Moderate 4 Complicate 3 Complicate 3
iii Available width of corridor 5 RoW 4 RoW 4 RoW 4
iv End Connectors 5 Feasible 4 Feasible 4 Feasible 4
v Traffic Dispersal 5 Good 5 Good 5 Good 5
B Environmental Considerations 25 20 14 14
i Environment Impacts 10 Tree cutting 6 Tree cutting 7 Tree cutting 7
ii Ambient Air Quality 10
Away from
Residents
7 Closer to Residents 3 Closer to Residents 3
Iii Noise Pollution 5
Away from
Residents
7 Closer to Residents 4 Closer to Residents 4
C Social Considerations 25 17 11 11
I 15 R&R on Alignment 10 R&R on Alignment 6 R&R on Alignment 6
Ii 10 R&R on DP road 7 R&R on DP road 5 R&R on DP road 5
D Implementation 25 Easier 15 Moderate 10 Moderate 10
TOTAL SCORE (out of 100 points) 100 72 55 54
Ranking First Second Third
Major East West Corridors in Mumbai
• W.E.H.
• E.E.H.
East West Links
• SCLR
• JVLR
• GMLR
( Proposed )
`
WEH
Aarey Colony LBS ROAD
M.B.R
IIT
CAMPUS
SONAPUR
JN.
Maharashtra Agro
Industry
Saki Vihar
Marol
Maroshi Jn.
Filtration
Plant
NAHUR
PROPOSED
GOREGAON MULUND
LINK ROAD
A
B
C
D’
D
E’
E
A-B - At Grade Road
B-C – Elevated Road
D-D’ – Saki Vihar
Connector
E-E’ – LBS Connector
SALIENT FEATURES
 Start Point – Western Express Highway, Goregaon
 End Point - Eastern Express Highway, Nahur
Sr. No. Chain-age Location Section
Length
(km)
1) 0+000 to 0+760 Aarey Colony At-grade Road 0.76
2) 0+760 to 14+360
Goregaon
to Nahur
Elevated Road
(Main Bridge)
13.60
3) 0+000 to 0+430 Saki Vihar, Powai
Elevated Road
(Connectors)
0.43
4) 0+000 to 1+280 LBS Road
Elevated Road
(Connectors)
1.28
TOTAL 16.07
WEH
Aarey Colony
LBS ROAD
M.B.R
IIT
CAMPUS
SONAPUR
JN.
Maharashtra Agro
Industry
Saki Vihar
Marol
Maroshi Jn.
NAHUR
PROPOSED
GOREGAON MULUND
LINK ROAD
Goetechnical Investigation
BH
Average depth
of Rock -6m
BH
Average depth
of Rock -7.5m
BH
Average depth of
Rock -8m
BH
Average depth
of Rock -7m
SALIENT FEATURES ……. (CONT’D)
1. Type of Foundation - Open Foundation /
Pile Foundation
2. Type of Substructure – R.C.C., Cast-in Situ Piers
3. Type of Superstructure - Precast Segmental Box Girder
4. Typical Spans – 25 m – 30 m
Note -Soil strata has been collected at 28 locations along
Alignment
TYPICAL SECTIONAL DETAILS –
MAIN BRIDGE
Description Details
No. of lanes 2 + 2
Width of Carriageway 7.5 m (each)
Width of Crash Barrier 0.5 m x 2
Width of Median 1.2 m
TYPICAL SECTIONAL DETAILS –
MAIN BRIDGE
Description Details
Total no. of Spans 445 Nos.
No. of Piers 444 Nos.
No. of Abutments 2 Nos.
Standard Span Lengths 25m, 30m, 35m, 40m
Special Span
(Over Mithi river, Saki Vihar Road)
70 m x 2 Nos.
No. of Emergency Breakdown Lanes 12 Nos.
TYPICAL SECTION
DETAILS OF
SAKI VIHAR ROAD, POWAI CONNECTOR
Description Details
No. of Lanes 2 + 2
Width of Carriageway 5.25 m (Each)
Total no. of Spans 10 Nos.
No. of Piers 9 Nos.
No. of Abutments 1 Nos.
Standard Span Lengths 30 m
DETAILS OF
SONAPUR JUNCTION, LBS ROAD CONNECTOR
Description Details
No. of Lanes 2 + 2
Width of Carriageway 5.25 m (each)
Total no. of Spans 31 Nos.
No. of Piers 30 Nos.
No. of Abutments 2 Nos.
Standard Span Lengths 30 m
LIST OF AFFECTED STRUCTURES
Type Of Structure Numbers
Residential 182
Commercial 85
Religious
(Church + Temple )
02
TOTAL 269
Bill No Description Amount (Rs.)
1 Section I - Main Bridge 1005,19,35,662
2 Section II - Ramp at Saki Vihar 13,39,00,772
3 Section III - Ramp at Sonapur junction 44,23,23,869
4 Section IV - Roadwork 31,37,16,010
5 Section V - Site clearance, Dismantling etc. 9,66,54,926
6 Section V - Nahur ROB 92,67,90,183
