OVERVIEW
In 1960, the pioneering founder of the
Total Productive Maintenance System,
Seiichi Nakajima coined the term
overall equipment efficiency (OEE).
Equipment can run for a long duration
of time but how much of it is actually
productive? That is what OEE helps to
determine.
Measurement of OEE and the
underlying losses helps managers to
get a clear idea on how to
systematically improve the
manufacturing process. It is the single
best metric that can be used to
identify losses, benchmark progress,
and improve the productivity of
manufacturing equipment.
Simply put, OEE measure the
performance of a manufacturing unit
as three separate components:
Availability, Performance, and Quality.
Availability refers to the percentage
of scheduled time that the machine is
available for operation. Performance
refers to the speed at which machine
runs as a percentage of its designed
speed. Quality refers to the units
produced by the machine as a
percentage of the Total Units
Started.
SIX BIG LOSSES
A 100% availability score means that a process is always
operational during the planned production time. Performance is
divided into minor stops and speed loss. A 100% score means that
the process is operating at the fastest speed of which it is capable.
Quality has been broken down to production rejects and rejects on
startup. 100% score in quality means that only good parts are
being produced by the process.
For thorough calculation of OEE, the
three categories can be further
subdivided into two categories each.
So, availability can be broken down
into planned downtime and
breakdowns.
CALCULATING
OEE
OEE can be calculated by dividing the
least amount of time required to
produce parts under optimal
conditions by the actual time needed
to produce them. It becomes the ratio
of Fully Productive Time to Planned
Production Time.
The formula is: OEE = (Good Count ×
Ideal Cycle Time) / Planned
Production Time
But this formula does not provide
information about the three loss-
related factors: Availability,
Performance, and Quality.
So, the universal formula through
which OEE is determined is
(Availability)*(Performance)*(Quality).
Availability represents all events that
can halt planned production long
enough where a reason can be
tracked for downtime. Essentially it is
a ratio of Run Time to Planned
Production Time.
It is calculated as: Availability = Run
Time / Planned Production Time
Performance represents anything that causes the manufacturing process
to run at less than the maximum possible speed while operational.
Therefore, it is a ratio of Net Run Time to Run Time.
It is calculated as: Performance = (Ideal Cycle Time × Total Count) / Run
Time
Quality represents the manufactured parts that are substandard and do
not meet the quality requirement. It also includes the parts that need to be
reworked.
It is calculated as: Quality = Good Count / Total Count
The first step in calculating OEE, is to exclude any Shift Time where there
is no intent of running production, such as breaks. Next we have to
calculate the amount of time when production was actually running and
was not stopped. Stop Time should include both Unplanned Stops like
Breakdowns and Planned Stops.
Next we have to typically calculate the individual values of availability,
performance and quality using the above formulas. Multiplying the three
factors gives us the OEE value.
IMPLEMENTING OEE
Before OEE can be implemented, a pilot area must be selected to
determine the success of OEE. It can be a single machine, cell, or line.
Secondly, a constraint or bottleneck has to be selected in that
particular process, which can be a single step or machine that
manage the throughput of the overall process. OEE can be either
manual or automated. Three pieces of information are needed to
calculate OEE:
01
02
03
GOOD COUNT
This only include parts that are defect-
free the first time through the process.
IDEAL CYCLE TIME
This is the theoretical minimum time to
produce one part, and
PLANNED PRODUCTION TIME
This is the total time that the
manufacturing process is scheduled for
production.
IMPROVING
OEE
OEE was developed under
Lean Manufacturing – as
part of the powerful and
holistic improvement
process known as TPM
(Total Productive
Maintenance). The
universal methodology for
driving any improvement
activity in OEE is referred
to as IDA (Information,
Decision, Action).
01
02
03
INFORMATION
This is the foundation of IDA. It can be
subdivided into identifying constraint
and capturing loss information.
DECISION
Decisions are the axle between
Information and Action. It comes as a
moment when Information is assessed
and a course of Action is decided. It can
be subdivided into picking a top loss and
deciding countermeasures.
ACTION
Action is where the Decisions are
transformed into Results. Here is where
you implement the decided
countermeasures and capture data.
OEE scores provide an accurate picture of how
effectively a particular manufacturing process
is running. It makes it easy to monitor and
track improvements in that process. It helps
managers to systematically improve the
manufacturing process.

