OEE ( Overall Equipment Effectiveness) manoji@yahoo.com
OEE : [Availability % ] X [Performance %] X [ Quality %]
a b c
Down Time Loss
A) How to calculate OEE ? Speed Loss
Quality Loss
a) Machine Availability
TYPES OF LOSSES ( Part of Six big Losses) - Read below for six big losses
Breakdowns : 1. Tooling Failures
2. Unplanned Maintenance
3. General Breakdowns
4. Equipment Failures
Setup & Adjustments: 1. Setup / Changeover This should address under
2.Materail Shortage setup time reduction
3.Operator Shortage programs
4.Major Adjustments
5.Warm-Up Time
b) Machine Performance%
Let's assume machine makes 1000 PCS during 5.00Hours of Work
Please note that we consider the production only during up-time
Machine Standard rate ( PCS) : 300PCS/HOUR
Current Performance ( PCS) : 1000PCS/5 HOURS
200PCS/HOUR
Machine Performance % : (200/300)X100 %
66.7%
TYPES OF LOSSES ( Part of Six big Losses)
Small Stops 1. Obstructed Product Flow
2. Components Jams
3. Misdeeds This includes stops that are
4. Sensor Blocks under five minutes and not
5. Delivery Blocked require maintence
6. Cleaning / Checking personal for recitification
Reduced Speed or 1. Rough Running
Slow Cycles 2.Below nameplate capacity
3.Under design capacity
4.Equipment Wear
5.Operator Inefficiency
c) Quality %
Let's assume machine makes 1000 PCS during 5.00Hours of Work
and 200 PCS are rejected by QAD.
Total Produced during 5.00 Hours ( PCS) : 1000
Quality Rejected ( PCS) : 200
Quality % : accepted products /total products
80.0%
TYPES OF LOSSES ( Part of Six big Losses)
Porduction Rejects 1. Scrap
2. Rework
3. In-process damage Rejctions during Steady
4. In-process expiration state production
5. Incorrect assembly
Startup Rejects 1. Scrap Rejects during worm-up
2.Rework start-up, other early
3. In-process damage production , may be improper
4. In-process expiration set-up…..etc
5. Incorrect assembly
OEE : [Availability % ] X [Perfomance %] X [ Quality %]
0.794X0.667X0.800
42.4%
B) Six Big Losses
http://www.oee.com/images/pt-oee-six-big-losses.png
C) How to Address SIX Big Losses ?
Breakdowns : Eliminating unplanned down-time is important in improving OEE.
You can use Pareto Charts to prioratize the severe losees and Root Cause Analysis for
solutions.
Setup and Adjustments:
This is measured between last good part produced before setup to first good part
produced after setup. Tracking setup time is important to reduce this loss togather with
an active program to reduce this time such as SMED ( Single Minute Exchange of Dies)
( Eg : Use of prefabricated setups , Magnetic clamps on Injection modling MC)
Small Stops ad Reduced Speeds :
This is very difficut to record and monitor . Comparing completed cycle times and
ideal cycle time , errant cycles can be spotted. Then , RCA ,PDCA , DMAIC , 8D
problem solving can be used.
Startup Rejects and Production Rejects: Startup Rejects and Production Rejects are two different things
root causes are also different between startup and steady-state production. Parts require
any kind of reworks are rejects . Often a six sigma program can be used to bring the
quality to near perfect level.
D) How to calculate OEE in plant ?
Let's say a plant can have few machines,
OEE: [Available Time MC1+Available Time MC2….]/[Scheduled Time MC1+Scheduled Time MC1…..]
X[Current Performance MC1+MC2…]/[Rated Performance MC1+MC2..]X[Approved Quantity MC1+
MC2…]/[Total Quantity MC1+MC2..]
E) How to calculate OEE in a Group of Plants?
Let's say a group of companes has three plant assets,
OEE : [OEE1+OEE2+OEE3]/3
F) What is world class OEE Levels ?
Availability 90%
Performance 95%
Quality 99.9%
OEE 85%
G) Visual OEE
Plant floor real time display of live OEE data for maximum team involvement.
http://www.vorne.com/
Reference
http://www.smartandon.com/files/OEE.jpg
http://www.oee.com/images/pt-oee-six-big-losses.png
http://www.vorne.com/

More Related Content

What's hot

SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
W3 Group Canada Inc.
 
