Discrete jobs can be created manually or through interfaces to track production. Standard jobs use default bills of materials and routings, while non-standard jobs are more flexible. Jobs statuses include unreleased, released, complete with charges allowed, and complete with no charges allowed. Materials and resources are issued and consumed against jobs through various transactions as the jobs are produced and moved between operations until completed.
The objective of this white paper is to assist users in better understanding and troubleshooting of discrete job closure issues. Additionally, common month end issues are addressed. When material and/or resource transactions are stuck, discrete job closure cannot be accomplished.
The objective of this white paper is to assist users in better understanding and troubleshooting of discrete job closure issues. Additionally, common month end issues are addressed. When material and/or resource transactions are stuck, discrete job closure cannot be accomplished.
This presentation is about how to Create Drop Ship Sales Order Across the Operating Units in R12i and then how to perform Inter company Transactions.
Here I will discuss following Process
1.Drop Ship SO Creation
2.PO Creation
3.Receiving against PO
4.AP/AR Invoice Creation
5.Intercompany Invoice Creation
Oracle Process Manufacturing enables firms to better manage batch production involving variable ingredients, scalable recipes and flexible routings to satisfy unique specifications typically found in chemicals, food and beverage, life sciences, pharma and natural resources.
Each ERP implementation has a set of main objectives, and one of them is to obtain Cost Accounting or Managerial Report for specific line of business.
As SAP, PeopleSoft or JD Edwards have such Cost Accounting module, we developed and offer a specialized module for Oracle Applications.
This presentation is about how to Create Drop Ship Sales Order Across the Operating Units in R12i and then how to perform Inter company Transactions.
Here I will discuss following Process
1.Drop Ship SO Creation
2.PO Creation
3.Receiving against PO
4.AP/AR Invoice Creation
5.Intercompany Invoice Creation
Oracle Process Manufacturing enables firms to better manage batch production involving variable ingredients, scalable recipes and flexible routings to satisfy unique specifications typically found in chemicals, food and beverage, life sciences, pharma and natural resources.
Each ERP implementation has a set of main objectives, and one of them is to obtain Cost Accounting or Managerial Report for specific line of business.
As SAP, PeopleSoft or JD Edwards have such Cost Accounting module, we developed and offer a specialized module for Oracle Applications.
Overcoming Order Fulfillment Challenges in Manufacturing, High-Tech & RetailCapgemini
http://www.capgemini.com/oracle
Capgemini and Oracle recently commissioned a study by Peerless Research Group on behalf of Supply Chain Management Review and Logistics Management that reveals the top order fulfillment challenges faced by 600 of your supply chain peers in the manufacturing, high-tech, and retail sectors; key areas for improvement; and tips for bringing your order fulfillment practices up to speed.
This webcast reveals key findings from the report and what they mean for your organization’s order fulfillment strategy. It also presents best practices and case studies of companies that have successfully addressed their industry-specific order fulfillment challenges.
Watch this webinar to learn how you can:
- Fulfill more orders faster and at lower costs
- Increase margins and profitability per order
- Improve accuracy of order promises and status
- Improve customer service and satisfaction levels
- Create a unified customer and user experience without replacing existing systems
Structural Packaging Summit: Using Consumer Insights to Satisfy the CustomerSonoco
Most of us are experts in our respective industries, but how do you become an expert in what the consumer wants? Jack Sanders, president and CEO-elect of Sonoco, will discuss Sonoco’s work to satisfy its customers using consumer insight research, and how this was successful in a recent collaboration with Pepperidge Farm on the brand’s popular Baked Naturals® Cracker Chip snack.
In manufacturing industrial the world be gotten registers requirement who shall be accomplished to
do named production process bill of materials which is: Component or goods list to process the
need or manufacturing to meet the need firm, that bill of material gets at suiting by totals
production requirement that will be needed to result finished goods or an a half so appropriate from
its requirement each firm.
On manufacturing industry in big scale, as corporate as automotive : car or motorbike exists
hundreds even thousands goods / components to form cars or that motorbike, Then how to control
it? which is with bill of significant or goods order list.