More Related Content

What's hot

Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking Software
Wintriss Controls Group, LLC
 
A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)
OEEsystems International
 
Work sampling
Work samplingWork sampling
Work sampling
Vinod Kanwar
 
Integrating OEE and Process Improvement
Integrating OEE  and Process ImprovementIntegrating OEE  and Process Improvement
Integrating OEE and Process Improvement
Edward Brown
 
Role Of OEE in Lean Manufacturing
Role Of OEE in Lean ManufacturingRole Of OEE in Lean Manufacturing
Role Of OEE in Lean Manufacturing
InfoStream Solutions
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
Brian Thomas
 
Top Tips for Improving your Quality Management
Top Tips for Improving your Quality ManagementTop Tips for Improving your Quality Management
Top Tips for Improving your Quality Management
Claire Healey
 
OEE
OEEOEE
Chattanooga sme oee down time presentation
Chattanooga sme oee down time presentationChattanooga sme oee down time presentation
Chattanooga sme oee down time presentation
James Mansfield
 
Overall equipment effectiveness
Overall equipment effectivenessOverall equipment effectiveness
Overall equipment effectiveness
Rachit Laharia
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
Adrian Pask
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
Kailas Sree Chandran
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
Marvin Norona
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
Adrian Pask
 
OEE Interphex New York 2013
OEE Interphex New York 2013OEE Interphex New York 2013
OEE Interphex New York 2013
Adrian Pask
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)
Lean Teams USA
 
OEE Webinar
OEE WebinarOEE Webinar
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
Operational Excellence Consulting
 
OEE
OEEOEE
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CaseMohammed Hamed Ahmed Soliman
 

What's hot (20)

Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking Software
 
A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)
 
Work sampling
Work samplingWork sampling
Work sampling
 
Integrating OEE and Process Improvement
Integrating OEE  and Process ImprovementIntegrating OEE  and Process Improvement
Integrating OEE and Process Improvement
 
Role Of OEE in Lean Manufacturing
Role Of OEE in Lean ManufacturingRole Of OEE in Lean Manufacturing
Role Of OEE in Lean Manufacturing
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Top Tips for Improving your Quality Management
Top Tips for Improving your Quality ManagementTop Tips for Improving your Quality Management
Top Tips for Improving your Quality Management
 
OEE
OEEOEE
OEE
 
Chattanooga sme oee down time presentation
Chattanooga sme oee down time presentationChattanooga sme oee down time presentation
Chattanooga sme oee down time presentation
 
Overall equipment effectiveness
Overall equipment effectivenessOverall equipment effectiveness
Overall equipment effectiveness
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
 
OEE Interphex New York 2013
OEE Interphex New York 2013OEE Interphex New York 2013
OEE Interphex New York 2013
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)
 
OEE Webinar
OEE WebinarOEE Webinar
OEE Webinar
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
OEE
OEEOEE
OEE
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business Case
 

Similar to Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry

The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
Corey Vodvarka
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
Jason Corder
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
Parsec_Automation_Corp
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performance
Yasmin AbdelAziz
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenance
FELIX JONATHAN
 
Overall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptxOverall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptx
Noman khan
 
Top OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms ExplainedTop OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms Explained
Jon Addison
 
total productive maintenance
total productive maintenancetotal productive maintenance
total productive maintenance
Shankha Goswami
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
ijsrd.com
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and management
bahir dar university
 
Maintenance metrics in oee
Maintenance metrics in oeeMaintenance metrics in oee
Maintenance metrics in oee
johnsqms
 
Why OEE?
Why OEE?Why OEE?
Why OEE?
AshleyTizard
 
A038301010
A038301010A038301010
A038301010
theijes
 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEE
ijsrd.com
 
I012536474
I012536474I012536474
I012536474
IOSR Journals
 
Ofs whitepaper
Ofs whitepaperOfs whitepaper
Ofs whitepaper
AarathiManokaran
 
OEE.pptx
OEE.pptxOEE.pptx
OEE.pptx
BalakumarV6
 

Similar to Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry (20)

lean & agile
lean & agilelean & agile
lean & agile
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performance
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenance
 
Overall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptxOverall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptx
 
Top OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms ExplainedTop OEE & Lean Manufacturing Terms Explained
Top OEE & Lean Manufacturing Terms Explained
 
total productive maintenance
total productive maintenancetotal productive maintenance
total productive maintenance
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and management
 
Maintenance metrics in oee
Maintenance metrics in oeeMaintenance metrics in oee
Maintenance metrics in oee
 
OEE article
OEE articleOEE article
OEE article
 
Oee
OeeOee
Oee
 
Why OEE?
Why OEE?Why OEE?
Why OEE?
 
