1. What is OEE
Operating time
Net operating time
Total production time
Planned production time
OEE (Overall Equipment Efficiency) is an indicator that serves to
measure the productive efficiency of industrial equipment.
Availability
- Setup and
Adjustments
Breakdowns
Performance
Quality
- Micro-stops.
- Reduced Speed
- Production Rejects
-- Reworks
2. Complexity and OEE
OEE Target Complexity
What factors influence in the level of production performance?
The Losses of time of OEE are associated
with three coeficients that evaluate the
complexity of the production line.
No. Equipment
No. Operations
No. Materials
No. Stops
No. Format changes
…
…
- of Equipment
- of Products
- of Working Methods
OEE (real, measured in the line)
3. What is OEE Target
OEE 100% (ideal, but unreachable)
Losses
OEETarget (calculated, maximum reachable OEE) Losses
OEE Target calculates the maximum OEE that your production lines
can achieve based on their complexity.
Once you have your OEETarget coefficient you know
the maximum performance you can achieve, and
therefore your future increase of benefits.
OEE
Goal
+ Benefit
The calculation is based on three coefficients.
4. How is OEE Target calculated?
OEE Target = OEEME x OEEMP x OEEMM
- OEEME: Maximum OEE by complexity of equipment.
- OEEMP: Maximum OEE by complexity of products and materials.
- OEEMM: Maximum OEE by complexity of working methods.
4.1. OEEME
+ Materials
Equipment
complexity
+ Operations + Movements
+ % of failure
The more complex the line equipment is, the more probability that
failures, bottlenecks, etc will occur.
(Managed by the equipment) (Performed by the equipment)
(%) OEEME
4.2. OEEMP
+ Kinds of
materials
+ Variety of these
kinds of
materials.
+ Format changes
Leaflet
Box
English
French
Big
+ Batch changes
Complexity
by products
and materials.
Chinese
Medium
Annual
Volume of
manufacture
Total
annual
orders
(%) OEEMP
4.3. OEEMM
Complexity by
working
methods
+ Work on the line
+ Breaks
+ Cleanings
+ Samples
+ Waste removals
(%) OEEMM
Continuous improvement with
OEE Target
1º - Determine the maximum OEE reachable.
74
79
84
89
94
99
1st OEE measurement
1st OEE Target calculation
Continuous improvement with
OEE Target
2º - As it is an objectively calculated goal, you can reach the
target.
74
79
84
89
94
99
1st OEE measurement
1st OEE Target calculation
2nd OEE measurement
Continuous improvement with
OEE Target
3º - Once you reach your actual OEE Target, you can simulate
new modifications in order to increase your OEE Target anew.
74
79
84
89
94
99
1st OEE measurement
1st OEE Target calculation
2nd OEE measurement
2nd OEE Target calculation
Continuous improvement with
OEE Target
To increase the OEE Target KPI, you must
reduce the complexity of your production
processes. OEE Target indicates the areas in
which you must focus the changes.
OEE Target Complexity
OEE Target Complexity
74
76
78
80
82
84
86
88
90
Increase of the OEE
Target (maximum OEE
reachable).
1st OEE measurement
1st OEE Target calculation
2nd OEE measurement
2nd OEE Target calculation
Comparing different lines
Material 3
Material 4
Material 5
Material 2
How do I compare the OEE measured in these production lines?
Material 1
Material 2
Op. 3
Op. 2
Op. 4 Operation 1
Operation 2
Op. 5
Operation 1
LINEA “A”
LINEA “B”
Material 1
Comparing different lines
OEE Target does permit comparison between lines with different
complexities.
You might think that line B has better performance than A,
but objectively it does not.
Complexity of line A, makes it difficult to achieve more than 62% of
OEE, so it´s at 96% of its maximum target performance.
Line OEE (Measured) OEE Target Objective performance
A 58% 62% 93.54%
B 70% 92% 76,08%
Increasing motivation
Realistic
Goals
Goals
achieved
Increasing
motivation
By defining a realistic improvement we
will be able to reach it, because
its objectively defined.
This will increase
motivation.
Tool to aid in decision making
Feasibility study for future investments.
The performance of new equipment
depends on the complexity of the
production process that this equipment
will be associated to.
OEE Target allows you to simulate the real performance of the new
equipment integrated into your production line conditions.
The data obtained with OEE Target can be used in your User
Specifications Requisites for the contract of sale.
OEE Target - ¿What is the basis for your current OEE goal?
OEE Target - ¿What is the basis for your current OEE goal?