6 Section VI - Goregaon Junction Development 30,00,00,000
Total 1226,53,21,421
Add Contingencies @ 4% 49,06,12,857
Add cost for fees of consultancy services at 2% 24,53,06,428
Total Amount 1300,12,40,706
ESTIMATED COST OF GMLR PROJECT
DETAILS OF AFFECTED STRUCTURES
Sr
.
N
o
From To Chainage Commercial Residential
Concerned
Ward
1
Chota Kashmir
Boating
Marol-
Maroshi
Junction
Ch. +1+540
–
Ch. +4+500
3
(1 party office, 1 food
court,
1 Pump house)
- P/S
2
Gautam Nagar
village
Mithi
river
Ch. +5+800
- Ch.
+6+320 10
26
(4 sheds)
S
3 Powai Subway
Saki Vihar
Road
Ch 0+000 –
Ch 0+320 2 BMC containers;
1 Temple.
S
4 Mithi river BC gate 2
Ch. +6+320
- Ch.
+6+900
25
(1Post office ; 1 MSEB
sub-station , 1 Church)
78
(1 NITIE Security
Quarters building )
(7 sheds)
S
5 BC gate 2 IIT Bridge
Ch. +6+900
- Ch.
+7+425 -
10
(1 shed)
S
DETAILS OF AFFECTED STRUCTURES (CONT’D)
Sr.
No
From To Chain-age Commercial Residential Concerned
Ward
6
Bandup
Complex
gate 1
Aqueduct
Ch. +11+960 -
Ch. +12+140
17
( 1- Forest
dept. Office ;
1 post office ;
1 trust office)
35
(2 - Bhandup
Complex staff
Quarters
buildings )
7 Aqueduct Sonapur Jn.
Ch. +12+140 -
Ch. +13+180
14
33
S
8 Sonapur Jn. Nahur Station
Ch. +13+180
- Ch. +14+420
13 - S/T
TOTAL 85 + 2= 87 182
Description
Total no. of
Trees
No. of trees in Aarey
Road
No. of trees in Bhandup
Complex & Others
To be Pruned 310 127 183
To be Transplanted 454 193 261
Trees saved in median of At-
grade road & skirting of slip road
88 57 31
To be Retained 272 117 155
To be Cut 1100 210 890
Total Affected trees 2,224 696 1,528
AFFECTED TREES
LENGTHWISE LAND OWNERSHIP DETAILS
Sr.
No
Competent Authority
Length
(Km)
Percentage (%)
1)
Maharashtra State Govt.
(Aarey Colony)
6.10 38
2) Central Government (IIT, Bombay) 1.89 12
3) MCGM (HE dept.) 3.50 22
4) MCGM (Existing land) 3.74 23
5) Land with private ownership 0.84 5
Total 16.07 100
1) Maharashtra
State Govt. (Aarey
Colony) - 6.1kms
2) Central
Government (IIT) -
1.89kms
3) MCGM
(Hydraulic
Engineering dept.) -
3.5kms
4) MCGM
(Existing land)-
3.74kms
5) Private land -
0.84kms
LAND OWNERSHIP
PERCENTAGE (%)
23%
5%
38%
12%
22%
PROPOSED ROW
Sr.
No.
Location Chain-age
Length
Section of
Elevated road
Ownership Details
Proposed
ROW
From To From To
1)
Goregaon
Junction
Aarey Road
unit no.32 O+000 1+180 1.8kms Main bridge
Maharashtra State
Government
(Aarey Colony)
30m
2)
Aarey Road
unit no.32
Passpoli
(Gautam
Nagar)
1+180 6+100 4.3kms Main bridge
Maharashtra State
Government
(Aarey Colony)
30m
3)
Passpoli
(Gautam
Nagar)
Morarji Gate 6+100 6+300 0.2kms Main bridge
MCGM
(HE department)
30m
4) Powai Subway
Saki Vihar
Road
O+020 0+450 0.45kms
Saki Vihar
ramps
MCGM
(Existing road)
35m
5) Morarji Gate NITIE gate 6+300 6+780 0.48kms Main bridge Private land 30m
6) NITIE gate Vihar Lake 6+780 8+700 1.92kms Main bridge
Central Govt.
(IIT )
30m
7) Vihar Lake Khindipada 8+700 12+040 3.3kms Main bridge
MCGM
(HE department)
30m
8) Khindipada
Amar Nagar
junction
12+040 12+400 0.36kms Main bridge Private land 30m
9)
Amar Nagar
junction
Nahur
(Niranjan Apt.)
12+400 14+100 1.7kms Main bridge
MCGM
(Existing Road)
30m
10)
Nahur
(Niranjan Apt.)
Nahur (before
ROB)
14+100 14+400 0.3kms Main bridge
MCGM
(Existing Road)
30m
11) Mulund Bhandup 0+000 1+370 1.37kms LBS ramps
MCGM
(Existing Road)
30m
Sr.
No
Location
Chain-
age
Competent
Authority
Total no.
of lines
crossing
No. of
lines
affected
No. of lines
un-affected
Proposed change
Remarks/
Correspondence
1)
Passpoli (Open
grass land)
5+800 Tata Power 2 2 -