The 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation PosterThe 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation Poster
Operational Excellence Consulting
 
OEE-Practical-1.pptx
OEE-Practical-1.pptxOEE-Practical-1.pptx
OEE-Practical-1.pptx
ShreyanshiYadav
 
Poka Yoke
Poka YokePoka Yoke
Poka Yoke
Pankil Shah
 
TPM - tech talk
TPM - tech talk TPM - tech talk
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1
vedzen1234
 
Maintenance Autonomous
Maintenance AutonomousMaintenance Autonomous
Maintenance Autonomous
Ravi Kumar
 
TPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) Poster
TPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) PosterTPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) Poster
TPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) Poster
Operational Excellence Consulting
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
ChetanMehta39
 
Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Yadhu Gopinath
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
Pramod A
 
TPM & OEE
TPM & OEETPM & OEE
Tpm
TpmTpm
OEE
OEEOEE
My machine camp
My machine campMy machine camp
My machine camp
Jitesh Gaurav
 
Abnomality and jishu hozen
Abnomality and jishu hozenAbnomality and jishu hozen
Abnomality and jishu hozen
Rajasekaran Murugan
 
Oee and its Application
Oee and its ApplicationOee and its Application
Oee and its Application
Thilanka Hettiarachchi
 
AUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCEAUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCE
FauziahIbrahim15
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
Achuthan Rajagopal
 
Cost of poor quality
Cost of  poor qualityCost of  poor quality
Cost of poor quality
Abdullah Sasy
 

What's hot (20)

SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
The 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation PosterThe 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation Poster
 
OEE-Practical-1.pptx
OEE-Practical-1.pptxOEE-Practical-1.pptx
OEE-Practical-1.pptx
 
Poka Yoke
Poka YokePoka Yoke
Poka Yoke
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1
 
Maintenance Autonomous
Maintenance AutonomousMaintenance Autonomous
Maintenance Autonomous
 
TPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) Poster
TPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) PosterTPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) Poster
TPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) Poster
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
 
Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Tpm
TpmTpm
Tpm
 
OEE
OEEOEE
OEE
 
My machine camp
My machine campMy machine camp
My machine camp
 
Abnomality and jishu hozen
Abnomality and jishu hozenAbnomality and jishu hozen
Abnomality and jishu hozen
 
Oee and its Application
Oee and its ApplicationOee and its Application
Oee and its Application
 
AUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCEAUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCE
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
Cost of poor quality
Cost of  poor qualityCost of  poor quality
Cost of poor quality
 

Similar to OEE

Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenance
FELIX JONATHAN
 
H0432045055
H0432045055H0432045055
H0432045055
theijes
 
Just in-time systems
Just in-time systemsJust in-time systems
Just in-time systemsswati Mahajan
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET Journal
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
RahbiMalek
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
hossam hassanein
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET Journal
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentation
guest03d3e3
 
The six big losses - lean tool
The six big losses  - lean toolThe six big losses  - lean tool
The six big losses - lean tool
Prashant Uttarkar
 
Flexible Manufacturing System Design
Flexible Manufacturing System DesignFlexible Manufacturing System Design
Flexible Manufacturing System Design
Rahul Surajith (ラーフル)
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
Jason Corder
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
Parsec_Automation_Corp
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
Corey Vodvarka
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel Equipment
IRJET Journal
 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenancevivekmsmech
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET Journal
 

Similar to OEE (20)

Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenance
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
Internship Report
Internship ReportInternship Report
Internship Report
 
H0432045055
H0432045055H0432045055
H0432045055
 
Just in-time systems
Just in-time systemsJust in-time systems
Just in-time systems
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
6Sigma
6Sigma6Sigma
6Sigma
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentation
 
The six big losses - lean tool
The six big losses  - lean toolThe six big losses  - lean tool
The six big losses - lean tool
 
Flexible Manufacturing System Design
Flexible Manufacturing System DesignFlexible Manufacturing System Design
Flexible Manufacturing System Design
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
Design lean sysm
Design lean sysmDesign lean sysm
Design lean sysm
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel Equipment
 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 