More Related Content

What's hot

A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)OEEsystems International
 
Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareWintriss Controls Group, LLC
 
benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessahmed_shimi
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
OEE Interphex New York 2013
OEE Interphex New York 2013OEE Interphex New York 2013
OEE Interphex New York 2013Adrian Pask
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Adrian Pask
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsMarvin Norona
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityParsec_Automation_Corp
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Anang Tristianto
 
Overall equipment effectiveness
Overall equipment effectivenessOverall equipment effectiveness
Overall equipment effectivenessRachit Laharia
 
OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)mechanicalinventors
 

What's hot (20)

A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)
 
Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking Software
 
benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivness
 
How To Track OEE
How To Track OEEHow To Track OEE
How To Track OEE
 
OEE
OEEOEE
OEE
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
OEE Interphex New York 2013
OEE Interphex New York 2013OEE Interphex New York 2013
OEE Interphex New York 2013
 
Work sampling
Work samplingWork sampling
Work sampling
 
OEE
OEEOEE
OEE
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Role Of OEE in Lean Manufacturing
Role Of OEE in Lean ManufacturingRole Of OEE in Lean Manufacturing
Role Of OEE in Lean Manufacturing
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
OEE Webinar
OEE WebinarOEE Webinar
OEE Webinar
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)
 
Overall equipment effectiveness
Overall equipment effectivenessOverall equipment effectiveness
Overall equipment effectiveness
 
OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)
 
OEE IMPLEMENTATION part 1
OEE IMPLEMENTATION part 1OEE IMPLEMENTATION part 1
OEE IMPLEMENTATION part 1
 

Viewers also liked

IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICASIDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICASJesús Cañada
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)Marco Bueno
 
Cellular layout/Manufacturing
Cellular layout/ManufacturingCellular layout/Manufacturing
Cellular layout/ManufacturingFahad Ali
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)Lean Teams USA
 
Cellular LayOut
Cellular LayOutCellular LayOut
Cellular LayOutFahad Ali
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations managementshart sood
 

Viewers also liked (13)

Preso: The OEE Story
Preso: The OEE StoryPreso: The OEE Story
Preso: The OEE Story
 
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICASIDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
 
The mystery of OEE
The mystery of OEEThe mystery of OEE
The mystery of OEE
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)
 
Cellular layout/Manufacturing
Cellular layout/ManufacturingCellular layout/Manufacturing
Cellular layout/Manufacturing
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
Cellular LayOut
Cellular LayOutCellular LayOut
Cellular LayOut
 
Oee guide
Oee guideOee guide
Oee guide
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
OEE
OEEOEE
OEE
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
 

Similar to OEE Target - ¿What is the basis for your current OEE goal?

The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityCorey Vodvarka
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityJason Corder
 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEijsrd.com
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and managementbahir dar university
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEEijsrd.com
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performanceYasmin AbdelAziz
 
The reliability of the OEE indicator
The reliability of the OEE indicatorThe reliability of the OEE indicator
The reliability of the OEE indicatorJoão Leite
 
Proefficient 1.0 - – AN HOLISTIC TOOL TO CALCULATE AND INTERPRET OVERALL EQU...
Proefficient 1.0 -  – AN HOLISTIC TOOL TO CALCULATE AND INTERPRET OVERALL EQU...Proefficient 1.0 -  – AN HOLISTIC TOOL TO CALCULATE AND INTERPRET OVERALL EQU...
Proefficient 1.0 - – AN HOLISTIC TOOL TO CALCULATE AND INTERPRET OVERALL EQU...Ruchir Gupta
 
Overall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptxOverall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptxNoman khan
 
Edinn M2: The best tool for energy and productive improvement
Edinn M2: The best tool for energy and productive improvementEdinn M2: The best tool for energy and productive improvement
Edinn M2: The best tool for energy and productive improvementedinn_global
 
The efficiency modules
The efficiency modulesThe efficiency modules
The efficiency modulesnextsrl
 
Key manufacturing business metrics
Key manufacturing business metricsKey manufacturing business metrics
Key manufacturing business metricsMRPeasy
 

Similar to OEE Target - ¿What is the basis for your current OEE goal? (20)

The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEE
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and management
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
 
lean & agile
lean & agilelean & agile
lean & agile
 
Why OEE?
Why OEE?Why OEE?
Why OEE?
 
OEE-Presentation.pdf
OEE-Presentation.pdfOEE-Presentation.pdf
OEE-Presentation.pdf
 
I012536474
I012536474I012536474
I012536474
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performance
 
The reliability of the OEE indicator
The reliability of the OEE indicatorThe reliability of the OEE indicator
The reliability of the OEE indicator
 
OEE article
OEE articleOEE article
OEE article
 
Oee
OeeOee
Oee
 
Ofs whitepaper
Ofs whitepaperOfs whitepaper
Ofs whitepaper
 
Proefficient 1.0 - – AN HOLISTIC TOOL TO CALCULATE AND INTERPRET OVERALL EQU...
Proefficient 1.0 -  – AN HOLISTIC TOOL TO CALCULATE AND INTERPRET OVERALL EQU...Proefficient 1.0 -  – AN HOLISTIC TOOL TO CALCULATE AND INTERPRET OVERALL EQU...
Proefficient 1.0 - – AN HOLISTIC TOOL TO CALCULATE AND INTERPRET OVERALL EQU...
 