New Pylon at greater height
10m clearance from Bridge
(FRL)
Joint inspection
completed.
Estimate awaited
2)
Passpol-Gautam
Nagar
6+060 Tata power 1 1 -
New Pylon at greater height
10m clearance from Bridge
(FRL)
3)
Renaissance
hotel/
Bhandup
Complex gate 2
6+880 Tata Power 1 1 -
Underground diversion of HT
Lines
4)
IIT hostels
(IIT composting
ground)
8+340-
8+440
Tata Power 3 2 1
New Pylon at greater height
10m clearance from Bridge
(FRL)
Underground diversion of HT
Lines
5)
Bhandup
Complex (Near
Filtration plant)
11+620 Tata Power 1 - 1 NA
6)
Aqueduct
(Khindipada)
12+120 Tata Power 1 1 -
New Pylon at greater height
10m clearance from Bridge
(FRL)
UTILITIES:-OVERHEAD(H.T.LINES)
UTILITIES:- OVERHEAD(H.T.LINES CONT’D)
Sr.
No
Location Chain-age
Competent
Authority
Total no.
of lines
crossing
No. of
lines
affect
ed
No. of
lines un-
affected
Proposed change
Remarks/
Correspondence
7)
Bhandup
Complex gate
1
11+960
MSETCL
(Airoli
department)
1 1 -
New Pylon at greater height
10m clearance from Bridge
(FRL)
Joint inspection carried out.
Estimate awaited
8)
GTB Chowk
(Amar Nagar
junction)
12+460
MSEDCL
(Mulund
division)
1 1 -
Underground diversion of
HT Lines
Joint inspection carried
out.
Estimate awaited
9)
Nirmal
Lifestyle
12+840
MSEDCL
(Wagle
Estate
Division)
1 1 -
Underground diversion of
HT Lines
Joint inspection carried
out.
Estimate awaited
10) Nahur 14+260
MSETCL
(Airoli
departmen
t)
1 1 -
New Pylon at greater height
10m clearance from Bridge
(FRL)
Joint inspection carried
out.
Estimate awaited
UTILITIES:- UNDERGROUND
 Correspondence is in progress with following
underground utilities
1. Tata power Cables
2. Reliance optical fiber
3. MTNL
4. Mahanagar Gas Limited
5. Other departmental utilities like sewer, storm
water drains etc.
MAJOR CHALLENGES
Issues Action taken Decision
Land acquisition
from:
Aarey,
IIT (Bombay),
MCGM (HE),
Private land)
• Initial letters submitted
• Reminder letters also
submitted
High Tension lines
Relocation:
Tata Power,
MSEDCL,
MSETCL
Joint inspection completed
Cost estimate of this
work is awaited from
all 3 agencies.
CHALLENGES (…. CONT’D)
Issues Action taken
Tree transplantation & new
plantation
(Land requirements)
Location of the land is identified in Aarey;
final approval is to be taken after
discussion with Aarey officials
Resettlement & Rehabilitation of
PAP
Necessary joint survey with concerned
ward officials has been completed
Confirmation of Forest
Boundary in Bhandup complex &
Khindipada
Correspondence is in progress
MODIFICATION IN CURRENT
ALIGNMENT
 As per H.E (Hydraulic Engineer) the current
alignment passes through the area which is near to
MBR and filtration plants.
 Hence it is recommended to modified the current
alignment
 Modified alignment will be parallel to compound wall
and at a distance of aprrox.200 mtr away from MBR.
ALTERNATE ALIGNMENT AVOIDING MBR
Aarey Colony
IIT
CAMPUS
SAKI VIHAR
Marol
Maroshi Jn.
Filtration
Plant
WEH
LBS
ROAD
SONAPUR
JN.
NAHUR
ALTERNATE
Alignment
Proposed
Alignment
Proposed
ALIGNMENT
ALTERNATIVE
ALIGNMENT
SALIENT FEATURES
 Alignment passes along less dense tree region
 Proximity to MBR and Filtration plant is avoided
completely
 Partial proximity to Vihar lake is also avoided
 Ease of access during construction phase
 The residential & Commercial structures of Bhandup
Complex are not affected
 No. of structures on private land: approx 60-70 nos.
ALTERNATIVE
PROPOSED
ALIGNMENT
ALTERNATIVE
PROPOSED
ALIGNMENT
GMLR PPT MC 22-06-15-final
GMLR PPT MC 22-06-15-final