Sameer Mitter - What is Project Management and How to Handle itSameer Mitter
Sameer Mitter is an IT professional in Bournemouth, UK. He is an expert for information technology at JP Morgan. He always shares his skills with his team members.
Enhancement Packages 5 & 6 – Where to find the business functions that matter...John Jordan
When SAP introduced the concept of enhancement packages and packaged functionality in business functions, administrators were relieved that they would not have to test everything when they upgraded. However, it made some business functions difficult to locate.
In this session from Controlling 2014, Janet Salmon dives into hard to find functionality important to Controllers including:
1. FIN_CO_COGM: Parallel valuation of cost of goods manufactured allows for different costing approaches for each accounting principle your company follows
2. LOG_MM_SIT: Actual costing and stock in transit allows you to pass production variances to other plants, even if they are assigned to other company codes
3. LOG_EAM_OLC: Operation level costing provides a more detailed view of your service and maintenance costs
4. FIN_CO_CCMGMT: New user interfaces for cost center, order and activity type master data and first planning applications
5. FIN_CO_CCPLAN and FIN_CO_ORPLAN: New user interfaces for cost center planning, order planning, and project planning
Leave this session with the ability to go back to the office and quickly identify and use the business functions that benefit you.
Production Module & Report Completion Sub-Module. .pptxLamees EL- Ghazoly
SAP B1 is an ERP software for SMBs seeking to get up & running quickly.
Offers a lean, clean set of modules that make up the core of ERP.
Users can expect to see financial management, inventory management, production management, procurement, service management, some basic project systems, dashboards, embedded analytics, excel integration, access via an internet browser, and basic multi-company functionality. SAP Business One Enterprise Search Engine.
The “five M’s.”
Production management’s responsibilities are summarized by the “five M’s”:
Manpower, Machines, Methods, Materials, and Money.
SAP Product costing Calculation With Components - SkillstekSkillstek
SAP Product Cost Calculation is done in the 6 key components of Product Costing, which is part of SAP CO.
Read it at Skillstek's Blog:- https://skillstek.com/product-costing-in-sap/
For more informative content, visit:-
https://skillstek.com/blog
Contact Details:-
Website:- https://skillstek.com
Phone:- +91-9556432150
Email:- info@skillstek.com
Social Accounts:-
LinkedIn:- https://www.linkedin.com/company/skillstek
Facebook:- https://www.facebook.com/SkillstekEdu
YouTube Channel:- https://www.youtube.com/c/skillstek
Instagram:- https://www.instagram.com/skillsteksap/
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
Epistemic Interaction - tuning interfaces to provide information for AI supportAlan Dix
Paper presented at SYNERGY workshop at AVI 2024, Genoa, Italy. 3rd June 2024
https://alandix.com/academic/papers/synergy2024-epistemic/
As machine learning integrates deeper into human-computer interactions, the concept of epistemic interaction emerges, aiming to refine these interactions to enhance system adaptability. This approach encourages minor, intentional adjustments in user behaviour to enrich the data available for system learning. This paper introduces epistemic interaction within the context of human-system communication, illustrating how deliberate interaction design can improve system understanding and adaptation. Through concrete examples, we demonstrate the potential of epistemic interaction to significantly advance human-computer interaction by leveraging intuitive human communication strategies to inform system design and functionality, offering a novel pathway for enriching user-system engagements.
UiPath Test Automation using UiPath Test Suite series, part 4DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 4. In this session, we will cover Test Manager overview along with SAP heatmap.
The UiPath Test Manager overview with SAP heatmap webinar offers a concise yet comprehensive exploration of the role of a Test Manager within SAP environments, coupled with the utilization of heatmaps for effective testing strategies.
Participants will gain insights into the responsibilities, challenges, and best practices associated with test management in SAP projects. Additionally, the webinar delves into the significance of heatmaps as a visual aid for identifying testing priorities, areas of risk, and resource allocation within SAP landscapes. Through this session, attendees can expect to enhance their understanding of test management principles while learning practical approaches to optimize testing processes in SAP environments using heatmap visualization techniques
What will you get from this session?