A038301010
A038301010A038301010
A038301010
 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEE
 
I012536474
I012536474I012536474
I012536474
 
Ofs whitepaper
Ofs whitepaperOfs whitepaper
Ofs whitepaper
 
OEE.pptx
OEE.pptxOEE.pptx
OEE.pptx
 

Recently uploaded

ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 

Recently uploaded (20)

ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 

Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry

  • 1. OVERALL EQUIPMENT EFFICIENCY A Next-Gen KPI for the Manufacturing Industry
  • 2. OVERVIEW In 1960, the pioneering founder of the Total Productive Maintenance System, Seiichi Nakajima coined the term overall equipment efficiency (OEE). Equipment can run for a long duration of time but how much of it is actually productive? That is what OEE helps to determine. Measurement of OEE and the underlying losses helps managers to get a clear idea on how to systematically improve the manufacturing process. It is the single best metric that can be used to identify losses, benchmark progress, and improve the productivity of manufacturing equipment.
  • 3. Simply put, OEE measure the performance of a manufacturing unit as three separate components: Availability, Performance, and Quality. Availability refers to the percentage of scheduled time that the machine is available for operation. Performance refers to the speed at which machine runs as a percentage of its designed speed. Quality refers to the units produced by the machine as a percentage of the Total Units Started.
  • 4. SIX BIG LOSSES A 100% availability score means that a process is always operational during the planned production time. Performance is divided into minor stops and speed loss. A 100% score means that the process is operating at the fastest speed of which it is capable. Quality has been broken down to production rejects and rejects on startup. 100% score in quality means that only good parts are being produced by the process. For thorough calculation of OEE, the three categories can be further subdivided into two categories each. So, availability can be broken down into planned downtime and breakdowns.
  • 5. CALCULATING OEE OEE can be calculated by dividing the least amount of time required to produce parts under optimal conditions by the actual time needed to produce them. It becomes the ratio of Fully Productive Time to Planned Production Time. The formula is: OEE = (Good Count × Ideal Cycle Time) / Planned Production Time
  • 6. But this formula does not provide information about the three loss- related factors: Availability, Performance, and Quality. So, the universal formula through which OEE is determined is (Availability)*(Performance)*(Quality). Availability represents all events that can halt planned production long enough where a reason can be tracked for downtime. Essentially it is a ratio of Run Time to Planned Production Time. It is calculated as: Availability = Run Time / Planned Production Time
  • 7. Performance represents anything that causes the manufacturing process to run at less than the maximum possible speed while operational. Therefore, it is a ratio of Net Run Time to Run Time. It is calculated as: Performance = (Ideal Cycle Time × Total Count) / Run Time Quality represents the manufactured parts that are substandard and do not meet the quality requirement. It also includes the parts that need to be reworked. It is calculated as: Quality = Good Count / Total Count The first step in calculating OEE, is to exclude any Shift Time where there is no intent of running production, such as breaks. Next we have to calculate the amount of time when production was actually running and was not stopped. Stop Time should include both Unplanned Stops like Breakdowns and Planned Stops. Next we have to typically calculate the individual values of availability, performance and quality using the above formulas. Multiplying the three factors gives us the OEE value.
  • 8. IMPLEMENTING OEE Before OEE can be implemented, a pilot area must be selected to determine the success of OEE. It can be a single machine, cell, or line. Secondly, a constraint or bottleneck has to be selected in that particular process, which can be a single step or machine that manage the throughput of the overall process. OEE can be either manual or automated. Three pieces of information are needed to calculate OEE:
  • 9. 01 02 03 GOOD COUNT This only include parts that are defect- free the first time through the process. IDEAL CYCLE TIME This is the theoretical minimum time to produce one part, and PLANNED PRODUCTION TIME This is the total time that the manufacturing process is scheduled for production.
  • 10. IMPROVING OEE OEE was developed under Lean Manufacturing – as part of the powerful and holistic improvement process known as TPM (Total Productive Maintenance). The universal methodology for driving any improvement activity in OEE is referred to as IDA (Information, Decision, Action).
  • 11. 01 02 03 INFORMATION This is the foundation of IDA. It can be subdivided into identifying constraint and capturing loss information. DECISION Decisions are the axle between Information and Action. It comes as a moment when Information is assessed and a course of Action is decided. It can be subdivided into picking a top loss and deciding countermeasures. ACTION Action is where the Decisions are transformed into Results. Here is where you implement the decided countermeasures and capture data.
  • 12. OEE scores provide an accurate picture of how effectively a particular manufacturing process is running. It makes it easy to monitor and track improvements in that process. It helps managers to systematically improve the manufacturing process.