IE working procedure
IE working procedureIE working procedure
IE working procedure
 
Overall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptxOverall Equipment Effectiveness (OEE).pptx
Overall Equipment Effectiveness (OEE).pptx
 
Edinn M2: The best tool for energy and productive improvement
Edinn M2: The best tool for energy and productive improvementEdinn M2: The best tool for energy and productive improvement
Edinn M2: The best tool for energy and productive improvement
 
The efficiency modules
The efficiency modulesThe efficiency modules
The efficiency modules
 
Key manufacturing business metrics
Key manufacturing business metricsKey manufacturing business metrics
Key manufacturing business metrics
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 

OEE Target - ¿What is the basis for your current OEE goal?

  • 1.
  • 2. 1. What is OEE Operating time Net operating time Total production time Planned production time OEE (Overall Equipment Efficiency) is an indicator that serves to measure the productive efficiency of industrial equipment. Availability - Setup and Adjustments Breakdowns Performance Quality - Micro-stops. - Reduced Speed - Production Rejects -- Reworks
  • 3. 2. Complexity and OEE OEE Target Complexity What factors influence in the level of production performance? The Losses of time of OEE are associated with three coeficients that evaluate the complexity of the production line. No. Equipment No. Operations No. Materials No. Stops No. Format changes … … - of Equipment - of Products - of Working Methods
  • 4. OEE (real, measured in the line) 3. What is OEE Target OEE 100% (ideal, but unreachable) Losses OEETarget (calculated, maximum reachable OEE) Losses OEE Target calculates the maximum OEE that your production lines can achieve based on their complexity. Once you have your OEETarget coefficient you know the maximum performance you can achieve, and therefore your future increase of benefits. OEE Goal + Benefit
  • 5. The calculation is based on three coefficients. 4. How is OEE Target calculated? OEE Target = OEEME x OEEMP x OEEMM - OEEME: Maximum OEE by complexity of equipment. - OEEMP: Maximum OEE by complexity of products and materials. - OEEMM: Maximum OEE by complexity of working methods.
  • 6. 4.1. OEEME + Materials Equipment complexity + Operations + Movements + % of failure The more complex the line equipment is, the more probability that failures, bottlenecks, etc will occur. (Managed by the equipment) (Performed by the equipment) (%) OEEME
  • 7. 4.2. OEEMP + Kinds of materials + Variety of these kinds of materials. + Format changes Leaflet Box English French Big + Batch changes Complexity by products and materials. Chinese Medium Annual Volume of manufacture Total annual orders (%) OEEMP
  • 8. 4.3. OEEMM Complexity by working methods + Work on the line + Breaks + Cleanings + Samples + Waste removals (%) OEEMM
  • 9. Continuous improvement with OEE Target 1º - Determine the maximum OEE reachable. 74 79 84 89 94 99 1st OEE measurement 1st OEE Target calculation
  • 10. Continuous improvement with OEE Target 2º - As it is an objectively calculated goal, you can reach the target. 74 79 84 89 94 99 1st OEE measurement 1st OEE Target calculation 2nd OEE measurement
  • 11. Continuous improvement with OEE Target 3º - Once you reach your actual OEE Target, you can simulate new modifications in order to increase your OEE Target anew. 74 79 84 89 94 99 1st OEE measurement 1st OEE Target calculation 2nd OEE measurement 2nd OEE Target calculation
  • 12. Continuous improvement with OEE Target To increase the OEE Target KPI, you must reduce the complexity of your production processes. OEE Target indicates the areas in which you must focus the changes. OEE Target Complexity OEE Target Complexity 74 76 78 80 82 84 86 88 90 Increase of the OEE Target (maximum OEE reachable). 1st OEE measurement 1st OEE Target calculation 2nd OEE measurement 2nd OEE Target calculation
  • 13. Comparing different lines Material 3 Material 4 Material 5 Material 2 How do I compare the OEE measured in these production lines? Material 1 Material 2 Op. 3 Op. 2 Op. 4 Operation 1 Operation 2 Op. 5 Operation 1 LINEA “A” LINEA “B” Material 1
  • 14. Comparing different lines OEE Target does permit comparison between lines with different complexities. You might think that line B has better performance than A, but objectively it does not. Complexity of line A, makes it difficult to achieve more than 62% of OEE, so it´s at 96% of its maximum target performance. Line OEE (Measured) OEE Target Objective performance A 58% 62% 93.54% B 70% 92% 76,08%
  • 15. Increasing motivation Realistic Goals Goals achieved Increasing motivation By defining a realistic improvement we will be able to reach it, because its objectively defined. This will increase motivation.
  • 16. Tool to aid in decision making Feasibility study for future investments. The performance of new equipment depends on the complexity of the production process that this equipment will be associated to. OEE Target allows you to simulate the real performance of the new equipment integrated into your production line conditions. The data obtained with OEE Target can be used in your User Specifications Requisites for the contract of sale.