More Related Content

What's hot

Bangalore Namma Metro.docx
Bangalore Namma Metro.docxBangalore Namma Metro.docx
Bangalore Namma Metro.docxVijay979365
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case studyAKSHAY CHATURVEDI
 
Widening of roads
Widening of roadsWidening of roads
Widening of roadsSanjeev B
 
Road and traffic control
Road and traffic controlRoad and traffic control
Road and traffic controlBRS ENGINEERING
 
Traffic engineering IVHS
Traffic engineering IVHSTraffic engineering IVHS
Traffic engineering IVHSJbrk Vinnu
 
3.TRAFFIC REGULATION (TE) 2170613 GTU
3.TRAFFIC REGULATION (TE)  2170613 GTU3.TRAFFIC REGULATION (TE)  2170613 GTU
3.TRAFFIC REGULATION (TE) 2170613 GTUVATSAL PATEL
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGRNRANGANATH
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge Hakkim Shajahan
 

What's hot (17)

Bangalore Namma Metro.docx
Bangalore Namma Metro.docxBangalore Namma Metro.docx
Bangalore Namma Metro.docx
 
Kashmir rail project
Kashmir rail projectKashmir rail project
Kashmir rail project
 
PPT FINAL.pptx
PPT FINAL.pptxPPT FINAL.pptx
PPT FINAL.pptx
 
Highway planning
Highway planningHighway planning
Highway planning
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case study
 
Widening of roads
Widening of roadsWidening of roads
Widening of roads
 
Road and traffic control
Road and traffic controlRoad and traffic control
Road and traffic control
 
Traffic engineering IVHS
Traffic engineering IVHSTraffic engineering IVHS
Traffic engineering IVHS
 
RCD INTERNSHIP REPORT
RCD INTERNSHIP REPORTRCD INTERNSHIP REPORT
RCD INTERNSHIP REPORT
 
3.TRAFFIC REGULATION (TE) 2170613 GTU
3.TRAFFIC REGULATION (TE)  2170613 GTU3.TRAFFIC REGULATION (TE)  2170613 GTU
3.TRAFFIC REGULATION (TE) 2170613 GTU
 
Mumbai Local trains
Mumbai Local trainsMumbai Local trains
Mumbai Local trains
 
Etika lalulintas
Etika lalulintasEtika lalulintas
Etika lalulintas
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
 
report
reportreport
report
 
Road safety session for teacher workshop
Road safety  session for teacher workshopRoad safety  session for teacher workshop
Road safety session for teacher workshop
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge
 

Similar to GMLR PPT MC 22-06-15-final

Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge ConstructionSukhdeep Jat
 
IRJET- Highway Networking System
IRJET-  	  Highway Networking SystemIRJET-  	  Highway Networking System
IRJET- Highway Networking SystemIRJET Journal
 
Eia mumbai metro
Eia mumbai metroEia mumbai metro
Eia mumbai metro1392pramod
 
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...IRJET Journal
 
Special Repair of Roads in Patiala City
Special Repair of Roads in Patiala CitySpecial Repair of Roads in Patiala City
Special Repair of Roads in Patiala CityEmaan Sharma
 
Problem Identification of Traffic and Transport : Muzaffarpur City, Bihar
Problem Identification of Traffic and Transport : Muzaffarpur City, BiharProblem Identification of Traffic and Transport : Muzaffarpur City, Bihar
Problem Identification of Traffic and Transport : Muzaffarpur City, BiharIRJET Journal
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineeringAavani Thampi
 
Highway design project 8 b
Highway design project 8 bHighway design project 8 b
Highway design project 8 bSandun Mayadunna
 
Comprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuramComprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuramJoel Manoj
 
Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Malyar Talash
 
Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.Mayank Panchal
 
Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Munir Hussain
 
Outer ring road network in valley
Outer ring road network in valleyOuter ring road network in valley
Outer ring road network in valleyNarayan Rijal
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,Indiaoyepuneeta
 

Similar to GMLR PPT MC 22-06-15-final (20)

Pr case study
Pr case studyPr case study
Pr case study
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
IRJET- Highway Networking System
IRJET-  	  Highway Networking SystemIRJET-  	  Highway Networking System
IRJET- Highway Networking System
 
Eia mumbai metro
Eia mumbai metroEia mumbai metro
Eia mumbai metro
 
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
 
Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"
 
Special Repair of Roads in Patiala City
Special Repair of Roads in Patiala CitySpecial Repair of Roads in Patiala City
Special Repair of Roads in Patiala City
 
New mandovi bridge
New mandovi bridgeNew mandovi bridge
New mandovi bridge
 
Problem Identification of Traffic and Transport : Muzaffarpur City, Bihar
Problem Identification of Traffic and Transport : Muzaffarpur City, BiharProblem Identification of Traffic and Transport : Muzaffarpur City, Bihar
Problem Identification of Traffic and Transport : Muzaffarpur City, Bihar
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
 
Highway design project 8 b
Highway design project 8 bHighway design project 8 b
Highway design project 8 b
 
41946 ind-seia
41946 ind-seia41946 ind-seia
41946 ind-seia
 
Comprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuramComprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuram
 
Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)
 
Surat BRTS - Abhijit Lokre
Surat BRTS - Abhijit LokreSurat BRTS - Abhijit Lokre
Surat BRTS - Abhijit Lokre
 
Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.
 
Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019
 
ProjectReport.pdf
ProjectReport.pdfProjectReport.pdf
ProjectReport.pdf
 
Outer ring road network in valley
Outer ring road network in valleyOuter ring road network in valley
Outer ring road network in valley
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
 