Recently uploaded

road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 

OEE

  • 1. OEE ( Overall Equipment Effectiveness) manoji@yahoo.com OEE : [Availability % ] X [Performance %] X [ Quality %] a b c Down Time Loss A) How to calculate OEE ? Speed Loss Quality Loss a) Machine Availability TYPES OF LOSSES ( Part of Six big Losses) - Read below for six big losses Breakdowns : 1. Tooling Failures 2. Unplanned Maintenance 3. General Breakdowns 4. Equipment Failures Setup & Adjustments: 1. Setup / Changeover This should address under 2.Materail Shortage setup time reduction 3.Operator Shortage programs 4.Major Adjustments 5.Warm-Up Time b) Machine Performance% Let's assume machine makes 1000 PCS during 5.00Hours of Work Please note that we consider the production only during up-time Machine Standard rate ( PCS) : 300PCS/HOUR Current Performance ( PCS) : 1000PCS/5 HOURS 200PCS/HOUR Machine Performance % : (200/300)X100 % 66.7%
  • 2. TYPES OF LOSSES ( Part of Six big Losses) Small Stops 1. Obstructed Product Flow 2. Components Jams 3. Misdeeds This includes stops that are 4. Sensor Blocks under five minutes and not 5. Delivery Blocked require maintence 6. Cleaning / Checking personal for recitification Reduced Speed or 1. Rough Running Slow Cycles 2.Below nameplate capacity 3.Under design capacity 4.Equipment Wear 5.Operator Inefficiency c) Quality % Let's assume machine makes 1000 PCS during 5.00Hours of Work and 200 PCS are rejected by QAD. Total Produced during 5.00 Hours ( PCS) : 1000 Quality Rejected ( PCS) : 200 Quality % : accepted products /total products 80.0% TYPES OF LOSSES ( Part of Six big Losses) Porduction Rejects 1. Scrap 2. Rework 3. In-process damage Rejctions during Steady 4. In-process expiration state production 5. Incorrect assembly Startup Rejects 1. Scrap Rejects during worm-up 2.Rework start-up, other early 3. In-process damage production , may be improper 4. In-process expiration set-up…..etc 5. Incorrect assembly OEE : [Availability % ] X [Perfomance %] X [ Quality %] 0.794X0.667X0.800 42.4%
  • 3. B) Six Big Losses http://www.oee.com/images/pt-oee-six-big-losses.png C) How to Address SIX Big Losses ? Breakdowns : Eliminating unplanned down-time is important in improving OEE. You can use Pareto Charts to prioratize the severe losees and Root Cause Analysis for solutions. Setup and Adjustments: This is measured between last good part produced before setup to first good part produced after setup. Tracking setup time is important to reduce this loss togather with an active program to reduce this time such as SMED ( Single Minute Exchange of Dies) ( Eg : Use of prefabricated setups , Magnetic clamps on Injection modling MC) Small Stops ad Reduced Speeds : This is very difficut to record and monitor . Comparing completed cycle times and ideal cycle time , errant cycles can be spotted. Then , RCA ,PDCA , DMAIC , 8D problem solving can be used. Startup Rejects and Production Rejects: Startup Rejects and Production Rejects are two different things root causes are also different between startup and steady-state production. Parts require any kind of reworks are rejects . Often a six sigma program can be used to bring the quality to near perfect level. D) How to calculate OEE in plant ? Let's say a plant can have few machines, OEE: [Available Time MC1+Available Time MC2….]/[Scheduled Time MC1+Scheduled Time MC1…..] X[Current Performance MC1+MC2…]/[Rated Performance MC1+MC2..]X[Approved Quantity MC1+ MC2…]/[Total Quantity MC1+MC2..] E) How to calculate OEE in a Group of Plants? Let's say a group of companes has three plant assets, OEE : [OEE1+OEE2+OEE3]/3 F) What is world class OEE Levels ? Availability 90% Performance 95% Quality 99.9% OEE 85%
  • 4. G) Visual OEE Plant floor real time display of live OEE data for maximum team involvement. http://www.vorne.com/ Reference http://www.smartandon.com/files/OEE.jpg http://www.oee.com/images/pt-oee-six-big-losses.png http://www.vorne.com/