1. Insights into SAP testing best practices
2. Heatmap utilization for testing
3. Optimization of testing processes
4. Demo
Topics covered:
Execution from the test manager
Orchestrator execution result
Defect reporting
SAP heatmap example with demo
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Ramesh Iyer
In today's fast-changing business world, Companies that adapt and embrace new ideas often need help to keep up with the competition. However, fostering a culture of innovation takes much work. It takes vision, leadership and willingness to take risks in the right proportion. Sachin Dev Duggal, co-founder of Builder.ai, has perfected the art of this balance, creating a company culture where creativity and growth are nurtured at each stage.
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
Connector Corner: Automate dynamic content and events by pushing a buttonDianaGray10
Here is something new! In our next Connector Corner webinar, we will demonstrate how you can use a single workflow to:
Create a campaign using Mailchimp with merge tags/fields
Send an interactive Slack channel message (using buttons)
Have the message received by managers and peers along with a test email for review
But there’s more:
In a second workflow supporting the same use case, you’ll see:
Your campaign sent to target colleagues for approval
If the “Approve” button is clicked, a Jira/Zendesk ticket is created for the marketing design team
But—if the “Reject” button is pushed, colleagues will be alerted via Slack message
Join us to learn more about this new, human-in-the-loop capability, brought to you by Integration Service connectors.
And...
Speakers:
Akshay Agnihotri, Product Manager
Charlie Greenberg, Host
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
How world-class product teams are winning in the AI era by CEO and Founder, P...
Oracle R12 Work In Process
1. WIP- Discrete Job Creation Process (Manual)
Production
Identify the
item to Build
Standard
Assembly
?
Select BOM and
Routing
Enter Assembly
and Quantity
Attach a
document if
required
NOYES
Determine
the Job
Number
Create
Discrete Job
Select type
as
‘Standard’
Select type
as ‘Non
Standard’
Release a
Discrete Job
2. Create Discrete Job
Overview
• Discrete jobs may be created from Planner Workbench through the WIP Mass Interface, or
they may be created using the Discrete Job form.
• Non-standard discrete jobs for repair, engineering prototypes, and released new build jobs
using optional bills of materials or routings may be created using the Discrete Job form.
• A standard job is for items that have a standard released bill of material.
• Non-standard jobs are more flexible than standard jobs. They can be used for rework, field
service repair, upgrades, disassembly, maintenance engineering prototypes, and other
miscellaneous projects
• For a standard job, if a primary BOM and/or routing exist for the assembly they will be
defaulted. You can also enter an alternate BOM and/or routing.
• You can attach illustrative or explanatory files-in the form of text, images, word processing
documents, spreadsheets, video, etc. to discrete jobs.
• Change the Status on the job from Unreleased to Released.
3. Modify Discrete Job
Overview:
• You can change discrete jobs using the Discrete Jobs and Discrete Jobs Summary windows.
• What We Can Change?
Date changes: For date changes, it is only necessary to change either the start date or the
completion date. If the start date is changed, the system will forward schedule and
recalculate the completion date. If the completion date is changed, the system will
backward schedule and recalculate the start date. These changes can be made through the
Define Discrete Job form.
Quantity changes: Quantity changes can be done with no restrictions if the job is unreleased.
You can also increase the quantity as a job is released. If the job is released and work has
begun on the assembly, you cannot decrease the job quantity lower than the number of
assemblies that have already passed the Queue intraoperation step of the first operation. If
a sales order is linked to the job, you cannot decrease the job quantity lower than the order
quantity.
Comments: The text of one-time comments can be amended. Standard comments can
either be added or deleted.
4. Modify Discrete Job
Status: Jobs can have the following statuses: Unreleased, Released, Complete - Charges
Allowed, Complete - No Charges Allowed, On Hold, and Cancelled.
Firm: Unreleased schedules or jobs may be firmed to prevent MRP date changes from being
reflected automatically on the schedule or job.