GMLR PPT MC 22-06-15-final

  • 1. GOREGAON - MULUND LINK ROAD
  • 2. NEED OF THE PROJECT  The population of Greater Mumbai is approximately 16.43 million as per 2011 Census  The growth in no. of vehicles has resulted in traffic congestion  The Western & Central suburbs of the city are developing in terms of housing infrastructure to accommodate the growing population
  • 3. NEED OF THE PROJECT (cont’d)  The major North-South bound Roads (Suburbs) : 1. Western Express Highway (WEH) 2. Eastern Express Highway (EEH) 3. Sion-Panvel Highway 4. Eastern Freeway 5. Linking Road, 6. Swami Vivekananda (SV) Road 7. Lal Bahadur Shastri (LBS) Marg
  • 4. NEED OF THE PROJECT (cont’d)  The East-West corridors connecting the various North- South routes are as follows 1. Sion – Dharavi - Mahim Link Road, 2. Santacruz - Chembur Link Road (SCLR) 3. Andheri - Ghatkopar Link Road (AGLR) 4. Jogeshwari - Vikhroli Link Road (JVLR) 5. Goregaon - Mulund Link Road (GMLR) [Proposed]
  • 5. NEED OF THE PROJECT (cont’d)  Comprehensive Transportation Study (CTS) for Mumbai Metropolitan Region (MMR) has proposed extensive transport network for the travel needs of MMR for the horizon period up to 2031  GMLR proposed in CTS  GMLR previously considered under MUTP
  • 6. CURRENT TRAFFIC SCENARIO (peak hour) Details JVLR (TOTAL) * WEH + JVLR + EEH Length (km) 10.3 18 Average speed (km/hr) 15 15 Time required (mins) 42 - 45 72 - 75 Road Capacity (PCU) 1,08,000 - • Start Point – Junction Of WEH & Aarey Road • End Point - Junction Of EEH (Existing GMLR)
  • 7. TRAFFIC SCENARIO AFTER GMLR IS CONSTRUCTED (peak Hour) Details GMLR JVLR WEH + JVLR + EEH Length (km) 14.36 10.03 18 Average speed (km/hr) 60 25 35 Time Required (mins) 15 30 45 Road Capacity (PCU) 80,000 1,08,000 -
  • 8. INITIAL PROPOSAL for Alignments : 3 options VIHAR LAKE • Alternative A1 • Alternative A2 • Alternative A3
  • 9. Sr. No. Criteria Points assignment for each Alternative A1 Alternative A2 Alternative A3 Along Pipeline road Along Pipeline passing through Tulshetpada Slums Along Aqueduct passing throughtembhipada Slums Quantity Score Quantity Score Quantity Score A Technical and Operation characteristics 25 20 20 19 i Length 5 6.91 km 3 6.2 km 4 6.78 km 3 ii Geometry 5 Moderate 4 Complicate 3 Complicate 3 iii Available width of corridor 5 RoW 4 RoW 4 RoW 4 iv End Connectors 5 Feasible 4 Feasible 4 Feasible 4 v Traffic Dispersal 5 Good 5 Good 5 Good 5 B Environmental Considerations 25 20 14 14 i Environment Impacts 10 Tree cutting 6 Tree cutting 7 Tree cutting 7 ii Ambient Air Quality 10 Away from Residents 7 Closer to Residents 3 Closer to Residents 3 Iii Noise Pollution 5 Away from Residents 7 Closer to Residents 4 Closer to Residents 4 C Social Considerations 25 17 11 11 I 15 R&R on Alignment 10 R&R on Alignment 6 R&R on Alignment 6 Ii 10 R&R on DP road 7 R&R on DP road 5 R&R on DP road 5 D Implementation 25 Easier 15 Moderate 10 Moderate 10 TOTAL SCORE (out of 100 points) 100 72 55 54 Ranking First Second Third
  • 10. Major East West Corridors in Mumbai • W.E.H. • E.E.H. East West Links • SCLR • JVLR • GMLR ( Proposed )
  • 11. ` WEH Aarey Colony LBS ROAD M.B.R IIT CAMPUS SONAPUR JN. Maharashtra Agro Industry Saki Vihar Marol Maroshi Jn. Filtration Plant NAHUR PROPOSED GOREGAON MULUND LINK ROAD A B C D’ D E’ E A-B - At Grade Road B-C – Elevated Road D-D’ – Saki Vihar Connector E-E’ – LBS Connector
  • 12. SALIENT FEATURES  Start Point – Western Express Highway, Goregaon  End Point - Eastern Express Highway, Nahur Sr. No. Chain-age Location Section Length (km) 1) 0+000 to 0+760 Aarey Colony At-grade Road 0.76 2) 0+760 to 14+360 Goregaon to Nahur Elevated Road (Main Bridge) 13.60 3) 0+000 to 0+430 Saki Vihar, Powai Elevated Road (Connectors) 0.43 4) 0+000 to 1+280 LBS Road Elevated Road (Connectors) 1.28 TOTAL 16.07
  • 13. WEH Aarey Colony LBS ROAD M.B.R IIT CAMPUS SONAPUR JN. Maharashtra Agro Industry Saki Vihar Marol Maroshi Jn. NAHUR PROPOSED GOREGAON MULUND LINK ROAD Goetechnical Investigation BH Average depth of Rock -6m BH Average depth of Rock -7.5m BH Average depth of Rock -8m BH Average depth of Rock -7m