Note: Changes cannot be made on components and operations in the Discrete Job form.
5. WIP-Component Issue Process
Production
Stores
Identify Discrete
Job
Pending
Material
Requirement
?
Print Move Order
Pick Slip
Run ‘Component
Pick Release’
View and allocate
material
YES
Check the
material
requirement
Transact Move
Order
6. WIP-Change Material Requirement Process
Production
Planning
Check Discrete Job
for which additional
material required
Query discrete job
where changes are
required
Identify the changes in
item/Quantity/dates/
comments/status/firm
fields
Enter and Save the
changes
Open Material
Requirement form
7. Modify Material Requirement
Once a discrete job has been created you may modify material requirements if they differ
from the BOM. You may also use this form to add requirements for a non-standard discrete
job.
This responsibility is majorly provided to Planner or Shop Floor In charge as this will cause
audit issue when “ Require Qty in BOM V/S Actual Consumption” is calculated.
Caution:
• Major changes in the Material Requirement are done through BOM revision.
• Change the material requirement when the Job is in ‘Release or Un-release’ State
• Changes in material requirement after JOB completion may cause variance.
8. WIP-Move Transaction Process
(Inter-Operation Moves)
Operation 10 QUEUE
QUEUEOperation 20
RUN TO MOVE REJECT SCRAP
RUN TO MOVE REJECT SCRAP
Operation 30
QUEUE RUN TO MOVE REJECT SCRAP
Operation N
9. WIP-Move Transaction Process
(Intra-Operation Moves)
Operation 10 QUEUE
QUEUEOperation 20
RUN TO MOVE REJECT SCRAP
RUN TO MOVE REJECT SCRAP
Operation 30
QUEUE RUN TO MOVE REJECT SCRAP
Operation N
10. Move Transaction
Overview:
Using the Move Transactions form, you can move the assemblies you are building from one
operation and/or intraoperation step to another.
You can move assemblies forward and backward within and between operations.
Moving assemblies into the To Move, Reject, or Scrap intraoperation step of an operation
completes those assemblies at that operation.
When assemblies are completed at an operation, the system automatically backflushes
Operation Pull components and charges resources.
Interoperation Moves: Moving assemblies from one operation to another is an interoperation
move. Moves usually follow the forward sequence defined by the routing, but you can move
assemblies from any operation to any other, even preceding operations.
Intraoperation Moves: Moving assemblies from one intraoperation step of an operation to
another intraoperation step of the same operation is an intraoperation move. You can move
assemblies from any enabled intraoperation step, (Queue, Run, To move, Reject, or Scrap), as
required.
11. Things to Check
View Pending Jobs
Use the Pending Jobs and Schedules form to view, update, delete, and resubmit records that
have failed validation and remain in the Open Job and Schedule Interface table.
You cannot close a job if pending transactions exist. If no pending transactions exist on a job
then the results of the search will return nothing.
Navigate to: Discrete > Pending Jobs and Schedules
Pending Move Transactions
You can view, update, delete, and resubmit move transaction records that have failed
validation and remain in the Open Move Transaction Interface table.
You can view error messages associated with failed records. Error messages can assist you in
updating failed records before resubmission.
Navigate to: Move Transactions > Pending Move Transactions
12. Things to Check
Pending Resource Transactions
You can view, update, delete and resubmit resource transactions that have failed validation or
processing and remain in the Open Resource Transaction Interface table.
You can view error messages associated with failed records, which can help you in updating
the failed records before resubmission.
At period close this table should be reviewed prior to closing the period to make sure all
resource transactions have cleared.
Navigate to: Resource Transactions > Pending Resource Transactions
13. WIP Value Summary
View A WIP Value Summary
Use the WIP Value Summary form to view the current value of open and closed jobs.
Navigate to: Discrete > WIP Value Summary
How to Understand the form output:
Periods From/To: This field will display the current period unless you entered a range into the
previous form.
Quantities: This area will display the quantity information related to the discrete job selected.