  • 14. SALIENT FEATURES ……. (CONT’D) 1. Type of Foundation - Open Foundation / Pile Foundation 2. Type of Substructure – R.C.C., Cast-in Situ Piers 3. Type of Superstructure - Precast Segmental Box Girder 4. Typical Spans – 25 m – 30 m Note -Soil strata has been collected at 28 locations along Alignment
  • 15. TYPICAL SECTIONAL DETAILS – MAIN BRIDGE Description Details No. of lanes 2 + 2 Width of Carriageway 7.5 m (each) Width of Crash Barrier 0.5 m x 2 Width of Median 1.2 m
  • 16. TYPICAL SECTIONAL DETAILS – MAIN BRIDGE Description Details Total no. of Spans 445 Nos. No. of Piers 444 Nos. No. of Abutments 2 Nos. Standard Span Lengths 25m, 30m, 35m, 40m Special Span (Over Mithi river, Saki Vihar Road) 70 m x 2 Nos. No. of Emergency Breakdown Lanes 12 Nos.
  • 18. DETAILS OF SAKI VIHAR ROAD, POWAI CONNECTOR Description Details No. of Lanes 2 + 2 Width of Carriageway 5.25 m (Each) Total no. of Spans 10 Nos. No. of Piers 9 Nos. No. of Abutments 1 Nos. Standard Span Lengths 30 m
  • 19. DETAILS OF SONAPUR JUNCTION, LBS ROAD CONNECTOR Description Details No. of Lanes 2 + 2 Width of Carriageway 5.25 m (each) Total no. of Spans 31 Nos. No. of Piers 30 Nos. No. of Abutments 2 Nos. Standard Span Lengths 30 m
  • 20. LIST OF AFFECTED STRUCTURES Type Of Structure Numbers Residential 182 Commercial 85 Religious (Church + Temple ) 02 TOTAL 269
  • 21. Bill No Description Amount (Rs.) 1 Section I - Main Bridge 1005,19,35,662 2 Section II - Ramp at Saki Vihar 13,39,00,772 3 Section III - Ramp at Sonapur junction 44,23,23,869 4 Section IV - Roadwork 31,37,16,010 5 Section V - Site clearance, Dismantling etc. 9,66,54,926 6 Section V - Nahur ROB 92,67,90,183 6 Section VI - Goregaon Junction Development 30,00,00,000 Total 1226,53,21,421 Add Contingencies @ 4% 49,06,12,857 Add cost for fees of consultancy services at 2% 24,53,06,428 Total Amount 1300,12,40,706 ESTIMATED COST OF GMLR PROJECT
  • 22. DETAILS OF AFFECTED STRUCTURES Sr . N o From To Chainage Commercial Residential Concerned Ward 1 Chota Kashmir Boating Marol- Maroshi Junction Ch. +1+540 – Ch. +4+500 3 (1 party office, 1 food court, 1 Pump house) - P/S 2 Gautam Nagar village Mithi river Ch. +5+800 - Ch. +6+320 10 26 (4 sheds) S 3 Powai Subway Saki Vihar Road Ch 0+000 – Ch 0+320 2 BMC containers; 1 Temple. S 4 Mithi river BC gate 2 Ch. +6+320 - Ch. +6+900 25 (1Post office ; 1 MSEB sub-station , 1 Church) 78 (1 NITIE Security Quarters building ) (7 sheds) S 5 BC gate 2 IIT Bridge Ch. +6+900 - Ch. +7+425 - 10 (1 shed) S
  • 23. DETAILS OF AFFECTED STRUCTURES (CONT’D) Sr. No From To Chain-age Commercial Residential Concerned Ward 6 Bandup Complex gate 1 Aqueduct Ch. +11+960 - Ch. +12+140 17 ( 1- Forest dept. Office ; 1 post office ; 1 trust office) 35 (2 - Bhandup Complex staff Quarters buildings ) 7 Aqueduct Sonapur Jn. Ch. +12+140 - Ch. +13+180 14 33 S 8 Sonapur Jn. Nahur Station Ch. +13+180 - Ch. +14+420 13 - S/T TOTAL 85 + 2= 87 182
  • 24. Description Total no. of Trees No. of trees in Aarey Road No. of trees in Bhandup Complex & Others To be Pruned 310 127 183 To be Transplanted 454 193 261 Trees saved in median of At- grade road & skirting of slip road 88 57 31 To be Retained 272 117 155 To be Cut 1100 210 890 Total Affected trees 2,224 696 1,528 AFFECTED TREES
  • 25. LENGTHWISE LAND OWNERSHIP DETAILS Sr. No Competent Authority Length (Km) Percentage (%) 1) Maharashtra State Govt. (Aarey Colony) 6.10 38 2) Central Government (IIT, Bombay) 1.89 12 3) MCGM (HE dept.) 3.50 22 4) MCGM (Existing land) 3.74 23 5) Land with private ownership 0.84 5 Total 16.07 100
  • 26. 1) Maharashtra State Govt. (Aarey Colony) - 6.1kms 2) Central Government (IIT) - 1.89kms 3) MCGM (Hydraulic Engineering dept.) - 3.5kms 4) MCGM (Existing land)- 3.74kms 5) Private land - 0.84kms LAND OWNERSHIP PERCENTAGE (%) 23% 5% 38% 12% 22%
  • 27. PROPOSED ROW Sr. No. Location Chain-age Length Section of Elevated road Ownership Details Proposed ROW From To From To 1) Goregaon Junction Aarey Road unit no.32 O+000 1+180 1.8kms Main bridge Maharashtra State Government (Aarey Colony) 30m 2) Aarey Road unit no.32 Passpoli (Gautam Nagar) 1+180 6+100 4.3kms Main bridge Maharashtra State Government (Aarey Colony) 30m 3) Passpoli (Gautam Nagar) Morarji Gate 6+100 6+300 0.2kms Main bridge MCGM (HE department) 30m 4) Powai Subway Saki Vihar Road O+020 0+450 0.45kms Saki Vihar ramps MCGM (Existing road) 35m 5) Morarji Gate NITIE gate 6+300 6+780 0.48kms Main bridge Private land 30m 6) NITIE gate Vihar Lake 6+780 8+700 1.92kms Main bridge Central Govt. (IIT ) 30m 7) Vihar Lake Khindipada 8+700 12+040 3.3kms Main bridge MCGM (HE department) 30m 8) Khindipada Amar Nagar junction 12+040 12+400 0.36kms Main bridge Private land 30m 9) Amar Nagar junction Nahur (Niranjan Apt.) 12+400 14+100 1.7kms Main bridge MCGM (Existing Road) 30m 10) Nahur (Niranjan Apt.) Nahur (before ROB) 14+100 14+400 0.3kms Main bridge MCGM (Existing Road) 30m 11) Mulund Bhandup 0+000 1+370 1.37kms LBS ramps MCGM (Existing Road) 30m
  • 28. Sr. No Location Chain- age Competent Authority Total no. of lines crossing No. of lines affected No. of lines un-affected Proposed change Remarks/ Correspondence 1) Passpoli (Open grass land) 5+800 Tata Power 2 2 - New Pylon at greater height 10m clearance from Bridge (FRL) Joint inspection completed. Estimate awaited 2) Passpol-Gautam Nagar 6+060 Tata power 1 1 - New Pylon at greater height 10m clearance from Bridge (FRL) 3) Renaissance hotel/ Bhandup Complex gate 2 6+880 Tata Power 1 1 - Underground diversion of HT Lines 4) IIT hostels (IIT composting ground) 8+340- 8+440 Tata Power 3 2 1 New Pylon at greater height 10m clearance from Bridge (FRL) Underground diversion of HT Lines 5) Bhandup Complex (Near Filtration plant) 11+620 Tata Power 1 - 1 NA 6) Aqueduct (Khindipada) 12+120 Tata Power 1 1 - New Pylon at greater height 10m clearance from Bridge (FRL) UTILITIES:-OVERHEAD(H.T.LINES)
  • 29. UTILITIES:- OVERHEAD(H.T.LINES CONT’D) Sr. No Location Chain-age Competent Authority Total no. of lines crossing No. of lines affect ed No. of lines un- affected Proposed change Remarks/ Correspondence 7) Bhandup Complex gate 1 11+960 MSETCL (Airoli department) 1 1 - New Pylon at greater height 10m clearance from Bridge (FRL) Joint inspection carried out. Estimate awaited 8) GTB Chowk (Amar Nagar junction) 12+460 MSEDCL (Mulund division) 1 1 - Underground diversion of HT Lines Joint inspection carried out. Estimate awaited 9) Nirmal Lifestyle 12+840 MSEDCL (Wagle Estate Division) 1 1 - Underground diversion of HT Lines Joint inspection carried out. Estimate awaited 10) Nahur 14+260 MSETCL (Airoli departmen t) 1 1 - New Pylon at greater height 10m clearance from Bridge (FRL) Joint inspection carried out. Estimate awaited
  • 30. UTILITIES:- UNDERGROUND  Correspondence is in progress with following underground utilities 1. Tata power Cables 2. Reliance optical fiber 3. MTNL 4. Mahanagar Gas Limited 5. Other departmental utilities like sewer, storm water drains etc.
  • 31. MAJOR CHALLENGES Issues Action taken Decision Land acquisition from: Aarey, IIT (Bombay), MCGM (HE), Private land) • Initial letters submitted • Reminder letters also submitted High Tension lines Relocation: Tata Power, MSEDCL, MSETCL Joint inspection completed Cost estimate of this work is awaited from all 3 agencies.
  • 32. CHALLENGES (…. CONT’D) Issues Action taken Tree transplantation & new plantation (Land requirements) Location of the land is identified in Aarey; final approval is to be taken after discussion with Aarey officials Resettlement & Rehabilitation of PAP Necessary joint survey with concerned ward officials has been completed Confirmation of Forest Boundary in Bhandup complex & Khindipada Correspondence is in progress
  • 33. MODIFICATION IN CURRENT ALIGNMENT  As per H.E (Hydraulic Engineer) the current alignment passes through the area which is near to MBR and filtration plants.  Hence it is recommended to modified the current alignment  Modified alignment will be parallel to compound wall and at a distance of aprrox.200 mtr away from MBR.
  • 34. ALTERNATE ALIGNMENT AVOIDING MBR Aarey Colony IIT CAMPUS SAKI VIHAR Marol Maroshi Jn. Filtration Plant WEH LBS ROAD SONAPUR JN. NAHUR ALTERNATE Alignment Proposed Alignment Proposed ALIGNMENT ALTERNATIVE ALIGNMENT
  • 35. SALIENT FEATURES  Alignment passes along less dense tree region  Proximity to MBR and Filtration plant is avoided completely  Partial proximity to Vihar lake is also avoided  Ease of access during construction phase  The residential & Commercial structures of Bhandup Complex are not affected  No. of structures on private land: approx 60-70 nos.