Cost Element: Displays the cost element associated with the cost information listed.
Account: Displays the account associated with the cost you are viewing.
Cost Incurred: Displays the current cost incurred on the discrete job by element.
Cost Relieved: Displays the current cost relieved on the discrete job by element.
Variances Relieved: Displays the current cost variance relieved on the discrete job by element.
14. WIP Value Summary
Variance Relieved= Costs Incurred - Costs Relieved
COST INCURRED >> (Production Cost) Term used to indicate the total amount spent to
produce an assembly by using/consuming applicable MATERIALS (sub assembly &
components) & RESOURCES (such as machine, man power, consumables, tools etc.)
COST RELIEVED >> (BOM Cost) Cost or Rate of the assembly item produced by the
manufacturing process, which is defined as Item standard cost at Item Costs form of
costing module
15. WIP Material Transactions
When Material Transaction is used:
• Excess material may have been issued in error to a job.
• The bill of materials for an assembly may be incorrect and may call for too many or too few
components.
• A component may have been damaged during assembly and it is decided to issue another
component to the schedule or job, while leaving the damaged component charged to the
schedule or job also.
• Components may be consumed during assembly set-up and it has been decided to leave the loss
charged to the schedule or job and replace the components.
• One WIP supply subinventory may have a short-term oversupply and it may be decided to transfer
the components to another WIP supply subinventory requiring them.
16. WIP Material Transactions Types
WIP Material Transaction Types:
• WIP Component Issue-Issues components from inventory to jobs and schedules to fulfill
positive material requirements.
• WIP component Return-Returns components from jobs and schedules to inventory.
• WIP negative component issue-Issues components from jobs and schedules to inventory to
fulfill negative material requirements. (WIP negative component issue is to return material
into stock, material requirement should be – yes)
• WIP negative component return-Returns components to jobs and schedules from inventory
to fulfill negative material requirements. WIP negative component returns reverse WIP
negative component issues.
• Replenishment supply subinventory-Replenishes the supply subinventories of Operation Pull
or Assembly Pull supply type components. This transaction works the same as performing a
subinventory transfer in inventory.
• Inventory sub transfer-Performs a subinventory transfer of one subinventory to another. This
is similar to the replenishment supply subinventory type.
17. WIP-Complete Discrete Job Process
Production
Check Discrete Job
which needs to be
complete
Pending
Material
Requirement
?
Pending
Move
Transaction
?
Use ‘Completion
Transaction’ and
complete desired
assembly units
Complete move
transaction
Is it a last
operation?
To component
Pick Release
Process
YES
NO NO
YES
YES
NO
18. Complete Discrete Job
Overview
• A job must have a status of “Released” in order to have completions transacted against it.
• When the last assembly on the job is completed, Materials or Manufacturing will process
the final completion transaction and change the status of the job to “complete charges
allowed”.
• The job will remain open for a determined amount of time in this state in order to allow for
all appropriate charges to be made against it.
• At the end of that time, Cost Accounting will change the status of the job to “complete no
charges allowed”.
• At the end of the accounting period, Cost Accounting will change the status of all jobs
currently at “complete no charges allowed” to “closed”.
19. WIP- Discrete Job Close Process
Production
Cost
Accounting
Identify the
Discrete Job
to complete
Is it a
serialized
item ?
Charge the Job
with appropriate
charges
Change the job
status to “
Complete-No
Charge Allowed”
Close Discrete
Job
NO
YESMove assembly
to FG or
Shipping
Enter
completion
data
Enter serial
numbers
Partial
quantity ?
NO
YES
20. Close Discrete Job
Overview
• A job must have a status of “Released” in order to complete quantities against it.
• When the last assembly on the job is completed and transacted, Materials or Manufacturing
will change the status of the job to “Complete-Charges Allowed”.
• The job will remain open for a determined amount of time to allow all transactions to be
done against the job and variances to be researched and resolved.
• Materials or Manufacturing will change the status to “Complete-No Charges Allowed”. Cost
Accounting will review all jobs in this status and then close the jobs.